19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
CURRICULUM VITAE 
Gwen.Bengtsson@gmail.com  ♦  tel 070 251 70 98 
 
 
I recently moved from my home country of the United States after my husband and I decided that we wanted to                                         
relocate to his home country of Sweden. We have an apartment and I am looking for a (preferably) permanent                                     
position with a good company in the Stockholm/surrounding area. I am currently learning Swedish (my third foreign                                 
language). In recent years I have performed the a combination role of Project Engineer (Projektledare), Designer,                               
and Drafter (Projektör). This was because I have 9 years of civil engineering experience and was recently working in                                     
small offices that required both management and design work from all staff. While working at large companies, I                                   
have worked on projects located in many of the different States within the US, and so I am accustomed to adjusting                                         
design and management approaches to suit the requirements and formats of different governments and communities.   
 
Since graduating from university, I have purposefully diversified my work experience while also specializing in a few                                 
key areas of primarily stormwater management, land development and infrastructure improvements. After working                         
the required years and obtaining approval to take the exam, I was able to obtain my Professional Engineer (PE)                                     
license; permitting me to have the responsibility of signing my name to design plans and reports prior to beginning                                     
construction. My previous job responsibilities consists of work in several areas of land and infrastructure                             
development, including preparing designs and permitting applications for municipal/state/federal approval, LEED                     
certification, interacting with clients and public officials directly, presenting proposed designs to both government                           
officials and the public, participate in construction meetings, mentor younger engineers, prepare proposals for                           
obtaining projects, attend and also put together industry education and networking events, assist in monitoring budgets                               
through the project phases, and both actively drafting and contributing to AutoCAD C3D standards for the company.  
 
My personal background is a diverse experience as I have relocated my life twice before. During my teenage years                                     
my father’s career moved our family from the center of the US (to first Texas and then) to Connecticut just north of                                           
New York City. After moving to Connecticut I was able to gain acceptance to the notably ranked engineering                                   
program at the University of Connecticut, from which I graduated in 2005 with a bachelor’s degree in Civil                                   
Engineering. My interests include kayaking, skiing, fishing, oil painting, hiking, and gardening. Now that we live in                                 
Sweden, I look forward to taking up cross country skiing.  
 
E XPERIENCE  ______________________________________________________ 
 
Carroll Engineering , Hillsborough, New Jersey                         November 2015 ­ April 2016 
Left this position to move permanently to Sweden 
Project Engineer 
 
While working in the New Jersey based office I worked on actually several projects which involved various levels of 
design and permitting requirements. Here, I was able to experience adjusting to the different design standards and 
methods with the regulatory entities and differing permitting processes in a new area (of New Jersey rather than 
Connecticut) and also everyday use the AutoCAD C3D platform for land development projects.  
 
Reference:  Thomas Fik, PE, Office Manager  (and my direct supervisor)  
Tom.Fik@carrollengineering.com  +1 908.847.7500 extension 216  
Additional references available upon request. 
 
 
Page 1 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
HRP Associates Inc. , Farmington, Connecticut                            December 2013 ­ July 2015 
Left this position to move to New Jersey to be with my husband  
Project Engineer 
While working for this larger environmental company I had the opportunity to perform the role of the senior 
production engineer. I worked on projects that ran the gamut of the civil engineering profession on a daily basis. 
Here, mentoring and training junior engineers in addition to reviewing their work was a notable portion of my 
responsibilities. The majority of the project engineers I support within the organization (with engineering solutions) 
are not themselves engineers. Being able to decipher what they need and provide recommendations when they fairly 
do not know what information they need to provide or what to ask of the engineering department was an extremely 
valuable learning experience.  
 
Reference:  Thomas Battles, PE, Director of Civil Engineering  (and my direct supervisor) 
Thomas.Battles@hrpassociates.com  +1 203.674.9570 extension 100 
Additional references available upon request. 
_______________________________________________________________________________________________________________________________________________________________________________ 
H.E. Cole & Son , Plantsville, Connecticut                                   April 2013 ­ December 2013 
Project Engineer 
While working for this smaller company I had the opportunity to take the reins on projects and engage in more 
designs of the every­day/local project work which my large­scale projects of the past did not as often afford. I have 
worked on subdivisions and septic designs on confined and challenging terrain, reviewed and signed off on designs, 
estimated hours/costs for job proposals, and working directly with clients and municipalities.  
 
Reference:  Stephen Guidice, LS, Owner (and my direct supervisor) 
sguidice@hecole.com   +1 860.628.4484 extension 105 
Additional references available upon request. 
_______________________________________________________________________________________________________________________________________________________________________________ 
Northwestern Mutual , Wilton, Connecticut                                December 2011 ­ April 2013  
Financial Representative 
Provided financial planning recommendations and guidance to individuals, families, and small business owners. I was 
support staff for the Agents by generating their financial models used in both assessing client needs and also used in 
presenting recommendations. I also worked directly with clients ranging from middle­class to upper­level executives, 
generating comprehensive financial plans using various software programs and financial information resources.   
 
Reference:  Robert Dickinson, CLU, ChFC, CFP, Financial Advisor (and my direct supervisor) 
Bob.Dickinson@nm.com   +1 203.313.0690  
Additional references available upon request. 
 
 
 
 
Page 2 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
Milone & MacBroom, Inc , Cheshire, Connecticut                      May 2005 ­ September 2011 
Civil Engineer 
Member of a design team during my tenure for an array of construction projects throughout Connecticut, New York 
and Maine.  Projects ranged from land development, to urban redevelopment to water resources projects.  
 
