Q.91: Which of the following is the task of a Tester?
I. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.
ii. Prepare and acquire Test Data.
Iii. Implement Tests on all test levels, execute and log the tests.
iv. Create the Test Specifications.
A. I,ii,iii is true and iv is false.
B. ii, iii, iv is true and I is false.
C. I is true and ii, iii, iv are false.
D. iii and iv is correct and I and ii are incorrect.
Interaction: t ng tácươ
vendor: nhà cung c pấ
identify: xác đ nhị
leverage: t n d ngậ ụ
acquire: ki m đ c, thu đ c.ế ượ ượ
Specifications: chi ti t k thu t.ế ỹ ậ
Explain:
Đáp án nào d i đây là nhi m v c a ng i tester?ướ ệ ụ ủ ườ
i. T ng tác v i các tool test c a nhà cung c p đ xác đ nh con đ ng/ l a ch n t t nh t đ t n d ngươ ớ ủ ấ ể ị ườ ự ọ ố ấ ể ậ ụ
đ c tool test trong d án. => th ng là lead quy t đ nh.ượ ự ườ ế ị
ii. Chu n b và ki m đ c các test data.ẩ ị ế ượ
Iii. Thi hành ki m th trên t t c các c p b c, th c hi n và logbug.ể ử ấ ả ấ ậ ự ệ
iv. T o các đ c đi m k thu t testạ ặ ể ỹ ậ
Sau khi d ch các b n có th d dàng ch n đáp ánị ạ ể ễ ọ B.
Q.92: What can static analysis NOT find?
A. The use of a variable before it has been defined.
B. Unreachable (“dead”) code.
C. Memory leaks
D. Array bound violations.
static: tĩnh
variable: bi nế
Unreachable: Không th truy c pể ậ
Memory: b nhộ ớ
leaks: rò rỉ
violations: vi ph mạ
bound: ràng bu cộ
Gi i thích: Dả ynamic Testing là khi b n đang làm vi c v i h th ng th t (Không ph i 1 s hi n v tạ ệ ớ ệ ố ậ ả ố ệ ậ
ho c mô hình đ i di n cho h th ng). V y khi không đ c làm vi c v i h th ng th t thì không thặ ạ ệ ệ ố ậ ượ ệ ớ ệ ố ậ ể
bi t vi c rò r thông tin b nh có th x y ra hay không? Static testing không th làm đ c đi u này.ế ệ ỉ ộ ớ ế ả ể ượ ề
Ch n đáp ánọ C.
the end...continue
Q.93: White Box Techniques are also called as:
A. Structural Testing
B. Design Based Testing
C. Error Guessing Technique
D. Experience Based Technique.
Ch n đáp ánọ A. Câu này quá d không c n gi i thích há háễ ầ ả
Q. 94: Reviewing the test Basis is a part of which phase
A. Test Analysis and Design
B. Test Implementation and execution
C. Test Closure Activities
D. Evaluating exit criteria and reporting.
Câu này cũng ki u h c thu c thôi. Có gi i thích cũng khó cho mình >< Đáp ánể ọ ộ ả A nha.
Q.95: Component Testing is also called as :
i. Unit Testing
ii. Program Testing
iii. Module Testing
iv. System Component Testing .
A. i,ii,iii are true and iv is false
B. i,ii,iii,iv are false
C. i,ii,iv are true and iii is false
D. all of above is true
=> Đáp án A
Q. 96: Based on the IEEE Standard for Software Test Documentation (IEEE
Std 829-1998), which sections of the test incident report should the
following items be recorded?
Sections
a) Test incident report identifier
b) Summary
c) Incident description
d) Impact/ tác đ ngộ
Items
1. Impact on test plans
2. Unique identifier
3. Anomalies/ b t th ngấ ườ
4. Procedure step
5. Environment
6. References to other relevant documents/ tham kh o các tài li u liên quan khác.ả ệ
A. a: 2; b: 4; c: 1, 3 and 5; d: 6
B. a: 2; b: 3; c: 4, 5 and 6; d: 1
C. a: 2; b: 6; c: 3, 4 and 5; d: 1
D. a: 2; b: 1; c: 3, 4 and 5; d: 6
Ch n đáp ánọ C
Câu này đ ch n đ c đáp án đúng các b n có th tham kh o tài li u link sau:ể ọ ượ ạ ể ả ệ ở
http://www.ufjf.br/eduardo_barrere/files/2011/06/SQETestIncidentReportTemplate.pdf
Q. 97: Which of the following is true about Formal Review or Inspection/ ki mể
tr:-
i. Led by Trained Moderator (not the author).
ii. No Pre Meeting Preparations
iii. Formal Follow up process.
iv. Main Objective is to find defects
A. ii is true and i,iii,iv are false
