welder Name: Esnail Moghadam stamp:01 Date: 13 December,2012
THE ABOVE WEIDER |s qUAUF|ED FOR THE FOlt OWtilG RANGE
DEPOSIT
SEQUENCE
PROCESS TYPE POSTTtON PROGRESS DC.AC POIARITY FILLER METAL OR
ET"ECTRODE
Root
Hot
Fill& Cap
GMAW
GMAW
GMAW
MANUAL
MANUAL
MANUAL
6G
5G
6G
UPHILL
UPHILL
UPHILL
DC
DC
DC
+
+
+
Esab Autrod L2.51
Tubrod 15.14
Tubrod 15.14
ACruAL VATUES RAT{GE OF QUAUFIED
Plate or Pipe
Position
Diameter
WallThickness
Groove or Fillet Weld
Eacking Gas and Flour Rate
Pipe
6G
8"
L1- mm
Groove
NA
Pipe
2-6G
3" & Above
25 mm
Both
NA
WPE OF NDE
w
PT
MT
UT
RT
Accept
Accept
Name:
Date:
Signature:
tnspector | l{DTtmpector Factory director Alt/LA C.ompessor n tID drectol
E. Moghadam I A. Aabloyan A. Ter-Grigoryan
{t