PART 1 IBS Introduce
PART 1 IBS Introduce ( Indoor Base Station )
Materials 1800Mhz&2
100Mhz
Window 3~5 DB
Cement brick wall 7~11 DB
Hollow brick 2~5 DB
Door(wood) 2~4 DB
Door(metal) 7~12 DB
Wood plank wall (5-10cm) 2~4 DB
gypsum drywall 3~5 DB
Reinforced concrete wall 18~28 DB
Floor barrier >28 DB
PART 1 IBS Introduce
Network Structure
PART 1 IBS Introduce
Place need Indoor coverage (Ellily Hotel Case)
1 All sides is surrounded
2 5 star Int. Hotel.
3 High blgd
4 New BTS is too cost
PART 1 IBS Introduce
Application Scenarios
PART 2 IBS Equipment And Materials
PART 2 IBS Equipment And Materials
Omni Antenna & Panel Antenna
Multiband 800-2500M
In Ethiopia :
GSM 900 / DCS 1800 / LTE 1800 / WCDMA
2100 / WIFI 2.4G.
Coverage Range
5 m to 10 m Coverage Radius
Base on different situation
Three kinds of installation
Install with Ceiling Antenna Bracket/
Antenna external inserted into
the ceiling/
Antenna inside the ceiling
Panel ANT.
Using for big room:
Meeting room /
Large venues
PART 2 IBS Equipment And Materials
Logarithm Period Antenna
 More Stronger Direction
 Used as donor antenna
 Used to coverage the elevator
PART 2 IBS Equipment And Materials
Coupler Multiband
Input Output
Coupler Side
Output = Input – Loss
Coupler Side = Input – Coupler Value
C Value 5 DB 7 DB 10 DB 15 DB 20 DB 30DB
Loss 2 1.4 0.8 0.4 0.2 0.2
PART 2 IBS Equipment And Materials
Power Splitter
Input
Output 2
Output 1
Output 1 = Output 2/3/4 = Input - Loss
Splitter 2 Way 3 Way 4 Way
LOSS 3.3dbm 5.3dbm 6.6dbm
PART 2 IBS Equipment And Materials
Connector and Cable
Connector for ½
cable
Connector for
7/8 cable
Right Angle
N-Male-Female
NJJ
(male-male)
NKK
(female-female)
Attenuator 6DB
& 10DB
Multiband
PART 2 IBS Equipment And Materials
Auxiliary material
Insulated tape
Antenna Bracket
Ground wire
1/2 Grounding cards
Power cable
Cable tie black/white
Waterproof tape
PART 2 IBS Equipment And Materials
Trunking
PART 2 IBS Equipment And Materials
Repeater
Input power : -40 dbm ~ -80 dbm
Output power : 10W = 40 dbm
Length(mm) Width(mm) Height(mm) Weight(Kg)
530 420 285 50
P=10W = 1000 mW= 1*104 mW
10LgP = 10 lg (1*104)
=10*(0+4)
=40 dbm
NO Mark Meaning Port
1 POWE
R
AC220V or DC24V Waterproof socket
2 FAN Fan connector
3 GND Earthing busbar
4 DONO
R
D+W Donor RF signal
interface
NF
5 REPEA
T
D+W Service RF signal
interface
NF
6 PWR Power Indicator
7 RUN working Indicator
8 RS232 Local Monitoring Interface Waterproof DB9
Female
9 RJ45 Ethernet port
10 Modem Modem Antenna Interface SMA( Female )
11 VENT Breathable film
PART 2 IBS Equipment And Materials
Repeater
PART 2 IBS Equipment And Materials
Amplifier
Length(mm) Width(mm) Height(mm) Weight(Kg)
530 440 230 30
Mark Meaning Remark
1、POWER AC220V Power Input
2、VENT Holes
3、RF-IN RF Input -15 ~ 0 dbm
4、Modem Modem antenna
5、PWR Power Indicator
6、RUN Running indicator
7、RS232 Debugging Serial Connect to test tool
8、RF-OUT RF output
PART 3 Site Survey & Design
PART 3 Site Survey & Design
Survey Tools
Test Phone
Signal test
Site Master
Spectrum analyze
Distance Master
Distance measure
Yagi ANT.
Donor position
PART 3 Site Survey & Design
Survey
2
4
1
3
5
Donor Ant. & Device
Test and choose the best position for
donor antenna, and select a place for
repeater/ amplifier install.
Antenna
Base on the measure put the ant.
