A Definition of Proactive Problem Management
2
CONTENTS
Executive Summary .......................................................................................................4
Licence ...........................................................................................................................5
Introduction...................................................................................................................6
Purpose of this Paper.................................................................................................6
Objective of this Paper ..............................................................................................6
Method ......................................................................................................................6
General Description.......................................................................................................7
Objective of Proactive Problem Management ..............................................................8
Reactive Problem Management....................................................................................8
Proactive Detection .......................................................................................................9
Trend Analysis............................................................................................................9
Problem Prevention.....................................................................................................13
Retrofitting Fixes......................................................................................................13
Resource Management............................................................................................14
Risk Register Monitoring .........................................................................................14
Project Issues Log ....................................................................................................14
Vendor-driven Proactive Notification......................................................................15
Pre-Emptive Action......................................................................................................15
Inhibitors......................................................................................................................16
Incoming Data Quality .............................................................................................16
Incident and Problem Management Maturity.........................................................17
Hero Culture ............................................................................................................18
Appendix A - Implementation .....................................................................................19
A Definition of Proactive Problem Management
3
Appendix B – Pattern Analysis Example ......................................................................23
Authors ........................................................................................................................24
Paul Offord...............................................................................................................24
Steve White .............................................................................................................24
Acknowledgements .....................................................................................................25
Additional Information ................................................................................................26
A Definition of Proactive Problem Management
4
EXECUTIVE SUMMARY
There is a great deal of discussion about the merits of Proactive Problem
Management, but there seems to be some confusion and disagreement regarding the
activities involved.
What actually is Proactive Problem Management, and how does it differ from its
reactive counterpart? What can it do for an IT department and a business in
general?
In this paper we outline a set of activities that make up the practice of Proactive
Problem Management and the benefits that these can bring. The information has
been gathered from more than 20 problem managers through online forums and
telephone discussions.
A Definition of Proactive Problem Management
5
LICENCE
This work is the property of itSMF UK and is licensed to you under the terms and
conditions of the licence Creative Commons Attribution 3.0 Unported. This means
that:
You are free:
 to Share — to copy, distribute and transmit the work
 to Remix — to adapt the work
 to make commercial use of the work
Under the following condition:
Attribution — You must attribute this work by adding a specific footnote or endnote
that refers to this document by title, the copyright holder and a web page reference
to the source.
The Attribution must be readable without magnification, and must not in any way
suggest that itSMF UK endorses you or your use of this work.
With the understanding that:
 Waiver — Any of the above conditions can be waived if you get permission
from the copyright holder.
 Public Domain — Where the work or any of its elements is in the public
domain under applicable law, that status is in no way affected by the licence.
 Other Rights — In no way are any of the following rights affected by the
licence:
o Your fair dealing or fair use rights, or other applicable copyright
exceptions and limitations;
o The author's moral rights;
o Rights other persons may have either in the work itself or in how the
work is used, such as publicity or privacy rights.
To view the Full Licence, please see the web page
http://creativecommons.org/licenses/by/3.0/legalcode
A Definition of Proactive Problem Management
6
INTRODUCTION
Purpose of this Paper
This paper is intended to:
 Provoke discussion about Proactive Problem Management
 Define terms and language so that future discussions about the subject share
the same terminology
 Provide guidance to those wishing to introduce Proactive Problem
Management into their organisation
Objective of this Paper
The objective of this paper is to provide a draft definition of the practice of Proactive
Problem Management. We don’t consider this to be an end point, but it does
represent the thoughts on the subject of a group of experienced IT professionals.
Method
Through online forums, telephone discussions and face-to-face meetings we have
sought the opinion of a wide range of people that includes practicing problem
managers from many industries, independent consultants and other IT professionals.
Of course, such wide consultation will occasionally lead to contradictory opinions. In
such cases we have adopted the view of the majority, tempered with what we1
believe is realistically achievable.
We have then cross-checked the information against the Service Operations 2011
manual.[1]
Although ITIL is a little vague on the subject of Proactive Problem
Management, we have tried to ensure that the guidance we provide here is aligned
with the framework.
1
In this case the term ‘we’ refers to the itSMF UK Problem Management Special Interest Group.
A Definition of Proactive Problem Management
7
GENERAL DESCRIPTION
Proactive Problem Management (PPM) means identifying, resolving and preventing
problems before they cause service impacting incidents.
Reactive Problem Management deals with the investigation, diagnosis and resolution
of problems that have already been detected because they have had a recognised
impact on services.
PPM differs from its reactive counterpart by addressing three areas not otherwise
covered, namely:
 Proactive Detection – the recognition of patterns of events (service
impacting or not) that suggest an underlying problem
 Problem Prevention – identification of opportunities to prevent future
problems
 Pre-emptive Action – identification of threats in critical situations
Techniques can be learnt, tools can be purchased and procedures developed to assist
in the early detection of problems. Because the subsequent investigation and
resolution actions will be the same as would be undertaken for any other problem,
developing this capability is relatively straightforward.
Developing the ability to identify possible future problems is a greater challenge for a
problem management team. The rate of development is dependent on the breadth
of technical skills of the team, their relationships with other IT teams and the level of
Reactive Problem Management experience. In this area, there is also some overlap
with other IT teams, and so some work is needed to define roles and responsibilities.
A Definition of Proactive Problem Management
8
OBJECTIVE OF PROACTIVE PROBLEM MANAGEMENT
Proactive Problem Management means identifying and resolving issues prior to
service disruption, so that we:
 Avoid incidents from occurring in the first place
 Reduce IT support workload caused by repeated low priority incidents
ITIL states that the objectives of PPM are to, “... improve the overall availability and
end user satisfaction with IT services”. This is not a particularly useful definition as
these objectives are the same as those of Reactive Problem Management discipline.
REACTIVE PROBLEM MANAGEMENT
To provide some contrast, it’s useful to list the activities that relate to Reactive
Problem Management, which are:
 Problem detection
 Problem record logging and management
 Categorisation
 Management of prioritisation
 Management of investigation and diagnosis of production problems
 Management of investigation and diagnosis of problems during pre-
production testing
 Managing entries in a KEDB
 Liaising with support teams in the application of fixes and workarounds
 Liaising with the Change Management function
 Management of the resolution of a problem in a live service
A Definition of Proactive Problem Management
9
 Management of the resolution of a problem in a pre-production service
 Closure of problem records
 Review of closed problems to learn lessons
 Recording lessons learnt in a knowledgebase and CSI initiatives
It’s important to note that dealing with Priority 3 and 4 problems is a Reactive
Problem Management activity, whereas identifying trends in P3 and P4 incidents to
identify problems is a Proactive Problem Management activity. We highlight this
particular point as some people consider the resolution of Priority 3 and 4 problems
