SlideShare a Scribd company logo
1 of 3
Download to read offline
Ali Mostafa Ali Shaaban
Ali Eldakrory
Jeddah – K.S.A
Mobile: 0540289837
0542934752
E-mail: eng_ali_mostafa@yahoo.com
OBJECTIVE
Seeking a challenging position where I can take my place in the future construction and
contribute relevant experience background to my working field.
CURRENT JOB
 Feb. 2013 – Till Now
Employer: ORASCOM SAUDI for Construction & Industrial Company.
Client: SAUDI BINLADIN GROUP.
Job Title: Electrical project Engineer
Job Description: -Responsible for electrical work in utility tunnel.
-Responsible for installation cable ladder ,cable tray and cable trunk.
-Responsible for pulling MV cables by GREENLEETools
(www.greenlee.com) , arranged it by cable cleat.
-Responsible for termination MV cable ( at load center ,splicing ,Tee
connection and sub-station or transformer), tested it (Megger and
Highpot test).
-Responsible for pulling LV cable and tested it ( Megger).
-Responsible for installation lighting and small power systems.
-Responsible for installation LV substation , transformer.
-Responsible for installation main distribution panels and sub
distribution panels.
Project: KING ABDULAZIZ INTERNATIONAL AIRPORT
DEVELOPMENT PROJET
JEEDA – KINGDOM OF SAUDI ARABIA.
WORK EXPERIENCE
 November 2012 – Feb. 2013
Employer: MEGA for construction & Industrial Company.
Client: INITEC ENERGIA
Job Title: Electrical Site Engineer
Job Description: - Responsible for installation service transformer in workshop area.
-Responsible for installation Diesel Generator 300KVA with ATS
panel in workshop area
- Responsible for installation lighting and small power systems in
workshop and site.
Project: Giza North Simple Cycle Power Plant
1000 MW Gas Turbine Project
Giza – EGYPT
 November 2011 – August 2012
Employer: Kharafi National for Mechanical & Electrical Works, S.A.E
Client: East Delta Electricity Production Company
Job Title: Electrical Site Engineer
Job Description: -Responsible for GIS equipments installation and testing.
-Responsible for lighting & small power & data and telephone &
paging & fire alarm and lightning systems for GIS Buildings
- Responsible for receiving all Switchgear, Load Centers and MCC
panels supplied from Schneider and Hyundai and connect cables.
- Responsible for utilities works duct bank all over the plant, pulling
M.V, L.V cables and yard lighting.
- Responsible for preparing as built drawings.
Project: West Damietta Simple Cycle Power Plant
500 MW Gas Turbine Project
Damietta – EGYPT
 December 2010 – November 2011 (End of project)
Employer: Kharafi National for Mechanical & Electrical Works, S.A.E
Client: East Delta Electricity Production Company
Job Title: Electrical Site Engineer
Job Description: - Responsible for the installation of all Switchgear, Load Centers and
MCC panels supplied from Schneider and GE and Hysoung.
- Responsible for the installation Diesel Generator and testing.
-Responsible for utilities works duct bank all over the plant, pulling
chambers around the turbines and yard lighting.
-Responsible for Lighting, Small power, Telephone & Data, Fire
alarm and Paging Systems in all buildings.
-Responsible for Earthing system cw welding all the pigtails going to
equipments and Lightning protection over buildings.
-Responsible for preparing as built drawings.
Project: Damietta Simple Cycle Power Plant
500 MW Gas Turbine Project
Damietta – EGYPT
 July 2010 – November 2010
Employer: Kahromika (Egyptian Company for Electrical and Mechanical
Projects).
Client: Head Office at Tender Department
Job Title: Electrical Engineer
Job Description: - Responsible for study the Offers and take-off the require materials
(Cables, Cable Tray ,Conduits and Accessories) and send it to
Supplier and Compare between the supplier’s offers.
- Responsible for Revise Technical Offices Site Reports.
 October 2008 – July 2010
Employer: Kahromika (Egyptian Company for Electrical and Mechanical
Projects).
Client: Alstom , CMI and INITEC ENERGIA ,
Upper Egypt Electricity Production Company(UEEPC).
Job Title: Electrical Site Engineer
Job Description: - Responsible for pulling control &LV and MV cables and tested it .
- Responsible for installation Load Center & MCC & Protection and
Control Panels .
- Responsible for installation Iso-Phase Bus Duct and tested it.
- Responsible for installation Fire alarm system and lighting system.
- Responsible for close Punch List with Owner .
Project: El kuruimat III combined cycle power station Project
750 MW (3*250MW).
EDUCATION
 Fayoum University'2008'
o Bachelor degree in the power and electrical machine engineering:
 General grade: Good
 4th
year grade: Good
 Project grade: Excellent
 Project: Design , implementation and practical application for
programmable logic controller (PLC)
COURSES
 Jelecom A.D. Panasonic company , Cairo , Egypt
PLC (programmable logic controller) advanced course (level 1)
 industrial regulations company , Cairo , Egypt
SCADA & PLC & Touch screen course
 Cairo University ,. Microcontroller course.
SKILLS
 Computer Skills:
 Excellent Knowledge of operating system Windows.
 Very good Knowledge of Word, Excel, Power point, Auto-CAD, Internet, MATLAB
& MS Outlook.
 Linguistic Skills:
 Native language Arabic.
 Very good command of both written and spoken English.
 Personal Skills:
 Dynamic leader and team builder, consistently motivating others towards success.
 Outstanding customer service skills.
 Ability to work under pressure.
PERSONAL INFORMATION
 Date of Birth: 20/10/1984
 Nationality: Egyptian
 Marital Status: married
 Military Status: Exempted

