SHELDON AVENUE
H I G H G A T E L O N D O N N 6
BIRCHWOOD
description
Our clients approached us with a requirement to refurbish a much loved house which had
been in their ownership for 25 years.
Our response was to design a contemporary living space which connected and celebrated the
beautiful rear garden which backs directly onto Highgate Golf Course.
Our construction partners, Champion Build, worked with us to hone the scheme to
‘get it right before site’.
We submitted our scheme to Haringey Planning Control and once planning was granted
commenced on site against a highly driven and condensed programme.
P R O J E C T VA L U E : £ 2 . 8 M D E V E L O P M E N T
P R O J E C T T E R M : 11 M O N T H S
C U R R E N T VA L U E : £ 7 M
01
02
03
04
05
06
07
08
09
10
shelves
Coats
WC
DiningRoom
Study
Library
Kitchen
Hall
UtilityRoom
+103.92
103.92
+103.92
+103.92
fire
+103.785
+103.65
+103.65
+103.92
+103.785
+103.50
+103.65+103.65
103.92
+103.785
+103.785
+103.65
+103.50
+103.50
+103.35
0 5 10 15 20 M
15560
existing brick retaining wall
WaughThistleton
ArchitectsLtd
74PaulStreet
STATUS
Job
Title
Date
Scale
Drawn
REV COMM
A Scale
LocatiB
Size &C
Pool lD
Pavin
to refl
250m
E
+103.65
+103.
+103.
+103.35
existing brick wall
to be retained &
extended
= 600 x 900
external paver
STEP
proposed planting
bed
existing wooden
shed
Pool Location (1:100)
Site Plan
11
D0-03
D0-02
D0-04
shelves shelves
Coats
WC
Dining Room
Study
Library
Kitchen
Hall
Utility Room
fire
D0-01
D0-05
D0-06
D0-07
D0-08
D0-09
extent of terrace TBC
relocated position
of A/C unit (TBC)
relocated position
of A/C unit (TBC)
Ground Floor
12
First Floor
13
Second Floor
blissspace.co.uk

More Related Content

Viewers also liked (7)

una_logo vertical
una_logo verticaluna_logo vertical
una_logo vertical
 
Project Photo
Project PhotoProject Photo
Project Photo
 
certificate
certificatecertificate
certificate
 
2016-09-16 18-29
2016-09-16 18-292016-09-16 18-29
2016-09-16 18-29
 
Question 4
Question 4Question 4
Question 4
 
infancia y Escuela en la Construccion de Subjetividad
infancia y Escuela en la Construccion de Subjetividadinfancia y Escuela en la Construccion de Subjetividad
infancia y Escuela en la Construccion de Subjetividad
 
Ramada-Plaza-Hotel-case-study
Ramada-Plaza-Hotel-case-studyRamada-Plaza-Hotel-case-study
Ramada-Plaza-Hotel-case-study
 

Similar to 33 Sheldon Avenue (7)

27 Hurst Ave
27 Hurst Ave27 Hurst Ave
27 Hurst Ave
 
Hyde Housing's Public Consultation document 9 April 2014
Hyde Housing's Public Consultation document 9 April 2014Hyde Housing's Public Consultation document 9 April 2014
Hyde Housing's Public Consultation document 9 April 2014
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Practice Profile
Practice ProfilePractice Profile
Practice Profile
 
RD Stott Architects
RD Stott ArchitectsRD Stott Architects
RD Stott Architects
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
 
QEN Portfolio CV Residential
QEN Portfolio CV ResidentialQEN Portfolio CV Residential
QEN Portfolio CV Residential
 

33 Sheldon Avenue