2. 210
90
210
90
210
90
210
90
210
90
210
90
210
90
210
90
210
90
210
90
210
90
210
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
200
90
210
90
210
80
210
90
210
90
210
90
210
90
210
80
210
90
210
90
210
80
210
90
210
90
210
80
210
90
210
90
210
90
180
150
180
150
150
120
240
80
240
80
180
180
240
80
180
150
240
80
180
150
180
150
180
150
150
120
240
80
240
80
180
180
180
150
240
80
240
80
180
150
200
90
200
90
200
90
200
90
200
90
200
90
210
90
210
90
240
180
210
90
210
90
260
90
260
90
260
90
260
90
N
13
18
16 15
17 1423 20
22 21
19
24
4 450
300 440 260 500 300 850 300 500 200 500 300
110 55 90 130 90 115 90 60 115 90 385 90 130 90 290 90 130 90 290 90 130 90 290 90 130 90 290 90 130 90 230 90 90
4 450
30 560 85 166 116 166 85 554 238 445 238 554 252 116 252 554 36
2690
290710600600360130
26360013615510023023023090120
45
13090140130
2690
290710600600360130
26360013615510023016023070120624
300 600 600 300 850 300 500 200 500 300
200
330
390 228
200 470
430
460
200
200
592
745
180
275
557
745
275
180
348
745
330
470263
180138
745
348330
665263
180138
592
745
180
275
557
745
275
180
348
745
330
470 263
180138
745
348330
665 263
180138
460
180186296
275
456
562
180186296
275
456
562
180186
275
456
562
180186
275
456
562
296
296
774
774
774
774
+4,30
A
2' 5 6'
6' 10
10
11
11
12' 13
13
A
B
C
D
E
C
D
E
1'
1' 2'
4
3'
7' 8'
7' 8'
9'
9'
12'
F"F"
H' H'
B
B
A A
0 5 10 15
Level 1 +4,30m
-2,00
±0,00
+1,50
+4,30
+7,10
+10,00
+11,50
200150280280290150
-2,00
±0,00
+1,50
+4,30
+7,10
+10,00
+11,50
200150280280290150
-2,00
+1,50
+4,30
+7,10
-2,00
+1,50
+4,30
+7,10
330202602026020390
330202602026020260
3302026020260
B - B
work title:
salasuka home for
elderly people
location:
salasuka,
bulgaria
gross floor area:
1850 sqm
height/ storey:
11,5m/ 2,5-storeys
structure:
reinforced concrete
completion date:
2013.12
description:
The project aims to
become exemplary for
future elderly
developments in
Bulgaria. The
architectural aim is to
harmonize as much as
possible the investor’s
requirements with the
best world practices
and thus achieving the
goal of fully meeting
the new higher
standards, while
tailoring the building to
the specific climatic
and area conditions.
architect
Georgi Bibin
georgi.bibin@yahoo.com
+44 (0)75 840 53719
3. work title:
tree house
location:
gorna dikanya,
bulgaria
submission date:
2013.09
description:
the project was
comissioned by a
family who wanted to
build themselves a
tree house in their lake
estate.
i have worked closely
with my clients, so i
was able to tailor my
design fulfiling all their
desires and expecta-
tions.
when i have cleared
the design aspect of
the project i had to
start thinking of the
building proccess.
i have created a
building system that
allows the building to
be erected without the
need of skilled labor,
so that the project
could be finished only
by the family members
which was stated in
the brief.
i have designed and
calculated the structu-
re for the whole
project.
i have provided my
clients not only with
the standard archi-
tectural and technical
drawings, but i have
delivered an extremely
user friendly bim solu-
tion which they can
use on site.
1
2
3
4
5
6
7
8
9
10
11
12
3,9 m2
15,4 m2
17,0 m2
301304625065
±0,00
+0,30
+1,60
+2,06
+4,56
+5,21
132 9 65 325 65
22 41
22
56 22 364 22
81°
4. work title:
bab competiton
location:
manama,
bahrain
submission date:
2012.01
description:
The main goal of my
project named Fluid
Park is the creation of
high quality public
spaces, horizontally
and vertically, as well
as preserving and
improving the sense of
space. The main
element of the structu-
re is the parking. It is
elevated five meters
above ground and is
on two levels, provid-
ing 800 parking places,
200 more than the
existing capacity. The
sides of the parking
act as bio canvas, with
vegetation which can
be periodically chang-
ed, creating different
compositions. The roof
is a public space,
green park with a 360
degree view of the sur-
rounding area. It can
be accessed directly
from the ground level
through several
vertical connections.
photovoltaic panels will
reduce the energy
demand of the building
and promoting sustain-
ability as trait of
Bahrein, following the
example of the World
Trade Center located
nearby.