Reference:  Darin Overton, PE, Project Manager (and my direct supervisor) 
DarinO@miloneandmacbroom.com  +1 203.271.1773  
Additional references available upon request. 
_______________________________________________________________________________________________________________________________________________________________________________ 
H.E. Cole & Son , Plantsville, Connecticut      Summer & Winter of 2004 
Civil Engineering Intern 
Gained valuable hands on experience supporting a team of experienced engineers and surveyors.  
● Performed survey field work and generating base mapping in AutoCAD 
● Evaluated test pits and performed soil percolation tests for residential septic system design 
● Stormwater drainage system design including detention basin design 
Was offered a full time position upon graduation. 
 
Reference:  Stephen Guidice, LS, Owner (and my direct supervisor) 
sguidice@hecole.com  +1 860.628.4484  
Additional references available upon request.  
 
 
P ROJECTS_________________________________________________________________ 
 
Urban Redevelopment & Infrastructure  
Harbor Point / Yale & Towne,  Stamford, Connecticut 
Provided engineering services for this design­build urban revitalization project in which an existing 80+ acre                             
brownfield site ,adjacent to a hurricane barrier, was demolished and developed into an entire neighborhood consisting                               
of residential buildings, commercial buildings, renovated buildings, parks, a school and a grocery store.  
Design construction administration experience included:  
The reconstruction and realignment of existing roads, proposed roadways within the multitude of vertical and                             
horizontal constraints of an urban brownfield site, existing and proposed road cross­sections, intersection grading,                           
lane configuration, signalization design, site investigation and assessment of existing sanitary and stormwater sewers,                           
design of storm and sanitary sewer expansion and upgrades, earthwork computations involving an engineered cap and                               
balancing the site for consideration of contaminated material below the cap and clean fill above the cap, design of                                     
underground utilities (90% of all utilities were underground) in consideration of the engineered cap, coordination of                               
utility design with the needs of the existing and proposed buildings and their various proposed uses, site grading,                                   
improvements atop and adjacent to the earthen portion of the hurricane barrier, demolition of derelict structures                               
anchored off­shore of the hurricane barrier, and the layout and design of all utilities involved.  
 
Page 3 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
Carter Carburetor Superfund Site , St. Louis, Missouri 
Lead production engineer providing engineering services for the various stages of this politically controversial project                             
involving remediation, excavation, wastewater treatment, permitting, demolition activities, and the generation of bid                         
documents for this large­scale urban project. Capture and treatment of contaminated stormwater was a huge factor. 
 
One Dock Street,  Stamford, Connecticut 
Performing traffic study to determine necessary number and frequency of shuttle busses to local railway transit                               
station. Parking space layout, drainage design, proposed underground electrical conduit routing and pavement striping                           
for the proposed parking lot.  
 
Spindle Hill Road, Welton Pond , Wolcott, Connecticut 
Lead design engineer for the roadway design and realignment of approximately 2,000 linear feet of spindle hill road.                                   
The project was reviewed by the department of transportation municipal roads unit. I developed the layout and design                                   
of the mill and overlay of the existing roadway which contained culverts associated with Welton Pond. Road design                                   
was accomplished utilizing the most current AutoCAD Civil 3D software. Hydrology and hydraulic calculations for                             
the culvert design were performed utilizing various methods and software programs including the most recent version                               
of  HEC­HMS  software. Services included the generation of bid and contract documents for the Town’s use. 
 
U.S. Tobacco Property,  Greenwich, Connecticut 
Layout, grading, and drainage for the renovation of an existing office building property grounds, realign the access                                 
drive, and increase the available parking. This design included the implementation of pervious pavers and creative                               
stormwater solutions to provide a zero increase in stormwater runoff with minimal utility infrastructure alterations.  
 
Greenville Transfer Station,   Greenville, Maine 
Layout, grading, local permitting and Maine DEP permitting for the proposed municipal waste transfer station.  
 
Large­Scale Development Planning , Duke Energy, Florida 
Generating various alternate (high­level) layouts for potential multi­acreage development for industrial and                       
commercial facilities based upon existing infrastructure conditions, potential future infrastructure, and the projected                         
regulatory restrictions and allowances. Proposed uses ranged from warehouses to business parks for multiple sites                             
throughout Florida.  
 
Residential and Commercial Development 
River View at New Bridge Landing,  River Edge, New Jersey 
The Design and Project Engineer for the design plans for a 69­unit apartment building to be constructed atop                                   
a very high retaining wall. All of which was to be constructed adjacent to a railway in a densely populated                                       
area a stone’s throw from New York City. I coordinated the work for the various design disciplines and all                                     
approvals/permitting/infrastructure improvements for the municipality, state agencies, and utility companies.   
 
The Willows at Westampton,  Westampton, NJ 
The Design and Project Engineer for the design plans for a 72­unit apartment campus consisting of six                                 
apartment buildings and a community building. The existing infrastructure and topography necessitated the                         
design of a sanitary sewer pump station, sanitary force main, and off­site gravity sewer design. Extensive                               
design review and permitting approvals were necessary at the State level.  
 
Page 4 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
Beaver Brook Homestead,  Hillsborough, NJ 
The Design and Project Engineer for the design plans for a 56­unit apartment campus consisting of five                                 
apartment buildings and restoring a historical building to serve a community building. On this project I had                                 
the opportunity to not only coordinate the project but to also be the primary AutoCAD C3D designer and test                                     
the latest templates and standards of the company to identify areas for improvement.  
 
