Alexandr Muravschi, GIZ senior advisor - Regional sectorial planning. Goals set for the following sectors: water and sanitation, waste management, energy efficiency
Similar to Alexandr Muravschi, GIZ senior advisor - Regional sectorial planning. Goals set for the following sectors: water and sanitation, waste management, energy efficiency
Financing regional and local government investments: Case examples on ways to...OECD CFE
Similar to Alexandr Muravschi, GIZ senior advisor - Regional sectorial planning. Goals set for the following sectors: water and sanitation, waste management, energy efficiency (20)
Alexandr Muravschi, GIZ senior advisor - Regional sectorial planning. Goals set for the following sectors: water and sanitation, waste management, energy efficiency
1. Page 1
Regional sectorial planning. Goals set for
the following sectors: water and
sanitation, waste management, energy
efficiency
Modernization of Local Public
Services in the Republic of
Moldova
2. Page 2
Modernization of Local Public Services
in the Republic of Moldova
16/07/2013
• Project proposal based on results of bilateral Government negotiations
• Moldova-Germany 11/2009
• Duration of 6 years: 1/2010 – 12/2015
• Institutional Counterpart Ministry of Regional Development and Construction
• Initial Contribution of BMZ: 3 Mio. €
• Co-Financing by Romanian Government of 0.7 Mio. €
• Co-Financing by Swedish Government of 3.3 Mio €
• Additional funds commissioned by BMZ in 12/2012:
• 2 Mio € for project activities
• 10.9 Mio. € for investments
Moldova
3. Page 316/07/2013
Overall Project Objective
Improved Local Public Serviсes in selected villages and towns
in the Republic of Moldova
through
I Intervention Area
Investments in innovative technologies
Increased capacities and modernized management of service providers
Enhanced inter-municipal cooperation and local participation
II Intervention Area
Enhanced coordination between institutions on local, regional and central level by integrated
planning and programming of investments
4. Page 4
Scope of work Regional Planning and Programming
16/07/2013
Scenario A:
• Development of the Sectoral Development plans for water and sanitation (WSS), solid waste
management (SWM), energy efficiency (EE) in public buildings, integration into the regional
policy documents;
• Project pipeline of investment fiches in the above sectors (worth up to EUR 170 million);
• Capacity development of local and regional regional development (RD) actors.
Scenario B (when mandated):
• Regional operational plans also for local and regional roads;
• Developing the “viable project” concepts into “ready to finance project” concepts (incl.
feasibility studies, environmental impact assessments, technical design docs, etc.);
• Pipeline of investment projects (in 4 sectors).
the Intervention Area (IA) 2 consultants introduced the idea of the Regional
Sector Program (RSP) as a tool to support the development of a pipeline of
viable sector investment projects.
5. Page 5
Regional Planning and Programming
16/07/2013
The Regional Sector Program (RSP) is an operational tool which will be used
to support the development of better investment projects in Moldova. The
RSP:
• RSP Incorporates sector development needs, and complies with existing
sectoral policies, practices and the relevant strategic framework;
• Extends the planning horizon set out by Regional Operation Plans (ROP)
with a larger view on the sector development challenges;
• Defines the necessity of financial investments;
• Contributes to funded decision making about the need for financial
resources for further projects development;
• Contributes to investment attract in the sectors (SWM, WSS, EE, Regional
and Local Roads);
• Identifies possible project concepts (PPCs) that are to be considered for
further development.
7. Page 716/07/2013
• PPC– project idea that is relevant and consistent with the regional plan;
• VPC– project idea which has been sufficiently developed that many of
the features became very clear; stable understanding of the
results/positive change the project can bring;
• RGP–final project proposal, not necessarily or only full feasibility study,
but which has all the required documentation, tender docs,
commitments, etc.
• Project Pipeline - a mechanism whereby a series of projects, and their
promoters are assisted to progress their projects from conception
towards readiness. Projects in the pipeline can have different degrees
of readiness, qualities, speeds, but it is necessary to ensure that poor
quality projects do not progress in the pipeline.
Key stages in project concepts identification and
development, according to the RSP approach
8. Page 8
Introduction: sector regional planning
and programming, RSP as instrument,
participatory approach to RSP
development
Current sector status, legal, institutional
frame, development of the RD’ vision on
improved services,
The elaboration and discussion of
scenarios, development of the
sector architecture, facilitating
Project concepts development
Regional Sector Programs drafting,
consultation and approval, Project
concepts development
Jan-
March
2013
April-
June
2013
July-Sept
2013
Nov- Dec
2012
SWM I
SWM II
EE I WSS I
SWM III
SWM IV EE II
WSS II
WSS III
• Regional Sector Working Groups (RSWG), of about 15 representatives of LPAs, public service providers,
line ministries, specialized dis-concentrated institutions formed by the RDAs under the auspices of the
MRDC in each sector, each region.
• RSPs developed by RSWGs through a series of WSs with the purpose to engage participants, draw on
their experience and expertise, enable them to think and plan strategically, support them in analysis and
practical solutions identification.
Regional Planning Working Groups- workshops
9. Page 9
15 PPC 10 projects 7 projects20 PPC
VPC
RGP
16/07/2013
• As a result of planning activities in 3 development regions, 4 sectors - SWM, EE of
Public Buildings, WSS, regional local roads = a list of Viable Projects Concepts, based
on project idea which has been sufficiently developed that many of the features became very
clear; stable understanding of the results/positive change the project can bring;
• RGP– final project proposal, not necessarily or only full feasibility study, but which has all the
required documentation, tender docs, commitments, etc.
About 60 projects worth up to
EUR 170 million
Project Pipeline
10. Page 1016/07/2013
German Development Cooperation through GIZ
Chișinău, 31a Bulgară str.,
T + 373 22 22-83-19
F + 373 22 00-02-38
Internet: www.giz.de, www.serviciilocale.md
Welcome to invest.