More Related Content
Similar to FRANK BALLESTERO Resume 3-5-2015
Similar to FRANK BALLESTERO Resume 3-5-2015 (20)
FRANK BALLESTERO Resume 3-5-2015
- 1. FRANK BALLESTERO
26 Templar Way
Parsippany, NJ07054
Phone:973-599-1440
Cell:973-219-4458
Email frank.ballestero@verizon.net
SKILLS
WirelessConstructionManagementfor15 years. CoordinatedRFcrews,powerplantcrews,towerclimbers.
Coordinated 700 MHz, 800 MHz, 1900 MHz and2.5 MHz panel antennaupgradesforCDMA and LTE 4G. Setupcrane
pickswithJLG crews.CoordinatedNYCscaffoldingassignments. ManagedControlledDescentassignments.Field
SafetyOfficer.Responsible forCloseout documentation.Finalizetownshipinspections.KnowledgeablewithRRH
radioheads and Fiberlayouts.Some experiencewithDASinstallations. Knowledgeable withBridge Wave,Ceragon,
Motorola Micro Wave backhaul systems.Experiencedwith MicrosoftOffice. BilingualinSpanish.
EricssonMobitecsand Switchmaintenance, SkyDataSatellite Systems,NorthernTelecomPBXSystems,Motorola
Spectraand MSF 5000 Base Stations,HAZMATtraining, PPCCertified,CertifiedFiberOpticstesting, NARDA SiteRF
MonitoringEquipment.Defensive Drivingcourses.Trainedin MotorolaR-56standards.Thoroughknowledge of all
typesof communicationstestequipment:IFR,Motorola, Cushman,Fluke,Firebird,SimpsonMultimeterand
Telewave WattMeter, AnritsuFiberOpticAccessMasterOTDR.
EDUCATION
Morris CommunityCollege 2007-2008
School of Visual Arts 1979-1980
RobertsTechnical Trade School 1977-1978
HighSchool of Art & Design 1974-1977
Employment
Odyssia Global Communications, Woodside NY October 14 to February 15
Construction/Safety Manager
Responsible foreverydayconstructionoperationsof cell site towersforBechtel/AT&TLTE 4G project, VerizonLTE,
MetroPCS,T-Mobile,Sprintincludingreviewingdrawings,workingwithvariousinternal constructioncrews,
deploying,workschedulesthatinvolve electrical,RFmanagement,fiberopticcable systems,upgradeDCpower-
plantsystems,andoversee turnkeyoperations.
Work withthe Bechtel clientonbidproposalsforonsite constructionactivitiesincluding40ton crane operations,
installationof steel platforms,andmodificationof cell site antennasystems;coordinatedcontrol descentcrews
downbuildingstoinstall DCandfibertrunk lineswith NYCclimbersCD-5.
Coordinate projecttimetable withinternal crewsandsubtiercontractors.
Oversee the companysafetyprogramincludingOSHA regulationspolicies,Bechtel safetyprocedures,in-house
safetymeetings,providingsafetyawarenesstointernal crews,visitingsitestoensure compliance withsafety
protocolsandqualityperformance. Conductedsafetytail gate meetings.
Ensure qualityworkbeingperformedonall assignedjobsites.
InfinigyEngineering April 13 to May 14
PerformPre-ConwalksforSprintsites.ConductedD-14walks,submittedD-14reports,alsopassedorfailedsitesafter
completion.InspectedDe-Comatsitesthatwere 4-Gupgraded.InspectedFiberOpticsinstallations andGroundingof
sites.Responded tolandlordissuesandcorrectedasneeded.Coordinatedeveningmaintenance workscheduleswith
contractors. InspectedPitch-pocketinstallationspriortothe steel platforminstall.Reviewedclose-outpackages,then
enteredthemintoSprintsCore-fusionserver.Performedlandsurveys. KnowledgeablewithEricssonRRHheads.
- 2. General Dynamics (Contract through Adecco) Jan 13 to March 13
ConstructionManager for the Northeast Region
Responsible forcoordinating AT&Tgeneratorprojectwith architectural andengineeringvendors;overseeingthe audit
documentation,reviewed constructiondrawings,coordinated siteaccess,collectingsitedataandresolvingsite issues,
and updatingsite tracker. Databasesinclude Siterra,One-Visionandpersonal trackersforupdatestoCorporate.
Coordinate site surveyswithGeneral Dynamics withAT&Tsite coordinator.
FB Almighty PowerGenerator,Parsippany NJ Dec 11 to Present
Owner/SalesManager/Project Manager (Part Time)
Salesandinstallations of commercial backuppowergeneratorsforhome andbusinessservicingthe MorrisCounty
NJarea. I manage the jobswitha plumbingandelectrical team;Ihave pulledtownpermits, conductedfinal construction
inspection andapprovals.Soldandinstalledautomatic100/200 amp transferswitches.