Highland Ridge Estates & St. Anne’s Golf Course , Winchester, Connecticut 
Full design of a new development on a 800+ acre site. Designed storm and sanitary sewers, performed earthwork                                   
computations, analyzed sight lines, prepared materials for submission to the Army Corps of Engineers for wetland                               
activities, designed and staged sediment controls and construction phasing for a site consisting of two club houses,                                 
467 residential units and an 18­hole golf course.  
 
University Liggitt School,  Gross Point Wood, Michigan 
Expansion of school campus required expansion and reconfiguration of parking and internal circulation for pick­up                             
and drop­off of children. Traffic calming measures and travel­way design generated to protect safety of                             
schoolchildren. Construction cost estimates were also generated.  
 
Spare Time Bowl , Vernon, Connecticut 
Lead engineer and managed the engineering work for the site layout and permitting for the building addition to an                                     
existing bowling alley. 
 
Pine Hollow Estates , Southington, Connecticut 
Design of plot plans for subdivided properties of the proposed development. The design was on an individual bases                                   
for each property owner. Design included the placement of the proposed home and associated utilities including the                                 
design and layout of the septic system. 
 
Pinnacle Business Park,  New Britain, Connecticut 
Generating project manual for the subdivision of municipally owned property. Development partially funded through                           
the American Recovery and Reinvestment Act. This included front end and specifications conforming to Connecticut                             
Department of Transportation format and including information required for a federal project. A cost estimate and bid                                 
form were also generated. 
Ferry Road,  Old Saybrook, Connecticut 
Performing test pit investigation and design of residential subdivision feasibility layout based on soil investigation.  
 
Cheshire Lifestyle Center , Cheshire, Connecticut 
Existing utility infrastructure feasibility report provided to investors.  
 
Pleasant View Estates , Bridgton, Maine 
Generated construction­level drawings and Site Location of Development Application (SLODA) and Natural                       
Resource Protection Act (NRPA) application packages to be submitted to the Maine Department of Environmental                             
Protection (DEP) for review and approval.  
 
 
 
Page 5 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
Sport Fields Development, Freeport Recreation Facility,  Freeport, Maine 
Design drawings and SLODA and NRPA applications for the construction of a little league baseball field, two soccer                                   
fields and an indoor arena.  
 
Apollo Road Subdivision,  Bethel, Connecticut 
Conducted regular erosion control inspections and monitoring of the stormwater control measures throughout                         
construction activities of a multiple phase active adult community development. Provided direction on necessary                           
improvements to erosion control measures throughout process as needed to prevent the transport of sediment off­site                               
or into adjacent wetlands.  
Water Resources 
 
Site Stabilization and Stormwater Detention , Benjamin Hawkins Parkway, Byron, Georgia 
Lead engineer performing hydrologic and hydraulic analysis and provided erosion control design the for 700+acres of                               
a previously forested property which had been fully cleared of vegetation. The damage to the adjacent waterways and                                   
the destabilization to the adjacent roadway generated an emergency condition. Plans and construction sequencing                           
depicting the necessary erosion control and stormwater detention measures were provided to the client. 
 
Long Meadow Pond Dam , Bethlehem, Connecticut 
Performed quality control review of engineering analysis approach and modeling within software programs for the                             
purpose of mentoring junior members of the engineering staff. Work reviewed was produced to generate the                               
inundation study and emergency action plan for the dam in question. Review and feedback on the actual report body                                     
was also performed. 
 
Cedar Lake Dam , Wolcott, Connecticut 
Provided engineering quality assurance for the design for the dam improvements to increase the dam’s ability to                                 
convey the required design storms. Associated weir, embankment, and outfall improvements were also designed. The                             
most current releases of the  HEC­HMS  software and  Hydraflow StormSewers  software was utilized. 
 
CT DEEP Dam Safety Inspection Program , various Connecticut locations 
Performing inspections of dams of various hazard levels including high hazard classified dams. Generating the                             
inspection report for the client’s use in submitting to the state to maintain compliance with the program. Performing                                   
analyses of the dams as necessary to comply with state design standards include the functionality for various design                                   
storms.  
 
Redland Brick , South Windsor,  Connecticut 
Provided engineering design and analysis associated with the discharge flows of treated water pumped from the                               
existing clay quarry. Analysis included the modeling of the existing brook and downstream culvert for the affects of                                   
the proposed additional flow with regards to scouring and backwater effects. Analysis of the mult­level pond system                                 
integral to the detention of stormwater and discharge flow from the site. Design of the treatment basin utilized for the                                       
pre­treatment of water pumped from the quarry prior to primary treatment. Design of the discharge culvert and control                                   
weir prior to discharging to on­site detention basins in series.  
Page 6 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
 
Culvert Analysis, Magnolia Hill Road , Bethlehem, Connecticut 
Performed hydrologic and hydraulic calculation to determine capacity of an existing 60 inch diameter cross culvert.                               
Services completed in 2014. 
 
Bigelow Brook Culvert Replacement,  Center Spring Park, Manchester, Connecticut 
Design of culvert replacement using the HY­8 program for hydraulic function and improvement of fish passage.                               
Work included submission of General Diversion Permit to the Connecticut Department of Environmental Protection                           
(CTDEP).  
 
Fishway at Hasen Pond Dam,  Saugatuck river, Weston, Connecticut 
Determined seasonal river flows and designed a fishway to provide passage fro the target species. This included the                                   
layout of the fishway and the sequencing of construction. Elements of design included the layout and configuration of                                   
the fishway construction level plans and specifications including the sequencing of construction.  
 