position on the floor plan, and
remark the cable route.
Measure
Measure every floors and remark on the
floor plan . Remark the door position and
wall position.
Cable rise
Check cable rise position fro every floor,
and check it is connect each other or not.
Site floor plan
Get the floor plan, or draw the floor
plan on site.
PART 3 Site Survey & Design Survey
Ellily Hotel Block A 4th
Floor
23.4m
13.2m
Cable
Rise
A. Cable rise position
B. Measure the floor
C. ANT. position
D. Cable route
PART 3 Site Survey & Design
IBS Donor Antenna Position & Direction
A. Use site master check one
direction strongest signal
around the building.
B. Lock the signal by test phone
to check the signal is good or
not.
C. Check another direction if the
signal cannot be used.
Site Master First
A. Lock signal one by one
from the neighbour cells
list , and select the best
signal.
B. Use site master with yagi
ant. to find that signal
direction.
Test Phone First
1 2
PART 3 Site Survey & Design
Frequency and frequency Num.
Region
GSM 1800 UMTS 2100 LTE 1800
UL DL UL DL UL DL
Addis Ababa
1. 1747.5 - 1756.5
2. 1776.5 - 1785
1. 1842.5 -
1851.5
2. 1871.5 -
1880
1. 1924.9 -
1929.9
2. 1929.9 -
1934.9
3. 1945.1 -
1950.1
4. 1940.1 -
1945.1
1. 2114.9 - 2119.9
2. 2119.9- 2124.9
3. 2135.1 - 2140.1
4. 2130.1 - 2135.1
1756.5 -
1776.5
1851.5 -1871.5
DCS1800: F DL = 1805 + 0.2*(NBCCH - 511)
NBCCH = (F DL – 1805) * 5 +511
WCDMA: UARFCN = Center Fre. * 5
((2119.9 – 2114.9) / 2 +2114.9 ) * 5 = 10587
10587 / 10612 / 10688 / 10663
LTE Band 3: EARFCN = (Center Fre. -1805)*10+1200
((1871.5-1851.5)/2 +1851.5)*10 + 1200 = 1765
PART 3 Site Survey & Design
IBS
Design
PART 3 Site Survey & Design
Design Considerations
Output power for repeater Ant. DCS: 8 ~ 13 dbm
WCDMA: 1~6 dbm
Cable route The design route must be available to pass the
cable, and must be beautiful.
Cable rise position
If the building don't have cable rise, the main
route of the design must be one cable.
Special area Consider about the special area
Repeater&Donor ANT. Position
System power is start from repeater ;
Donor antenna must be far away indoor ant..
1
2
3
4
5
PART 3 Site Survey & Design
About the system power & loss
Repeater output: 40dbm (37dbm)
Amplifier output: 37dbm
1/2 cable loss: 0.112dbm / m
7/8 cable loss: 0.072dbm / m
C Value 5 DB 7 DB 10 DB 15 DB 20 DB 30DB
Loss 2dbm 1.4dbm 0.8dbm 0.4dbm 0.2dbm 0.2dbm
Splitter 2 Way 3 Way 4 Way
LOSS 3.3dbm 5.3dbm 6.6dbm
DCS: 8~13dbm
WCDMA: 1~6dbm
PART 3 Site Survey & Design
1. Select the main route.
2. Every last two antenna of
branch route ,we use two
way to connect.
3. Coupler output power
always stronger than
coupler side output.
4. Antenna Num. start from ?
ANT6
ANT5
ANT4
ANT3
ANT2
ANT1
PART 3 Site Survey & Design
Example 2
ANT7
ANT5
ANT4
ANT3
ANT2
ANT1
ANT6
PART 3 Site Survey & Design
Example 3
ANT3
ANT1
ANT7
ANT6
ANT5
ANT4
ANT2
PART 3 Site Survey & Design
Example 4
ANT7
ANT5
ANT1
ANT2
ANT3
ANT4
ANT6
ANT7
ANT5
ANT1
ANT2
ANT3
ANT4
ANT6
PART 3 Site Survey & Design
System diagram
ANT7
ANT6
ANT1
ANT2
ANT3
ANT4
ANT5
Power from cable rise
PART 3 Site Survey & Design
System diagram
ANT3
ANT1
ANT7
ANT6
ANT5
ANT4
ANT2
ANT7
ANT6
ANT1
ANT2
ANT3
ANT4
ANT5
Power from cable rise
PART 3 Site Survey & Design
How to connect each floor
ANT7
ANT6
ANT1
ANT2
ANT3
ANT4
ANT5