to be a proactive activity.
PROACTIVE DETECTION
Trend Analysis
Incident trend analysis is cited as a PPM activity in ITIL Service Operations. However,
three types of trend analysis are common:
 Incident – the analysis of recovered incidents
 Monitoring System – the review of alerts generated by support team
monitoring systems
 Human Detection – the instinctive recognition by technical or service
operations people that something isn’t quite right
Incident trend analysis should include P3 and P4 incidents, not just high priority
events.
In the following subsections we look at these areas in more detail. Trend analysis
strictly refers to the change in a metric over time, and some of the guidance below
should be described as pattern analysis.
A Definition of Proactive Problem Management
10
Incident
Technical Causes
Incident trend analysis should be carried out to identify frequent occurrences,
common failures and fragile CIs. The analysis should include the trending of low
priority incidents as these are often a sign of bigger problems to come.
Although it may seem counter-intuitive, users should be encouraged to raise
incidents with the service desk. This will ensure that we get a clearer picture of the
true state of our services, which helps with PPM. Of course, all teams must be seen
to be investigating problems for the users to remain interested in raising incidents.
A review of incidents should be carried out periodically (weekly, monthly or
quarterly). Incident analysis can be computerised by reporting:
 Incidents by service – to identify the problematic applications and
underpinning infrastructure
 Incidents by location – to identify problems with shared infrastructure
 Incidents by CI make and model – to identify problems with hardware or
software
 Incidents by business unit – to identify problems associated with functional
groups of systems or particular transactions
 Incidents by date/time – to identify transitory periods of overload
It’s wise to consult with the appropriate support group before raising a problem
ticket.
Poor incident categorisation can be a problem and this issue is dealt with in Inhibitors
starting on page 16.
Development and Transition Issues
If software releases from a particular group of developers always seem to result in an
increased number of incidents for associated services, it would be a good idea to flag
A Definition of Proactive Problem Management
11
the issue. This would allow problem managers to review pre-production testing of
new releases with Release Management and the development team.
Identification of these types of issues can be achieved by:
 Pattern Analysis – what is the current level of the issue compared to other
development teams in the organisation or versus an industry benchmark?
 Trend Analysis – is there are growing issue with a particular team?
Infrastructure Support Issues
Similarly, issues relating to installations, changes and upgrades carried out by
technical support teams or suppliers can be analysed in the same manner as those
for Development and Transition Issues.
Application Support Issues
The issue here is slightly different to that described under Development and
Transition Issues in that these relate to ongoing BAU support. There are often
multiple application support teams, perhaps aligned with business units. Through
analysis of incidents it’s possible to check that each team is as effective and accurate
as the next. To see how this is possible see Appendix B – Pattern Analysis Example
on page 23.
Training Issues
Analysis of incidents by application or service where the closure code indicates a user
error or related cause can be undertaken to identify user training issues. Other
possible solutions are better online help systems and encouragement to self-help
through use of Internet resources.
Eliminating training issues will reduce the number of calls to the service desk and
increase user productivity.
A Definition of Proactive Problem Management
12
Monitoring System
Automated monitoring would generally involve tools and systems installed and
managed by application and infrastructure technical support teams. These
monitoring systems generate two types of event:
 Alert – indicating that a threshold has been crossed
 Alarm – indicating the failure of a component
An alert may be generated where, for instance, a server CPU load has exceeded a
threshold, the rate of network errors is excessive or response times are not meeting
the target time. The condition that causes the alert will often not result in a call to
the service desk. However, alerts are very often an early warning of future
problems.
Business systems are often built for high availability by duplicating components and
providing a failover mechanism. Therefore an alarm may not impact the service
delivered to the user.
Ensuring that the technical support teams act on alerts and alarms is a valid PPM
activity. Inevitably this also means stepping on the toes of support managers. For
example, if monitoring is in place to alert a server team to a low disk space condition,
then proactive work involves following up on repeated alerts where no remedial
action is noted such as log file clean up, ordering more disks, etc.
Many technical monitoring systems provide the ability to automatically generate a
‘ticket’ (Incident or Problem Record) when an alarm or alert is generated. Although
this seems ideal, in reality such configurations take a significant amount of
management. Common issues are:
 Thresholds are set too low and so a high number of false tickets are
generated
 Thresholds are set too high and so no tickets are generated at all
 Planned downtime generates false tickets
A Definition of Proactive Problem Management
13
 Configuration changes cause false tickets or monitoring fails so no tickets are
generated
Therefore, a more realistic approach is to ask each technical support team to
produce a consolidated exception report which can then be manually reviewed by
the problem management team.
The technical support workload required can be reduced by improved tooling. This is
a very rich area at this time with a new generation of performance monitoring, data
gathering, symptom matching and automatic fix installation tools becoming
available; these in themselves could be considered as proactive problem
management tools.
Human Detection
Technical or other service operations people (such as incident managers) also have a
role to play in Proactive Problem Management. Such people may spot an issue that
happens repeatedly in the course of their daily work, and this should trigger
Proactive Problem Management by asking for a problem ticket to be opened.
Where an expert has a ‘hunch’ or feels instinctively that something is going on, this
should be followed up and should be a valid trigger for Proactive Problem
Management. Experts’ hunches have been shown by psychological research to be
the subconscious gathering together of seemingly unrelated information, from which
highly sophisticated expertise distils the information without the expert consciously
realising it is going on.[2]
A further trigger for proactive activity is as simple as a request from somebody senior
to investigate something.
PROBLEM PREVENTION
Retrofitting Fixes
Future problems can be prevented by retrofitting corrective actions identified from
one failure (as a part of RCA process) to CIs of the same type. If we find the root
A Definition of Proactive Problem Management
14
cause of a problem and implement a fix, there will be other CIs where we can
implement the same fix to prevent a similar issue before it occurs. Even though the
CIs may not be causing problems at this time, changes in workload pattern or use
could trigger the problem.
Resource Management
Consider the situation where an incident has been caused by low free disk space on a
server. We can set in place a regular housekeeping task to check the free space on a
server and so avoid future incidents.
Although the monitoring of resources such as disk free space will be the
responsibility of a capacity management team, or the technical support team that
owns the CI, Problem Management has a role to play in the identification of this
specific resource as a known cause of problems, and ensuring that steps are taken to
mitigate the risk of related downtime.
Risk Register Monitoring
A Risk Register can provide a good means to identify potential problems. Periodic
reports can be run to check for risks that could cause IT service impairment or
failures.
Related to the Risk Register is the identification of Fragile Artefacts, those being CIs
with support issues such as an OS that is no longer supported, or a piece of hardware
that is out of warranty and for which no service contract has been arranged.
Project Issues Log
A project manager will often maintain a log of issues that have arisen during the
project. Some (probably not many) problem management teams treat these issues
alongside other reactive activities. The Issues Log should be reviewed by Problem
Management to ensure that problems that exist in pre-production are not migrated
into the production environment.
A Definition of Proactive Problem Management
15
Vendor-driven Proactive Notification
It would be possible to avoid problems by working with your vendor to get proactive
notifications based on your infrastructure's hardware profile. However, there do not
seem to be any major vendors offering this type of service at this time.
Activities could include swapping out hardware when it’s at 80% of its life
expectancy; or when it’s detected that redundant hardware is failing. It would then
be possible to work with the vendor and swap out all cards with similar
manufacturing dates.
PRE-EMPTIVE ACTION
Techniques can be used to identify threats to the organisation without a specific
incident having yet happened. In critical situations where;
 there is a stress event coming up which needs to go well
 detection of an incident would come too late for anything to be done
 if an incident happens it is important to have planned the restoration
activities in advance
then potential problems and likely causes can be generated from the knowledge and
experience of technical and business staff.
The synthesis of subject matter expert experiences may highlight potential problems
