Site Engineer Nov 2003 - May2009
Baghdad Province Water & Sewer Utility, Iraq
Field Engineer July 2007 - July 2009
CH2M HILL/Parsons Corporation & Stanley Baker Hill (SBH), Iraq
• Supervised the mechanical engineering contractor during the construction/rehabilitation,
commissioning, operation and maintenance of the largest wastewater facility in Baghdad;
replaced over 80% of all on-site equipment, including major equipment, piping, motors, screens,
gears and tank bridges; 1 year project with budget of USD $3.5M.
• Designed and installed new pipes and valves for 4 pumps; budget more than USD $500K.
• Managed 2 subcontractors with 75 employees for the rehabilitation of the 100 mgd water facility;
installed and inspected 50 pressure vessels and related piping that made up the filtration system.
• Direct and supervise the maintenance work and operation for 3 small sewage plants, conduct
field investigations to measure steam flows, reservoir capacities and calculate hydraulic
capacities of diversion works. 1500 m³/hr.
• Direct the maintenance and operation for 100 small water treatment units (50 m³/hr-200 m³/hr).
• Developed customize pump designs and application and build pumps based for 3 pump station
Surface water treatment plant compact unit type its capacity 50 m³/hr (equivalent to 1200 m³/day).
• Perform detailed mechanical design/analysis of pumping station, water supply systems and
prepare project cost estimates.
• Troubleshoot and resolve pumping equipment problems and recommend repair options :
120 pump station Surface water treatment plant 50 m³/hr-200 m³/hr
Three Sewage treatment plant 1500 m³/hr
One pump station 240000 m³/day
• Prepare technical procedures and engineering calculations.
• Failure analysis, predictive performance analysis, installation and test reviews.
• Vibration monitoring, heat and balancing of pumps.
• Equipment review for three sewage treatment plant at Baghdad.
• Pumping applications for water/wastewater and large infrastructure pumping projects.
Trainer Mar 2014 – Mar 2015
Apple Company “Volt” (Contract), Sacramento, CA
• Trained all new technicians; managed 3 lines with 75 employees inspecting and doing functional
tests of various iPhone models.
• Develops and/or revises standard operating procedures and observes workers to ensure
compliance with standards.
• Directly responsible for training, coaching, and developing Leads and staff. This is done through
observation and providing regular feedback.
• Ensures plant staff (Leads) enforces Company policies and procedures, plant wide safety rules
and employee rules of conduct.
• Responsible for: developing people; improving processes; reducing costs; quality monitoring and
improvements; superior customer service; and on-time delivery.
And here some pictures for these projects:
•
 
 

More Related Content

What's hot (20)

jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
AIMAN RESUME
AIMAN RESUMEAIMAN RESUME
AIMAN RESUME
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modified
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
ADEL's CV, 2016 -SHORT
ADEL's CV, 2016 -SHORT ADEL's CV, 2016 -SHORT
ADEL's CV, 2016 -SHORT
 
MatthewMV3.Resume
MatthewMV3.ResumeMatthewMV3.Resume
MatthewMV3.Resume
 
3 - 01 - 2015
3 - 01 - 20153 - 01 - 2015
3 - 01 - 2015
 
Najeeullah CV
Najeeullah CVNajeeullah CV
Najeeullah CV
 
vijay cv
vijay cvvijay cv
vijay cv
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
SES_Southafrica Flyer
SES_Southafrica FlyerSES_Southafrica Flyer
SES_Southafrica Flyer
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
Muhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updatedMuhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updated
 
Edward J Key
Edward J KeyEdward J Key
Edward J Key
 
Edward J
Edward JEdward J
Edward J
 
Erica Anderson Resume
Erica Anderson ResumeErica Anderson Resume
Erica Anderson Resume
 
Oral Presentation
Oral PresentationOral Presentation
Oral Presentation
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 

Similar to Hamid Al-Nuaimi's Professional Experience

Similar to Hamid Al-Nuaimi's Professional Experience (20)

CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016CV-Mohamed Abulila 01- 2016
CV-Mohamed Abulila 01- 2016
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
resume-4-1.docx (1)
resume-4-1.docx (1)resume-4-1.docx (1)
resume-4-1.docx (1)
 
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
 
Enrico S. Simon
Enrico S. SimonEnrico S. Simon
Enrico S. Simon
 
2016 Resume
2016  Resume2016  Resume
2016 Resume
 
RESUME_SIVA
RESUME_SIVARESUME_SIVA
RESUME_SIVA
 
MO7SEN FAROUK.
MO7SEN FAROUK.MO7SEN FAROUK.
MO7SEN FAROUK.
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Ng onga Mazimba CV
Ng onga Mazimba CVNg onga Mazimba CV
Ng onga Mazimba CV
 
Presentation_O_M.ppt
Presentation_O_M.pptPresentation_O_M.ppt
Presentation_O_M.ppt
 

Hamid Al-Nuaimi's Professional Experience

  • 1.   PROFESSIONAL EXPERIENCE “Hamid Al-Nuaimi” Site Engineer Nov 2003 - May2009 Baghdad Province Water & Sewer Utility, Iraq Field Engineer July 2007 - July 2009 CH2M HILL/Parsons Corporation & Stanley Baker Hill (SBH), Iraq • Supervised the mechanical engineering contractor during the construction/rehabilitation, commissioning, operation and maintenance of the largest wastewater facility in Baghdad; replaced over 80% of all on-site equipment, including major equipment, piping, motors, screens, gears and tank bridges; 1 year project with budget of USD $3.5M. • Designed and installed new pipes and valves for 4 pumps; budget more than USD $500K. • Managed 2 subcontractors with 75 employees for the rehabilitation of the 100 mgd water facility; installed and inspected 50 pressure vessels and related piping that made up the filtration system. • Direct and supervise the maintenance work and operation for 3 small sewage plants, conduct field investigations to measure steam flows, reservoir capacities and calculate hydraulic capacities of diversion works. 1500 m³/hr. • Direct the maintenance and operation for 100 small water treatment units (50 m³/hr-200 m³/hr). • Developed customize pump designs and application and build pumps based for 3 pump station Surface water treatment plant compact unit type its capacity 50 m³/hr (equivalent to 1200 m³/day). • Perform detailed mechanical design/analysis of pumping station, water supply systems and prepare project cost estimates. • Troubleshoot and resolve pumping equipment problems and recommend repair options : 120 pump station Surface water treatment plant 50 m³/hr-200 m³/hr Three Sewage treatment plant 1500 m³/hr One pump station 240000 m³/day • Prepare technical procedures and engineering calculations. • Failure analysis, predictive performance analysis, installation and test reviews. • Vibration monitoring, heat and balancing of pumps. • Equipment review for three sewage treatment plant at Baghdad. • Pumping applications for water/wastewater and large infrastructure pumping projects.
  • 2. Trainer Mar 2014 – Mar 2015 Apple Company “Volt” (Contract), Sacramento, CA • Trained all new technicians; managed 3 lines with 75 employees inspecting and doing functional tests of various iPhone models. • Develops and/or revises standard operating procedures and observes workers to ensure compliance with standards. • Directly responsible for training, coaching, and developing Leads and staff. This is done through observation and providing regular feedback. • Ensures plant staff (Leads) enforces Company policies and procedures, plant wide safety rules and employee rules of conduct. • Responsible for: developing people; improving processes; reducing costs; quality monitoring and improvements; superior customer service; and on-time delivery. And here some pictures for these projects: •
  • 3.  
  • 4.