More Related Content

What's hot

What's hot (19)

ASIF RESUME 00
ASIF RESUME 00ASIF RESUME 00
ASIF RESUME 00
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
Sooraj Padman CV
Sooraj Padman CVSooraj Padman CV
Sooraj Padman CV
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathi
 
hossam electrical power engineer
hossam electrical power engineerhossam electrical power engineer
hossam electrical power engineer
 
Electrical Engineer Cv
Electrical Engineer CvElectrical Engineer Cv
Electrical Engineer Cv
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Mohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical EngineerMohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical Engineer
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
ehab mohamed
ehab mohamedehab mohamed
ehab mohamed
 
Abdelrahman Elsayed CV
Abdelrahman Elsayed CVAbdelrahman Elsayed CV
Abdelrahman Elsayed CV
 
CV 10-5-2014
CV 10-5-2014CV 10-5-2014
CV 10-5-2014
 
cv
cvcv
cv
 

Viewers also liked

An Introduction to Teaching With Social Media
An Introduction to Teaching With Social MediaAn Introduction to Teaching With Social Media
An Introduction to Teaching With Social Mediasociamigo
 
What the young indians want
What the young indians wantWhat the young indians want
What the young indians wantsarathbabu b
 
Kindpakket brochure gem Capelle
Kindpakket brochure gem CapelleKindpakket brochure gem Capelle
Kindpakket brochure gem CapelleGert van der Beek
 
05. pti perangkat keras; input dan output
05. pti   perangkat keras; input dan output05. pti   perangkat keras; input dan output
05. pti perangkat keras; input dan outputHerii Disubang
 
духовные законы
духовные законыдуховные законы
духовные законыmaria_kostyk
 
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®DGCommunications
 
SelfAssessment_Online
SelfAssessment_OnlineSelfAssessment_Online
SelfAssessment_OnlineYi Liu
 
How about start up
How about start upHow about start up
How about start upSunny Chiu
 
Presentazione prime ipotesi 11.05.2015
Presentazione prime ipotesi 11.05.2015Presentazione prime ipotesi 11.05.2015
Presentazione prime ipotesi 11.05.2015A.C.M.E. Devise
 
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®DGCommunications
 
Amazing woman dialogues word presentation
Amazing woman dialogues word presentationAmazing woman dialogues word presentation
Amazing woman dialogues word presentationVaida Odongo
 
Study in ukraine cost
Study in ukraine costStudy in ukraine cost
Study in ukraine costEdufactsIndia
 

Viewers also liked (16)

An Introduction to Teaching With Social Media
An Introduction to Teaching With Social MediaAn Introduction to Teaching With Social Media
An Introduction to Teaching With Social Media
 
