Project Planning
• After the project charter is approved, the Project
Initiation phase is complete and you are ready to
proceed to the Project Planning phase.
• When the Project Planning phase is complete, you are
ready to proceed to Project Implementation
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Project Planning
• Project planning is the second major project phase,
and the second of the five process groups identified in
PMBOK.
• After the project charter is approved, the Project
Initiation phase is complete and you are ready to
proceed to the Project Planning phase.
• When the Project Planning phase is complete, you are
ready to proceed to Project Implementation
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Purpose
of the project planning phase
• Establishing business requirements.
• Establishing cost, schedule, list of deliverables, and
delivery dates.
• Establishing resources plan.
• Getting management approval and proceeding to the
next phase.
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Basic processes
of project planning
• Scope planning
• Preparing the Work Breakdown Structure
• Project schedule development
• Resource planning
• Budget planning
• Procurement planning
• Risk management
• Quality planning
• Communication planning
• Stakeholder management planning
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Scope planning
• Determining the scope is a key piece of being able to
prepare a plan.
• What is in?
• What is out?
• Make it
• Specific
• Measurable
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Preparing the WBS
Work breakdown structure:
• List of all tasks and subtasks required to achieve the scope
(produce the deliverables)
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
WBS - Examples
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Project Schedule development
• How long will each task on the WBS take?
• What are the relationships between the tasks?
• Independent
• Direct Precedence
• More complex relationships
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Resource Planning
• What resources are required to carry out each task on
the WBS?
• Human
• Budget
• Specialized equipment
• Etc.
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Budget Planning
• What is the required budget?
• When during the project will the amounts be needed?
• Is an external source of funding required?
• Etc.
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Procurement Planning
• Will equipment/supplies/software/etc. be purchased
from another organization in order to carry out the
project?
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Risk Management
• What can you anticipate in the way of unknowns that
might impact the project?
• Can you eliminate/reduce/mitigate the impacts of these
risks? How?
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Quality Planning
• What is the required quality?
• How will it be measured?
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Communication Planning
• What kinds of communication will be required
throughout the project?
• With the team
• With the sponsor
• With other stakeholders
• What forms of communication will you use?
• Formal, informal, written, oral
• What is the planned frequency of communication?
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Stakeholder Management
Planning
• The project initiation phase identified the stakeholders
• During the planning phase
• Additional stakeholders may be identified
• Detailed plans are made about the format and frequency of
communications with each stakeholder group
• Tools are identified which can be used to track and control the
relationships between the stakeholders and the project
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Summary
• Project Planning phase includes Scope planning, Work
Breakdown Structure, Project schedule development,
Resource planning, Budget planning, Procurement
planning, Risk management, Quality planning,
Communication planning and Stakeholder
Management Planning
• When the project plan is approved by the sponsor, you
are ready to proceed to implementation
This work is licensed under a
Creative Commons Attribution 3.0 Unported License (CC-BY).
Project Management
Chapter 8: Overview of Project Planning
Questions?

More Related Content

Similar to Chapter-8.pptx

Project Schedule PlanningThis work is licensed under aCrea.docx
Project Schedule PlanningThis work is licensed under aCrea.docxProject Schedule PlanningThis work is licensed under aCrea.docx
Project Schedule PlanningThis work is licensed under aCrea.docx
simonlbentley59018
 
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptxChapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
ssdongre1
 
12 steps to initiate and plan a successful project
12 steps to initiate and plan a successful project12 steps to initiate and plan a successful project
12 steps to initiate and plan a successful project
ProjectPractical.com
 
Scope PlanningThis work is licensed under aCreative Common.docx
Scope PlanningThis work is licensed under aCreative Common.docxScope PlanningThis work is licensed under aCreative Common.docx
Scope PlanningThis work is licensed under aCreative Common.docx
WilheminaRossi174
 

Similar to Chapter-8.pptx (20)

Project Schedule PlanningThis work is licensed under aCrea.docx
Project Schedule PlanningThis work is licensed under aCrea.docxProject Schedule PlanningThis work is licensed under aCrea.docx
Project Schedule PlanningThis work is licensed under aCrea.docx
 
Microsoft Project.pptx
Microsoft Project.pptxMicrosoft Project.pptx
Microsoft Project.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Chapter-2.pptx
Chapter-2.pptxChapter-2.pptx
Chapter-2.pptx
 
