WORK SUMMARY
Client Name: African Copper PLC
Country: Botswana, Central Africa
SENET’s Role: EPCM Design, Supply, Ship, Construction, Erection & Commission
Approximate Value: US$ 45 Million
Project Period: 2007 - 2008
Throughput/Materials: 1MTPA
Unique Features: Dry tailings due to water shortage in the area
Mowana is located close to Botswana's second largest city,
Francistown, in the north-eastern part of the
country, in an area which has been mined
for the past 400 years.
technology and has been designed to produce saleable
copper concentrates from the treatment of 1MTPA of oxide,
supergene and sulphide ores.
-
-
ers are sent to an oxide
circuit. Most other mineral species are recovered in the
excess process water, as are
tailings. Tailings will be dry stacked. Water recovered in the
dewatering stages will be recycled to the various parts of
the plant as process water.
SENET was responsible for the design, supply, and construc-
tion and commissioning of the process.
cost estimate phase led by SENET, during which detailed
cost estimates were developed for the capital and operat-
ing cost components associated with this project.
MOWANA (DUKWE) MINE
COPPER CONCENTRATOR PROJECT
WORK SUMMARY
Client Name: African Copper PLC
Country: Botswana, Central Africa
SENET’s Role: EPCM Design, Supply, Ship, Construction,
Erection & Commission
Approximate Value: US$ 45 Million
Project Period: 2007 - 2008
Throughput/Materials: 1Mtpa
Unique Features: Dry tailings due to water shortage in the area
MOWANA (DUKWE) MINE
COPPER CONCENTRATOR PROJECT 1Mtpa
Mowana is located close to Botswana's second largest city,
Francistown, in the north-eastern part of the country, in an
area which has been mined for the past 400 years.
-
nology and has been designed to produce saleable copper
concentrates from the treatment of 1Mtpa of oxide, supergene
and sulphide ores.
sent to an oxide circuit. Most other mineral species are recov-
recover excess process water, as are tailings. Tailings will be dry
stacked. Water recovered in the dewatering stages will be recy-
cled to the various parts ofthe plant as process plant.
SENET was responsible for the design, supply, and construction
and commissioning of the process.
estimate phase led by SENET, during which detailed cost
estimates were developed for the capital and operating cost
components associated with this project.
PROCESS PLANT - COPPER
www.senet.co.za | +27(0) 11 409 1300

More Related Content

Similar to Mowana_Dukwe_low

VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15
Victor Couto
 
Emea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
Emea nov11-b2-southern.engineering-bro-s Researched Abi AbagunEmea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
Emea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
Abi Abagun
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 

Similar to Mowana_Dukwe_low (20)

Nickel concentrate at Cosmic Boy in Australia
Nickel concentrate at Cosmic Boy in AustraliaNickel concentrate at Cosmic Boy in Australia
Nickel concentrate at Cosmic Boy in Australia
 
Thedaily
ThedailyThedaily
Thedaily
 
Thedaily
ThedailyThedaily
Thedaily
 
507262 (tnpa) port of durban monitor newsletter final
507262 (tnpa) port of durban monitor newsletter final507262 (tnpa) port of durban monitor newsletter final
507262 (tnpa) port of durban monitor newsletter final
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
Deep Sea Resources The Next Frontier
Deep Sea Resources The Next FrontierDeep Sea Resources The Next Frontier
Deep Sea Resources The Next Frontier
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
CV-Dirk - Latest 2016
CV-Dirk - Latest 2016CV-Dirk - Latest 2016
CV-Dirk - Latest 2016
 
International Montoro Resources, Fact Sheet April 2014
International Montoro Resources, Fact Sheet April 2014International Montoro Resources, Fact Sheet April 2014
International Montoro Resources, Fact Sheet April 2014
 
VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15
 
Grahame Binks 11.16
Grahame Binks 11.16Grahame Binks 11.16
Grahame Binks 11.16
 
CV_Rockandel_08-2015
CV_Rockandel_08-2015CV_Rockandel_08-2015
CV_Rockandel_08-2015
 
Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016
 
Lion's lair 2014 lerama resources
Lion's lair 2014   lerama resourcesLion's lair 2014   lerama resources
Lion's lair 2014 lerama resources
 
Lion's lair 2014 lerama resources
Lion's lair 2014   lerama resourcesLion's lair 2014   lerama resources
Lion's lair 2014 lerama resources
 
Corporate Presentation - November 2014
Corporate Presentation - November 2014Corporate Presentation - November 2014
Corporate Presentation - November 2014
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 
Emea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
Emea nov11-b2-southern.engineering-bro-s Researched Abi AbagunEmea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
Emea nov11-b2-southern.engineering-bro-s Researched Abi Abagun
 
Can Upper Spencer Gulf's marine environment survive the South Australian mini...
Can Upper Spencer Gulf's marine environment survive the South Australian mini...Can Upper Spencer Gulf's marine environment survive the South Australian mini...
Can Upper Spencer Gulf's marine environment survive the South Australian mini...
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 

Mowana_Dukwe_low

  • 1. WORK SUMMARY Client Name: African Copper PLC Country: Botswana, Central Africa SENET’s Role: EPCM Design, Supply, Ship, Construction, Erection & Commission Approximate Value: US$ 45 Million Project Period: 2007 - 2008 Throughput/Materials: 1MTPA Unique Features: Dry tailings due to water shortage in the area Mowana is located close to Botswana's second largest city, Francistown, in the north-eastern part of the country, in an area which has been mined for the past 400 years. technology and has been designed to produce saleable copper concentrates from the treatment of 1MTPA of oxide, supergene and sulphide ores. - - ers are sent to an oxide circuit. Most other mineral species are recovered in the excess process water, as are tailings. Tailings will be dry stacked. Water recovered in the dewatering stages will be recycled to the various parts of the plant as process water. SENET was responsible for the design, supply, and construc- tion and commissioning of the process. cost estimate phase led by SENET, during which detailed cost estimates were developed for the capital and operat- ing cost components associated with this project. MOWANA (DUKWE) MINE COPPER CONCENTRATOR PROJECT WORK SUMMARY Client Name: African Copper PLC Country: Botswana, Central Africa SENET’s Role: EPCM Design, Supply, Ship, Construction, Erection & Commission Approximate Value: US$ 45 Million Project Period: 2007 - 2008 Throughput/Materials: 1Mtpa Unique Features: Dry tailings due to water shortage in the area MOWANA (DUKWE) MINE COPPER CONCENTRATOR PROJECT 1Mtpa Mowana is located close to Botswana's second largest city, Francistown, in the north-eastern part of the country, in an area which has been mined for the past 400 years. - nology and has been designed to produce saleable copper concentrates from the treatment of 1Mtpa of oxide, supergene and sulphide ores. sent to an oxide circuit. Most other mineral species are recov- recover excess process water, as are tailings. Tailings will be dry stacked. Water recovered in the dewatering stages will be recy- cled to the various parts ofthe plant as process plant. SENET was responsible for the design, supply, and construction and commissioning of the process. estimate phase led by SENET, during which detailed cost estimates were developed for the capital and operating cost components associated with this project. PROCESS PLANT - COPPER www.senet.co.za | +27(0) 11 409 1300