that have not ever happened before, but could do given a new circumstance or
starting condition. These likely causes can have pre-emptive actions taken to reduce
the threats, and contingent actions planned against the potential problems.
A Definition of Proactive Problem Management
16
INHIBITORS
There are issues that work against Proactive Problem Management.
Incoming Data Quality
People
If there are inexperienced people working the Incident and Problem Management
processes, then there is a lower chance of getting the quality of incoming
documentation required to deliver PPM.
Process
Incident Records:
The quality of the Incident Records directly affects the ability to implement PPM –
this is a primary source of data about the state of the IT estate, and if it is poorly
completed, full of irrelevant noise or incomplete, the ability to undertake the PPM
described here will be impaired. The Incident Management process will need to
ensure that the quality of incident records is consistently good.
Problem Records:
The records of problems are a core area for research, and again they need to be an
accurate representation of the problems that have been handled. The Problem
Management process will need to ensure that the quality of problem records is
consistently good.
Continual Service Improvement:
The activity of the CSI team should build on the discoveries and work of the PPM
team. A poorly implemented or non-existent CSI team will diminish the benefits of
PPM.
Risk Register:
If there is no Risk Register process, then there is an inherent risk of hardware or
software becoming production and service risks without anyone noticing.
A Definition of Proactive Problem Management
17
Product
The products which are involved in Proactive Problem Management will provide
alerts and alarms for the incident managers. The alarms clearly kick off activity to
understand the alarm and manage it – the alerts will give an early warning of
problems to come. Out of date or non-existent monitoring products will impair
proactive activities.
Poor Incident Categorisation
Overcoming Poor Categorisation
Due to problems with controlling the quality of incident records, it’s sometimes
necessary to scan the free text description within them to spot trends. Such analysis
improves with experience and the technical capabilities of the problem manager.
Proactively Managing Poor Categorisation
Since the value of Proactive Problem Management can only be realised when there is
good quality data to work on, it is worth first ensuring that the data around each
incident is an accurate representation of the incident.
Incident and Problem Management Maturity
There are some prerequisites to effective Proactive Problem Management:
 Mature Incident Management is important to allow successful incident trend
and pattern analysis
 Strong assimilation of Reactive Problem Management activities into the IT
department
On the issue of the maturity of Reactive Problem Management, an honest
assessment of the level of activity and capabilities relating to the activities defined in
Reactive Problem Management on page 8 would be a good starting point.
Resourcing is a big problem. At the time of writing, many problem management
teams are totally consumed with the review of major incidents and high priority
A Definition of Proactive Problem Management
18
problems. They have no time to investigate low priority problems, let alone start a
Proactive Problem Management initiative.
One way to overcome the resourcing issue is to ring-fence a group of problem
managers that will only deal with PPM. Successful ring-fencing in this way requires a
great deal of discipline, an unwavering commitment from senior managers and a
clear understanding of the value proposition of PPM.
Hero Culture
An organisation may have a very strong ‘hero’ culture, in which case staff just love a
good incident to get all excited about. The proactive activity is viewed as boring and
of little value. A high-profile incident provides a very visible opportunity to
demonstrate technical skill.
Some large organisations remain focused on technology rather than service, and so
troubleshooting success is measured by the technical support team’s ability to
recover from incidents, even if the incidents are recurring. Problem management in
such an environment is difficult; Proactive Problem Management would probably
have little success.
A Definition of Proactive Problem Management
19
APPENDIX A - IMPLEMENTATION
The following table provides some guidance regarding the order in which each PPM activity should be introduced. There is a large list of possible
activities, and trying to tackle them all could swamp a problem management team. A pragmatic way to deal with this issue is to spread the activity
in phases throughout the calendar. For example, in Q1 problem managers could look at trends associated with Development and Transition, in Q2
those associated with Infrastructure Support, and so on.
The benefit derived from these activities will vary from organisation to organisation. Nevertheless, we have provided some guidance here based
on the knowledge and experiences of the authors.
Step Activity Level of Benefit Prerequisites
1 Trend Analysis: Incident
– Technical Causes
H Accurate incident management categorisation.
2 Trend Analysis: Incident
– Development and Transition Issues
M Logging of development and transition incident records in the
ITSM.
A Definition of Proactive Problem Management
20
Step Activity Level of Benefit Prerequisites
3 Trend Analysis: Incident
– Application Support Issues
H Participation by application support staff in the incident
management process, at least use of incident records.
4 Trend Analysis: Incident
– Infrastructure Support Issues
H Participation by infrastructure support staff in the incident
management process, at least use of incident records.
5 Trend Analysis: Incident
– Training Support Issues
M Clear categorisation of user errors by the Service Desk, and
accurate service references.
6 Trend Analysis: Monitoring System H Well maintained monitoring systems that produce reliable alerts
and alarms.
7 Trend Analysis: Human Detection H The identification of a group of technical staff whose judgement
in the status of the IT environment has been found to be
reliable.
A Definition of Proactive Problem Management
21
Step Activity Level of Benefit Prerequisites
8 Retrofitting Fixes L Mature change and release management. A CMDB so that
appropriate target CIs can be identified. Good pre-deployment
test procedures.
9 Resource Management M Strong interpersonal relationships with the technical support
and capacity management teams.
10 Risk Register Monitoring L The risks included in the Risk Register must include quite
detailed entries relating the IT systems and components. The
tool used to maintain the register must be capable of
categorising the risks.
11 Project Issues Log L A project issues log must be maintained and the tool used to
maintain it must be capable of categorising the issues.
12 Vendor-driven Proactive Notification L A vendor’s capability to provide the required notification.
A Definition of Proactive Problem Management
22
Step Activity Level of Benefit Prerequisites
13 Pre-emptive Problem Management L Knowledge of the techniques needed to think of potential
threats in a structured manner.
Level of Benefit – Expected number of issues avoided relative to the mean of all of the steps above.
A Definition of Proactive Problem Management
23
APPENDIX B – PATTERN ANALYSIS EXAMPLE
The following example was provided by Michael Hall:
[Let’s imagine we] have three application teams supporting three different
businesses. Each has a set of applications, let's say three each to make it simple.
Incident data for each is tracked and reviewed regularly by Problem Management.
Over the last three quarters:
 Team 1 is averaging 3 sev 1 incidents, 15 sev 2 incidents, 100 sev 3 incidents
 Team 2 is averaging 2 sev 1 incidents, 25 sev 2 incidents, 100 sev 3 incidents
 Team 3 is averaging 0 sev 1 incidents, 50 sev 2 incidents, 100 sev 3 incidents
So what is going on? Why does Team 3 have so many sev 2 incidents? This is where
Problem Management can raise a proactive problem to go and do some digging,
applying their analysis skills to get to the bottom of it. It's worthwhile, because, if
they could get the number of sev 2 incidents down to the average of the other two
groups (20), [it would prevent] 30 incidents per quarter, or up to 120 each year.
A Definition of Proactive Problem Management
24
AUTHORS
Paul Offord
Paul Offord has had a 35-year career in the IT industry that includes roles in
hardware engineering, software engineering and network management. Prior to
founding Advance7 in 1989, he worked for IBM, National Semiconductor and Hitachi
Data Systems. Paul is now the Development Director at Advance7.
Paul is a Certified IT Professional and a Fellow of the British Computer Society.
Steve White
Steve White began his career in Computer Systems Maintenance in 1989 in various
roles that have included Hardware on-site support, software Incident and Problem
Management, backline software support and the deployment of RCA processes into
a variety of companies and industries. He is currently a Senior Consultant with
Kepner Tregoe, specialising in the integration of clear thinking processes in IT
Support.
A Definition of Proactive Problem Management
25
ACKNOWLEDGEMENTS
We are greatly indebted to members of the ITIL Problem Management forum on
LinkedIn for their input, particularly:
Peter Dodd
Pramesh Iyer
Patrick Collings
Prasanna Lakshmi
Eric Sambraus
Kundan Yadav
Manish Singh
Rahul Sahasrabudhe
Tim Jobson
Martina Todorova
Carl Bindels
Pradeep Bains
Boitumelo Machogo
Michael Hall
Dan Skwire
Lorie Wilson
Shannon Mcilroy
Swapnonil Bose
Peter Senese
Mark Dickinson
Dahud Khan
Bruce Burghgraef
Joe Gallagher
Stephen Maclean
A Definition of Proactive Problem Management
26
ADDITIONAL INFORMATION
ITIL definition of Problem Management:
1. David Cannon and David Wheeldon (2007) ITIL Service Operation, The Stationery
Office, ISBN 978-0-1133-1046-3
2. Gary Klein (2004) The Power of Intuition: How to Use Your Gut Feelings to Make
Better Decisions at Work, Currency, ISBN 0-385-50289-3
itSMF UK
150 Wharfedale Road
Winnersh Triangle
Wokingham
RG41 5RB
United Kingdom
Phone: +44 (0) 118 918 6500
Web: www.itsmf.co.uk
Revision 1.06