5. work title:
post milano expo 2016
location:
milan, italy
submission date:
2012.01
description:
the project is located
on the site of the inter-
national expo in milan,
taking place in 2015.
it’s aim is to give urban
and architectural
solution for the site
after the end of the
expo.
my concept was to use
as much as possible
of the infrastructure
created for the event,
minimising the costs
of the new
developments.
i have not only kept,
but enhanced the
cardum and
decumanum, linking
the new site not only to
the memory of the
expo, but to the italian
and roman cultural
and historical heritage.
i have also tried to
incorporate my vision
for the green cities of
the twenty first century
in my proposal.
6. work title:
art complex anel
(2nd extension)
location:
sozopol,
bulgaria
size:
6 houses, spa and
swim complex
structure:
reinforced concrete
completion date:
2010.05
description:
the second extension
compliments the initial
project of four houses.
the task was to plan
six new houses, spa
center, outdor leisure
and swim are, as well
as landscape function-
ing as open air art
exhibition.
the new buildings were
done with high end
materials.
while the building
works where made the
project evolved and
changes where made
on site.
the complex is still
expanding and is
considered to be one
of the gems of the
black sea.
7. work title:
invest bank
head quarters
location:
sofia,
bulgaria
height/ storey:
30m/ 9-storeys
structure:
reinforced concrete
completion date:
2009.09
description:
located on 83 bulgaria
bulevard, between the
the festa barcelo hotel,
awarded building of
the year 2005 and
bellissimo business
center awarded
building of the year
2006. initially the task
was just for facade
study, to determine the
best aproach for the
very demanding plot.
the investors where
impressed by it and
that lead to receiving
the complete project
including the interior
design of the building.
8. work title:
switch to pure volvo
location:
italy
submission date:
2013.04
description:
the project aims to
outline the design fea-
tures of the volvo v60,
particularly the harmo-
ny between the
installation and the
car’s silhouette.
the simplicity of the
form brings the design
of the vehicle to the
foreground.
the installation is com-
posed of three main
components:
the main body made of
opaque recycled
plastic is assembled of
60 elements.
interior elements,
made of translucent
plastic with built-in
multicolor led tubes,
allowing the creation
of music and light
shows; the elements
can be placed In a
random order in the
main body, that allow
creative interventions
during the showcase.
rotating podium giving
the ability to complete-
ly showcase the car;
the complete project
will be way under the
maximum budget of
60 000 euro and is
designed to be easily
assembled and
disassembled by two
people for less than an
hour.
9. work title:
collider activity center,
for walltopia
location:
sofia, bulgaria
submission date:
2013.02
description:
the competition brief
has three main
aspects: urban, archi-
tectural, and lands-
cape.
the plot is located in
the fringe area of the
city, bordering the old
residential blocks,the
green belt around it,
and the new business
district.
my approach was to
create a space that is
extremly functional,
respecting 100% the
design brief, as well as
my personal sustain-
ability criterias, it had
to be budget smart, so
it could be easily built.
the landscape is
complimenting the
overall concept of the
box in the box i have
used to amplify the
monumental impact
the project will have on
the area, the
community, and the
city itself, as this is
going to be the first
complete indoor climb-
ing center of its kind.
5
6
7
8
9
10
11
12
13
14
15
0 1 2 3 4 5 10 15
S-01 S-01
45,00
45,00
45,00
45,00
7,30
±0,00
high wall area
bolders area
funtopia
Restaurant
lobby & cafe
info point
bar
&
reception
Storage
&
Washing
party area
kitchen
cold
store
storage staff
M
staff
Fstorage
inner court
N
-3,50
±0,00
+6,00
+12,00
+16,00
+22,00
+45,00
-3,50
±0,00
+6,00
+12,00
+16,00
+22,00
+45,00
3,506,006,004,006,0023,00
3,506,006,004,006,0023,00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10. work title:
new wing of the
medical college
yordanka filaretova
location:
sofia, bulgaria
submission date:
2009.01
description:
this is a student
project done during
my bachelor degree.
it is an actual brief,
delivered to several of
the bigest architectural
practices in the
country.
the project is located
in the center of the city,
the available plot was
narrow, bordering an
ancient church on the
north. the brief was
extremly complicated,
as it covered plenty
requirements and
building functions.
one of the biggest
quests was to fulfill it,
with the current
building parameters
and restrictions in the
area.
my project aimed to
deliver a very neutural
and functional building,
that could be built with
low budget, but not
sacrificing its sustain-
ability.