Thermes Participações SA
        June 2009
A privately held firm
headquartered in Rio de
Janeiro, Brazil that invests in
power generation. The firm
develops power plants and sells
them when operational.
Thermes has amassed
considerable expertise in the
the greenfield phase of project
development. Our ability to
manage and reduce risks
during this phase is a
significant asset and a source
of competitive advantage.
project development critical path

         1                    2                     3                   4                    5

                        Cash Flow             Contract              Partner              Project
  Origination
                        Modeling             Negotiation           Selection             Finance

continuously vet      develop robust       negotiate major      selecting sponsors   navigate regulatory
and generate ideas    financial models      contracts such as    so as to guarantee   hurdles and
that are candidates   based on realistic   Engineering,         project success,     requirements of
for new projects      assumptions tested   Procurement, and     requires extensive   federal and state
both internally and   by experience and    Construction, Fuel   knowledge of the     financial
through an            validated by         Supply, and Power    strengths and        institutions that
extensive network     outside experts.     Purchasing           weaknesses of        provide long term
of collaborators.                          Agreements,          players in the       funding at below
                                           Equipment Supply     energy sector.       market cost.
                                           and Civil Works.
The firm is widely recognized
as one of Brazil’s leading
developers of thermal power
plants.

Taken together, current
engagements and completed
projects total 1,700MW gross
capacity of power plants
throughout Brazil.
Completed Projects and                         Project                       Location
                                                                                                 Starting
                                                                                                   Date   Share.

Under Development                         MW
                                          94
                                               Hydro
                                                UHE Energética Corumbá III   Luziânia, GO        Mar-09
                                                                                                            %
                                                                                                            5
                                         115    UHE Murta Energética         Coronel Murta, MG   Jan-12    33
                                         209   Total

                                               Thermal
                                         166    UTE BREITENER                Maracanaú, CE       Oct-02    24
Thermes played a decisive role in all
                                          83    UTE Tambaqui                 Manaus, AM          Dec-05    24
of the critical stages of each            83    UTE Jaraqui                  Manaus, AM          Mar-05    24
individual project. Other players        169    UTE Borborema                Fortaleza, CE       Jan-10    50
were brought in subsequently to          164    UTE Maracanaú                Fortaleza, CE       Jan-10    50
diversify risk and limit balance sheet   300    UTE Geraldo Rola             Pecém, CE           Jan-11    38
exposure.                                 70    UTE Lambari                  Fortaleza, CE       Jan-12    50
                                         337    UTE Escolha                  Linhares, ES        Jan-13    38
                                         127    UTE Cacimbaes                Linhares, ES        Jan-13    38
                                         1,499 Total

                                         1,708 TOTAL                                                       37
The Investment Opportunity
PPAs Obtained Per Annum

                                                               1,580
                                                       764MW
Thermes has an                                 396MW
enviable track record of
developing new projects                204MW
and obtaining PPAs
through competitive            166MW
bids at auction.

                               2002    2005    2007    2008    2009
Our expansion plans offer
investors willing to take on
greenfield risk an excellent
choice of sector or energy
specific strategies and vehicles.
Newco Energia Participações SA

 Thermes Par.         Wind Par.                    Hydro Par.     Alternative Par.

SPE Tambaqui       CGE Ventos de Zumby 09       SPE ECIII         Campina Grande 09
SPE Jaraqui        CGE Marcos Porto 09          SPE Murta         Maracanaú 09
SPE Borborema      CGE Ventos do Atlântico 09   Alto Corumbá 10   Pacatuba 09
SPE Maracanaú      CGE Acaraú 09                Rio Parnaíba 10   Conesud 09
SPE Lambari        CGE São Francisco 09                           Rio Grande 09
SPE Geraldo Rola   CGE Galinhos 10                                Pelotas 09
SPE Capixabas      CGE Parazinho 10                               Passo Fundo 09
Thermes is able to maintain a
lean managment team by
developing power plants
through SPVs (special purpose
vehicles). Each SPV is endowed
with an executive management
team that reports to a board of
directors. Each board, in turn,
is comprised of members
elected by Thermes and other
shareholders.
EBITDA


            5-Year Cash Flow
            Projections and
   EQUITY   Equity Requirements
Thermal HFO (Heavy Fuel Oil)
UTE BREITENER 166MW

Located in Maracanaú, CE.
PPA from 2002 to 2004
Annual Revenues R$240mm
EBITDA R$80mm
Cap X R$300mm.