B. i,iii,iv are true and ii is false
C. i,iii,iv are false and ii is true
D. iii is true and I,ii,iv are false
Các phases c a Formal Review bao g mủ ồ
1. Preparation
2. Kick of
3. Review meeting
4. Planning
5. Follow up
6. Rework
V yậ ii. No Pre Meeting Preparations là sai => Ch n đáp ánọ C.
Q. 98: The Phases of formal review process is mentioned below arrange them in
the correct order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual Preparations
v. Kick Off
vi. Follow Up
A. i,ii,iii,iv,v,vi
B. vi,i,ii,iii,iv,v
C. i,v,iv,ii,iii,vi
D. i,ii,iii,v,iv,vi
T m iừ ớ
arrange: s p x pắ ế
Đáp án C
Q. 99: Testing activity which is performed to expose defects in the interfaces and
in the interaction between integrated components is :
A. System Level Testing
B. Integration Level Testing
C. Unit Level Testing
D. Component Testing
T m iừ ớ
expose: l raộ
Ch n đáp ánọ B
Q. 100: Methodologies adopted/ áp d ng while performing Maintenanceụ
Testing:-
A. Breadth Test and Depth Test/ test chi u r ng và test chi u sâu.ề ộ ề
B. Re-testing
C. Confirmation Testing
D. Sanity Testing
Note: Smoke Testing is Breadth First Testing.
Sanity Testing is Depth First Testing.
=> Ch n đáp ánọ A
Q. 101: The Switch is switched off once the temperature falls below 18 and then
it is turned on when the temperature is more than 21. When the temperature is
more than 21. Identify the Equivalance values which belong to the same class.
A. 12,16,22
B. 24,27,17
C. 22,23,24
D. 14,15,19
Phân vùng t ng đ ng, d dàng ch n đáp ánươ ươ ễ ọ C
Q. 102: What is an equivalence partition (also known as an equivalence class)?
A. A set of test cases for testing classes of objects
B. An input or output range of values such that only one value in the range becomes a test case
C. An input or output range of values such that each value in the range becomes a test case
D. An input or output range of values such that every tenth value in the range becomes a test case.
V n là mô t v phân vùng t ng đ ng , ch n đáp ánẫ ả ề ươ ươ ọ B
Input Ouput giá tr trong m t ph m vi sao cho m i giá tr trong m t ph m vi tr thành m t testcase.ị ộ ạ ỗ ị ộ ạ ở ộ
Q. 103: Which of the following is not a part of the Test Implementation and
Execution Phase
A. Creating test suites from the test cases
B. Executing test cases either manually or by using test execution tools
C. Comparing actual results
D. Designing the Tests
Ch n đáp ánọ D,
Gi i thích: T t nhiên mu n thi hành test thì ph i thi t k testcase b c tr c r i. V y nên, thi t kả ấ ố ả ế ế ở ướ ướ ồ ậ ế ế
tests là đáp án c n ch n.ầ ọ
Q. 104: Link Testing is also called as :
A. Component Integration testing
B. Component System Testing
C. Component Sub System Testing
D. Maintenance testing
Đáp án A
Gi i thích:ả
As the name suggests, this testing is performed by linking (say modules). Now if
we look at the options, only option ‘a’ is performed by linking or integrating
modules/components.
Q. 105: Who are the persons involved in a Formal Review :-
i. Manager
ii. Moderator/ ng i đi u hànhườ ề
iii. Scribe / Recorder
iv. Assistant Manager
A. i,ii,iii,iv are true
B. i,ii,iii are true and iv is false.
C. ii,iii,iv are true and i is false.
D. i,iv are true and ii, iii are false.
Gi i thích: Ai là ng i có liên quan đ n Forrmal Review, ch n đáp ánả ườ ế ọ B
Q. 106: Which of the following statements regarding static testing is false:
A. Static testing requires the running of tests through the code
B. Static testing includes desk checking
C. Static testing includes techniques such as reviews and inspections
