Client: Santos
Design: Flour Australia
Head Contractor: Clough Downer Joint Venture
Completed: Under construction
Location: QLD
Size: 420,000m2
Material Quantity: 1,260,000m2
Scope:
Supply and installation of triple layer lining system, permanent ballast-
ing of the floor, animal egress and water level indicators to the following
associate ponds:
 200ML Associated Water Balance Pond
 340ML Permeate Pond
 4 x 350ML Brine Ponds A, B, C & D
Design and Construction:
The Flour design was a triple layer system consisting of triplanar drain-
age net covered by geosynthetic clay liner, followed by a 1.5mm HDPE
smooth geomembrane liner as the primary layer.
The primary liner floor of each pond was electrical tested to ASTM
D7007 Standard Practices for Electrical Methods for Locating Leaks in
Geomembranes Covered with Water or Earth Minerals, and the walls to
ASTM D7703 Standard Practices for Electrical Leak Location on Ex-
posed Geomembranes using the Water Lance System. The primary
liner was secured to spillways and sump structures using Fablock sup-
plied prefabricated by Fabtech, and precast into the concrete struc-
tures.
Fabtech was recognised by Clough Downer Joint Venture for diligence
regarding all aspects of safety on site.
Santos | GLNG Upstream Project - Fairview HUB 04
Design Testing Supply Installation  
www.fabtech.com.au
Shawn Brown being presented an award for diligence
regarding all aspects of safety onsite.

More Related Content

What's hot

Feb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress ReportFeb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress Report
Honolulu Civil Beat
 
Feb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily ReportFeb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily Report
Honolulu Civil Beat
 
Case Study - Cellweb TRP - Keats Way (Extended CS)
Case Study - Cellweb TRP -  Keats Way (Extended CS)Case Study - Cellweb TRP -  Keats Way (Extended CS)
Case Study - Cellweb TRP - Keats Way (Extended CS)
Owen Hutchison
 
Gabriel d'arcy ceo bord na mona 17.10.12
Gabriel d'arcy ceo bord na mona 17.10.12Gabriel d'arcy ceo bord na mona 17.10.12
Gabriel d'arcy ceo bord na mona 17.10.12
Alice Charles
 
Feb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress ReportFeb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress Report
Honolulu Civil Beat
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
Cherylwitmer
 
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavementsAsphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
Yousif Aljammas
 

What's hot (19)

Feb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress ReportFeb. 3: Waste Management Progress Report
Feb. 3: Waste Management Progress Report
 
Feb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily ReportFeb. 2: Waste Management Daily Report
Feb. 2: Waste Management Daily Report
 
HATS 2A
HATS 2AHATS 2A
HATS 2A
 
Case Study - Cellweb TRP - Keats Way (Extended CS)
Case Study - Cellweb TRP -  Keats Way (Extended CS)Case Study - Cellweb TRP -  Keats Way (Extended CS)
Case Study - Cellweb TRP - Keats Way (Extended CS)
 
Green Hollow Court Outfall Restoration
Green Hollow Court Outfall RestorationGreen Hollow Court Outfall Restoration
Green Hollow Court Outfall Restoration
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
Crestleigh Way Outfall Restoration
Crestleigh Way Outfall RestorationCrestleigh Way Outfall Restoration
Crestleigh Way Outfall Restoration
 
316b Booklet for S&L
316b Booklet for S&L316b Booklet for S&L
316b Booklet for S&L
 
Kenedy County GCD, Mary Sahs
Kenedy County GCD, Mary SahsKenedy County GCD, Mary Sahs
Kenedy County GCD, Mary Sahs
 
Radius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford TownRadius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford Town
 
Abberton ICE Meeting
Abberton ICE MeetingAbberton ICE Meeting
Abberton ICE Meeting
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
Gabriel d'arcy ceo bord na mona 17.10.12
Gabriel d'arcy ceo bord na mona 17.10.12Gabriel d'arcy ceo bord na mona 17.10.12
Gabriel d'arcy ceo bord na mona 17.10.12
 
Feb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress ReportFeb. 8: Waste Management Progress Report
Feb. 8: Waste Management Progress Report
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1
 
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavementsAsphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
Asphalt pavement association_of_oregon_design_guide_for_porous_asphalt_pavements
 
Porous Pavement in Cold Climates Part 2
Porous Pavement in Cold Climates Part 2Porous Pavement in Cold Climates Part 2
Porous Pavement in Cold Climates Part 2
 
Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenanc...
Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenanc...Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenanc...
Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenanc...
 

