SlideShare a Scribd company logo
1 of 1
Type of Project Domain Project Name Description Applications Outcome Achievement
Rapid Application
Development
(RAD)
Automation
Process
Improvement
Retail, U K
general
Insurance
O nshore,
O ffshore
1. C ipher,
Dashboard II,
C apita Logon
2. Q uality C apita Logon
1. Workflow management tool for insurance, Web
chat, Email & V oice process. C aptures details at
every step Data validation, Work routing, Work
allocation (manual/Automatic), processing, Q uality
check, back to processor for removing errors,
Direct Dispatch processing, Back to processor for
completion.
2. P re-QC, define sampling method; C lient approved
Q uality C hecklist, Define RCA, A uto Quality Email
generation
M S O utlook, M DMS, Broke
A ssure 64, Broker link, Excel
extract from different
applications like JIRA,CRM
etc, Excel, A ccess, SQL, VBA
1. Real time reporting, Daily Dashboard, Inventory &
M anpower allocation, P roductivity & U tilization
tracker, SLA tracker, KP I tracker, Data available
for analysis & forecast. C ommunication medium
between management and staff.
2. M et A udit target, Q uality reports - A ccuracy, QC
productivity, Sampling tracker, Q uality matrix
1. 1100+ user using tool 24/7 , s tarted
meeting T AT, governance in process,
planned resource mgmt.
2. 25 Q uality checker use it.
A chieved 9 9% accuracy at DPU
(Defect P er U nit)
Kaizen, Lean, 6-
Sigma Yellow belt
Process
Improvement
Retail, U K
general
Insurance
1.P KT T ool
2.Roster
3.P roductivity Improvement
1. P roduct knowledge test – A utomated test tool to
provide monthly score for agent KP I.
2. Leave management, Shrinkage management,
Roster creation, Login-Logout tracking
3. Q uartile wise productivity improvement &
efficiency benefit
Excel, A ccess, SQL, V BA,
A nalytical Skills
1.Waste Reduction in process, Drive Efficiency, Save
P aper
2.Q uality (Lean 6 -Sigma) Efficiency Improvement
3.6-sigma Y ellow belt project
1. 3445 U SD soft saving
2. ~1 FT E saving
3. ~20 FT E benefit with quartile wise
movement.
Planning &
Forecasting
Retail, U K
general
Insurance
1.Capacity Plan for 18 month
2.Planned Vs Actual
1. Forecast for coming next 1½ yr basis on known
facts & past 3 -yr data.
2. M easure month on month/week on week
performance against Capacity P lan measure
progress.SMT can decide recruitment/efficiency
benefit plan for upcoming month.
U se analytical techniques
normalization, business
mix, 80-20 method,
moving averages ,FTE
calculation (basis on
onshore/offshore hrs)
1.SM T propose Business P lan numbers including
T ransition requirements to C lient.
2.Help operations to stay on track & highlight
deviations from plans & take proactive measures
to ensure SLA delivery & improve P NL.
1. Successfully planning from past
4yrs for 300+ general insurance
process & 500+ retail process.
2. A chieved within +/- 4% variance in
P VA 2013,2014,2015
Dashboard,
Reporting &
Analysis
Retail, UK
general
Insurance
1.Balance score card
2.T A T ,A HT Analysis
3.GA P Analysis
4.T hird party survey DHP
1. Daily Dashboard, P roduction pack, M BR, Billing
report.
2. T o define coming year T AT target with C lient basis
on past performance. A HT analysis to define
efficiency target.
3. Idle time, No work, other production time &
Leakage analysis
4. P eople connect & EWS updates, yearly target &
objective, span of control.
M S-Office, A nalytical skills -
Q uartile calculation, M in-
M ax – M edian calculations,
P rocess knowledge
1.T A T reduction, planning of available capacity
2.Define T arget
3.Efficiency benefit
4.P repare pack for operations brining out
commercial issues, opportunities to improve &
develop operational service
1. Successfully implemented all formats
across 8 processes. A lso agreed with
C lient for circulation.
2. ~26 FT E benefit YOY
3.A chieved 76% U tilization by reducing
Idle time, No work & Leakage %
4.Identified areas of efficiency benefit
worth 70 FT E.
Transition
Retail, U K
general
Insurance
1. LMPR platform transition
2. WFM & Reporting work
transition
1. P rovided value added inputs during platform
transition for better performance & save
resources.
2. NICE WEM & C lient M I report transition.
NIC E WFM tool, C ISC O
reports, Firefox, Excel
1. Data validation step eliminated, linked
augmentation process with BA U processing tool.
2. O ngoing tool management with reporting
1. ~10 FT E saving by eliminating
steps & linking one tool with
another.
2. Successfully transfer 3 FT E worth
work to offshore M I team.
Training &
Documentation
Retail, U K
general
Insurance
1. T ool training, skill training
2. T DD (T echnical Design
documents), SO Ps, Risk register
1. A gent training on tool during process training.
Brief them about tool & its benefit in KP I
tracking & its link with payroll calculations. T rain
BP M I analyst to improve Excel & V BA skills.
2. T ool documentation, SOPs for different BA U
reports.
C apita Logon, DBII, C ipher
& other
Daily/weekly/monthly/yearly
& billing report
1. Successfully implemented tools with help of
operation & IT team.
2. SO Ps, C hecklist are updated for all onshore &
offshore reports.
Ensure business continuity