D. Static testing can give measurements such as cyclomatic complexity
Đáp án A
Static test là k thu t ki m tra các tài li u (review) và t đ ng phân tích cú pháp ( static analys) c aỹ ậ ể ệ ự ộ ủ
code ho c các tài li u khác c a d án mà không c n ch y code.ặ ệ ủ ự ầ ạ
Q. 107: Designing the test environment set-up and identifying any required
infrastructure/ c s h t ng and tools are a part of which phaseơ ở ạ ầ
A. Test Implementation and execution
B. Test Analysis and Design
C. Evaluating the Exit Criteria and reporting
D. Test Closure Activities
Đáp án B
Q. 108: A Type of functional Testing, which investigates the functions relating to
detection of threats, such as virus from malicious outsiders.
A. Security Testing
B. Recovery Testing
C. Performance Testing
D. Functionality Testing
Đáp án A
investigates: Đi u traề
threats: m i đe d aố ọ
malicious: đ c h iộ ạ
Gi i thích câu h iả ỏ
M t lo i Ki m tra ch c năng, đi u tra các ch c năng liên quan đ n vi c phát hi n các m i đe d a,ộ ạ ể ứ ề ứ ế ệ ệ ố ọ
ch ng h n nh vi-rút t nh ng ng i bên ngoài đ c h i.ẳ ạ ư ừ ữ ườ ộ ạ
Q. 109: A Person who documents all the issues, problems and open points that
were identified during a formal review.
A. Moderator.
B. Scribe
C. Author
D. Manager
D ch là ra đáp ánị B ^^
Q. 110: The Test Cases Derived from use cases
A. Are most useful in uncovering defects in the process flows during real world use of the system
B. Are most useful in uncovering defects in the process flows during the testing use of the system
C. Are most useful in covering the defects in the process flows during real world use of the system
D. Are most useful in covering the defects at the Integration Level
Derived: ngu n g cồ ố
useful: h u íchữ
=> Đáp án A
Gi i thích: ch c n d ch đ c ra ti ng vi t là làm m t ngay :Dả ỉ ầ ị ượ ế ệ ượ
Q. 110: Các tr ng h p th nghi m B t ngu n t các tr ng h p s d ng là….ườ ợ ử ệ ắ ồ ừ ườ ợ ử ụ
A. Có ích nh t trong vi c phát hi n ra các khi m khuy t trong dòng quy trình trong quá trình sấ ệ ệ ế ế ử
d ng h th ng trong th gi i th cụ ệ ố ế ớ ự
B. Có ích nh t trong vi c phát hi n ra các khi m khuy t trong dòng quy trình trong quá trình sấ ệ ệ ế ế ử
d ng th nghi m h th ngụ ử ệ ệ ố
C. Có ích nh t trong vi c bao g m các khi m khuy t trong dòng quy trình trong quá trình s d ngấ ệ ồ ế ế ử ụ
h th ng trong th gi i th cệ ố ế ớ ự
D. Có ích nh t trong vi c kh c ph c các khi m khuy t C p đ Tích h pấ ệ ắ ụ ế ế ở ấ ộ ợ
Q. 121: Test Implementation and execution has which of the following major
tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally
preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.
A. i,ii,iii are true and iv is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,iii,iv are true and i is false
=> Ch n đáp ánọ A
Q. 122: One of the fields on a form contains a text box which accepts numeric
values in the range of 18 to 25. Identify the invalid Equivalance class
A. 17
B. 19
C. 24
D. 21
=> Ch n đáp ánọ A
Q. 123: Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible
=> Ch n đáp ánọ C
Q. 124: Which tool needs to interface with other office automation software
in order to generate reports in the format required by the organization?
A. Progress tracking tools
B. Test management tools
C. Metrics management tools
D. Test execution tools
=> Ch n đáp ánọ B
Q. 125: Which one is not comes under international standard
A. IEC
B. IEEE
C. ISO
D. All of the above
=> Ch n đáp ánọ B
Q. 126: In which phase static tests are used
A. Requirements
B. Design
C. Coding
D. All of the above
=> Ch n đáp ánọ D
Q. 127: What’s the disadvantage of Black Box Testing