Chapter-2.pptx
Chapter-2.pptxChapter-2.pptx
Chapter-2.pptx
 
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptxChapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
Chapter-2 ON PROJECT MANAGEMENT HOW TO SELECT PROJECT.pptx
 
Ch05
Ch05Ch05
Ch05
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
12 steps to initiate and plan a successful project
12 steps to initiate and plan a successful project12 steps to initiate and plan a successful project
12 steps to initiate and plan a successful project
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
Ch05
Ch05Ch05
Ch05
 
Scope PlanningThis work is licensed under aCreative Common.docx
Scope PlanningThis work is licensed under aCreative Common.docxScope PlanningThis work is licensed under aCreative Common.docx
Scope PlanningThis work is licensed under aCreative Common.docx
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Project management for the supply management professional rev. 5 13-13
Project management for the supply management professional rev. 5 13-13Project management for the supply management professional rev. 5 13-13
Project management for the supply management professional rev. 5 13-13
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Project Scope Management in IT Project and Software Project
Project Scope Management in IT Project and Software ProjectProject Scope Management in IT Project and Software Project
Project Scope Management in IT Project and Software Project
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 

Recently uploaded

TriStar Gold- 05-13-2024 corporate presentation
TriStar Gold- 05-13-2024 corporate presentationTriStar Gold- 05-13-2024 corporate presentation
TriStar Gold- 05-13-2024 corporate presentation
Adnet Communications
 

Recently uploaded (20)

amil baba in australia amil baba in canada amil baba in london amil baba in g...
amil baba in australia amil baba in canada amil baba in london amil baba in g...amil baba in australia amil baba in canada amil baba in london amil baba in g...
amil baba in australia amil baba in canada amil baba in london amil baba in g...
 
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
 
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usanajoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
 
TriStar Gold- 05-13-2024 corporate presentation
TriStar Gold- 05-13-2024 corporate presentationTriStar Gold- 05-13-2024 corporate presentation
TriStar Gold- 05-13-2024 corporate presentation
 
MalaysianStates_AnalysisGDPandInvestment_web (1).pdf
MalaysianStates_AnalysisGDPandInvestment_web (1).pdfMalaysianStates_AnalysisGDPandInvestment_web (1).pdf
MalaysianStates_AnalysisGDPandInvestment_web (1).pdf
 
Pinakes Apotelesmatwn_4h tropopoihsh entaxhs.pdf
Pinakes Apotelesmatwn_4h tropopoihsh entaxhs.pdfPinakes Apotelesmatwn_4h tropopoihsh entaxhs.pdf
Pinakes Apotelesmatwn_4h tropopoihsh entaxhs.pdf
 
black magic removal amil baba in pakistan karachi islamabad america canada uk...
black magic removal amil baba in pakistan karachi islamabad america canada uk...black magic removal amil baba in pakistan karachi islamabad america canada uk...
black magic removal amil baba in pakistan karachi islamabad america canada uk...
 
Retail sector trends for 2024 | European Business Review
Retail sector trends for 2024  | European Business ReviewRetail sector trends for 2024  | European Business Review
Retail sector trends for 2024 | European Business Review
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usanajoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
najoomi asli amil baba kala jadu expert rawalpindi bangladesh uk usa
 
No 1 Top Love marriage specialist baba ji amil baba kala ilam powerful vashik...
No 1 Top Love marriage specialist baba ji amil baba kala ilam powerful vashik...No 1 Top Love marriage specialist baba ji amil baba kala ilam powerful vashik...
No 1 Top Love marriage specialist baba ji amil baba kala ilam powerful vashik...
 
Abhay Bhutada: Driving Digital Transformation in NBFC Sector
Abhay Bhutada: Driving Digital Transformation in NBFC SectorAbhay Bhutada: Driving Digital Transformation in NBFC Sector
Abhay Bhutada: Driving Digital Transformation in NBFC Sector
 
Black magic specialist in pakistan usa dubai oman karachi multan canada londo...
Black magic specialist in pakistan usa dubai oman karachi multan canada londo...Black magic specialist in pakistan usa dubai oman karachi multan canada londo...
Black magic specialist in pakistan usa dubai oman karachi multan canada londo...
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
asli amil baba bengali black magic kala jadu expert in uk usa canada france c...
asli amil baba bengali black magic kala jadu expert in uk usa canada france c...asli amil baba bengali black magic kala jadu expert in uk usa canada france c...
asli amil baba bengali black magic kala jadu expert in uk usa canada france c...
 
