1. Qaiser Abdulhadi Almiyahi
[IRAQ /Basra | 07712618750] , 07809184714 [Qaisar.Abdulhadi@gmail.com]
Graduation year : 2011 -2012
Career Summary
˃ Enthusiastic professional, experience in Civil engineering. Worked on various
diversified domain projects.
˃ skilled professionalcapableof handling the entire round of civil engineering
cycles, including planning, designing, evaluating and overseeing construction of
building structures and facilities.
˃ ensured that the projectshould be implemented as per specification and
complete in stipulated time with quality.
˃ Expertise in latest engineering tools and costevaluation techniques.
˃ Ability to work in high pressureenvironments and also a good team player.
Key Skills
˃ Expertise in AutoCAD
˃ using survey devices below to determined the coordinates, distances and levels
of the sites that extracted fromlayouts and tender of the projects:
Total station
Theodolite
Level
˃ effectively work with Microsoftoffice tools.
˃ Efficient management and organizationalabilities
˃ Ability to work in complex environments.
˃ Excellent Ability to handle variety of tasks and shift priorities simultaneously.
2. Personality Traits
˃ Excellent communication and interpersonalskills.
˃ Excellent Leadership quality.
˃ Strong in reconciling problems and resolveconflict.
˃ Ability to work independently and in a team environment.
Experience
Anwar Soura Company
September 2012 –2013 April(10months)
1-site engineer in the Alsmood bridge, I am worked responsiblefor the
compaction of soils in the Approaches of this bridge.
2-examine every layers of the approaches by sand cone test and make sureevery
layer has a acceptable compaction ratio according to the standards in the projects
tender.
3-installation of steel girders that held in the mid of this bridge,a curved girders in
order when the load come then make it on level and these girders stand on plastic
pads to let it expansion through summer.
4-precastconcrete: on the sides of the bridge a precast concrete was held in
these sides to supportthe sub base compaction.
5-test the concrete truck before begin the casting process by slump test and
examination of water quantity inside it.
6--Supervision and implementation of the foundations (pillars caps) with
calculating the limit of blows of pillars by using level and according to the
standards thatgiven in the projectplan.
3. Tarik al Salam Company.
April 2013– October 2013 (6months)
1-using AutoCAD for extract and determines all dimensions of these buildings
2-using total station +theodolite +level in any construction activity to make it on
standards thatgiven in the tender and the drawings.
3-directsupervision on any equipment’s that works insidethe site: shovel, grader,
compaction machines.
4-supervision on the works of the steel bars reinforcing specialin this projectwe
used a 25 mm bars with a big quantity to cover a 600 cubic meters and makesure
these bars are placed correct place.
5-calculating the required steel bars and concrete in any construction part.
6-takea sampleof cubic of concrete to examination og 7 age and 28 age.
7-treatment of the concrete after each casting process by water or any chemical.
October 2013 – Present Basrah
Facility coordinator.
that in charge of facilities maintenance of OILSERV building based
in Basra ,i am leading a team that contains :constructions
teams,electricals teams ,plumbers teams, generator operators
,also i am working as a site engineer on every construction
process that happen inside the base ,supervisor of compaction
sub base Works. Leading a team to fixing all routine faults that
happen in the buildings