1. Item
No.
Description Unit Quantity Unit
Price(RM)
Total(RM)
1 Supply & laying and
compacting of 150mm thick
over burnt brick.
1400 21.20 29,694
2 Providing and laying in
position cement concrete
1:4:8 specifies grade
including the cost of
centering and shuttering
2315 15.89 36,785.35
3 12mm thick cement plaster
of mix 1:5(I cement:5
course sand) on walls
sqm 140 821.12 114,956.80
4 Marble stone slab with
18mm thick marble flooring
600 109.14 6548.40
5 Foundations, footings,
bases of columns, etc for
mass concrete
sqm 170 40.65 6910.50
6 Stairs,( excluding landings) sqm 290 11.25 3262.50
7 Providing fixing stainless
steel railing in staircase
RM 90 7.90 711
8 Painting/ polishing over
doors or windows
RM 25 150 3750
9 60W circular Pendant
ceiling mount, IP54
fluorescent light fixture
with all accessories
RM 20 21 420
10 Fire alarm push button,
double action type, UL
Listed
RM 4 8 32
11 Emergency evacuation
lighting
RM 3 7 21
12 Fire Rated Door RM 8 95 760
13 Roof timber structure on
the trusses.
236 650 153,400
14 Standing seam metal
roofing
782 75.86 59,322.52
15 3 (1X4mm2) wires pulled in
24mm PVC
Conduit
6 900 54,000
2. Bill No. Item Description Total (RM)
1 1 Total for Electrical 95,468
2 2 Total for Site 357,963
3 3 Total for Structure 45,742
4 4 Total to Finish 267,946
5 5 Total for Water Supply Service 56,842
6 6 Total for Interior 93,742
7 7 Total for General 69,628
Total 987,331