More Related Content

What's hot

ITIL Incident management
ITIL Incident managementITIL Incident management
ITIL Incident management
ManageEngine
 
RDrew ITIL Presentation
RDrew ITIL PresentationRDrew ITIL Presentation
RDrew ITIL Presentation
Ron Drew
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation Overview
Alan McSweeney
 
ITSM and Service Catalog Overview
ITSM and Service Catalog OverviewITSM and Service Catalog Overview
ITSM and Service Catalog Overview
Christopher Glennon
 
Incident Escalation process Presentation
Incident Escalation process PresentationIncident Escalation process Presentation
Incident Escalation process Presentation
Lukas Williamson
 

What's hot (20)

Deal With Production Issues - The ITIL Way
Deal With Production Issues - The ITIL WayDeal With Production Issues - The ITIL Way
Deal With Production Issues - The ITIL Way
 
ITIL Incident Management Workflow PowerPoint Presentation Slides
ITIL Incident Management Workflow PowerPoint Presentation SlidesITIL Incident Management Workflow PowerPoint Presentation Slides
ITIL Incident Management Workflow PowerPoint Presentation Slides
 
ITIL Incident management
ITIL Incident managementITIL Incident management
ITIL Incident management
 
ITIL Incident Management Workflow - Process Guide
	 ITIL Incident Management Workflow - Process Guide	 ITIL Incident Management Workflow - Process Guide
ITIL Incident Management Workflow - Process Guide
 
Introducing ITIL
Introducing ITILIntroducing ITIL
Introducing ITIL
 
IT Service Management Overview
IT Service Management OverviewIT Service Management Overview
IT Service Management Overview
 
ITIL Practical Guide - Service Operation
ITIL Practical Guide - Service OperationITIL Practical Guide - Service Operation
ITIL Practical Guide - Service Operation
 
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle. Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
 
ITSM Presentation
ITSM PresentationITSM Presentation
ITSM Presentation
 
Pain Point Analysis Guide & Template
Pain Point Analysis Guide & TemplatePain Point Analysis Guide & Template
Pain Point Analysis Guide & Template
 
RDrew ITIL Presentation
RDrew ITIL PresentationRDrew ITIL Presentation
RDrew ITIL Presentation
 
Incident and Problem management simplified
Incident and Problem management simplifiedIncident and Problem management simplified
Incident and Problem management simplified
 
Service catalogue presentation
Service catalogue presentationService catalogue presentation
Service catalogue presentation
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation Overview
 
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
 
ITSM Governance Overview
ITSM Governance OverviewITSM Governance Overview
ITSM Governance Overview
 
Change Management ITIL
Change Management ITILChange Management ITIL
Change Management ITIL
 
Itil service desk business case
Itil service desk business caseItil service desk business case
Itil service desk business case
 
ITSM and Service Catalog Overview
ITSM and Service Catalog OverviewITSM and Service Catalog Overview
ITSM and Service Catalog Overview
 