Power from cable rise
ANT7
ANT6
ANT1
ANT2
ANT3
ANT4
ANT5
Power from cable rise
PART 3 Site Survey & Design
How to connect each floor
Cable rise2nd
Cable rise1st
Cable rise3rd
Cable rise4th
Cable rise5th
Repeater
PART 3 Site Survey & Design
How to connect each floor
PART 3 Site Survey & Design
Practice time
PART 3 Site Survey & Design
LTE access
2G & 3G
Repeater
LTE
Repeater
LTE bandwidth filter
Hybrid Coupler
Load
PART 3 Site Survey & Design
LTE access
2G & 3G
Repeater
LTE
Repeater
LTE bandwidth filter
Hybrid Coupler
PART 4 Configuration & Testing
PART 4 Configuration & Testing
Tools
Tools:
Laptop(Windows 7/ XP)
USB-232 Cable
Test phone( Tems pocket)
Software:
Testtools / Simple OMC
TEMS Investigation 14 / 16
PART 4 Configuration & Testing
Driver for configuration cable
1 3
4
2
PART 4 Configure & Testing Testtools
1
2
3
4
5
6
7
8
9
RS232
P2
PART 4 Configure & Testing
Testtools
P4
PART 4 Configure & Testing
Testtools
P3
>-80
<-30
>10
<43
<33
<3
>-100
<-30
>10
<43
<33
<3
Channel 2 : WCDMA
Channel 3 : DCS
PART 4 Configure & Testing
Testtools
WCDMA UL AP switching
WCDMA DL AP switching
DCS UL AP switching
DCS DL AP switching
WCDMA ATT.
DCS ATT.
1. Channel2 is WCDMA, channel3 is DCS.
2. Adjusting the uplink & downlink att. To
change repeater power.
3. Uplink att. Must be bigger than
downlink att. (6~3db)
P6
PART 4 Configure & Testing
Testtools
PART 4 Configure & Testing
Testing
1
2
3
2G TESTING
BCCH RxLev.
TCH RxQual.
Call Test
1
2
3
3G TESTING
RSCP
Ec/No
Call Test
PART 4 Configure & Testing
Testing
2G TESTING 3G TESTING
BCCH Rxlev. S BCCH S Rxlev.
TCH TCH RxQual.
UARFCN RSCP Ec/No
4G TESTING
PART 4 Configure & Testing
Testing
BCCH : Broadcast Control Channel
RxLev.: Received Signal Level
TCH: Traffic Channel
RxQual.: Received Signal Quality
UARFCN : UTRA absolute radio frequency channel number
RSCP: Received Signal Code Power
Ec/No: Ratio of energy per modulating bit to the noise spectral density.
EARFCN: E-UTRA absolute radio frequency channel number
RSRP: Reference Signal Receiving Power
RSRQ: Reference Signal Receiving Quality
PART 4 Configure & Testing
Testing
PART 5 Trouble Shooting
PART 5 Trouble Shooting
Trouble Shooting Step
1.To check all the equipment parameters through the
monitoring center of remote telemetry or local check.
2.To check the indicator light
power light Dual light
(green)on——normal power supply (red)on—equipment trouble
light off or flickering——abnormal power supply (green)on—working well
3.Test input and output for every part.
PART 5 Trouble Shooting
Common
54
Power for repeater
Check the power connection for
repeater and amplifier .
Module
Test module inside repeater.
Cable connection
Check the connection in the cable
rise.
Donor Ant.
Choose another position for donor
antenna.
PART 5 Trouble Shooting
Common alarm and approaches
Downlink low input power alarm
Downlink VSWR alarm
Downlink low output power alarm
A. Check donor ant. position signal , choose another
direction or change another position.
B. Check the cable connection from donor to repeater.
C. Check the module working conditions.
A. Check the input power on the range or no.
B. Check the ATT. Inside repeater , adjust AAT.
C. Check the module working conditions.
A. Check the cable connection for repeater output power
to antenna.
THANKS
GrenTech
END