Gen set MAN 8 x 18V 48/60 + 2 x 16V 32/40
Transmission line 69kV x 3.5 km.
Grid connection at SE DID II – Coelce.
UTE BREITENER 166MW

          Petrobras
             35%

                      Enerconsult
                          6%
                          Orteng
                            6%




 SKANSKA I&D          Thermes
     30%                24%
UTE Tambaqui 83MW

Located in Manaus, AZ.
PPA from 2005 to 20025
Annual Revenues R$62mm
EBITDA R$35mm
Cap X R$75mm.


Gen set MAN 4 x 18V 48/60 + 1 x 16V 32/40
Transmission line 69kV x 8 km.
Grid connection at SE MESA.
UTE Tambaqui 83MW

          Petrobras
             35%

                      Enerconsult
                          6%
                          Orteng
                            6%




 SKANSKA I&D          Thermes
     30%                24%
UTE Jaraqui 83MW

Located in Manaus, AZ.
PPA from 2005 a 2025
Annual Revenues R$60mm
EBITDA R$35mm
Cap X R$150mm.


Gen set MAN 4 x 18V 48/60 + 1 x 16V 32/40
Transmission line 69kV x 3 km.
Grid connection at SE MESA.
UTE Jaraqui 83MW

         Petrobras
            35%

                     Enerconsult
                         6%
                         Orteng
                           6%




SKANSKA I&D          Thermes
    30%                24%
BORBOREMA Energética 169MW

Located in Campina Grande, PB.
PPA from 2010 to 2024
Annual Revenues R$64.9mm
EBITDA R$48mm
Cap X R$325mm.


Gen set Wärtsilä 20 x 20V 32
Transmission line 230kV x 3,5km.
Grid connection at SE Campina Grande II-
CHESF.
BORBOREMA Energética 169MW

                   Thermes
                     50%




    Consórcio Infra-Estrutura BERTIN EQUIPAV
                       50%
Maracanaú Geradora de Energia 162MW


Located in Maracanaú, CE.
PPA from 2010 to 2024
Annual Revenues R$ 65.4mm
EBITDA R$50,6mm
Cap X R$340mm.


Gen set Wärtsilä 8 x 20V 46
Transmission line 69kV x 8,5 km.
Grid connection at SE DID II – Coelce.
Maracanaú Geradora de Energia 162MW


                     Thermes
                       50%




      Consórcio Infra-Estrutura BERTIN EQUIPAV
                         50%
Lambari Geradora de Energia 70MW

Located in Maracanaú, CE.
PPA from 2012 to 2026
Annual Revenues R$27.2mm
EBITDA R$8mm
Cap X R$120mm.


Gen set Wärtsilä 4 x 20V 46
Transmission line 69kV x 8,5 km.
Grid connection at SE DID II – COELCE.
Lambari Geradora de Energia 70MW

                    Thermes
                      50%




     Consórcio Infra-Estrutura BERTIN EQUIPAV
                        50%
Thermal LNG (Liquid Natural Gas)
Geraldo Rola 300MW

Located in Pecém, CE.
PPA from 2011 a 2025
Annual Revenues R$87mm
EBITDA R$46mm
Cap X R$380mm.


Gen set Wärtsilä 36 x 20V 34 SG
Transmission line 230kV x 4,5 km.
Grid connection at SE Cauipe.
Geraldo Rola 300MW

               Thermes
                 38%




                         Agroenergia
                            13%




   Petrobras
      49%
Escolha 337MW

Located in Linhares, ES.
PPA from 2013 a 2027
Annual Revenues R$123.7mm
EBITDA R$92mm
Cap X R$420mm.