More Related Content

Similar to CV - Project Synopsis_Gauri

Similar to CV - Project Synopsis_Gauri (20)

Resume_Madhu Akkasali
Resume_Madhu AkkasaliResume_Madhu Akkasali
Resume_Madhu Akkasali
 
New_nidhi_resume_1.doc
New_nidhi_resume_1.docNew_nidhi_resume_1.doc
New_nidhi_resume_1.doc
 
CV Joaquim Mestre
CV Joaquim MestreCV Joaquim Mestre
CV Joaquim Mestre
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
Coherent - Insurtech Innovation Award 2023
Coherent - Insurtech Innovation Award 2023Coherent - Insurtech Innovation Award 2023
Coherent - Insurtech Innovation Award 2023
 
Nagbandi Shyam
Nagbandi ShyamNagbandi Shyam
Nagbandi Shyam
 
3.spc course outline
3.spc course outline3.spc course outline
3.spc course outline
 
Marjorie_Paller_CV_05172016
Marjorie_Paller_CV_05172016Marjorie_Paller_CV_05172016
Marjorie_Paller_CV_05172016
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Yogesh Keshaowar_Profile
Yogesh Keshaowar_ProfileYogesh Keshaowar_Profile
Yogesh Keshaowar_Profile
 
sm prsasd Resume
sm prsasd  Resumesm prsasd  Resume
sm prsasd Resume
 
SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
 
Performance Testing
Performance Testing Performance Testing
Performance Testing
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Sample IT resume from RedRocketResume
Sample IT resume from RedRocketResumeSample IT resume from RedRocketResume
Sample IT resume from RedRocketResume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Vineet Malu-Resume
Vineet Malu-ResumeVineet Malu-Resume
Vineet Malu-Resume
 
Final UP Mandi Automation Presentation
Final UP Mandi Automation PresentationFinal UP Mandi Automation Presentation
Final UP Mandi Automation Presentation
 