Pronouns
PronounsPronouns
Pronouns
 
What the young indians want
What the young indians wantWhat the young indians want
What the young indians want
 
Kindpakket brochure gem Capelle
Kindpakket brochure gem CapelleKindpakket brochure gem Capelle
Kindpakket brochure gem Capelle
 
05. pti perangkat keras; input dan output
05. pti   perangkat keras; input dan output05. pti   perangkat keras; input dan output
05. pti perangkat keras; input dan output
 
MY LAST VACACION
MY LAST VACACIONMY LAST VACACION
MY LAST VACACION
 
духовные законы
духовные законыдуховные законы
духовные законы
 
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®
Proper Pool and Fountain Maintenance | Tips from The Grounds Guys®
 
SelfAssessment_Online
SelfAssessment_OnlineSelfAssessment_Online
SelfAssessment_Online
 
How about start up
How about start upHow about start up
How about start up
 
Presentazione prime ipotesi 11.05.2015
Presentazione prime ipotesi 11.05.2015Presentazione prime ipotesi 11.05.2015
Presentazione prime ipotesi 11.05.2015
 
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®
Fertilizer: A Balanced Diet for Your Plants | Tips from The Grounds Guys®
 
Amazing woman dialogues word presentation
Amazing woman dialogues word presentationAmazing woman dialogues word presentation
Amazing woman dialogues word presentation
 
6 Ways to Save Your Hearing
6 Ways to Save Your Hearing6 Ways to Save Your Hearing
6 Ways to Save Your Hearing
 
Patent Design
Patent DesignPatent Design
Patent Design
 
Study in ukraine cost
Study in ukraine costStudy in ukraine cost
Study in ukraine cost
 

Similar to Electrical Engineer Resume

Similar to Electrical Engineer Resume (20)

Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
CV mohamed -2016
CV mohamed  -2016CV mohamed  -2016
CV mohamed -2016
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 
Mohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque ResumeMohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque Resume
 
ENG-ALI CV construction
ENG-ALI CV constructionENG-ALI CV construction
ENG-ALI CV construction
 
amr updated
amr updatedamr updated
amr updated
 
cvee new
cvee newcvee new
cvee new
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
M.Ashraf
M.AshrafM.Ashraf
M.Ashraf
 
Nizar Maddah CV
Nizar Maddah CVNizar Maddah CV
Nizar Maddah CV
 
ENDI_MAFI_UTIH_resume
ENDI_MAFI_UTIH_resume ENDI_MAFI_UTIH_resume
ENDI_MAFI_UTIH_resume
 