Turbine GE x 2 + CC x 1
Transmission line 345 KV x 3 km.
conexão no seccionamento da Transmission
line .
Escolha 337MW

           Thermes
             38%




Cobrapar
  5%

Spectrum
   8%



                     Petrobras
                        49%
Cacimbaes 127MW

Located in Linhares, ES.
PPA from 2013 a 2027
Annual Revenues R$120mm
EBITDA R$41.4mm
Cap X R$158mm.


Turbine GE x 1 + CC x 1
Transmission line 138 KV x 3.5 km.
conexão no seccionamento da Transmission
line .
Cacimbaes 127MW

           Thermes
             38%




Cobrapar
  5%

Spectrum
   8%



                     Petrobras
                        49%
Hydro
Energética Corumbá III 94 MW

Located in Luziânia, GO.
PPA from 2009 to 2042
Annual Revenues R$120mm
EBITDA R$68,5mm
Cap X R$420mm.


Turbine Energomach 47 x 2
Transmission line 138kV x 120 km.
Grid connection at SE Santa Maria CEB.
Energética Corumbá III 94 MW

       Neoenergia
          60%




                           Thermes
                             5%
                       Energpower
                           5%


                    Celg
             CEB    15%
             15%
Murta Energética 115MW

Located at the Jequitinhonha river in
Coronel Murta, MG.
PPA
Requested environamental license
Murta Energética 115MW

          Thermes
            33%




  Logos             Eptisa
   34%               33%
Hydro Pipeline

We are in the process of studying Rio
Parnaiba which appears to have a
1,000MW potential in Hydro plants, that
will be the object of government
auctions during 2009 and 2010. We are
also studying Rio Corumba, to establish
its potential for run of river projects.
Wind
Wind Pipeline

We have confirmed wind measurements,
and obtained land use rights to
locations representing aproximately
1,300MW of wind farm potential in
Northeastern Brazil. In 2009, we expect
to win 580MW at auction under 20 year
PPAs, and an additional 620MW in 2010.
We have reason to believe that we have
identified sites representing an aditional
1GW of that will be developed in 2011.
CGE Ventos de ZUMBY 45MW

          Thermes
            97%




                         ACNI
                          3%



 Expected starting date 2010.
 237 hectares in Rio do Fogo, RN.
 Cap X R$ 225mm.
 Annual revenues R$29.9mm x 20 yrs..
CGE Ventos de ZUMBY 45MW

 Turbine 1.5MW GE SLE a 80m.
 Efficiency factor 38%.
 Average wind speed 7.8 m/s at 80 m.
 Transmission line 69kV x 1 km.
 Grid connection at linha Iberdrola.
CGE Marcos Porto 210MW

              Thermes
                97%




                              ACNI
                               3%


Expected starting date 2010.
1.320 hectares in Timbau - Grossos, RN.
Cap X R$1.050mm.
Annual revenues R$132.8mm x 20 yrs..
CGE Marcos Porto 210MW

Turbine 1.5MW GE SLE a 80m.
Efficiency factor 36%.
Average wind speed 7.2 m/s at 80 m.
Transmission line 230kV x45 km.
Grid connection at SE Mossoro II.
CGE Ventos do Atlântico 186MW

            Thermes
              97%




                           ACNI
                            3%


 Expected starting date 2010.
 1.250 hectares in Areia Branca, RN.
 Cap X R$930mm.
 Annual revenues R$136.8mm x 20 yrs..
CGE Ventos do Atlântico 186MW


   Turbine 1.5MW GE SLE a 80m.
   Efficiency factor 42%.
   Average wind speed 8.5 m/s at 80 m.
   Transmission line 230kV x 100 km.
   Grid connection at SE Mossoro III.
CGE São Francisco 55MW

         Thermes
           97%




                        ACNI
                         3%


Expected starting date 2010.
322 hectares in Acarau, RN.
Cap X R$275mm.
Annual revenues R$38.5mm x 20 yrs..
CGE São Francisco 55MW

 Turbine 2.5MW Fuhrlander 2500 a 80m.
 Efficiency factor 40%.
 Average wind speed 8.2 m/s at 80 m.
 Transmission line 230kV x 95 km.
 Grid connection at SE Sobral III.
CGE Acaraú 75MW
          Thermes
            97%




