More Related Content
More from English107 (20)
Tianyu LU
- 2. Issue
• Long waiting time
• Slow train and bus speed
• Small coverage
• Lack connection with other transit
• Sustainable problem
- 3. Solution
• More train and bus
• Build train only tunnel
• Add more line
• Better coordination with other transit
• More option for ticket