Bank Stabilization & Canoe Portage , Bronx Zoo/Bronx River Dam, Bronx New York 
Provided construction­level design plans, specifications, and cost estimates for dam improvements. The design                         
included erosion mediation/repair, bank stabilization and canoe portage to meet the Wildlife conservation Society’s                           
canoe portage needs, the standards of the New York State Department of Environmental Conservation, as well as the                                   
Bronx Zoo’s operations and aesthetic requirements.  
 
Stream Restoration Project, West Branch Neversink , Claryville, New York 
Stream restoration conceptual design plans for the restoration of eroded upland areas impairing the water quality of                                 
the stream.   
 
Hitchcock Lake Stormwater Analysis,  Wolcott, Connecticut 
Assessment of existing drainage conditions to determine possible causes of stormwater quality issues affecting the                             
receiving lake. This included stormwater sampling and analysis. Design and maintenance recommendations were                         
provided.  
 
LEED Projects 
 
Provided design and documentation for obtaining Leadership in Energy and Environmental Design (LEED) credits for                             
the following projects: 
Harbor Point / Yale & Towne,  Stamford, Connecticut 
Certified LEED­ND (Neighborhood Development) Stage Two Gold 
 
Greenhill Business Office,  Wallingford, Connecticut 
Generation for documentation for Construction Activity Pollution Protection and Stormwater Quality and Quantity                         
Control credits. LEED Certified Gold .  
 
Southern Connecticut State University, Laboratory Building,  New Haven, Connecticut 
Generation of design and documentation for for Construction Activity Pollution Protection, Stormwater Quality and                           
Quantity Control, and Water Efficiency credits. Certification goal of LEED­BD+C Silver.  
 
Page 7 of 8 
19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016 
 
E DUCATION  &  C REDENTIALS   
______________________________________________ 
Bachelor of Science, Civil Engineering (BSCE), 2005 University of Connecticut (UConn)  
Graduated Dean’s List 
 
Registered Professional Engineer (PE): in Connecticut  
I also have an approve NCEES profile which allows me to more quickly obtain a PE license for any state in 
the US if needed. 
 
Leadership in Energy Efficient Design Accredited Professional (LEED AP BD+C) 
 
OSHA HAZWOPPER 40­Hour 
 
Software Applications 
 Proficient:  AutoCAD  C3D ~ Hydraflow Hydrographs & Storm Sewers ~ HEC­HMS ~ Autoturn 
Functional:  HydroCAD ~ HEC­RAS ~ ArcGIS   
 
 
Page 8 of 8 

More Related Content

Viewers also liked

Principles of Design
Principles of DesignPrinciples of Design
Principles of DesignBrianna Ovitt
 
Resume 2012 Kevin Deysenroth
Resume 2012 Kevin DeysenrothResume 2012 Kevin Deysenroth
Resume 2012 Kevin DeysenrothDeysenroth
 
Seth thompson updated resume 2017 (business)
Seth thompson updated resume 2017 (business)Seth thompson updated resume 2017 (business)
Seth thompson updated resume 2017 (business)Seth Thompson, MBA
 
August 2012 Resume - Tink Newman
August 2012 Resume - Tink NewmanAugust 2012 Resume - Tink Newman
August 2012 Resume - Tink NewmanTink Newman
 
Elliott, John A. Resume May 2012
Elliott, John A. Resume May 2012Elliott, John A. Resume May 2012
Elliott, John A. Resume May 2012JohnAElliott
 
Lynn september 2012 resume bio
Lynn  september 2012 resume bioLynn  september 2012 resume bio
Lynn september 2012 resume bioMarc Thomas
 
1117 cetplast uc wall putty
1117   cetplast  uc  wall putty1117   cetplast  uc  wall putty
1117 cetplast uc wall puttyDevrajsinh Gohil
 

Viewers also liked (10)

Principles of Design
Principles of DesignPrinciples of Design
Principles of Design
 
Resume 2012 Kevin Deysenroth
Resume 2012 Kevin DeysenrothResume 2012 Kevin Deysenroth
Resume 2012 Kevin Deysenroth
 
Seth thompson updated resume 2017 (business)
Seth thompson updated resume 2017 (business)Seth thompson updated resume 2017 (business)
Seth thompson updated resume 2017 (business)
 
August 2012 Resume - Tink Newman
August 2012 Resume - Tink NewmanAugust 2012 Resume - Tink Newman
August 2012 Resume - Tink Newman
 
Network Engineer
Network EngineerNetwork Engineer
Network Engineer
 
Rohan_Purekar
Rohan_PurekarRohan_Purekar
Rohan_Purekar
 
RESUME52716
RESUME52716RESUME52716
RESUME52716
 
Elliott, John A. Resume May 2012
Elliott, John A. Resume May 2012Elliott, John A. Resume May 2012
Elliott, John A. Resume May 2012
 
Lynn september 2012 resume bio
Lynn  september 2012 resume bioLynn  september 2012 resume bio
Lynn september 2012 resume bio
 
1117 cetplast uc wall putty
1117   cetplast  uc  wall putty1117   cetplast  uc  wall putty
1117 cetplast uc wall putty
 

Similar to CV.GwenBengtsson

_RSM-Resume16
_RSM-Resume16_RSM-Resume16
_RSM-Resume16Roy Morum
 
Anna Polspoel - Cover Letter - 2015
Anna Polspoel - Cover Letter - 2015Anna Polspoel - Cover Letter - 2015
Anna Polspoel - Cover Letter - 2015Anna Polspoel
 
Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0Dan Wraggett
 
Architecture Resume
Architecture ResumeArchitecture Resume
Architecture ResumeJoel Ward
 
