2. Criteria Point Fact and Figure
Actual
point
Quality Standards Check list made and followed 1Done 1
EP Buddy JD defined and implemented 1Done 1
iSOS Service is implemented and used for all Eps 1Done 1
Insurance or Visa Partnership done or used 2done 2
All cases addressed and closed with comments 2 done 2
OPS and CPS conducted for 90% Eps
(Specify number of attendees) 2Not done
0
OPS and CPS conducted (2 each before
summer) 2
Spring rec: 2 OPS & 1 CPS
Pocket Rec: 1 OPS 1 CPS 2
2 LEADs Organized 3
included in OPS and CPS 3
At least 1 Newsletter sent for each engagement
phase 3 none 0
3. Number of Application forms come form
Facebook/website: 32 = 71%
Criteria Point Fact and Figure Actual point
All forms on podio workspace have an
allotted status
1
not done 0
Match 2 Realize App have 90% of Eps
registered
3
not done 0
IR survey App to get details from LCs 3done 3
oGCDP Partnerships app to save all
partnerships done
3
done 3
All EP Data from national Ors and OP is
addressed
2
done 2
All Audits since january are filled
completely on time
2
done 2
OGX Experience tracker updated 1done 1
National OGX meeting attended(may
and june) *1
1+1
done 2
4. International Relations Management
Criteria Point Fact and Figure Actual point
All EPs needs to be updated in national
search tool with relevant details
2
Not done 0
EP Searchtool is updated within 48 hours
of new TNs/partnership announcement
1
Not done 0
Partnership Framework and codelivery
checklist is made between partnering
entities
2
done 2
EP Profile generated for your LC and used 1
done with some
cases 1
In fact, EPs of LC Hanoi show a more interest in self-matching. We delivered
all the partnership, matching mania, … to EP, but it’s not effective
5. Goals Management
Criteria PointFact and Figure Actual point
50% Eps matched through National Partnerships 5no 0
80% Eps matched through National Partnerships 8no 0
80% attendance of representatives in matching
manias and power hours
2
no 0
SU and expansions achieve target promised 3done 3
More than 70% of planned Eps realized (RE) 364 actual 0
More than 90% of planned Eps realized (RE) 5 0
More than 70% of planned Eps Matched (MA) 358 actual 0
More than 90% of planned Eps Matched (MA) 5 0
>80% Raise target achieved as per plans 5 0
6. Innovation and Initiatives
Criteria
Point
Fact and
Figure Actual point
Issue Based Sub Product(Brand Packaging) promoted 1done 1
90% stories generated from Winter peak 2no 0
10 stories submitted for Showcasing Platform from LC 2no 0
Innovative Posters and Message 2 2
Year Long Promotions conducted for registrations 2 2
Activeness on commission (Reply to mails/ Confirmations/
Sharing stories, experiences)
5
5
Innovations and Initiatives with results 5 5
7. Innovation and Initiatives
Criteria
Point
Fact and
Figure Actual point
Issue Based Sub Product(Brand Packaging) promoted 1done 1
90% stories generated from Winter peak 2no 0
10 stories submitted for Showcasing Platform from LC 2no 0
Innovative Posters and Message 2 2
Year Long Promotions conducted for registrations 2 2
Activeness on commission (Reply to mails/ Confirmations/
Sharing stories, experiences)
5
5
Innovations and Initiatives with results 5 5