More Related Content

Similar to IBS TRAINING(new).pptx

Abhinav End Sem Presentation Software Defined Radio
Abhinav End Sem Presentation Software Defined RadioAbhinav End Sem Presentation Software Defined Radio
Abhinav End Sem Presentation Software Defined Radioguestad4734
 
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...CBO GmbH
 
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...CBO GmbH
 
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...CBO GmbH
 
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...CBO GmbH
 
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...CBO GmbH
 
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...Allen He
 
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...CBO GmbH
 
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...CBO GmbH
 
Athens Standard & Technical
Athens Standard & TechnicalAthens Standard & Technical
Athens Standard & TechnicalGianluca Musetti
 
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...CBO GmbH
 
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...CBO GmbH
 
ANAVIEW Class-D Amplifier AMS1000-2600
ANAVIEW Class-D Amplifier  AMS1000-2600ANAVIEW Class-D Amplifier  AMS1000-2600
ANAVIEW Class-D Amplifier AMS1000-2600HTCS LLC
 
Poster_140320705506
Poster_140320705506Poster_140320705506
Poster_140320705506Patel Neel
 
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...CBO GmbH
 
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...CBO GmbH
 
Miniproject report receiver
Miniproject report receiverMiniproject report receiver
Miniproject report receiverGAURAV SINHA
 
cisco-air-ant2524dg-r-datasheet.pdf
cisco-air-ant2524dg-r-datasheet.pdfcisco-air-ant2524dg-r-datasheet.pdf
cisco-air-ant2524dg-r-datasheet.pdfHi-Network.com
 

Similar to IBS TRAINING(new).pptx (20)

Abhinav End Sem Presentation Software Defined Radio
Abhinav End Sem Presentation Software Defined RadioAbhinav End Sem Presentation Software Defined Radio
Abhinav End Sem Presentation Software Defined Radio
 
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...
BlueOptics Bo65 j33640d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 40 km ...
 
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...
BlueOptics Bo65j27640d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 40 km s...
 
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...
BlueOptics Bo31j13602d 10gbase-lr xfp transceiver 1310nm 2km singlemode lc du...
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...
BlueOptics Bo65j27610d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 10 km s...
 
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...
BlueOptics Bo65j33610d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 10 km s...
 
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
 
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
 
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
BlueOptics Bo66hxx640d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 40km s...
 
Athens Standard & Technical
Athens Standard & TechnicalAthens Standard & Technical
Athens Standard & Technical
 
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...
BlueOptics Bo65j27660d 10gbase-bx-u xfp transceiver tx1270nm-rx1330nm 60 km s...
 
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...
BlueOptics Bo65j33660d 10gbase-bx-d xfp transceiver tx1330nm-rx1270nm 60 km s...
 
ANAVIEW Class-D Amplifier AMS1000-2600
ANAVIEW Class-D Amplifier  AMS1000-2600ANAVIEW Class-D Amplifier  AMS1000-2600
ANAVIEW Class-D Amplifier AMS1000-2600
 
Poster_140320705506
Poster_140320705506Poster_140320705506
Poster_140320705506
 
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...
BlueOptics Bo66hxx680d 2-4-8gbase-cwdm xfp transceiver 1471nm - 1611nm 80km s...
 
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...
BlueOptics Bo66jxx660d 10gbase cwdm xfp transceiver 1271nm 1451nm 60 km singl...
 
Miniproject report receiver
Miniproject report receiverMiniproject report receiver
Miniproject report receiver
 
TDA18273HN_C1_518
TDA18273HN_C1_518TDA18273HN_C1_518
TDA18273HN_C1_518
 
cisco-air-ant2524dg-r-datasheet.pdf
cisco-air-ant2524dg-r-datasheet.pdfcisco-air-ant2524dg-r-datasheet.pdf
cisco-air-ant2524dg-r-datasheet.pdf
 