InfinigyEngineering,MahwahNJ July 12 to Dec 12
ConstructionManager (Part Time 1099)
Performsite walks,gatherinformation,evaluate the site forSprint’sLTE4G upgrades.Provide close-outdocumentation
withphotographsandvideo.
Odyssia Global Communications, Woodside NY Dec 10 to Aug 11
Construction/Safety Manager
Responsible foreverydayconstructionoperationsof cell site towersforBechtel/AT&TLTE 4G project, VerizonLTE,
MetroPCS,T-Mobile includingreviewingdrawings,workingwithvariousinternalconstructioncrews,deploying,
workschedulesthatinvolveelectrical,RFmanagement,fiberopticcable systems,upgrade DCpower-plantsystems,
and oversee turnkeyoperations.
Work withthe Bechtel clientonbidproposalsforonsite constructionactivitiesincluding40ton crane operations,
installationof steel platforms,andmodificationof cell site antennasystems;coordinatedcontrol descentcrews
downbuildingstoinstall DCandfibertrunklineswith NYCclimbersCD-5.
Coordinate projecttimetable withinternal crewsandsubtiercontractors.
Oversee the companysafetyprogramincludingOSHA regulationspolicies,Bechtel safetyprocedures,in-house
safetymeetings,providingsafetyawarenesstointernal crews,visitingsitestoensure compliance withsafety
protocolsandqualityperformance.
Ensure qualityworkbeingperformedonall assignedjobsites.
Clear wire/Sprint4G network implementation Nov 09 – Nov10
TelecomConstructionManager
Responsible forSprint’sCDMA &iDennetworkupgrades,andcoordinate the constructionof microwave linksof a
wirelessbackhaulEthernetsystem.
Supervisedvendorsonsite modificationsof antennas,relocationof BTSequipmentandmanagedseveral field
supervisors.
Performedsite walks.
Responsible forR-56ground implementation standards attransmittersites.
Oversee withinstallationsof outside buildingrisersystemsforpower&coax runs; instructedContractorsre:proper
installationof compressioncoax connectorsandfiberopticsruns.
Oversee the installationandrepairof telephone circuits,T-1circuitsand LAN systems.PerformedBid-walks.
ReviewedBOMrequests.
WorkedcloselywithRFteamstoensure all specificationsatsiteswere met.
Maintainedspreadsheetconstructiontrackers.
Reviewedclose outpackageswhensite wascompletedandsubmittedtocorporate offices.
- 3. Servedasa qualitycontrol fieldmanageratcell sites.
Rectifiedanycivil orconstructionissues.
Completed137 site MOD’sin tenmonths.
Responsible forSprint/Clearwire weeklyconstructionschedule.
IndependentContractor March 2008- November2009
Managed small constructionprojects:installationof home kitchens,repaircivil issues,plumbingmodifications.
Installationsof home theatersystems,route home cabling,installationof bathroomfacilities.
Installationof ceramic/porcelaintilework.
Managed constructionof a photographystudio.
Customwoodworkinstallations.
Basic electrical wiringrepair;performedpunch-downsof CroninblocksforT-1servicesMetroPCS.
Performedsite walks,inspectionsandphotodocumentationforvariouscellularcarriersTMobile & Sprint.
TekSystems-Sprint/Nextel,Mahwah,NJ Sep 07- Mar 08
ConstructionManager
Responsible forthe constructionof cell siteswithvendorsandcontractors.
Assuredqualitycontrol betweenSprintandlandlordmanagement.
Coordinatedcrewswithtowerandroof topinstallations,insuredOHSA proceduresonsite were implemented.
Performfollowupvisitswithbuildingmanagementoncivil issues.
Maintainedspreadsheettrackersonmaterial andsite progress.
Responsible withorderingsite materials,coax,connectors,antennapanels,groundingkitsandothermaterials
required.
Reviewedproposalsandinsuredinvoicessubmittedbyvendorsandcontractorswere accurate.Approvedstructural
reportsand reviewedconstructiondrawings.
Completed186 siteswithina4 monthperiodwithantennaupgradesandsysteminstallations.
Met withtowninspectorsforfinal approvals.
Coordinatedwithwarehouse managementondeploymentof all of Sprintsmaterials.
CoordinatedwithRFdepartmentstoensure properalignmentof antennasectorsandthatall installationspassedRF
sweeptests.
Reviewedcloseoutpackagesonce siteswerecompleted.Performedsite inspectionswithdocumentationandphoto
reports.
Pinnacle TelecomGroup,East Hanover, NJ Sep 05 – Jul 07
RF Consultant Team Leader Engineer
Performsite surveysforT-Mobile,evaluatedcellsiteswithpoorperformance issues.
Installedmulticoupleramplifierunitsforexpanded cell siteuse.
Troublesshoot PCSantennasystems. ( T-Mobile )
CollectedRFdatafor Motorola’s“Channel 16 DOITT Project.”
InstalledASADunitsforthe NYCFire Dept.