Graduate Portfolio - Georgia Parr
Graduate Portfolio - Georgia ParrGraduate Portfolio - Georgia Parr
Graduate Portfolio - Georgia ParrGeorgia Parr
 
HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15Henry Appleby
 
Exploring Careers series
Exploring Careers seriesExploring Careers series
Exploring Careers seriesJoe Parenteau
 
SandyGhaly_Resume
SandyGhaly_ResumeSandyGhaly_Resume
SandyGhaly_ResumeSandy Ghaly
 
mklopper_curriculum vitae
mklopper_curriculum vitaemklopper_curriculum vitae
mklopper_curriculum vitaeMatthew Klopper
 
Ross_Spargur_Resume_2016
Ross_Spargur_Resume_2016Ross_Spargur_Resume_2016
Ross_Spargur_Resume_2016Ross Spargur
 
Bruce Gibert_Cover Letter
Bruce Gibert_Cover LetterBruce Gibert_Cover Letter
Bruce Gibert_Cover LetterBruce Gilbert
 
Stanley Logue Professional Profile 2015
Stanley Logue Professional Profile  2015Stanley Logue Professional Profile  2015
Stanley Logue Professional Profile 2015Stan Logue
 
AdamPridgen_Resume_2015
AdamPridgen_Resume_2015AdamPridgen_Resume_2015
AdamPridgen_Resume_2015Adam Pridgen
 
Neil bron jalac cv1 (2)
Neil bron jalac  cv1 (2)Neil bron jalac  cv1 (2)
Neil bron jalac cv1 (2)Neil Jalac
 

Similar to CV.GwenBengtsson (20)

_RSM-Resume16
_RSM-Resume16_RSM-Resume16
_RSM-Resume16
 
Résumé
RésuméRésumé
Résumé
 
katanov resume
katanov resumekatanov resume
katanov resume
 
Anna Polspoel - Cover Letter - 2015
Anna Polspoel - Cover Letter - 2015Anna Polspoel - Cover Letter - 2015
Anna Polspoel - Cover Letter - 2015
 
Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0
 
Architecture Resume
Architecture ResumeArchitecture Resume
Architecture Resume
 
FAB Resume_covlet
FAB Resume_covletFAB Resume_covlet
FAB Resume_covlet
 
Graduate Portfolio - Georgia Parr
Graduate Portfolio - Georgia ParrGraduate Portfolio - Georgia Parr
Graduate Portfolio - Georgia Parr
 
HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15HENRY APPLEBY- CV_03.09.15
HENRY APPLEBY- CV_03.09.15
 
Exploring Careers series
Exploring Careers seriesExploring Careers series
Exploring Careers series
 
SandyGhaly_Resume
SandyGhaly_ResumeSandyGhaly_Resume
SandyGhaly_Resume
 
Design Resume 1.1
Design Resume 1.1Design Resume 1.1
Design Resume 1.1
 
mklopper_curriculum vitae
mklopper_curriculum vitaemklopper_curriculum vitae
mklopper_curriculum vitae
 
Ross_Spargur_Resume_2016
Ross_Spargur_Resume_2016Ross_Spargur_Resume_2016
Ross_Spargur_Resume_2016
 
Bruce Gibert_Cover Letter
Bruce Gibert_Cover LetterBruce Gibert_Cover Letter
Bruce Gibert_Cover Letter
 
Tom Barnes CV
Tom Barnes CVTom Barnes CV
Tom Barnes CV
 
Stanley Logue Professional Profile 2015
Stanley Logue Professional Profile  2015Stanley Logue Professional Profile  2015
Stanley Logue Professional Profile 2015
 
AdamPridgen_Resume_2015
AdamPridgen_Resume_2015AdamPridgen_Resume_2015
AdamPridgen_Resume_2015
 
Omar Santana CV
Omar Santana CVOmar Santana CV
Omar Santana CV
 
Neil bron jalac cv1 (2)
Neil bron jalac  cv1 (2)Neil bron jalac  cv1 (2)
Neil bron jalac cv1 (2)
 