Recently uploaded

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

IBS TRAINING(new).pptx

  • 1. Indoor Mobile Network IBS Basic Training
  • 2. Outline Part 1 Part 3 Part 2 Part 4 Part 5
  • 3. PART 1 IBS Introduce
  • 4. PART 1 IBS Introduce ( Indoor Base Station ) Materials 1800Mhz&2 100Mhz Window 3~5 DB Cement brick wall 7~11 DB Hollow brick 2~5 DB Door(wood) 2~4 DB Door(metal) 7~12 DB Wood plank wall (5-10cm) 2~4 DB gypsum drywall 3~5 DB Reinforced concrete wall 18~28 DB Floor barrier >28 DB
  • 5. PART 1 IBS Introduce Network Structure
  • 6. PART 1 IBS Introduce Place need Indoor coverage (Ellily Hotel Case) 1 All sides is surrounded 2 5 star Int. Hotel. 3 High blgd 4 New BTS is too cost
  • 7. PART 1 IBS Introduce Application Scenarios
  • 8. PART 2 IBS Equipment And Materials
  • 9. PART 2 IBS Equipment And Materials Omni Antenna & Panel Antenna Multiband 800-2500M In Ethiopia : GSM 900 / DCS 1800 / LTE 1800 / WCDMA 2100 / WIFI 2.4G. Coverage Range 5 m to 10 m Coverage Radius Base on different situation Three kinds of installation Install with Ceiling Antenna Bracket/ Antenna external inserted into the ceiling/ Antenna inside the ceiling Panel ANT. Using for big room: Meeting room / Large venues
  • 10. PART 2 IBS Equipment And Materials Logarithm Period Antenna  More Stronger Direction  Used as donor antenna  Used to coverage the elevator
  • 11. PART 2 IBS Equipment And Materials Coupler Multiband Input Output Coupler Side Output = Input – Loss Coupler Side = Input – Coupler Value C Value 5 DB 7 DB 10 DB 15 DB 20 DB 30DB Loss 2 1.4 0.8 0.4 0.2 0.2
  • 12. PART 2 IBS Equipment And Materials Power Splitter Input Output 2 Output 1 Output 1 = Output 2/3/4 = Input - Loss Splitter 2 Way 3 Way 4 Way LOSS 3.3dbm 5.3dbm 6.6dbm
  • 13. PART 2 IBS Equipment And Materials Connector and Cable Connector for ½ cable Connector for 7/8 cable Right Angle N-Male-Female NJJ (male-male) NKK (female-female) Attenuator 6DB & 10DB Multiband
  • 14. PART 2 IBS Equipment And Materials Auxiliary material Insulated tape Antenna Bracket Ground wire 1/2 Grounding cards Power cable Cable tie black/white Waterproof tape
  • 15. PART 2 IBS Equipment And Materials Trunking
  • 16. PART 2 IBS Equipment And Materials Repeater Input power : -40 dbm ~ -80 dbm Output power : 10W = 40 dbm Length(mm) Width(mm) Height(mm) Weight(Kg) 530 420 285 50 P=10W = 1000 mW= 1*104 mW 10LgP = 10 lg (1*104) =10*(0+4) =40 dbm
  • 17. NO Mark Meaning Port 1 POWE R AC220V or DC24V Waterproof socket 2 FAN Fan connector 3 GND Earthing busbar 4 DONO R D+W Donor RF signal interface NF 5 REPEA T D+W Service RF signal interface NF 6 PWR Power Indicator 7 RUN working Indicator 8 RS232 Local Monitoring Interface Waterproof DB9 Female 9 RJ45 Ethernet port 10 Modem Modem Antenna Interface SMA( Female ) 11 VENT Breathable film PART 2 IBS Equipment And Materials Repeater
  • 18. PART 2 IBS Equipment And Materials Amplifier Length(mm) Width(mm) Height(mm) Weight(Kg) 530 440 230 30 Mark Meaning Remark 1、POWER AC220V Power Input 2、VENT Holes 3、RF-IN RF Input -15 ~ 0 dbm 4、Modem Modem antenna 5、PWR Power Indicator 6、RUN Running indicator 7、RS232 Debugging Serial Connect to test tool 8、RF-OUT RF output
  • 19. PART 3 Site Survey & Design
  • 20. PART 3 Site Survey & Design Survey Tools Test Phone Signal test Site Master Spectrum analyze Distance Master Distance measure Yagi ANT. Donor position