A. Chances of having repetition of tests that are already done by programmer.
B. The test inputs needs to be from large sample space.
C. It is difficult to identify all possible inputs in limited testing time. So writing test cases is slow
and difficult
D. All above
=> Ch nọ D
Q. 128: What is the process of analyzing and removing causes of failures
in software?
A. Validation
B. Testing
C. Debugging
D. Verification
=> Ch n đáp án Cọ
Q. 129: Majority of system errors occur in the _________ phase
A. Requirements Phase.
B. Analysis and Design Phase
C. Development Phase
D. Testing Phase
=> Ch n đáp ánọ A
Q. 130: Which of the following is a MAJOR task when evaluating the exit
criteria?
A. Creating test suites and cases for efficient execution
B. Writing a test summary report for stakeholders
C. Handing the testware to the maintenance organization
D. Identifying any required infrastructure and tools
stakeholders: Các bên liên quan
=> Ch n đáp ánọ B
Q. 131: How much percentage of the life cycle costs of a software are spent on
maintenance.
A. 10%
B. 30%
C. 50%
D. 70%
=> Đáp án D nhé
Q. 132: When a defect is detected and fixed then the software should be retested
to confirm that the original defect has been successfully removed. This is called
A. Regression testing
B. Maintenance testing
C. Confirmation testing
D. None of the above
=> Đáp án C
Q. 133: Which of the following is a valid objective of an incident report?
A. Prove that the tester is contributing to the quality of the system.
B. Provides test management ideas for test process improvement.
C. Gives a statistical way to determine which modules to redesign.
D. Provides developers a way to critique their individual work processes.
Objective: m c đích, m c tiêuụ ụ
Prove: ch ng minh, ch ng tứ ứ ỏ
Contributing: đóng góp
Provides: Cung c pấ
improvement: C i thi nả ệ
statistical: th ng kêố
redesign: thi t k l iế ế ạ
critique: phê bình
individual: cá nhân
=> Ch n đáp ánọ B
Q. 134: When to stop Testing?
A. Stop when scheduled time for testing expires
B. Stop if 75% of the pre-defined number of errors is detected.
C. Stop when all the test cases execute with detecting few errors.
D. None above
=> Ch n đáp ánọ A
Q. 135: Which of the following are success factors for reviews?
I. Clear objectives for each review.
II. Checklists and/or roles are used to increase effectiveness of defect identification.
III. There is an emphasis on process improvement.
IV. People issues and psychological aspects are not reviewed.
A. I and III
B. II, III and IV
C. I, II and III
D. IV
emphasis: nh n m nhấ ạ
aspects: khía c nhạ
reviewed: xem xét
=> Ch n đáp ánọ C
Q. 136: Structure is unknown for which type of development project
A. Traditional system development
B. Iterative development
C. System maintenance
D. Purchased/contracted software
=> Ch n đáp ánọ D
Q. 137: ________indicates how important it is to fix the bug and when it should
be fixed
A. Severity
B. Priority
C. All of the above
D. None of the above
=> Ch n đáp ánọ C
Q. 138: The person who leads the review of the document(s), planning the
review,running the meeting and follow-up after the meeting
A. Reviewer
B. Author
C. Moderator
D. Auditor
follow-up: theo sát
=> Ch n đáp án C, ng i đi u hànhọ ườ ề
Q. 139: Performs sufficient testing to evaluate every possible path and condition
in the application system. The only test method that guarantees the proper
functioning of the application system is called as _____________
A. Regression Testing
B. Exhaustive Testing
C. Basic Path Testing
D. Branch Testing
sufficient: đ y đầ ủ
