2. Contents
Introduction
Motivation
Objectives
Investigation
Test Bench and Fuel Injection Pump
Problem Statement
Solution Development - Proposed Framework
Project Management
Individual Contribution
Project Timeline
Conclusion – Impact on Society
DFIPTB 2
3. Introduction
Motivation
Working with industry HIT.
Do something for our country.
Objectives
Very useful for all kinds of automobile industry.
Entrepreneurial Venture
DFIPTB 3
9. Comparison
Sensor Name Sensor Size
(mm)
Temperature
Resistivity
(oC)
Cost
($)
Working
Principal
Operating
Voltage
(DC)
Microwave 48x63 Better ~6 Microwaves
Reflection
5V + 0.25 V
Ultrasonic 35 x16 Good ~0.5 Ultrasonic
waves
reflection
5 V
LASER 30 x 12 Best ~80.0 Laser Beam
Reflection
11V – 30 V
DFIPTB 9
10. Project Management
Individual Contribution
Hamza Zaheer : Report Writing and Visit
Arooj Zulfiqar : Data Composing and Visit
Rabiya Majeed : Data Collection from secondary sources and Visit
Shahrukh khan : Data Collection from primary sources and Visit
Project Timeline
We will complete our project by the end of April 2018 by completing all milestones
DFIPTB 10
11. Conclusion – Impact on Society
After digitization accuracy will be enhanced
Issue related to FIP of Al-Zarrar Tank will be sort out
Giving back our knowledge to our country
DFIPTB 11