InstalledTelcocablingandmanagedinstallationteamsatMetro-TechCenterforthe NYCFire Dept911 dispatch
center.
Responsible withdirectingelectricianswithimplementingpowerandgroundinginstallations.
Responsible withcoordinatingcrewsinstallingMotorolaCentracom911 DispatchequipmentforFDNYat boro
dispatchcenters.
Coordinatedinstallationsof GPSreceiversatFDNY communicationshelters.
InstalledRFBase-stationsforFDNYat all 5 borosof New YorkCity.
Performedrandommobileradioinspectionsof EMS andFDNY emergencyvehicles.
UpgradedPubicsafetyradiosystemsatNYC 911 call centerMetro Techlocation.
Supervisedwithinstallation&maintenance R-56groundingstandardsforMotorolaclients.
VelocitaWirelessData (FormerlyCingularWirelessData,Formerly BellSouthWirelessDataand Ram WirelessData)
- 4. Woodbridge,NJ Sep 95 – Jun 05
Network ConstructionEngineer/ProjectManager
Responsible forconstructionof networkswitching/transmittersitesthroughoutthe Northeastregion,
simultaneouslymanagingmultiple projectstosupportBlackberry/RIMdevices.
Evaluate potential sites,performsite feasibilitysurveys,andplanequipmentinstallation.
Solicitbidsfromcontractorsand architectsandwork withmunicipalitiestoensure compliancewithall permitting
regulations.
Meet withtowninspectorsforfinal approval.Negotiate pricingwithvendorsinlinewithprojectbudgets.
Coordinate installationplanswithall necessaryvendors(electricians,antennainstallationcrews,HVACand
Telephone Company).
Reviewall constructiondrawings,make modificationsandapprovals.Transport,assemble andtroubleshootCingular
base stationequipmentincludingcoax,antenna,cabinets,back-upbatterysystemsandUPS.
Alsoresponsible forimplementationandupgradinggeneratorpowerplants tosupportexpandednetworks.
Assignedtogovernmentcontracts,i.e.,HomelandSecurity,House of Representatives,Pentagon,Capital,Senateand
Congress.
Setup temporarybase stationsforthe 2004 DemocraticConventionandcustomerdemonstrations.Installed
terrestrial satellitesystemswhere telephone/dataservice wasnotavailable.
SeniorFieldEngineer:Responsibleforthe installationandmaintenance of 100 remote wirelessdatatransmitter
sites,BellSouthheadquarterstopnode/hubfacility,inbuildingdigital circuits,56K,256K circuits,Telematicsfront
endprocessors.
Performedupgrade andmaintenance of HDLCswitches,X25 backbone networkandEricssonMobitex Network
Switches.
Implementedhostconnectsatcustomerlocations;workedwithoutside vendorsonsite constructionprojects.
CollaboratedwithEricssonradioengineerstohelpthemtodesignabettertransmitterforBellSouthwireless
network.
Evaluatedcoverage forthe network,resolvedinterference issuesatsites,workedwithBell AtlanticonTelephone
issues:ISDN,Switch56,DDS, Digital Circuits.
InstalledCubixgatewaysforinternetaccess,routersandbridges.
Resolvedcustomerconcerns.
Respondedtonetworkoutagesasneeded.
Responsible foroperationsof uninterruptiblepowersupplyanddiesel generatorsystemsforheadquartersand
switchfacilities.
Improvedinbuildingcoverage atmanycustomerlocationsbyinstallingCellwave BDA solutions.
Marine Spill Response Corporation, Edison,NJ Dec 91 – Sep95
CommunicationsTechnician
Responsible forNortheastregional communicationsnetwork,includingbutnotlimitedtorecommendationsfor
purchase of troubleshootingequipmentand tools,coordinatingwiththe FCC,settingupbenchworkshop,planning
installations,modificationandoptimizationof 4marine vessel communicationscenters.
Workedwithvendorsontowerandwiringof regional communicationscenter.
Establishedproceduresforuse of all VHFand UHF frequencies;researchedanddeployedcellular,beepers,two-way
radios,set-updispatchconsole andprovidedinstructiononuse of all hardware.
Deploymentof 2.9metersatellitedish.
Conducteddemonstrationsandmade presentationsoncompanycommunicationscapabilitytomembersof MPA,
governmentofficials,CoastGuardand Newsmedia.
Motorola Inc., Whitestone,NY Feb83 –Jun 90
Radio Service Technician
Installedandservicedmobiletwo-wayradios.Installedandservicedradiobase stationsthruoutNew YorkCity.
Servicedrepeaters,pagingtransmittersandtrunkssystems.
Installedlowband,highbandradioandantennasystems.
- 5. Servicedtie line remotestone andDC.Performedcoveragetestandinbuildingevaluationsof portable radiosand
pagers.
Installedandservicedcellularmobile phonesinvehicles.Installedemergency2-wayradiosinpolice,fire trucksand
ambulances.
Installedlightracks,shotgunracksandsirenpackages.