guarantees: đ m b oả ả
proper: thích h pợ
=> Ch nọ C
Q. 140: Which of the following statements contains a valuable objective for a test
team?
A. Prove that the remaining defects will not cause any additional failures.
B. Run all of the tests that are defined for the test object as quickly as possible.
C. Prove that all faults have been identified through thorough testing.
D. Cause as many failures as possible so that faults can be identified and corrected.
Thorough: k l ngỹ ưỡ
=>Ch n đáp ánọ D, gây ra càng nhi u l i càng t t đ đ nh nghĩa và s a chúng.ề ỗ ố ể ị ử
Q. 141: A formal assessment of a work product conducted by one or more
qualified independent reviewer to detect defects.
A. Inspection. ki m treể
B. Walkthrough.
C. Review
D. Non Conformance
=> Ch n đáp án Aọ
assessment: đánh giá
Q. 142: Which of the following are MAJOR test implementation and
execution tasks?
I. Repeating test activities
II. Creating test suites
III. Reporting discrepancies
IV. Logging the outcome
V. Analyzing lessons learned. phân tích bài h c kinh nghi mọ ệ
A. II, III and IV
B. I, III, IV and V
C. I, II, III and IV
D. III, IV and V
=> Ch n Cọ
Q. 143: Which tasks are performed by a test leader versus. so v i a tester?ớ
S. Writing a project test strategy. chi n l cế ượ
T. Selecting tools to support testing
U. Preparing and acquiring data
V. Scheduling tests
A. Test leader: S and V; Tester: T and U
B. Test leader: S, T and V; Tester: U
C. Test leader: S, U and V; Tester: T
D. Test leader: S; Tester: T, U and V
=> Ch n đáp án Bọ
Q. 144: What type of tools to be used for Regression Testing
A. Performance
B. Record/Playback
C. A. & B.
D. None
=> Ch n đáp án Bọ
Q. 145: System Integration testing should be done after
A. Integration testing
B. System testing
C. Unit testing
D. Component integration testing
=> Ch n Cọ
Q. 146: During this event the entire. toàn b system is tested to verify that allộ
functional information structural and quality requirements have been met. A
predetermined combination of tests is designed that when executed successfully
satisfy management that the system meets specifications
A. Validation Testing
B. Integration Testing
C. User Acceptance Testing
D. System Testing
=> Ch n đáp án Cọ
Q. 147: What is the normal order of activities in which software testing is
organized?
A. Unit, integration, system, validation
B. System, integration, unit, validation
C. Unit, integration, validation, system
D. None of the above
=> Ch n Aọ
Q. 148: During testing, a defect was found in which the system crashed when the
network got disconnected while receiving data from the server. The defect was
fixed by correcting functionality which checks the network availability during
data transfer. Existing test cases did cover 100% of the module statements. To
verify the fix and ensure more extensive coverage, some tests were designed and
added to the test suite. What types of testing are mentioned above?
I. Functional testing
II. Structural testing
III. Confirmation testing
IV. Performance testing
A. I, III and IV
B. I and III
C. II and IV
D. I, II and III
=> Ch n đáp án Dọ
Q. 149: What is a scripting technique that uses data files to contain not
only test data and expected results, but also keywords related to the
application being tested?
A. Automation technique
B. Scripting language
C. Process-driven testing
D. Keyword-driven testing
=> Ch n đáp án D.ọ
Q. 150: The principal. ch y u attributes of tools and automation areủ ế
A. Speed & efficiency
B. Accuracy. đ chính xác & precisionộ
C. All of the above
D. None of the above
=> Ch n Cọ