Incident Escalation process Presentation
Incident Escalation process PresentationIncident Escalation process Presentation
Incident Escalation process Presentation
 

Similar to itSMF PMSIG - Proactive Problem Management

Requirements Workshop -Text Analytics System - Serene Zawaydeh
Requirements Workshop -Text Analytics System - Serene ZawaydehRequirements Workshop -Text Analytics System - Serene Zawaydeh
Requirements Workshop -Text Analytics System - Serene Zawaydeh
Serene Zawaydeh
 
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBookGoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
George Yu
 
Week8 Topic1 Translate Business Needs Into Technical Requirements
Week8 Topic1 Translate Business Needs Into Technical RequirementsWeek8 Topic1 Translate Business Needs Into Technical Requirements
Week8 Topic1 Translate Business Needs Into Technical Requirements
hapy
 
Requirements management and the business analyst
Requirements management and the business analystRequirements management and the business analyst
Requirements management and the business analyst
Robert Darko
 
IT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_WhitepaperIT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_Whitepaper
Chuck Boutcher
 
Consultancy Report Final
Consultancy Report FinalConsultancy Report Final
Consultancy Report Final
Bilal Ahmed
 

Similar to itSMF PMSIG - Proactive Problem Management (20)

ITIL
ITILITIL
ITIL
 
Business analyst interview questions and answers
Business analyst interview questions and answersBusiness analyst interview questions and answers
Business analyst interview questions and answers
 
Business analyst
Business analystBusiness analyst
Business analyst
 
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 final
 
Business analyst tools
Business analyst toolsBusiness analyst tools
Business analyst tools
 
Service Management for Dummies
Service Management for DummiesService Management for Dummies
Service Management for Dummies
 
Requirements Workshop -Text Analytics System - Serene Zawaydeh
Requirements Workshop -Text Analytics System - Serene ZawaydehRequirements Workshop -Text Analytics System - Serene Zawaydeh
Requirements Workshop -Text Analytics System - Serene Zawaydeh
 
Requirement elicitation
Requirement elicitationRequirement elicitation
Requirement elicitation
 
Cbap babok 2.0 ppt introduction
Cbap babok 2.0 ppt introductionCbap babok 2.0 ppt introduction
Cbap babok 2.0 ppt introduction
 
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBookGoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
GoToAssist-Be-Mighty-ITIL-Quick-Guide-eBook
 
Week8 Topic1 Translate Business Needs Into Technical Requirements
Week8 Topic1 Translate Business Needs Into Technical RequirementsWeek8 Topic1 Translate Business Needs Into Technical Requirements
Week8 Topic1 Translate Business Needs Into Technical Requirements
 
Dit yvol2iss50
Dit yvol2iss50Dit yvol2iss50
Dit yvol2iss50
 
Requirements management and the business analyst
Requirements management and the business analystRequirements management and the business analyst
Requirements management and the business analyst
 
IT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_WhitepaperIT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_Whitepaper
 
Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)
 
Consultancy Report Final
Consultancy Report FinalConsultancy Report Final
Consultancy Report Final
 
Business analysis
Business analysis Business analysis
Business analysis
 
Business analysis
Business analysis Business analysis
Business analysis
 
Managing Computer Security Incident Response Teams - Introduction
Managing Computer Security Incident Response Teams - IntroductionManaging Computer Security Incident Response Teams - Introduction
Managing Computer Security Incident Response Teams - Introduction
 