                         ACNI
                          3%


Expected starting date 2010.
398 hectares in Acarau, CE.
Cap X R$375mm.
Annual revenues R$52.5mm x 20 yrs..
CGE Acarau 75MW

     Turbine 2.5MW Fuhrlander 2500 a 80m.
     Efficiency factor 40%.
     Average wind speed 8.2 m/s at 80 m.
     Transmission line 230kV x 95 km.
     Grid connection at SE Sobral III.
Renewable
Municipal Waste-to-Energy
Pipeline
After identifying an enormous repressed
demand for solutions to solid urban
waste, we developed on a proprietary
basis and using exclusively national
technology a commercially viable and
scalable project for transforming waste
into energy. During 2009 we will begin
the roll out of this technology in the
following pilot municipalities: Campina
Grande, Marcanau, Pacatau, totaling
87MW.
Thermes Participações SA
        June 2009

More Related Content

Similar to Thermes Participações SA: Brazil's Leading Power Plant Developer

Enor Chile 2010 Corp
Enor Chile 2010 CorpEnor Chile 2010 Corp
Enor Chile 2010 Corprod_cl
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochurePolly Freeman
 
Update on projects presentation
Update on projects presentationUpdate on projects presentation
Update on projects presentationMPX_RI
 
Mpx corp presentation eng_v2
Mpx corp presentation eng_v2Mpx corp presentation eng_v2
Mpx corp presentation eng_v2MPX_RI
 
Conference Call Presentation 1Q11
Conference Call Presentation 1Q11Conference Call Presentation 1Q11
Conference Call Presentation 1Q11MPX_RI
 
A 5 auction results
A 5 auction resultsA 5 auction results
A 5 auction resultsMPX_RI
 
Corporate presentation january
Corporate presentation   januaryCorporate presentation   january
Corporate presentation januaryMPX_RI
 
sempra energy 2004 Annual Report
sempra energy 2004 Annual Reportsempra energy 2004 Annual Report
sempra energy 2004 Annual Reportfinance24
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationMPX_RI
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate PresentationMPX_RI
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation engMPX_RI
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationMPX_RI
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017CPFL RI
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX ResultsMPX_RI
 
Energy Storage Summit Day 1
Energy Storage Summit Day 1Energy Storage Summit Day 1
Energy Storage Summit Day 1Jill Kirkpatrick
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5MPX_RI
 

Similar to Thermes Participações SA: Brazil's Leading Power Plant Developer (20)

Enor Chile 2010 Corp
Enor Chile 2010 CorpEnor Chile 2010 Corp
Enor Chile 2010 Corp
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochure
 
Update on projects presentation
Update on projects presentationUpdate on projects presentation
Update on projects presentation
 
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
 
Mpx corp presentation eng_v2
Mpx corp presentation eng_v2Mpx corp presentation eng_v2
Mpx corp presentation eng_v2
 
Conference Call Presentation 1Q11
Conference Call Presentation 1Q11Conference Call Presentation 1Q11
Conference Call Presentation 1Q11
 
A 5 auction results
A 5 auction resultsA 5 auction results
A 5 auction results
 
PMD February
PMD FebruaryPMD February
PMD February
 
Effective Ways to Prevent Wind Blade Erosion
Effective Ways to Prevent Wind Blade ErosionEffective Ways to Prevent Wind Blade Erosion
Effective Ways to Prevent Wind Blade Erosion
 
Corporate presentation january
Corporate presentation   januaryCorporate presentation   january
Corporate presentation january
 
sempra energy 2004 Annual Report
sempra energy 2004 Annual Reportsempra energy 2004 Annual Report
sempra energy 2004 Annual Report
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate Presentation
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation eng
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX Results
 
Energy Storage Summit Day 1
Energy Storage Summit Day 1Energy Storage Summit Day 1
Energy Storage Summit Day 1
 
c v2016 (1)
c v2016 (1)c v2016 (1)
c v2016 (1)
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5
 