More Related Content

Similar to International Software Testing Qualifications Board (ISTQB)

Istqb question-paper-dump-12
Istqb question-paper-dump-12Istqb question-paper-dump-12
Istqb question-paper-dump-12TestingGeeks
 
Iseb question from book
Iseb question from bookIseb question from book
Iseb question from bookNatalia Iurii
 
Pertanyaan dan jawaban (graham et.al 2011) part 2
Pertanyaan dan jawaban (graham et.al 2011) part 2Pertanyaan dan jawaban (graham et.al 2011) part 2
Pertanyaan dan jawaban (graham et.al 2011) part 2ikhwana luthfi
 
Istqb iseb bh0-010-ajoy_singha
Istqb iseb bh0-010-ajoy_singhaIstqb iseb bh0-010-ajoy_singha
Istqb iseb bh0-010-ajoy_singhaTestingGeeks
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answersTestbytes
 
Istqb question-paper-dump-14
Istqb question-paper-dump-14Istqb question-paper-dump-14
Istqb question-paper-dump-14TestingGeeks
 
ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 Parul Chotalia
 
Pertanyaan dan jawaban (graham et.al 2011) part 1
Pertanyaan dan jawaban (graham et.al 2011) part 1Pertanyaan dan jawaban (graham et.al 2011) part 1
Pertanyaan dan jawaban (graham et.al 2011) part 1ikhwana luthfi
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011Helen Nguyễn
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011Akash gupta
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011TestingGeeks
 
Istqb sample paper 2011- www.ajoysingha.info
Istqb sample paper   2011- www.ajoysingha.infoIstqb sample paper   2011- www.ajoysingha.info
Istqb sample paper 2011- www.ajoysingha.infoTestingGeeks
 
Fundamentals of Testing
Fundamentals of TestingFundamentals of Testing
Fundamentals of TestingCode95
 
Istqb question-paper-dump-11
Istqb question-paper-dump-11Istqb question-paper-dump-11
Istqb question-paper-dump-11TestingGeeks
 

Similar to International Software Testing Qualifications Board (ISTQB) (20)

Istqb question-paper-dump-12
Istqb question-paper-dump-12Istqb question-paper-dump-12
Istqb question-paper-dump-12
 
Iseb question from book
Iseb question from bookIseb question from book
Iseb question from book
 
Pertanyaan dan jawaban (graham et.al 2011) part 2
Pertanyaan dan jawaban (graham et.al 2011) part 2Pertanyaan dan jawaban (graham et.al 2011) part 2
Pertanyaan dan jawaban (graham et.al 2011) part 2
 
EST-MCQ.pdf
EST-MCQ.pdfEST-MCQ.pdf
EST-MCQ.pdf
 
Chap5
Chap5Chap5
Chap5
 
Chap3
Chap3Chap3
Chap3
 
Istqb iseb bh0-010-ajoy_singha
Istqb iseb bh0-010-ajoy_singhaIstqb iseb bh0-010-ajoy_singha
Istqb iseb bh0-010-ajoy_singha
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answers
 
FEB-08 ISTQB PAPER
FEB-08 ISTQB PAPERFEB-08 ISTQB PAPER
FEB-08 ISTQB PAPER
 
Chap2
Chap2Chap2
Chap2
 
Istqb question-paper-dump-14
Istqb question-paper-dump-14Istqb question-paper-dump-14
Istqb question-paper-dump-14
 
ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3
 
Pertanyaan dan jawaban (graham et.al 2011) part 1
Pertanyaan dan jawaban (graham et.al 2011) part 1Pertanyaan dan jawaban (graham et.al 2011) part 1
Pertanyaan dan jawaban (graham et.al 2011) part 1
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011
 
500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011500 istqb-sample-papers-2010-2011
500 istqb-sample-papers-2010-2011
 
Istqb sample paper 2011- www.ajoysingha.info
Istqb sample paper   2011- www.ajoysingha.infoIstqb sample paper   2011- www.ajoysingha.info
Istqb sample paper 2011- www.ajoysingha.info
 
Fundamentals of Testing
Fundamentals of TestingFundamentals of Testing
Fundamentals of Testing
 
Istqb question-paper-dump-11
Istqb question-paper-dump-11Istqb question-paper-dump-11
Istqb question-paper-dump-11
 
AUG-17 (2013) ISTQB PAPER
AUG-17 (2013) ISTQB PAPERAUG-17 (2013) ISTQB PAPER
AUG-17 (2013) ISTQB PAPER
 

Recently uploaded

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 

Recently uploaded (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

International Software Testing Qualifications Board (ISTQB)