Viewers also liked (14)

Viviendo la mecacognición
Viviendo la mecacogniciónViviendo la mecacognición
Viviendo la mecacognición
 
O net54
O net54O net54
O net54
 
Top 8 sales & marketing executive resume samples
Top 8 sales & marketing executive resume samplesTop 8 sales & marketing executive resume samples
Top 8 sales & marketing executive resume samples
 
Smart city
Smart citySmart city
Smart city
 
Stayzapp investor deck
Stayzapp investor deck Stayzapp investor deck
Stayzapp investor deck
 
Presentacion grupo 11
Presentacion grupo  11Presentacion grupo  11
Presentacion grupo 11
 
Viviendo la mecacognición
Viviendo la mecacogniciónViviendo la mecacognición
Viviendo la mecacognición
 
ภาษาไทย50
ภาษาไทย50ภาษาไทย50
ภาษาไทย50
 
Chacha chaudhary chacha chaudhary ka truck
Chacha chaudhary chacha chaudhary ka truckChacha chaudhary chacha chaudhary ka truck
Chacha chaudhary chacha chaudhary ka truck
 
Slide Share proceso
Slide Share proceso Slide Share proceso
Slide Share proceso
 
Cantilever Home Design Build Brochure
Cantilever Home Design Build BrochureCantilever Home Design Build Brochure
Cantilever Home Design Build Brochure
 
Middle Tennessee State University Press Release
Middle Tennessee State University Press ReleaseMiddle Tennessee State University Press Release
Middle Tennessee State University Press Release
 
Funndamentos de las bases de datos
Funndamentos de las bases de datosFunndamentos de las bases de datos
Funndamentos de las bases de datos
 
Polynomial John Collins
Polynomial John CollinsPolynomial John Collins
Polynomial John Collins
 

Similar to Clough Downer Joint Venture

Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)
James Gormley
 
Tailings lagoon dewatering el mochito honduras
Tailings lagoon dewatering   el mochito hondurasTailings lagoon dewatering   el mochito honduras
Tailings lagoon dewatering el mochito honduras
pjgomezd
 
HydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigationHydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigation
Marzena Haddow
 
Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005
Niall Pembroke
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
Sikko Krol
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
NECB
 

Similar to Clough Downer Joint Venture (20)

Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)
 
Terrett Court Storm Drainage Improvements
Terrett Court Storm Drainage ImprovementsTerrett Court Storm Drainage Improvements
Terrett Court Storm Drainage Improvements
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green Roof
 
Tailings lagoon dewatering el mochito honduras
Tailings lagoon dewatering   el mochito hondurasTailings lagoon dewatering   el mochito honduras
Tailings lagoon dewatering el mochito honduras
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
HydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigationHydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigation
 
Park xpress presentation
Park xpress presentationPark xpress presentation
Park xpress presentation
 
Park xpress presentation
Park xpress presentationPark xpress presentation
Park xpress presentation
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005
 
Dim cs whynes_12.07
Dim cs whynes_12.07Dim cs whynes_12.07
Dim cs whynes_12.07
 
Dim cs whynes_12.07-2
Dim cs whynes_12.07-2Dim cs whynes_12.07-2
Dim cs whynes_12.07-2
 
Emin sg sistema dimension caso west hynes tank farm
Emin sg   sistema dimension caso west hynes tank farmEmin sg   sistema dimension caso west hynes tank farm
Emin sg sistema dimension caso west hynes tank farm
 
Peter Cox - Dryroom Basement Waterproofing
Peter Cox - Dryroom Basement WaterproofingPeter Cox - Dryroom Basement Waterproofing
Peter Cox - Dryroom Basement Waterproofing
 
Lining Track Records & Case Histories
Lining Track Records & Case HistoriesLining Track Records & Case Histories
Lining Track Records & Case Histories
 
Lung R X Renovation (2)
Lung  R X Renovation (2)Lung  R X Renovation (2)
Lung R X Renovation (2)
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
CC Intro
CC IntroCC Intro
CC Intro
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
 

Clough Downer Joint Venture

  • 1. Client: Santos Design: Flour Australia Head Contractor: Clough Downer Joint Venture Completed: Under construction Location: QLD Size: 420,000m2 Material Quantity: 1,260,000m2 Scope: Supply and installation of triple layer lining system, permanent ballast- ing of the floor, animal egress and water level indicators to the following associate ponds:  200ML Associated Water Balance Pond  340ML Permeate Pond  4 x 350ML Brine Ponds A, B, C & D Design and Construction: The Flour design was a triple layer system consisting of triplanar drain- age net covered by geosynthetic clay liner, followed by a 1.5mm HDPE smooth geomembrane liner as the primary layer. The primary liner floor of each pond was electrical tested to ASTM D7007 Standard Practices for Electrical Methods for Locating Leaks in Geomembranes Covered with Water or Earth Minerals, and the walls to ASTM D7703 Standard Practices for Electrical Leak Location on Ex- posed Geomembranes using the Water Lance System. The primary liner was secured to spillways and sump structures using Fablock sup- plied prefabricated by Fabtech, and precast into the concrete struc- tures. Fabtech was recognised by Clough Downer Joint Venture for diligence regarding all aspects of safety on site. Santos | GLNG Upstream Project - Fairview HUB 04 Design Testing Supply Installation   www.fabtech.com.au Shawn Brown being presented an award for diligence regarding all aspects of safety onsite.