Thermes Participações SA: Brazil's Leading Power Plant Developer

  • 2. A privately held firm headquartered in Rio de Janeiro, Brazil that invests in power generation. The firm develops power plants and sells them when operational.
  • 3. Thermes has amassed considerable expertise in the the greenfield phase of project development. Our ability to manage and reduce risks during this phase is a significant asset and a source of competitive advantage.
  • 4. project development critical path 1 2 3 4 5 Cash Flow Contract Partner Project Origination Modeling Negotiation Selection Finance continuously vet develop robust negotiate major selecting sponsors navigate regulatory and generate ideas financial models contracts such as so as to guarantee hurdles and that are candidates based on realistic Engineering, project success, requirements of for new projects assumptions tested Procurement, and requires extensive federal and state both internally and by experience and Construction, Fuel knowledge of the financial through an validated by Supply, and Power strengths and institutions that extensive network outside experts. Purchasing weaknesses of provide long term of collaborators. Agreements, players in the funding at below Equipment Supply energy sector. market cost. and Civil Works.
  • 5. The firm is widely recognized as one of Brazil’s leading developers of thermal power plants. Taken together, current engagements and completed projects total 1,700MW gross capacity of power plants throughout Brazil.
  • 6. Completed Projects and Project Location Starting Date Share. Under Development MW 94 Hydro UHE Energética Corumbá III Luziânia, GO Mar-09 % 5 115 UHE Murta Energética Coronel Murta, MG Jan-12 33 209 Total Thermal 166 UTE BREITENER Maracanaú, CE Oct-02 24 Thermes played a decisive role in all 83 UTE Tambaqui Manaus, AM Dec-05 24 of the critical stages of each 83 UTE Jaraqui Manaus, AM Mar-05 24 individual project. Other players 169 UTE Borborema Fortaleza, CE Jan-10 50 were brought in subsequently to 164 UTE Maracanaú Fortaleza, CE Jan-10 50 diversify risk and limit balance sheet 300 UTE Geraldo Rola Pecém, CE Jan-11 38 exposure. 70 UTE Lambari Fortaleza, CE Jan-12 50 337 UTE Escolha Linhares, ES Jan-13 38 127 UTE Cacimbaes Linhares, ES Jan-13 38 1,499 Total 1,708 TOTAL 37
  • 8. PPAs Obtained Per Annum 1,580 764MW Thermes has an 396MW enviable track record of developing new projects 204MW and obtaining PPAs through competitive 166MW bids at auction. 2002 2005 2007 2008 2009
  • 9. Our expansion plans offer investors willing to take on greenfield risk an excellent choice of sector or energy specific strategies and vehicles.
  • 10. Newco Energia Participações SA Thermes Par. Wind Par. Hydro Par. Alternative Par. SPE Tambaqui CGE Ventos de Zumby 09 SPE ECIII Campina Grande 09 SPE Jaraqui CGE Marcos Porto 09 SPE Murta Maracanaú 09 SPE Borborema CGE Ventos do Atlântico 09 Alto Corumbá 10 Pacatuba 09 SPE Maracanaú CGE Acaraú 09 Rio Parnaíba 10 Conesud 09 SPE Lambari CGE São Francisco 09 Rio Grande 09 SPE Geraldo Rola CGE Galinhos 10 Pelotas 09 SPE Capixabas CGE Parazinho 10 Passo Fundo 09
  • 11. Thermes is able to maintain a lean managment team by developing power plants through SPVs (special purpose vehicles). Each SPV is endowed with an executive management team that reports to a board of directors. Each board, in turn, is comprised of members elected by Thermes and other shareholders.