Eng.yahya zakaria 1
Eng.yahya zakaria 1Eng.yahya zakaria 1
Eng.yahya zakaria 1
 
Eng.Tamer CV
Eng.Tamer CVEng.Tamer CV
Eng.Tamer CV
 
Islam Emam
Islam EmamIslam Emam
Islam Emam
 
M Adel CV 2016
M Adel CV 2016M Adel CV 2016
M Adel CV 2016
 

Electrical Engineer Resume

  • 1. Ali Mostafa Ali Shaaban Ali Eldakrory Jeddah – K.S.A Mobile: 0540289837 0542934752 E-mail: eng_ali_mostafa@yahoo.com OBJECTIVE Seeking a challenging position where I can take my place in the future construction and contribute relevant experience background to my working field. CURRENT JOB  Feb. 2013 – Till Now Employer: ORASCOM SAUDI for Construction & Industrial Company. Client: SAUDI BINLADIN GROUP. Job Title: Electrical project Engineer Job Description: -Responsible for electrical work in utility tunnel. -Responsible for installation cable ladder ,cable tray and cable trunk. -Responsible for pulling MV cables by GREENLEETools (www.greenlee.com) , arranged it by cable cleat. -Responsible for termination MV cable ( at load center ,splicing ,Tee connection and sub-station or transformer), tested it (Megger and Highpot test). -Responsible for pulling LV cable and tested it ( Megger). -Responsible for installation lighting and small power systems. -Responsible for installation LV substation , transformer. -Responsible for installation main distribution panels and sub distribution panels. Project: KING ABDULAZIZ INTERNATIONAL AIRPORT DEVELOPMENT PROJET JEEDA – KINGDOM OF SAUDI ARABIA. WORK EXPERIENCE  November 2012 – Feb. 2013 Employer: MEGA for construction & Industrial Company. Client: INITEC ENERGIA Job Title: Electrical Site Engineer Job Description: - Responsible for installation service transformer in workshop area. -Responsible for installation Diesel Generator 300KVA with ATS panel in workshop area - Responsible for installation lighting and small power systems in workshop and site. Project: Giza North Simple Cycle Power Plant 1000 MW Gas Turbine Project Giza – EGYPT
  • 2.  November 2011 – August 2012 Employer: Kharafi National for Mechanical & Electrical Works, S.A.E Client: East Delta Electricity Production Company Job Title: Electrical Site Engineer Job Description: -Responsible for GIS equipments installation and testing. -Responsible for lighting & small power & data and telephone & paging & fire alarm and lightning systems for GIS Buildings - Responsible for receiving all Switchgear, Load Centers and MCC panels supplied from Schneider and Hyundai and connect cables. - Responsible for utilities works duct bank all over the plant, pulling M.V, L.V cables and yard lighting. - Responsible for preparing as built drawings. Project: West Damietta Simple Cycle Power Plant 500 MW Gas Turbine Project Damietta – EGYPT  December 2010 – November 2011 (End of project) Employer: Kharafi National for Mechanical & Electrical Works, S.A.E Client: East Delta Electricity Production Company Job Title: Electrical Site Engineer Job Description: - Responsible for the installation of all Switchgear, Load Centers and MCC panels supplied from Schneider and GE and Hysoung. - Responsible for the installation Diesel Generator and testing. -Responsible for utilities works duct bank all over the plant, pulling chambers around the turbines and yard lighting. -Responsible for Lighting, Small power, Telephone & Data, Fire alarm and Paging Systems in all buildings. -Responsible for Earthing system cw welding all the pigtails going to equipments and Lightning protection over buildings. -Responsible for preparing as built drawings. Project: Damietta Simple Cycle Power Plant 500 MW Gas Turbine Project Damietta – EGYPT  July 2010 – November 2010 Employer: Kahromika (Egyptian Company for Electrical and Mechanical Projects). Client: Head Office at Tender Department Job Title: Electrical Engineer Job Description: - Responsible for study the Offers and take-off the require materials (Cables, Cable Tray ,Conduits and Accessories) and send it to Supplier and Compare between the supplier’s offers. - Responsible for Revise Technical Offices Site Reports.  October 2008 – July 2010 Employer: Kahromika (Egyptian Company for Electrical and Mechanical Projects). Client: Alstom , CMI and INITEC ENERGIA , Upper Egypt Electricity Production Company(UEEPC). Job Title: Electrical Site Engineer Job Description: - Responsible for pulling control &LV and MV cables and tested it .
  • 3. - Responsible for installation Load Center & MCC & Protection and Control Panels . - Responsible for installation Iso-Phase Bus Duct and tested it. - Responsible for installation Fire alarm system and lighting system. - Responsible for close Punch List with Owner . Project: El kuruimat III combined cycle power station Project 750 MW (3*250MW). EDUCATION  Fayoum University'2008' o Bachelor degree in the power and electrical machine engineering:  General grade: Good  4th year grade: Good  Project grade: Excellent  Project: Design , implementation and practical application for programmable logic controller (PLC) COURSES  Jelecom A.D. Panasonic company , Cairo , Egypt PLC (programmable logic controller) advanced course (level 1)  industrial regulations company , Cairo , Egypt SCADA & PLC & Touch screen course  Cairo University ,. Microcontroller course. SKILLS  Computer Skills:  Excellent Knowledge of operating system Windows.  Very good Knowledge of Word, Excel, Power point, Auto-CAD, Internet, MATLAB & MS Outlook.  Linguistic Skills:  Native language Arabic.  Very good command of both written and spoken English.  Personal Skills:  Dynamic leader and team builder, consistently motivating others towards success.  Outstanding customer service skills.  Ability to work under pressure. PERSONAL INFORMATION  Date of Birth: 20/10/1984  Nationality: Egyptian  Marital Status: married  Military Status: Exempted