itSMF PMSIG - Proactive Problem Management

  • 1. A Definition of Proactive Problem Management A paper describing how problem management can prevent service impacting issues An itSMF UK White Paper January 2013© Copyright 2013 - itSMF
  • 2. A Definition of Proactive Problem Management 2 CONTENTS Executive Summary .......................................................................................................4 Licence ...........................................................................................................................5 Introduction...................................................................................................................6 Purpose of this Paper.................................................................................................6 Objective of this Paper ..............................................................................................6 Method ......................................................................................................................6 General Description.......................................................................................................7 Objective of Proactive Problem Management ..............................................................8 Reactive Problem Management....................................................................................8 Proactive Detection .......................................................................................................9 Trend Analysis............................................................................................................9 Problem Prevention.....................................................................................................13 Retrofitting Fixes......................................................................................................13 Resource Management............................................................................................14 Risk Register Monitoring .........................................................................................14 Project Issues Log ....................................................................................................14 Vendor-driven Proactive Notification......................................................................15 Pre-Emptive Action......................................................................................................15 Inhibitors......................................................................................................................16 Incoming Data Quality .............................................................................................16 Incident and Problem Management Maturity.........................................................17 Hero Culture ............................................................................................................18 Appendix A - Implementation .....................................................................................19
  • 3. A Definition of Proactive Problem Management 3 Appendix B – Pattern Analysis Example ......................................................................23 Authors ........................................................................................................................24 Paul Offord...............................................................................................................24 Steve White .............................................................................................................24 Acknowledgements .....................................................................................................25 Additional Information ................................................................................................26
  • 4. A Definition of Proactive Problem Management 4 EXECUTIVE SUMMARY There is a great deal of discussion about the merits of Proactive Problem Management, but there seems to be some confusion and disagreement regarding the activities involved. What actually is Proactive Problem Management, and how does it differ from its reactive counterpart? What can it do for an IT department and a business in general? In this paper we outline a set of activities that make up the practice of Proactive Problem Management and the benefits that these can bring. The information has been gathered from more than 20 problem managers through online forums and telephone discussions.
  • 5. A Definition of Proactive Problem Management 5 LICENCE This work is the property of itSMF UK and is licensed to you under the terms and conditions of the licence Creative Commons Attribution 3.0 Unported. This means that: You are free:  to Share — to copy, distribute and transmit the work  to Remix — to adapt the work  to make commercial use of the work Under the following condition: Attribution — You must attribute this work by adding a specific footnote or endnote that refers to this document by title, the copyright holder and a web page reference to the source. The Attribution must be readable without magnification, and must not in any way suggest that itSMF UK endorses you or your use of this work. With the understanding that:  Waiver — Any of the above conditions can be waived if you get permission from the copyright holder.  Public Domain — Where the work or any of its elements is in the public domain under applicable law, that status is in no way affected by the licence.  Other Rights — In no way are any of the following rights affected by the licence: o Your fair dealing or fair use rights, or other applicable copyright exceptions and limitations; o The author's moral rights; o Rights other persons may have either in the work itself or in how the work is used, such as publicity or privacy rights. To view the Full Licence, please see the web page http://creativecommons.org/licenses/by/3.0/legalcode
  • 6. A Definition of Proactive Problem Management 6 INTRODUCTION Purpose of this Paper This paper is intended to:  Provoke discussion about Proactive Problem Management  Define terms and language so that future discussions about the subject share the same terminology  Provide guidance to those wishing to introduce Proactive Problem Management into their organisation Objective of this Paper The objective of this paper is to provide a draft definition of the practice of Proactive Problem Management. We don’t consider this to be an end point, but it does represent the thoughts on the subject of a group of experienced IT professionals. Method Through online forums, telephone discussions and face-to-face meetings we have sought the opinion of a wide range of people that includes practicing problem managers from many industries, independent consultants and other IT professionals. Of course, such wide consultation will occasionally lead to contradictory opinions. In such cases we have adopted the view of the majority, tempered with what we1 believe is realistically achievable. We have then cross-checked the information against the Service Operations 2011 manual.[1] Although ITIL is a little vague on the subject of Proactive Problem Management, we have tried to ensure that the guidance we provide here is aligned with the framework. 1 In this case the term ‘we’ refers to the itSMF UK Problem Management Special Interest Group.
  • 7. A Definition of Proactive Problem Management 7 GENERAL DESCRIPTION Proactive Problem Management (PPM) means identifying, resolving and preventing problems before they cause service impacting incidents. Reactive Problem Management deals with the investigation, diagnosis and resolution of problems that have already been detected because they have had a recognised impact on services. PPM differs from its reactive counterpart by addressing three areas not otherwise covered, namely:  Proactive Detection – the recognition of patterns of events (service impacting or not) that suggest an underlying problem  Problem Prevention – identification of opportunities to prevent future problems  Pre-emptive Action – identification of threats in critical situations Techniques can be learnt, tools can be purchased and procedures developed to assist in the early detection of problems. Because the subsequent investigation and resolution actions will be the same as would be undertaken for any other problem, developing this capability is relatively straightforward. Developing the ability to identify possible future problems is a greater challenge for a problem management team. The rate of development is dependent on the breadth of technical skills of the team, their relationships with other IT teams and the level of Reactive Problem Management experience. In this area, there is also some overlap with other IT teams, and so some work is needed to define roles and responsibilities.
  • 8. A Definition of Proactive Problem Management 8 OBJECTIVE OF PROACTIVE PROBLEM MANAGEMENT Proactive Problem Management means identifying and resolving issues prior to service disruption, so that we:  Avoid incidents from occurring in the first place  Reduce IT support workload caused by repeated low priority incidents ITIL states that the objectives of PPM are to, “... improve the overall availability and end user satisfaction with IT services”. This is not a particularly useful definition as these objectives are the same as those of Reactive Problem Management discipline. REACTIVE PROBLEM MANAGEMENT To provide some contrast, it’s useful to list the activities that relate to Reactive Problem Management, which are:  Problem detection  Problem record logging and management  Categorisation  Management of prioritisation  Management of investigation and diagnosis of production problems  Management of investigation and diagnosis of problems during pre- production testing  Managing entries in a KEDB  Liaising with support teams in the application of fixes and workarounds  Liaising with the Change Management function  Management of the resolution of a problem in a live service