  • 12. EBITDA 5-Year Cash Flow Projections and EQUITY Equity Requirements
  • 13. Thermal HFO (Heavy Fuel Oil)
  • 14. UTE BREITENER 166MW Located in Maracanaú, CE. PPA from 2002 to 2004 Annual Revenues R$240mm EBITDA R$80mm Cap X R$300mm. Gen set MAN 8 x 18V 48/60 + 2 x 16V 32/40 Transmission line 69kV x 3.5 km. Grid connection at SE DID II – Coelce.
  • 15. UTE BREITENER 166MW Petrobras 35% Enerconsult 6% Orteng 6% SKANSKA I&D Thermes 30% 24%
  • 16. UTE Tambaqui 83MW Located in Manaus, AZ. PPA from 2005 to 20025 Annual Revenues R$62mm EBITDA R$35mm Cap X R$75mm. Gen set MAN 4 x 18V 48/60 + 1 x 16V 32/40 Transmission line 69kV x 8 km. Grid connection at SE MESA.
  • 17. UTE Tambaqui 83MW Petrobras 35% Enerconsult 6% Orteng 6% SKANSKA I&D Thermes 30% 24%
  • 18. UTE Jaraqui 83MW Located in Manaus, AZ. PPA from 2005 a 2025 Annual Revenues R$60mm EBITDA R$35mm Cap X R$150mm. Gen set MAN 4 x 18V 48/60 + 1 x 16V 32/40 Transmission line 69kV x 3 km. Grid connection at SE MESA.
  • 19. UTE Jaraqui 83MW Petrobras 35% Enerconsult 6% Orteng 6% SKANSKA I&D Thermes 30% 24%
  • 20. BORBOREMA Energética 169MW Located in Campina Grande, PB. PPA from 2010 to 2024 Annual Revenues R$64.9mm EBITDA R$48mm Cap X R$325mm. Gen set Wärtsilä 20 x 20V 32 Transmission line 230kV x 3,5km. Grid connection at SE Campina Grande II- CHESF.
  • 21. BORBOREMA Energética 169MW Thermes 50% Consórcio Infra-Estrutura BERTIN EQUIPAV 50%
  • 22. Maracanaú Geradora de Energia 162MW Located in Maracanaú, CE. PPA from 2010 to 2024 Annual Revenues R$ 65.4mm EBITDA R$50,6mm Cap X R$340mm. Gen set Wärtsilä 8 x 20V 46 Transmission line 69kV x 8,5 km. Grid connection at SE DID II – Coelce.
  • 23. Maracanaú Geradora de Energia 162MW Thermes 50% Consórcio Infra-Estrutura BERTIN EQUIPAV 50%
  • 24. Lambari Geradora de Energia 70MW Located in Maracanaú, CE. PPA from 2012 to 2026 Annual Revenues R$27.2mm EBITDA R$8mm Cap X R$120mm. Gen set Wärtsilä 4 x 20V 46 Transmission line 69kV x 8,5 km. Grid connection at SE DID II – COELCE.
  • 25. Lambari Geradora de Energia 70MW Thermes 50% Consórcio Infra-Estrutura BERTIN EQUIPAV 50%
  • 26. Thermal LNG (Liquid Natural Gas)
  • 27. Geraldo Rola 300MW Located in Pecém, CE. PPA from 2011 a 2025 Annual Revenues R$87mm EBITDA R$46mm Cap X R$380mm. Gen set Wärtsilä 36 x 20V 34 SG Transmission line 230kV x 4,5 km. Grid connection at SE Cauipe.
  • 28. Geraldo Rola 300MW Thermes 38% Agroenergia 13% Petrobras 49%
  • 29. Escolha 337MW Located in Linhares, ES. PPA from 2013 a 2027 Annual Revenues R$123.7mm EBITDA R$92mm Cap X R$420mm. Turbine GE x 2 + CC x 1 Transmission line 345 KV x 3 km. conexão no seccionamento da Transmission line .
  • 30. Escolha 337MW Thermes 38% Cobrapar 5% Spectrum 8% Petrobras 49%
  • 31. Cacimbaes 127MW Located in Linhares, ES. PPA from 2013 a 2027 Annual Revenues R$120mm EBITDA R$41.4mm Cap X R$158mm. Turbine GE x 1 + CC x 1 Transmission line 138 KV x 3.5 km. conexão no seccionamento da Transmission line .
  • 32. Cacimbaes 127MW Thermes 38% Cobrapar 5% Spectrum 8% Petrobras 49%
  • 33. Hydro