  • 21. PART 3 Site Survey & Design Survey 2 4 1 3 5 Donor Ant. & Device Test and choose the best position for donor antenna, and select a place for repeater/ amplifier install. Antenna Base on the measure put the ant. position on the floor plan, and remark the cable route. Measure Measure every floors and remark on the floor plan . Remark the door position and wall position. Cable rise Check cable rise position fro every floor, and check it is connect each other or not. Site floor plan Get the floor plan, or draw the floor plan on site.
  • 22. PART 3 Site Survey & Design Survey Ellily Hotel Block A 4th Floor 23.4m 13.2m Cable Rise A. Cable rise position B. Measure the floor C. ANT. position D. Cable route
  • 23. PART 3 Site Survey & Design IBS Donor Antenna Position & Direction A. Use site master check one direction strongest signal around the building. B. Lock the signal by test phone to check the signal is good or not. C. Check another direction if the signal cannot be used. Site Master First A. Lock signal one by one from the neighbour cells list , and select the best signal. B. Use site master with yagi ant. to find that signal direction. Test Phone First 1 2
  • 24. PART 3 Site Survey & Design Frequency and frequency Num. Region GSM 1800 UMTS 2100 LTE 1800 UL DL UL DL UL DL Addis Ababa 1. 1747.5 - 1756.5 2. 1776.5 - 1785 1. 1842.5 - 1851.5 2. 1871.5 - 1880 1. 1924.9 - 1929.9 2. 1929.9 - 1934.9 3. 1945.1 - 1950.1 4. 1940.1 - 1945.1 1. 2114.9 - 2119.9 2. 2119.9- 2124.9 3. 2135.1 - 2140.1 4. 2130.1 - 2135.1 1756.5 - 1776.5 1851.5 -1871.5 DCS1800: F DL = 1805 + 0.2*(NBCCH - 511) NBCCH = (F DL – 1805) * 5 +511 WCDMA: UARFCN = Center Fre. * 5 ((2119.9 – 2114.9) / 2 +2114.9 ) * 5 = 10587 10587 / 10612 / 10688 / 10663 LTE Band 3: EARFCN = (Center Fre. -1805)*10+1200 ((1871.5-1851.5)/2 +1851.5)*10 + 1200 = 1765
  • 25. PART 3 Site Survey & Design IBS Design
  • 26. PART 3 Site Survey & Design Design Considerations Output power for repeater Ant. DCS: 8 ~ 13 dbm WCDMA: 1~6 dbm Cable route The design route must be available to pass the cable, and must be beautiful. Cable rise position If the building don't have cable rise, the main route of the design must be one cable. Special area Consider about the special area Repeater&Donor ANT. Position System power is start from repeater ; Donor antenna must be far away indoor ant.. 1 2 3 4 5
  • 27. PART 3 Site Survey & Design About the system power & loss Repeater output: 40dbm (37dbm) Amplifier output: 37dbm 1/2 cable loss: 0.112dbm / m 7/8 cable loss: 0.072dbm / m C Value 5 DB 7 DB 10 DB 15 DB 20 DB 30DB Loss 2dbm 1.4dbm 0.8dbm 0.4dbm 0.2dbm 0.2dbm Splitter 2 Way 3 Way 4 Way LOSS 3.3dbm 5.3dbm 6.6dbm DCS: 8~13dbm WCDMA: 1~6dbm
  • 28. PART 3 Site Survey & Design 1. Select the main route. 2. Every last two antenna of branch route ,we use two way to connect. 3. Coupler output power always stronger than coupler side output. 4. Antenna Num. start from ? ANT6 ANT5 ANT4 ANT3 ANT2 ANT1
  • 29. PART 3 Site Survey & Design Example 2 ANT7 ANT5 ANT4 ANT3 ANT2 ANT1 ANT6
  • 30. PART 3 Site Survey & Design Example 3 ANT3 ANT1 ANT7 ANT6 ANT5 ANT4 ANT2
  • 31. PART 3 Site Survey & Design Example 4 ANT7 ANT5 ANT1 ANT2 ANT3 ANT4 ANT6
  • 32. ANT7 ANT5 ANT1 ANT2 ANT3 ANT4 ANT6 PART 3 Site Survey & Design System diagram ANT7 ANT6 ANT1 ANT2 ANT3 ANT4 ANT5 Power from cable rise
  • 33. PART 3 Site Survey & Design System diagram ANT3 ANT1 ANT7 ANT6 ANT5 ANT4 ANT2 ANT7 ANT6 ANT1 ANT2 ANT3 ANT4 ANT5 Power from cable rise