  • 9. A Definition of Proactive Problem Management 9  Management of the resolution of a problem in a pre-production service  Closure of problem records  Review of closed problems to learn lessons  Recording lessons learnt in a knowledgebase and CSI initiatives It’s important to note that dealing with Priority 3 and 4 problems is a Reactive Problem Management activity, whereas identifying trends in P3 and P4 incidents to identify problems is a Proactive Problem Management activity. We highlight this particular point as some people consider the resolution of Priority 3 and 4 problems to be a proactive activity. PROACTIVE DETECTION Trend Analysis Incident trend analysis is cited as a PPM activity in ITIL Service Operations. However, three types of trend analysis are common:  Incident – the analysis of recovered incidents  Monitoring System – the review of alerts generated by support team monitoring systems  Human Detection – the instinctive recognition by technical or service operations people that something isn’t quite right Incident trend analysis should include P3 and P4 incidents, not just high priority events. In the following subsections we look at these areas in more detail. Trend analysis strictly refers to the change in a metric over time, and some of the guidance below should be described as pattern analysis.
  • 10. A Definition of Proactive Problem Management 10 Incident Technical Causes Incident trend analysis should be carried out to identify frequent occurrences, common failures and fragile CIs. The analysis should include the trending of low priority incidents as these are often a sign of bigger problems to come. Although it may seem counter-intuitive, users should be encouraged to raise incidents with the service desk. This will ensure that we get a clearer picture of the true state of our services, which helps with PPM. Of course, all teams must be seen to be investigating problems for the users to remain interested in raising incidents. A review of incidents should be carried out periodically (weekly, monthly or quarterly). Incident analysis can be computerised by reporting:  Incidents by service – to identify the problematic applications and underpinning infrastructure  Incidents by location – to identify problems with shared infrastructure  Incidents by CI make and model – to identify problems with hardware or software  Incidents by business unit – to identify problems associated with functional groups of systems or particular transactions  Incidents by date/time – to identify transitory periods of overload It’s wise to consult with the appropriate support group before raising a problem ticket. Poor incident categorisation can be a problem and this issue is dealt with in Inhibitors starting on page 16. Development and Transition Issues If software releases from a particular group of developers always seem to result in an increased number of incidents for associated services, it would be a good idea to flag
  • 11. A Definition of Proactive Problem Management 11 the issue. This would allow problem managers to review pre-production testing of new releases with Release Management and the development team. Identification of these types of issues can be achieved by:  Pattern Analysis – what is the current level of the issue compared to other development teams in the organisation or versus an industry benchmark?  Trend Analysis – is there are growing issue with a particular team? Infrastructure Support Issues Similarly, issues relating to installations, changes and upgrades carried out by technical support teams or suppliers can be analysed in the same manner as those for Development and Transition Issues. Application Support Issues The issue here is slightly different to that described under Development and Transition Issues in that these relate to ongoing BAU support. There are often multiple application support teams, perhaps aligned with business units. Through analysis of incidents it’s possible to check that each team is as effective and accurate as the next. To see how this is possible see Appendix B – Pattern Analysis Example on page 23. Training Issues Analysis of incidents by application or service where the closure code indicates a user error or related cause can be undertaken to identify user training issues. Other possible solutions are better online help systems and encouragement to self-help through use of Internet resources. Eliminating training issues will reduce the number of calls to the service desk and increase user productivity.
  • 12. A Definition of Proactive Problem Management 12 Monitoring System Automated monitoring would generally involve tools and systems installed and managed by application and infrastructure technical support teams. These monitoring systems generate two types of event:  Alert – indicating that a threshold has been crossed  Alarm – indicating the failure of a component An alert may be generated where, for instance, a server CPU load has exceeded a threshold, the rate of network errors is excessive or response times are not meeting the target time. The condition that causes the alert will often not result in a call to the service desk. However, alerts are very often an early warning of future problems. Business systems are often built for high availability by duplicating components and providing a failover mechanism. Therefore an alarm may not impact the service delivered to the user. Ensuring that the technical support teams act on alerts and alarms is a valid PPM activity. Inevitably this also means stepping on the toes of support managers. For example, if monitoring is in place to alert a server team to a low disk space condition, then proactive work involves following up on repeated alerts where no remedial action is noted such as log file clean up, ordering more disks, etc. Many technical monitoring systems provide the ability to automatically generate a ‘ticket’ (Incident or Problem Record) when an alarm or alert is generated. Although this seems ideal, in reality such configurations take a significant amount of management. Common issues are:  Thresholds are set too low and so a high number of false tickets are generated  Thresholds are set too high and so no tickets are generated at all  Planned downtime generates false tickets
  • 13. A Definition of Proactive Problem Management 13  Configuration changes cause false tickets or monitoring fails so no tickets are generated Therefore, a more realistic approach is to ask each technical support team to produce a consolidated exception report which can then be manually reviewed by the problem management team. The technical support workload required can be reduced by improved tooling. This is a very rich area at this time with a new generation of performance monitoring, data gathering, symptom matching and automatic fix installation tools becoming available; these in themselves could be considered as proactive problem management tools. Human Detection Technical or other service operations people (such as incident managers) also have a role to play in Proactive Problem Management. Such people may spot an issue that happens repeatedly in the course of their daily work, and this should trigger Proactive Problem Management by asking for a problem ticket to be opened. Where an expert has a ‘hunch’ or feels instinctively that something is going on, this should be followed up and should be a valid trigger for Proactive Problem Management. Experts’ hunches have been shown by psychological research to be the subconscious gathering together of seemingly unrelated information, from which highly sophisticated expertise distils the information without the expert consciously realising it is going on.[2] A further trigger for proactive activity is as simple as a request from somebody senior to investigate something. PROBLEM PREVENTION Retrofitting Fixes Future problems can be prevented by retrofitting corrective actions identified from one failure (as a part of RCA process) to CIs of the same type. If we find the root
  • 14. A Definition of Proactive Problem Management 14 cause of a problem and implement a fix, there will be other CIs where we can implement the same fix to prevent a similar issue before it occurs. Even though the CIs may not be causing problems at this time, changes in workload pattern or use could trigger the problem. Resource Management Consider the situation where an incident has been caused by low free disk space on a server. We can set in place a regular housekeeping task to check the free space on a server and so avoid future incidents. Although the monitoring of resources such as disk free space will be the responsibility of a capacity management team, or the technical support team that owns the CI, Problem Management has a role to play in the identification of this specific resource as a known cause of problems, and ensuring that steps are taken to mitigate the risk of related downtime. Risk Register Monitoring A Risk Register can provide a good means to identify potential problems. Periodic reports can be run to check for risks that could cause IT service impairment or failures. Related to the Risk Register is the identification of Fragile Artefacts, those being CIs with support issues such as an OS that is no longer supported, or a piece of hardware that is out of warranty and for which no service contract has been arranged. Project Issues Log A project manager will often maintain a log of issues that have arisen during the project. Some (probably not many) problem management teams treat these issues alongside other reactive activities. The Issues Log should be reviewed by Problem Management to ensure that problems that exist in pre-production are not migrated into the production environment.
  • 15. A Definition of Proactive Problem Management 15 Vendor-driven Proactive Notification It would be possible to avoid problems by working with your vendor to get proactive notifications based on your infrastructure's hardware profile. However, there do not seem to be any major vendors offering this type of service at this time. Activities could include swapping out hardware when it’s at 80% of its life expectancy; or when it’s detected that redundant hardware is failing. It would then be possible to work with the vendor and swap out all cards with similar manufacturing dates. PRE-EMPTIVE ACTION Techniques can be used to identify threats to the organisation without a specific incident having yet happened. In critical situations where;  there is a stress event coming up which needs to go well  detection of an incident would come too late for anything to be done  if an incident happens it is important to have planned the restoration activities in advance then potential problems and likely causes can be generated from the knowledge and experience of technical and business staff. The synthesis of subject matter expert experiences may highlight potential problems that have not ever happened before, but could do given a new circumstance or starting condition. These likely causes can have pre-emptive actions taken to reduce the threats, and contingent actions planned against the potential problems.