  • 34. Energética Corumbá III 94 MW Located in Luziânia, GO. PPA from 2009 to 2042 Annual Revenues R$120mm EBITDA R$68,5mm Cap X R$420mm. Turbine Energomach 47 x 2 Transmission line 138kV x 120 km. Grid connection at SE Santa Maria CEB.
  • 35. Energética Corumbá III 94 MW Neoenergia 60% Thermes 5% Energpower 5% Celg CEB 15% 15%
  • 36. Murta Energética 115MW Located at the Jequitinhonha river in Coronel Murta, MG. PPA Requested environamental license
  • 37. Murta Energética 115MW Thermes 33% Logos Eptisa 34% 33%
  • 38. Hydro Pipeline We are in the process of studying Rio Parnaiba which appears to have a 1,000MW potential in Hydro plants, that will be the object of government auctions during 2009 and 2010. We are also studying Rio Corumba, to establish its potential for run of river projects.
  • 39. Wind
  • 40. Wind Pipeline We have confirmed wind measurements, and obtained land use rights to locations representing aproximately 1,300MW of wind farm potential in Northeastern Brazil. In 2009, we expect to win 580MW at auction under 20 year PPAs, and an additional 620MW in 2010. We have reason to believe that we have identified sites representing an aditional 1GW of that will be developed in 2011.
  • 41. CGE Ventos de ZUMBY 45MW Thermes 97% ACNI 3% Expected starting date 2010. 237 hectares in Rio do Fogo, RN. Cap X R$ 225mm. Annual revenues R$29.9mm x 20 yrs..
  • 42. CGE Ventos de ZUMBY 45MW Turbine 1.5MW GE SLE a 80m. Efficiency factor 38%. Average wind speed 7.8 m/s at 80 m. Transmission line 69kV x 1 km. Grid connection at linha Iberdrola.
  • 43. CGE Marcos Porto 210MW Thermes 97% ACNI 3% Expected starting date 2010. 1.320 hectares in Timbau - Grossos, RN. Cap X R$1.050mm. Annual revenues R$132.8mm x 20 yrs..
  • 44. CGE Marcos Porto 210MW Turbine 1.5MW GE SLE a 80m. Efficiency factor 36%. Average wind speed 7.2 m/s at 80 m. Transmission line 230kV x45 km. Grid connection at SE Mossoro II.
  • 45. CGE Ventos do Atlântico 186MW Thermes 97% ACNI 3% Expected starting date 2010. 1.250 hectares in Areia Branca, RN. Cap X R$930mm. Annual revenues R$136.8mm x 20 yrs..
  • 46. CGE Ventos do Atlântico 186MW Turbine 1.5MW GE SLE a 80m. Efficiency factor 42%. Average wind speed 8.5 m/s at 80 m. Transmission line 230kV x 100 km. Grid connection at SE Mossoro III.
  • 47. CGE São Francisco 55MW Thermes 97% ACNI 3% Expected starting date 2010. 322 hectares in Acarau, RN. Cap X R$275mm. Annual revenues R$38.5mm x 20 yrs..
  • 48. CGE São Francisco 55MW Turbine 2.5MW Fuhrlander 2500 a 80m. Efficiency factor 40%. Average wind speed 8.2 m/s at 80 m. Transmission line 230kV x 95 km. Grid connection at SE Sobral III.
  • 49. CGE Acaraú 75MW Thermes 97% ACNI 3% Expected starting date 2010. 398 hectares in Acarau, CE. Cap X R$375mm. Annual revenues R$52.5mm x 20 yrs..
  • 50. CGE Acarau 75MW Turbine 2.5MW Fuhrlander 2500 a 80m. Efficiency factor 40%. Average wind speed 8.2 m/s at 80 m. Transmission line 230kV x 95 km. Grid connection at SE Sobral III.
  • 52. Municipal Waste-to-Energy Pipeline After identifying an enormous repressed demand for solutions to solid urban waste, we developed on a proprietary basis and using exclusively national technology a commercially viable and scalable project for transforming waste into energy. During 2009 we will begin the roll out of this technology in the following pilot municipalities: Campina Grande, Marcanau, Pacatau, totaling 87MW.