CV.GwenBengtsson

  • 1. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    CURRICULUM VITAE  Gwen.Bengtsson@gmail.com  ♦  tel 070 251 70 98      I recently moved from my home country of the United States after my husband and I decided that we wanted to                                          relocate to his home country of Sweden. We have an apartment and I am looking for a (preferably) permanent                                      position with a good company in the Stockholm/surrounding area. I am currently learning Swedish (my third foreign                                  language). In recent years I have performed the a combination role of Project Engineer (Projektledare), Designer,                                and Drafter (Projektör). This was because I have 9 years of civil engineering experience and was recently working in                                      small offices that required both management and design work from all staff. While working at large companies, I                                    have worked on projects located in many of the different States within the US, and so I am accustomed to adjusting                                          design and management approaches to suit the requirements and formats of different governments and communities.      Since graduating from university, I have purposefully diversified my work experience while also specializing in a few                                  key areas of primarily stormwater management, land development and infrastructure improvements. After working                          the required years and obtaining approval to take the exam, I was able to obtain my Professional Engineer (PE)                                      license; permitting me to have the responsibility of signing my name to design plans and reports prior to beginning                                      construction. My previous job responsibilities consists of work in several areas of land and infrastructure                              development, including preparing designs and permitting applications for municipal/state/federal approval, LEED                      certification, interacting with clients and public officials directly, presenting proposed designs to both government                            officials and the public, participate in construction meetings, mentor younger engineers, prepare proposals for                            obtaining projects, attend and also put together industry education and networking events, assist in monitoring budgets                                through the project phases, and both actively drafting and contributing to AutoCAD C3D standards for the company.     My personal background is a diverse experience as I have relocated my life twice before. During my teenage years                                      my father’s career moved our family from the center of the US (to first Texas and then) to Connecticut just north of                                            New York City. After moving to Connecticut I was able to gain acceptance to the notably ranked engineering                                    program at the University of Connecticut, from which I graduated in 2005 with a bachelor’s degree in Civil                                    Engineering. My interests include kayaking, skiing, fishing, oil painting, hiking, and gardening. Now that we live in                                  Sweden, I look forward to taking up cross country skiing.     E XPERIENCE  ______________________________________________________    Carroll Engineering , Hillsborough, New Jersey                         November 2015 ­ April 2016  Left this position to move permanently to Sweden  Project Engineer    While working in the New Jersey based office I worked on actually several projects which involved various levels of  design and permitting requirements. Here, I was able to experience adjusting to the different design standards and  methods with the regulatory entities and differing permitting processes in a new area (of New Jersey rather than  Connecticut) and also everyday use the AutoCAD C3D platform for land development projects.     Reference:  Thomas Fik, PE, Office Manager  (and my direct supervisor)   Tom.Fik@carrollengineering.com  +1 908.847.7500 extension 216   Additional references available upon request.      Page 1 of 8 
  • 2. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    HRP Associates Inc. , Farmington, Connecticut                            December 2013 ­ July 2015  Left this position to move to New Jersey to be with my husband   Project Engineer  While working for this larger environmental company I had the opportunity to perform the role of the senior  production engineer. I worked on projects that ran the gamut of the civil engineering profession on a daily basis.  Here, mentoring and training junior engineers in addition to reviewing their work was a notable portion of my  responsibilities. The majority of the project engineers I support within the organization (with engineering solutions)  are not themselves engineers. Being able to decipher what they need and provide recommendations when they fairly  do not know what information they need to provide or what to ask of the engineering department was an extremely  valuable learning experience.     Reference:  Thomas Battles, PE, Director of Civil Engineering  (and my direct supervisor)  Thomas.Battles@hrpassociates.com  +1 203.674.9570 extension 100  Additional references available upon request.  _______________________________________________________________________________________________________________________________________________________________________________  H.E. Cole & Son , Plantsville, Connecticut                                   April 2013 ­ December 2013  Project Engineer  While working for this smaller company I had the opportunity to take the reins on projects and engage in more  designs of the every­day/local project work which my large­scale projects of the past did not as often afford. I have  worked on subdivisions and septic designs on confined and challenging terrain, reviewed and signed off on designs,  estimated hours/costs for job proposals, and working directly with clients and municipalities.     Reference:  Stephen Guidice, LS, Owner (and my direct supervisor)  sguidice@hecole.com   +1 860.628.4484 extension 105  Additional references available upon request.  _______________________________________________________________________________________________________________________________________________________________________________  Northwestern Mutual , Wilton, Connecticut                                December 2011 ­ April 2013   Financial Representative  Provided financial planning recommendations and guidance to individuals, families, and small business owners. I was  support staff for the Agents by generating their financial models used in both assessing client needs and also used in  presenting recommendations. I also worked directly with clients ranging from middle­class to upper­level executives,  generating comprehensive financial plans using various software programs and financial information resources.      Reference:  Robert Dickinson, CLU, ChFC, CFP, Financial Advisor (and my direct supervisor)  Bob.Dickinson@nm.com   +1 203.313.0690   Additional references available upon request.          Page 2 of 8 