  • 16. A Definition of Proactive Problem Management 16 INHIBITORS There are issues that work against Proactive Problem Management. Incoming Data Quality People If there are inexperienced people working the Incident and Problem Management processes, then there is a lower chance of getting the quality of incoming documentation required to deliver PPM. Process Incident Records: The quality of the Incident Records directly affects the ability to implement PPM – this is a primary source of data about the state of the IT estate, and if it is poorly completed, full of irrelevant noise or incomplete, the ability to undertake the PPM described here will be impaired. The Incident Management process will need to ensure that the quality of incident records is consistently good. Problem Records: The records of problems are a core area for research, and again they need to be an accurate representation of the problems that have been handled. The Problem Management process will need to ensure that the quality of problem records is consistently good. Continual Service Improvement: The activity of the CSI team should build on the discoveries and work of the PPM team. A poorly implemented or non-existent CSI team will diminish the benefits of PPM. Risk Register: If there is no Risk Register process, then there is an inherent risk of hardware or software becoming production and service risks without anyone noticing.
  • 17. A Definition of Proactive Problem Management 17 Product The products which are involved in Proactive Problem Management will provide alerts and alarms for the incident managers. The alarms clearly kick off activity to understand the alarm and manage it – the alerts will give an early warning of problems to come. Out of date or non-existent monitoring products will impair proactive activities. Poor Incident Categorisation Overcoming Poor Categorisation Due to problems with controlling the quality of incident records, it’s sometimes necessary to scan the free text description within them to spot trends. Such analysis improves with experience and the technical capabilities of the problem manager. Proactively Managing Poor Categorisation Since the value of Proactive Problem Management can only be realised when there is good quality data to work on, it is worth first ensuring that the data around each incident is an accurate representation of the incident. Incident and Problem Management Maturity There are some prerequisites to effective Proactive Problem Management:  Mature Incident Management is important to allow successful incident trend and pattern analysis  Strong assimilation of Reactive Problem Management activities into the IT department On the issue of the maturity of Reactive Problem Management, an honest assessment of the level of activity and capabilities relating to the activities defined in Reactive Problem Management on page 8 would be a good starting point. Resourcing is a big problem. At the time of writing, many problem management teams are totally consumed with the review of major incidents and high priority
  • 18. A Definition of Proactive Problem Management 18 problems. They have no time to investigate low priority problems, let alone start a Proactive Problem Management initiative. One way to overcome the resourcing issue is to ring-fence a group of problem managers that will only deal with PPM. Successful ring-fencing in this way requires a great deal of discipline, an unwavering commitment from senior managers and a clear understanding of the value proposition of PPM. Hero Culture An organisation may have a very strong ‘hero’ culture, in which case staff just love a good incident to get all excited about. The proactive activity is viewed as boring and of little value. A high-profile incident provides a very visible opportunity to demonstrate technical skill. Some large organisations remain focused on technology rather than service, and so troubleshooting success is measured by the technical support team’s ability to recover from incidents, even if the incidents are recurring. Problem management in such an environment is difficult; Proactive Problem Management would probably have little success.
  • 19. A Definition of Proactive Problem Management 19 APPENDIX A - IMPLEMENTATION The following table provides some guidance regarding the order in which each PPM activity should be introduced. There is a large list of possible activities, and trying to tackle them all could swamp a problem management team. A pragmatic way to deal with this issue is to spread the activity in phases throughout the calendar. For example, in Q1 problem managers could look at trends associated with Development and Transition, in Q2 those associated with Infrastructure Support, and so on. The benefit derived from these activities will vary from organisation to organisation. Nevertheless, we have provided some guidance here based on the knowledge and experiences of the authors. Step Activity Level of Benefit Prerequisites 1 Trend Analysis: Incident – Technical Causes H Accurate incident management categorisation. 2 Trend Analysis: Incident – Development and Transition Issues M Logging of development and transition incident records in the ITSM.
  • 20. A Definition of Proactive Problem Management 20 Step Activity Level of Benefit Prerequisites 3 Trend Analysis: Incident – Application Support Issues H Participation by application support staff in the incident management process, at least use of incident records. 4 Trend Analysis: Incident – Infrastructure Support Issues H Participation by infrastructure support staff in the incident management process, at least use of incident records. 5 Trend Analysis: Incident – Training Support Issues M Clear categorisation of user errors by the Service Desk, and accurate service references. 6 Trend Analysis: Monitoring System H Well maintained monitoring systems that produce reliable alerts and alarms. 7 Trend Analysis: Human Detection H The identification of a group of technical staff whose judgement in the status of the IT environment has been found to be reliable.
  • 21. A Definition of Proactive Problem Management 21 Step Activity Level of Benefit Prerequisites 8 Retrofitting Fixes L Mature change and release management. A CMDB so that appropriate target CIs can be identified. Good pre-deployment test procedures. 9 Resource Management M Strong interpersonal relationships with the technical support and capacity management teams. 10 Risk Register Monitoring L The risks included in the Risk Register must include quite detailed entries relating the IT systems and components. The tool used to maintain the register must be capable of categorising the risks. 11 Project Issues Log L A project issues log must be maintained and the tool used to maintain it must be capable of categorising the issues. 12 Vendor-driven Proactive Notification L A vendor’s capability to provide the required notification.
  • 22. A Definition of Proactive Problem Management 22 Step Activity Level of Benefit Prerequisites 13 Pre-emptive Problem Management L Knowledge of the techniques needed to think of potential threats in a structured manner. Level of Benefit – Expected number of issues avoided relative to the mean of all of the steps above.
  • 23. A Definition of Proactive Problem Management 23 APPENDIX B – PATTERN ANALYSIS EXAMPLE The following example was provided by Michael Hall: [Let’s imagine we] have three application teams supporting three different businesses. Each has a set of applications, let's say three each to make it simple. Incident data for each is tracked and reviewed regularly by Problem Management. Over the last three quarters:  Team 1 is averaging 3 sev 1 incidents, 15 sev 2 incidents, 100 sev 3 incidents  Team 2 is averaging 2 sev 1 incidents, 25 sev 2 incidents, 100 sev 3 incidents  Team 3 is averaging 0 sev 1 incidents, 50 sev 2 incidents, 100 sev 3 incidents So what is going on? Why does Team 3 have so many sev 2 incidents? This is where Problem Management can raise a proactive problem to go and do some digging, applying their analysis skills to get to the bottom of it. It's worthwhile, because, if they could get the number of sev 2 incidents down to the average of the other two groups (20), [it would prevent] 30 incidents per quarter, or up to 120 each year.
  • 24. A Definition of Proactive Problem Management 24 AUTHORS Paul Offord Paul Offord has had a 35-year career in the IT industry that includes roles in hardware engineering, software engineering and network management. Prior to founding Advance7 in 1989, he worked for IBM, National Semiconductor and Hitachi Data Systems. Paul is now the Development Director at Advance7. Paul is a Certified IT Professional and a Fellow of the British Computer Society. Steve White Steve White began his career in Computer Systems Maintenance in 1989 in various roles that have included Hardware on-site support, software Incident and Problem Management, backline software support and the deployment of RCA processes into a variety of companies and industries. He is currently a Senior Consultant with Kepner Tregoe, specialising in the integration of clear thinking processes in IT Support.
  • 25. A Definition of Proactive Problem Management 25 ACKNOWLEDGEMENTS We are greatly indebted to members of the ITIL Problem Management forum on LinkedIn for their input, particularly: Peter Dodd Pramesh Iyer Patrick Collings Prasanna Lakshmi Eric Sambraus Kundan Yadav Manish Singh Rahul Sahasrabudhe Tim Jobson Martina Todorova Carl Bindels Pradeep Bains Boitumelo Machogo Michael Hall Dan Skwire Lorie Wilson Shannon Mcilroy Swapnonil Bose Peter Senese Mark Dickinson Dahud Khan Bruce Burghgraef Joe Gallagher Stephen Maclean
  • 26. A Definition of Proactive Problem Management 26 ADDITIONAL INFORMATION ITIL definition of Problem Management: 1. David Cannon and David Wheeldon (2007) ITIL Service Operation, The Stationery Office, ISBN 978-0-1133-1046-3 2. Gary Klein (2004) The Power of Intuition: How to Use Your Gut Feelings to Make Better Decisions at Work, Currency, ISBN 0-385-50289-3 itSMF UK 150 Wharfedale Road Winnersh Triangle Wokingham RG41 5RB United Kingdom Phone: +44 (0) 118 918 6500 Web: www.itsmf.co.uk Revision 1.06