  • 34. PART 3 Site Survey & Design How to connect each floor ANT7 ANT6 ANT1 ANT2 ANT3 ANT4 ANT5 Power from cable rise ANT7 ANT6 ANT1 ANT2 ANT3 ANT4 ANT5 Power from cable rise
  • 35. PART 3 Site Survey & Design How to connect each floor Cable rise2nd Cable rise1st Cable rise3rd Cable rise4th Cable rise5th Repeater
  • 36. PART 3 Site Survey & Design How to connect each floor
  • 37. PART 3 Site Survey & Design Practice time
  • 38. PART 3 Site Survey & Design LTE access 2G & 3G Repeater LTE Repeater LTE bandwidth filter Hybrid Coupler Load
  • 39. PART 3 Site Survey & Design LTE access 2G & 3G Repeater LTE Repeater LTE bandwidth filter Hybrid Coupler
  • 40. PART 4 Configuration & Testing
  • 41. PART 4 Configuration & Testing Tools Tools: Laptop(Windows 7/ XP) USB-232 Cable Test phone( Tems pocket) Software: Testtools / Simple OMC TEMS Investigation 14 / 16
  • 42. PART 4 Configuration & Testing Driver for configuration cable 1 3 4 2
  • 43. PART 4 Configure & Testing Testtools 1 2 3 4 5 6 7 8 9 RS232
  • 44. P2 PART 4 Configure & Testing Testtools
  • 45. P4 PART 4 Configure & Testing Testtools P3 >-80 <-30 >10 <43 <33 <3 >-100 <-30 >10 <43 <33 <3 Channel 2 : WCDMA Channel 3 : DCS
  • 46. PART 4 Configure & Testing Testtools WCDMA UL AP switching WCDMA DL AP switching DCS UL AP switching DCS DL AP switching WCDMA ATT. DCS ATT. 1. Channel2 is WCDMA, channel3 is DCS. 2. Adjusting the uplink & downlink att. To change repeater power. 3. Uplink att. Must be bigger than downlink att. (6~3db)
  • 47. P6 PART 4 Configure & Testing Testtools
  • 48. PART 4 Configure & Testing Testing 1 2 3 2G TESTING BCCH RxLev. TCH RxQual. Call Test 1 2 3 3G TESTING RSCP Ec/No Call Test
  • 49. PART 4 Configure & Testing Testing 2G TESTING 3G TESTING BCCH Rxlev. S BCCH S Rxlev. TCH TCH RxQual. UARFCN RSCP Ec/No 4G TESTING
  • 50. PART 4 Configure & Testing Testing BCCH : Broadcast Control Channel RxLev.: Received Signal Level TCH: Traffic Channel RxQual.: Received Signal Quality UARFCN : UTRA absolute radio frequency channel number RSCP: Received Signal Code Power Ec/No: Ratio of energy per modulating bit to the noise spectral density. EARFCN: E-UTRA absolute radio frequency channel number RSRP: Reference Signal Receiving Power RSRQ: Reference Signal Receiving Quality
  • 51. PART 4 Configure & Testing Testing
  • 52. PART 5 Trouble Shooting
  • 53. PART 5 Trouble Shooting Trouble Shooting Step 1.To check all the equipment parameters through the monitoring center of remote telemetry or local check. 2.To check the indicator light power light Dual light (green)on——normal power supply (red)on—equipment trouble light off or flickering——abnormal power supply (green)on—working well 3.Test input and output for every part.
  • 54. PART 5 Trouble Shooting Common 54 Power for repeater Check the power connection for repeater and amplifier . Module Test module inside repeater. Cable connection Check the connection in the cable rise. Donor Ant. Choose another position for donor antenna.
  • 55. PART 5 Trouble Shooting Common alarm and approaches Downlink low input power alarm Downlink VSWR alarm Downlink low output power alarm A. Check donor ant. position signal , choose another direction or change another position. B. Check the cable connection from donor to repeater. C. Check the module working conditions. A. Check the input power on the range or no. B. Check the ATT. Inside repeater , adjust AAT. C. Check the module working conditions. A. Check the cable connection for repeater output power to antenna.