  • 3. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    Milone & MacBroom, Inc , Cheshire, Connecticut                      May 2005 ­ September 2011  Civil Engineer  Member of a design team during my tenure for an array of construction projects throughout Connecticut, New York  and Maine.  Projects ranged from land development, to urban redevelopment to water resources projects.     Reference:  Darin Overton, PE, Project Manager (and my direct supervisor)  DarinO@miloneandmacbroom.com  +1 203.271.1773   Additional references available upon request.  _______________________________________________________________________________________________________________________________________________________________________________  H.E. Cole & Son , Plantsville, Connecticut      Summer & Winter of 2004  Civil Engineering Intern  Gained valuable hands on experience supporting a team of experienced engineers and surveyors.   ● Performed survey field work and generating base mapping in AutoCAD  ● Evaluated test pits and performed soil percolation tests for residential septic system design  ● Stormwater drainage system design including detention basin design  Was offered a full time position upon graduation.    Reference:  Stephen Guidice, LS, Owner (and my direct supervisor)  sguidice@hecole.com  +1 860.628.4484   Additional references available upon request.       P ROJECTS_________________________________________________________________    Urban Redevelopment & Infrastructure   Harbor Point / Yale & Towne,  Stamford, Connecticut  Provided engineering services for this design­build urban revitalization project in which an existing 80+ acre                              brownfield site ,adjacent to a hurricane barrier, was demolished and developed into an entire neighborhood consisting                                of residential buildings, commercial buildings, renovated buildings, parks, a school and a grocery store.   Design construction administration experience included:   The reconstruction and realignment of existing roads, proposed roadways within the multitude of vertical and                              horizontal constraints of an urban brownfield site, existing and proposed road cross­sections, intersection grading,                            lane configuration, signalization design, site investigation and assessment of existing sanitary and stormwater sewers,                            design of storm and sanitary sewer expansion and upgrades, earthwork computations involving an engineered cap and                                balancing the site for consideration of contaminated material below the cap and clean fill above the cap, design of                                      underground utilities (90% of all utilities were underground) in consideration of the engineered cap, coordination of                                utility design with the needs of the existing and proposed buildings and their various proposed uses, site grading,                                    improvements atop and adjacent to the earthen portion of the hurricane barrier, demolition of derelict structures                                anchored off­shore of the hurricane barrier, and the layout and design of all utilities involved.     Page 3 of 8 
  • 4. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    Carter Carburetor Superfund Site , St. Louis, Missouri  Lead production engineer providing engineering services for the various stages of this politically controversial project                              involving remediation, excavation, wastewater treatment, permitting, demolition activities, and the generation of bid                          documents for this large­scale urban project. Capture and treatment of contaminated stormwater was a huge factor.    One Dock Street,  Stamford, Connecticut  Performing traffic study to determine necessary number and frequency of shuttle busses to local railway transit                                station. Parking space layout, drainage design, proposed underground electrical conduit routing and pavement striping                            for the proposed parking lot.     Spindle Hill Road, Welton Pond , Wolcott, Connecticut  Lead design engineer for the roadway design and realignment of approximately 2,000 linear feet of spindle hill road.                                    The project was reviewed by the department of transportation municipal roads unit. I developed the layout and design                                    of the mill and overlay of the existing roadway which contained culverts associated with Welton Pond. Road design                                    was accomplished utilizing the most current AutoCAD Civil 3D software. Hydrology and hydraulic calculations for                              the culvert design were performed utilizing various methods and software programs including the most recent version                                of  HEC­HMS  software. Services included the generation of bid and contract documents for the Town’s use.    U.S. Tobacco Property,  Greenwich, Connecticut  Layout, grading, and drainage for the renovation of an existing office building property grounds, realign the access                                  drive, and increase the available parking. This design included the implementation of pervious pavers and creative                                stormwater solutions to provide a zero increase in stormwater runoff with minimal utility infrastructure alterations.     Greenville Transfer Station,   Greenville, Maine  Layout, grading, local permitting and Maine DEP permitting for the proposed municipal waste transfer station.     Large­Scale Development Planning , Duke Energy, Florida  Generating various alternate (high­level) layouts for potential multi­acreage development for industrial and                        commercial facilities based upon existing infrastructure conditions, potential future infrastructure, and the projected                          regulatory restrictions and allowances. Proposed uses ranged from warehouses to business parks for multiple sites                              throughout Florida.     Residential and Commercial Development  River View at New Bridge Landing,  River Edge, New Jersey  The Design and Project Engineer for the design plans for a 69­unit apartment building to be constructed atop                                    a very high retaining wall. All of which was to be constructed adjacent to a railway in a densely populated                                        area a stone’s throw from New York City. I coordinated the work for the various design disciplines and all                                      approvals/permitting/infrastructure improvements for the municipality, state agencies, and utility companies.      The Willows at Westampton,  Westampton, NJ  The Design and Project Engineer for the design plans for a 72­unit apartment campus consisting of six                                  apartment buildings and a community building. The existing infrastructure and topography necessitated the                          design of a sanitary sewer pump station, sanitary force main, and off­site gravity sewer design. Extensive                                design review and permitting approvals were necessary at the State level.     Page 4 of 8 
  • 5. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    Beaver Brook Homestead,  Hillsborough, NJ  The Design and Project Engineer for the design plans for a 56­unit apartment campus consisting of five                                  apartment buildings and restoring a historical building to serve a community building. On this project I had                                  the opportunity to not only coordinate the project but to also be the primary AutoCAD C3D designer and test                                      the latest templates and standards of the company to identify areas for improvement.     Highland Ridge Estates & St. Anne’s Golf Course , Winchester, Connecticut  Full design of a new development on a 800+ acre site. Designed storm and sanitary sewers, performed earthwork                                    computations, analyzed sight lines, prepared materials for submission to the Army Corps of Engineers for wetland                                activities, designed and staged sediment controls and construction phasing for a site consisting of two club houses,                                  467 residential units and an 18­hole golf course.     University Liggitt School,  Gross Point Wood, Michigan  Expansion of school campus required expansion and reconfiguration of parking and internal circulation for pick­up                              and drop­off of children. Traffic calming measures and travel­way design generated to protect safety of                              schoolchildren. Construction cost estimates were also generated.     Spare Time Bowl , Vernon, Connecticut  Lead engineer and managed the engineering work for the site layout and permitting for the building addition to an                                      existing bowling alley.    Pine Hollow Estates , Southington, Connecticut  Design of plot plans for subdivided properties of the proposed development. The design was on an individual bases                                    for each property owner. Design included the placement of the proposed home and associated utilities including the                                  design and layout of the septic system.    Pinnacle Business Park,  New Britain, Connecticut  Generating project manual for the subdivision of municipally owned property. Development partially funded through                            the American Recovery and Reinvestment Act. This included front end and specifications conforming to Connecticut                              Department of Transportation format and including information required for a federal project. A cost estimate and bid                                  form were also generated.  Ferry Road,  Old Saybrook, Connecticut  Performing test pit investigation and design of residential subdivision feasibility layout based on soil investigation.     Cheshire Lifestyle Center , Cheshire, Connecticut  Existing utility infrastructure feasibility report provided to investors.     Pleasant View Estates , Bridgton, Maine  Generated construction­level drawings and Site Location of Development Application (SLODA) and Natural                        Resource Protection Act (NRPA) application packages to be submitted to the Maine Department of Environmental                              Protection (DEP) for review and approval.         Page 5 of 8 