DIGITAL COMMERCE SHAPE VIETNAMESE SHOPPING HABIT IN 4.0 INDUSTRY
DIGITAL COMMERCE SHAPE VIETNAMESE SHOPPING HABIT IN 4.0 INDUSTRYDIGITAL COMMERCE SHAPE VIETNAMESE SHOPPING HABIT IN 4.0 INDUSTRY
DIGITAL COMMERCE SHAPE VIETNAMESE SHOPPING HABIT IN 4.0 INDUSTRY
 
Shrambal_Distributors_Newsletter_May-2024.pdf
Shrambal_Distributors_Newsletter_May-2024.pdfShrambal_Distributors_Newsletter_May-2024.pdf
Shrambal_Distributors_Newsletter_May-2024.pdf
 
STRATEGIC MANAGEMENT VIETTEL TELECOM GROUP
STRATEGIC MANAGEMENT VIETTEL TELECOM GROUPSTRATEGIC MANAGEMENT VIETTEL TELECOM GROUP
STRATEGIC MANAGEMENT VIETTEL TELECOM GROUP
 

Chapter-8.pptx

  • 1. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Overview of Project Planning
  • 2. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Project Planning • After the project charter is approved, the Project Initiation phase is complete and you are ready to proceed to the Project Planning phase. • When the Project Planning phase is complete, you are ready to proceed to Project Implementation
  • 3. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Project Planning • Project planning is the second major project phase, and the second of the five process groups identified in PMBOK. • After the project charter is approved, the Project Initiation phase is complete and you are ready to proceed to the Project Planning phase. • When the Project Planning phase is complete, you are ready to proceed to Project Implementation
  • 4. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Purpose of the project planning phase • Establishing business requirements. • Establishing cost, schedule, list of deliverables, and delivery dates. • Establishing resources plan. • Getting management approval and proceeding to the next phase.
  • 5. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Basic processes of project planning • Scope planning • Preparing the Work Breakdown Structure • Project schedule development • Resource planning • Budget planning • Procurement planning • Risk management • Quality planning • Communication planning • Stakeholder management planning
  • 6. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Scope planning • Determining the scope is a key piece of being able to prepare a plan. • What is in? • What is out? • Make it • Specific • Measurable
  • 7. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Preparing the WBS Work breakdown structure: • List of all tasks and subtasks required to achieve the scope (produce the deliverables)
  • 8. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning WBS - Examples
  • 9. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Project Schedule development • How long will each task on the WBS take? • What are the relationships between the tasks? • Independent • Direct Precedence • More complex relationships
  • 10. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Resource Planning • What resources are required to carry out each task on the WBS? • Human • Budget • Specialized equipment • Etc.
  • 11. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Budget Planning • What is the required budget? • When during the project will the amounts be needed? • Is an external source of funding required? • Etc.
  • 12. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Procurement Planning • Will equipment/supplies/software/etc. be purchased from another organization in order to carry out the project?
  • 13. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Risk Management • What can you anticipate in the way of unknowns that might impact the project? • Can you eliminate/reduce/mitigate the impacts of these risks? How?
  • 14. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Quality Planning • What is the required quality? • How will it be measured?
  • 15. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Communication Planning • What kinds of communication will be required throughout the project? • With the team • With the sponsor • With other stakeholders • What forms of communication will you use? • Formal, informal, written, oral • What is the planned frequency of communication?
  • 16. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Stakeholder Management Planning • The project initiation phase identified the stakeholders • During the planning phase • Additional stakeholders may be identified • Detailed plans are made about the format and frequency of communications with each stakeholder group • Tools are identified which can be used to track and control the relationships between the stakeholders and the project
  • 17. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Summary • Project Planning phase includes Scope planning, Work Breakdown Structure, Project schedule development, Resource planning, Budget planning, Procurement planning, Risk management, Quality planning, Communication planning and Stakeholder Management Planning • When the project plan is approved by the sponsor, you are ready to proceed to implementation
  • 18. This work is licensed under a Creative Commons Attribution 3.0 Unported License (CC-BY). Project Management Chapter 8: Overview of Project Planning Questions?