GF CV
GF CVGF CV
GF CV
 

CV - Project Synopsis_Gauri

  • 1. Type of Project Domain Project Name Description Applications Outcome Achievement Rapid Application Development (RAD) Automation Process Improvement Retail, U K general Insurance O nshore, O ffshore 1. C ipher, Dashboard II, C apita Logon 2. Q uality C apita Logon 1. Workflow management tool for insurance, Web chat, Email & V oice process. C aptures details at every step Data validation, Work routing, Work allocation (manual/Automatic), processing, Q uality check, back to processor for removing errors, Direct Dispatch processing, Back to processor for completion. 2. P re-QC, define sampling method; C lient approved Q uality C hecklist, Define RCA, A uto Quality Email generation M S O utlook, M DMS, Broke A ssure 64, Broker link, Excel extract from different applications like JIRA,CRM etc, Excel, A ccess, SQL, VBA 1. Real time reporting, Daily Dashboard, Inventory & M anpower allocation, P roductivity & U tilization tracker, SLA tracker, KP I tracker, Data available for analysis & forecast. C ommunication medium between management and staff. 2. M et A udit target, Q uality reports - A ccuracy, QC productivity, Sampling tracker, Q uality matrix 1. 1100+ user using tool 24/7 , s tarted meeting T AT, governance in process, planned resource mgmt. 2. 25 Q uality checker use it. A chieved 9 9% accuracy at DPU (Defect P er U nit) Kaizen, Lean, 6- Sigma Yellow belt Process Improvement Retail, U K general Insurance 1.P KT T ool 2.Roster 3.P roductivity Improvement 1. P roduct knowledge test – A utomated test tool to provide monthly score for agent KP I. 2. Leave management, Shrinkage management, Roster creation, Login-Logout tracking 3. Q uartile wise productivity improvement & efficiency benefit Excel, A ccess, SQL, V BA, A nalytical Skills 1.Waste Reduction in process, Drive Efficiency, Save P aper 2.Q uality (Lean 6 -Sigma) Efficiency Improvement 3.6-sigma Y ellow belt project 1. 3445 U SD soft saving 2. ~1 FT E saving 3. ~20 FT E benefit with quartile wise movement. Planning & Forecasting Retail, U K general Insurance 1.Capacity Plan for 18 month 2.Planned Vs Actual 1. Forecast for coming next 1½ yr basis on known facts & past 3 -yr data. 2. M easure month on month/week on week performance against Capacity P lan measure progress.SMT can decide recruitment/efficiency benefit plan for upcoming month. U se analytical techniques normalization, business mix, 80-20 method, moving averages ,FTE calculation (basis on onshore/offshore hrs) 1.SM T propose Business P lan numbers including T ransition requirements to C lient. 2.Help operations to stay on track & highlight deviations from plans & take proactive measures to ensure SLA delivery & improve P NL. 1. Successfully planning from past 4yrs for 300+ general insurance process & 500+ retail process. 2. A chieved within +/- 4% variance in P VA 2013,2014,2015 Dashboard, Reporting & Analysis Retail, UK general Insurance 1.Balance score card 2.T A T ,A HT Analysis 3.GA P Analysis 4.T hird party survey DHP 1. Daily Dashboard, P roduction pack, M BR, Billing report. 2. T o define coming year T AT target with C lient basis on past performance. A HT analysis to define efficiency target. 3. Idle time, No work, other production time & Leakage analysis 4. P eople connect & EWS updates, yearly target & objective, span of control. M S-Office, A nalytical skills - Q uartile calculation, M in- M ax – M edian calculations, P rocess knowledge 1.T A T reduction, planning of available capacity 2.Define T arget 3.Efficiency benefit 4.P repare pack for operations brining out commercial issues, opportunities to improve & develop operational service 1. Successfully implemented all formats across 8 processes. A lso agreed with C lient for circulation. 2. ~26 FT E benefit YOY 3.A chieved 76% U tilization by reducing Idle time, No work & Leakage % 4.Identified areas of efficiency benefit worth 70 FT E. Transition Retail, U K general Insurance 1. LMPR platform transition 2. WFM & Reporting work transition 1. P rovided value added inputs during platform transition for better performance & save resources. 2. NICE WEM & C lient M I report transition. NIC E WFM tool, C ISC O reports, Firefox, Excel 1. Data validation step eliminated, linked augmentation process with BA U processing tool. 2. O ngoing tool management with reporting 1. ~10 FT E saving by eliminating steps & linking one tool with another. 2. Successfully transfer 3 FT E worth work to offshore M I team. Training & Documentation Retail, U K general Insurance 1. T ool training, skill training 2. T DD (T echnical Design documents), SO Ps, Risk register 1. A gent training on tool during process training. Brief them about tool & its benefit in KP I tracking & its link with payroll calculations. T rain BP M I analyst to improve Excel & V BA skills. 2. T ool documentation, SOPs for different BA U reports. C apita Logon, DBII, C ipher & other Daily/weekly/monthly/yearly & billing report 1. Successfully implemented tools with help of operation & IT team. 2. SO Ps, C hecklist are updated for all onshore & offshore reports. Ensure business continuity