SlideShare a Scribd company logo
1 of 3
Download to read offline
NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
DATE LOCATION TIME
1 21 OCTOBER ADMIN BUILDING - BP 09:30 AM
2 21 OCTOBER BC-1 10:00 AM
3 21 OCTOBER BC-2 10:30 AM
4 21 OCTOBER BC-3 11:00 AM
5 21 OCTOBER BC-4 11:30 AM
6 21 OCTOBER BC-5 01:00 PM
7 21 OCTOBER BC-6 02:00 PM
MOCK
DRILL
FIRE
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
DATE LOCATION TIME
1 19 OCTOBER ADMIN BUILDING - TP 12:00 PM
2 19 OCTOBER LA 01 - TP 01:15 PM
3 19 OCTOBER LA 02 - TP 01:15 PM
4 19 OCTOBER LA 03 - TP 01:15 PM
5 19 OCTOBER LA 04 - TP 01:15 PM
6 19 OCTOBER SA - TP 01:15 PM
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
MOCK
DRILL
FIRE
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
DATE LOCATION TIME
1 20 OCTOBER ADMIN BUILDING - IP 12:00 PM
2 20 OCTOBER LA 02 - IP 01:15 PM
3 20 OCTOBER LA 03 - IP 01:15 PM
4 20 OCTOBER LA 04 - IP 01:15 PM
5 20 OCTOBER LA 05 - IP 01:15 PM
NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
MOCK
DRILL
FIRE

More Related Content

What's hot

Safety Moment - Personal Protection Equipment
Safety Moment - Personal Protection EquipmentSafety Moment - Personal Protection Equipment
Safety Moment - Personal Protection EquipmentJason Hardin
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Security training manual
Security training manualSecurity training manual
Security training manualANILDEVADKAR
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CVSony Mani
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Safety (Security) Training
Safety (Security) TrainingSafety (Security) Training
Safety (Security) Trainingworksteadc
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentationLucy Reimer
 
Rev 00. 10 ways for working safety @ heights poster 30 july-2018
Rev 00.  10 ways for working safety @ heights poster  30 july-2018Rev 00.  10 ways for working safety @ heights poster  30 july-2018
Rev 00. 10 ways for working safety @ heights poster 30 july-2018Dwarika Bhushan Sharma
 
How to Inspire Your People to Work Safe
How to Inspire Your People to Work SafeHow to Inspire Your People to Work Safe
How to Inspire Your People to Work SafeSteve Wise
 
Safety Officer CV
Safety Officer CVSafety Officer CV
Safety Officer CVAli mardan
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksSajid Ali
 
security Guards - Duties & Discipline
  security Guards - Duties & Discipline  security Guards - Duties & Discipline
security Guards - Duties & DisciplineVS E
 
Quarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptxQuarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptxNezarKakhi
 

What's hot (20)

Safety Moment - Personal Protection Equipment
Safety Moment - Personal Protection EquipmentSafety Moment - Personal Protection Equipment
Safety Moment - Personal Protection Equipment
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
FIRE MOCK DRILL PPT
FIRE MOCK DRILL PPTFIRE MOCK DRILL PPT
FIRE MOCK DRILL PPT
 
Night work safety
Night work safetyNight work safety
Night work safety
 
Security training manual
Security training manualSecurity training manual
Security training manual
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Safety (Security) Training
Safety (Security) TrainingSafety (Security) Training
Safety (Security) Training
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Toolbox talks
Toolbox talks Toolbox talks
Toolbox talks
 
Rev 00. 10 ways for working safety @ heights poster 30 july-2018
Rev 00.  10 ways for working safety @ heights poster  30 july-2018Rev 00.  10 ways for working safety @ heights poster  30 july-2018
Rev 00. 10 ways for working safety @ heights poster 30 july-2018
 
How to Inspire Your People to Work Safe
How to Inspire Your People to Work SafeHow to Inspire Your People to Work Safe
How to Inspire Your People to Work Safe
 
Safety Officer CV
Safety Officer CVSafety Officer CV
Safety Officer CV
 
Access control at gates
Access control at gatesAccess control at gates
Access control at gates
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
 
security Guards - Duties & Discipline
  security Guards - Duties & Discipline  security Guards - Duties & Discipline
security Guards - Duties & Discipline
 
Quarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptxQuarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptx
 

Viewers also liked

Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)EAE Business School
 
CIAT in Ethiopia
CIAT in Ethiopia  CIAT in Ethiopia
CIAT in Ethiopia ILRI
 
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia Ivarova
 
áGua propriedade
áGua propriedadeáGua propriedade
áGua propriedadeSimone Maia
 
Projects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business valueProjects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business valueAssociation for Project Management
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous AlloyAkash Patel
 

Viewers also liked (9)

Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)
 
CIAT in Ethiopia
CIAT in Ethiopia  CIAT in Ethiopia
CIAT in Ethiopia
 
CV-mohammad 2016
CV-mohammad 2016CV-mohammad 2016
CV-mohammad 2016
 
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
 
áGua propriedade
áGua propriedadeáGua propriedade
áGua propriedade
 
Projects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business valueProjects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business value
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous Alloy
 
Hand hygiene pgr
Hand hygiene pgrHand hygiene pgr
Hand hygiene pgr
 
Swwe presentation 100516
Swwe presentation 100516Swwe presentation 100516
Swwe presentation 100516
 

More from Hazem Shehada

How to handle chemical products
How to handle chemical productsHow to handle chemical products
How to handle chemical productsHazem Shehada
 
Fire & Safety Awareness
Fire & Safety AwarenessFire & Safety Awareness
Fire & Safety AwarenessHazem Shehada
 
Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)Hazem Shehada
 
Safe & Efficient Fuel Driving
Safe & Efficient Fuel DrivingSafe & Efficient Fuel Driving
Safe & Efficient Fuel DrivingHazem Shehada
 
Green Family - Trees Planting
Green Family - Trees PlantingGreen Family - Trees Planting
Green Family - Trees PlantingHazem Shehada
 
Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Hazem Shehada
 

More from Hazem Shehada (8)

How to handle chemical products
How to handle chemical productsHow to handle chemical products
How to handle chemical products
 
Fire & Safety Awareness
Fire & Safety AwarenessFire & Safety Awareness
Fire & Safety Awareness
 
Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)
 
Safe & Efficient Fuel Driving
Safe & Efficient Fuel DrivingSafe & Efficient Fuel Driving
Safe & Efficient Fuel Driving
 
Low Fat Zone
Low Fat ZoneLow Fat Zone
Low Fat Zone
 
Green Family - Trees Planting
Green Family - Trees PlantingGreen Family - Trees Planting
Green Family - Trees Planting
 
Paperless Office
Paperless OfficePaperless Office
Paperless Office
 
Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)
 

RAK FTZ Emergency Evacuation Drill Schedule</TITLE

  • 1. NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM DATE LOCATION TIME 1 21 OCTOBER ADMIN BUILDING - BP 09:30 AM 2 21 OCTOBER BC-1 10:00 AM 3 21 OCTOBER BC-2 10:30 AM 4 21 OCTOBER BC-3 11:00 AM 5 21 OCTOBER BC-4 11:30 AM 6 21 OCTOBER BC-5 01:00 PM 7 21 OCTOBER BC-6 02:00 PM MOCK DRILL FIRE Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings.
  • 2. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. DATE LOCATION TIME 1 19 OCTOBER ADMIN BUILDING - TP 12:00 PM 2 19 OCTOBER LA 01 - TP 01:15 PM 3 19 OCTOBER LA 02 - TP 01:15 PM 4 19 OCTOBER LA 03 - TP 01:15 PM 5 19 OCTOBER LA 04 - TP 01:15 PM 6 19 OCTOBER SA - TP 01:15 PM Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings. NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM MOCK DRILL FIRE
  • 3. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings. DATE LOCATION TIME 1 20 OCTOBER ADMIN BUILDING - IP 12:00 PM 2 20 OCTOBER LA 02 - IP 01:15 PM 3 20 OCTOBER LA 03 - IP 01:15 PM 4 20 OCTOBER LA 04 - IP 01:15 PM 5 20 OCTOBER LA 05 - IP 01:15 PM NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM MOCK DRILL FIRE