  • 6. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    Sport Fields Development, Freeport Recreation Facility,  Freeport, Maine  Design drawings and SLODA and NRPA applications for the construction of a little league baseball field, two soccer                                    fields and an indoor arena.     Apollo Road Subdivision,  Bethel, Connecticut  Conducted regular erosion control inspections and monitoring of the stormwater control measures throughout                          construction activities of a multiple phase active adult community development. Provided direction on necessary                            improvements to erosion control measures throughout process as needed to prevent the transport of sediment off­site                                or into adjacent wetlands.   Water Resources    Site Stabilization and Stormwater Detention , Benjamin Hawkins Parkway, Byron, Georgia  Lead engineer performing hydrologic and hydraulic analysis and provided erosion control design the for 700+acres of                                a previously forested property which had been fully cleared of vegetation. The damage to the adjacent waterways and                                    the destabilization to the adjacent roadway generated an emergency condition. Plans and construction sequencing                            depicting the necessary erosion control and stormwater detention measures were provided to the client.    Long Meadow Pond Dam , Bethlehem, Connecticut  Performed quality control review of engineering analysis approach and modeling within software programs for the                              purpose of mentoring junior members of the engineering staff. Work reviewed was produced to generate the                                inundation study and emergency action plan for the dam in question. Review and feedback on the actual report body                                      was also performed.    Cedar Lake Dam , Wolcott, Connecticut  Provided engineering quality assurance for the design for the dam improvements to increase the dam’s ability to                                  convey the required design storms. Associated weir, embankment, and outfall improvements were also designed. The                              most current releases of the  HEC­HMS  software and  Hydraflow StormSewers  software was utilized.    CT DEEP Dam Safety Inspection Program , various Connecticut locations  Performing inspections of dams of various hazard levels including high hazard classified dams. Generating the                              inspection report for the client’s use in submitting to the state to maintain compliance with the program. Performing                                    analyses of the dams as necessary to comply with state design standards include the functionality for various design                                    storms.     Redland Brick , South Windsor,  Connecticut  Provided engineering design and analysis associated with the discharge flows of treated water pumped from the                                existing clay quarry. Analysis included the modeling of the existing brook and downstream culvert for the affects of                                    the proposed additional flow with regards to scouring and backwater effects. Analysis of the mult­level pond system                                  integral to the detention of stormwater and discharge flow from the site. Design of the treatment basin utilized for the                                        pre­treatment of water pumped from the quarry prior to primary treatment. Design of the discharge culvert and control                                    weir prior to discharging to on­site detention basins in series.   Page 6 of 8 
  • 7. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016      Culvert Analysis, Magnolia Hill Road , Bethlehem, Connecticut  Performed hydrologic and hydraulic calculation to determine capacity of an existing 60 inch diameter cross culvert.                                Services completed in 2014.    Bigelow Brook Culvert Replacement,  Center Spring Park, Manchester, Connecticut  Design of culvert replacement using the HY­8 program for hydraulic function and improvement of fish passage.                                Work included submission of General Diversion Permit to the Connecticut Department of Environmental Protection                            (CTDEP).     Fishway at Hasen Pond Dam,  Saugatuck river, Weston, Connecticut  Determined seasonal river flows and designed a fishway to provide passage fro the target species. This included the                                    layout of the fishway and the sequencing of construction. Elements of design included the layout and configuration of                                    the fishway construction level plans and specifications including the sequencing of construction.     Bank Stabilization & Canoe Portage , Bronx Zoo/Bronx River Dam, Bronx New York  Provided construction­level design plans, specifications, and cost estimates for dam improvements. The design                          included erosion mediation/repair, bank stabilization and canoe portage to meet the Wildlife conservation Society’s                            canoe portage needs, the standards of the New York State Department of Environmental Conservation, as well as the                                    Bronx Zoo’s operations and aesthetic requirements.     Stream Restoration Project, West Branch Neversink , Claryville, New York  Stream restoration conceptual design plans for the restoration of eroded upland areas impairing the water quality of                                  the stream.      Hitchcock Lake Stormwater Analysis,  Wolcott, Connecticut  Assessment of existing drainage conditions to determine possible causes of stormwater quality issues affecting the                              receiving lake. This included stormwater sampling and analysis. Design and maintenance recommendations were                          provided.     LEED Projects    Provided design and documentation for obtaining Leadership in Energy and Environmental Design (LEED) credits for                              the following projects:  Harbor Point / Yale & Towne,  Stamford, Connecticut  Certified LEED­ND (Neighborhood Development) Stage Two Gold    Greenhill Business Office,  Wallingford, Connecticut  Generation for documentation for Construction Activity Pollution Protection and Stormwater Quality and Quantity                          Control credits. LEED Certified Gold .     Southern Connecticut State University, Laboratory Building,  New Haven, Connecticut  Generation of design and documentation for for Construction Activity Pollution Protection, Stormwater Quality and                            Quantity Control, and Water Efficiency credits. Certification goal of LEED­BD+C Silver.     Page 7 of 8 
  • 8. 19811129­0584         G WEN   B ENGTSSON ,  PE, LEED AP BD+C                              June 2016    E DUCATION  &  C REDENTIALS    ______________________________________________  Bachelor of Science, Civil Engineering (BSCE), 2005 University of Connecticut (UConn)   Graduated Dean’s List    Registered Professional Engineer (PE): in Connecticut   I also have an approve NCEES profile which allows me to more quickly obtain a PE license for any state in  the US if needed.    Leadership in Energy Efficient Design Accredited Professional (LEED AP BD+C)    OSHA HAZWOPPER 40­Hour    Software Applications   Proficient:  AutoCAD  C3D ~ Hydraflow Hydrographs & Storm Sewers ~ HEC­HMS ~ Autoturn  Functional:  HydroCAD ~ HEC­RAS ~ ArcGIS        Page 8 of 8