1. Ganga R. Subedi (206)707-5135
3516 S 146th ST. #102 gangas@uw.edu
Seattle WA98168 linkedin.com/in/gangasubedi
Enthusiastic civil engineer seeking an engineering position in Design and Construction with emphasis in Quality Assurance
Management.
SUMMARY OF QUALIFICATION
Proficient in AutoCAD/Civil3D, SolidWorks, Primavera, GIS, PaveXpress, Bluebeam, and MS Office.
Highly adaptable, ethical, punctual,flexiblein all working environments, and able to multitask effectively.
Excellent problem solving and analytical skills to work independently as well as in group with diverse group ofpeople .
Knowledgeable and experienced in coordinating with QAmanagers, foreman, and labors.
Strong communication skills (verbal and written) and multilingual: fluent in English, Nepali, and Hindi.
EDUCATION
University of Washington, Seattle WA
BSCE, GPA:3.1/4.0 01/ 2014- 06/ 2016
Civil and Environmental Engineering
EIT in-progress
Coursework: Construction Engineering, Foundation Design, Geotechnical Engineering, Design Reinforced Concrete, Construction
Project Management, Structural Engineering, Transportation Engineering, GeotechnicalEngineering, Traffic Engineering Fundamentals,
Geographical Information System, Applied Limnology, Geosurveying, Construction Materials, Structural Design, Fluid Mechanic,
Environmental Engineering, Limnology, Transportation & Construction Capstone
Highline College, Des Moines, WA 09/2011-12/2013
Associate of Science in Engineering, GPA: 3.69/4.00
RELEVENT EXPERIENCE
Dragados-USA, Alaskan Way Viaduct Project, Seattle, WA QC Engineer 05/2016-present
Inspect tunnel segment prior to shipping assuring that they are stamped by SeattleTunnel Project (STP) and repaired
meeting all physical requirements according to the project specification.
Examine the gasket lines on segments aresecurely fastened and lined up accurately along gasket groove.
Review the procedures for patching, repairing gasket,approving segments ensuring the project specification prior to
inspecting the segments.
Measure and evaluate the size and depth ofthe spalls, bug holes, voids,and follow the Segment Repair Procedures Manual
to find the appropriate repairing process: epoxy or mortar.
Supervise the segment repairing and gasket replacement process to ensurethat the procedures meet theproject
specifications.
Coordinate the stamping process of segments with STP, foreman and labors preparing the appropriate documentations.
Interact with Quality Assurance (QA) manager regarding segment approval process,and coordinate the repairing process
with foreman and labors out in shipping yards.
Ship complete rings keeping the segment inventory in balance, and ensuring that segment combinations loaded on the
trucks do not exceed the allowable transportation weight.
Civil Engineering Dept. UW Seattle, WA Soil Tester 06/2014-09/2014
Research group member examining pollutants of chemicalspill on nearby lakes
Obtained sub-samples from the soil cores from the Occidental Chemical Corporation (OCC) site at 605 Alexander Avenue in
Tacoma, Washington and performed soil characterization experiments .
Conducted the Oxidation Reduction Potential (ORP) and reported the degree ofchemical species on soilsamples.
2. Performed soil moisture tests to measurethe percent ofwater in soilsamples.
Developed the Excel spreadsheets and scatter graphs and studied the soilbehaviors.
Documented and presented major findings suchas high silica concentration on soiland acid based solution on water .
OTHER EXPERIENCE
KCLS Material Distribution, Preston, WA, Monitor 01/2013-Present
Monitored library materials that need to be distributed to different King County library branch.
RELEVANT SCHOOL PROJECT
Pend Oreille Rd. & 25th Ave NE Intersection, Capstone Project, UW Spring 2016
Proposed the sustainable alternative to replace the existing Pend Oreille Rd between Mason Rd. and 25th Ave NE.
Recommended the widening ofroads and the pedestrian/bicyclist sidewalks on all along eastside ofcampus.
Suggested the three feet geo foam on the land that has the history ofpavement cracking due sewage dumping and other
geotechnical problems.
Offered the construction scheduling time and total cost estimates.
Drafted Plan View of the entire new intersection, and Cross-sectional Views ofthe all roads with the pavementdepth.
Performed traffic assimilation, bus station rerouting, studied the changes of traffic behavior and its impacts.
Garage Project, Construction Project Management, UW Summer 2015
Executed all the project planning and management using the software Primavera P6.
Identified all the activities needed to construct 20x20 feet garage.
Performed the cost estimating ofindividual activities using WAstate resources and the cost values.
Developed the relevant construction scheduling showing the interactiveGantt chart.
AWARD
Vice President Award (2011, 2012)
ALASKAN WAY VIADUCT PROJECT REFERENCE
Al Gabo, P.E. Fabrication Quality AssuranceManager , Seattle Tunnel Partners, Email: agabo@stp-jv.com,phone: (206) 496-
4500
Ana Notario, Quality Assurance Manager, Dragados-USA, Email: anotario@ dragados-USA.com, phone: (206) 604-6714
Rachael Wold, Materials Manager, Seattle Tunnel Partners,Email: rwold@stp-jv.com,phone: (206) 375-4448
Robert Harris, Supervisor, Dragados-USA, Email: rharris2@dragados-USA.com, phone: (253) 698-9644