  • 1. Luy n thi ch ng ch istqb, m i ng i m i ngày ôn luy n vàiệ ứ ỉ ọ ườ ỗ ệ câu nhé. Vì s l ng câu h i ôn t p cho m i ng i r t nhi uố ượ ỏ ậ ọ ườ ấ ề nên mình s d ch và gi i thích d n d n đ chúng ta cùng ti nẽ ị ả ầ ầ ể ế b và đ t k t qu cao trong bài thi nàyộ ạ ế ả Q.91: Which of the following is the task of a Tester? I. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Prepare and acquire Test Data. Iii. Implement Tests on all test levels, execute and log the tests. iv. Create the Test Specifications. A. I,ii,iii is true and iv is false. B. ii, iii, iv is true and I is false. C. I is true and ii, iii, iv are false. D. iii and iv is correct and I and ii are incorrect. Interaction: t ng tácươ vendor: nhà cung c pấ identify: xác đ nhị leverage: t n d ngậ ụ acquire: ki m đ c, thu đ c.ế ượ ượ Specifications: chi ti t k thu t.ế ỹ ậ Explain: Đáp án nào d i đây là nhi m v c a ng i tester?ướ ệ ụ ủ ườ i. T ng tác v i các tool test c a nhà cung c p đ xác đ nh con đ ng/ l a ch n t t nh t đ t n d ngươ ớ ủ ấ ể ị ườ ự ọ ố ấ ể ậ ụ đ c tool test trong d án. => th ng là lead quy t đ nh.ượ ự ườ ế ị ii. Chu n b và ki m đ c các test data.ẩ ị ế ượ Iii. Thi hành ki m th trên t t c các c p b c, th c hi n và logbug.ể ử ấ ả ấ ậ ự ệ iv. T o các đ c đi m k thu t testạ ặ ể ỹ ậ Sau khi d ch các b n có th d dàng ch n đáp ánị ạ ể ễ ọ B.
  • 2. Q.92: What can static analysis NOT find? A. The use of a variable before it has been defined. B. Unreachable (“dead”) code. C. Memory leaks D. Array bound violations. static: tĩnh variable: bi nế Unreachable: Không th truy c pể ậ Memory: b nhộ ớ leaks: rò rỉ violations: vi ph mạ bound: ràng bu cộ Gi i thích: Dả ynamic Testing là khi b n đang làm vi c v i h th ng th t (Không ph i 1 s hi n v tạ ệ ớ ệ ố ậ ả ố ệ ậ ho c mô hình đ i di n cho h th ng). V y khi không đ c làm vi c v i h th ng th t thì không thặ ạ ệ ệ ố ậ ượ ệ ớ ệ ố ậ ể bi t vi c rò r thông tin b nh có th x y ra hay không? Static testing không th làm đ c đi u này.ế ệ ỉ ộ ớ ế ả ể ượ ề Ch n đáp ánọ C. the end...continue
  • 3. Q.93: White Box Techniques are also called as: A. Structural Testing B. Design Based Testing C. Error Guessing Technique D. Experience Based Technique. Ch n đáp ánọ A. Câu này quá d không c n gi i thích há háễ ầ ả Q. 94: Reviewing the test Basis is a part of which phase A. Test Analysis and Design B. Test Implementation and execution C. Test Closure Activities D. Evaluating exit criteria and reporting. Câu này cũng ki u h c thu c thôi. Có gi i thích cũng khó cho mình >< Đáp ánể ọ ộ ả A nha. Q.95: Component Testing is also called as : i. Unit Testing ii. Program Testing iii. Module Testing iv. System Component Testing . A. i,ii,iii are true and iv is false B. i,ii,iii,iv are false C. i,ii,iv are true and iii is false D. all of above is true => Đáp án A
  • 4. Q. 96: Based on the IEEE Standard for Software Test Documentation (IEEE Std 829-1998), which sections of the test incident report should the following items be recorded? Sections a) Test incident report identifier b) Summary c) Incident description d) Impact/ tác đ ngộ Items 1. Impact on test plans 2. Unique identifier 3. Anomalies/ b t th ngấ ườ 4. Procedure step 5. Environment 6. References to other relevant documents/ tham kh o các tài li u liên quan khác.ả ệ A. a: 2; b: 4; c: 1, 3 and 5; d: 6 B. a: 2; b: 3; c: 4, 5 and 6; d: 1 C. a: 2; b: 6; c: 3, 4 and 5; d: 1 D. a: 2; b: 1; c: 3, 4 and 5; d: 6 Ch n đáp ánọ C Câu này đ ch n đ c đáp án đúng các b n có th tham kh o tài li u link sau:ể ọ ượ ạ ể ả ệ ở http://www.ufjf.br/eduardo_barrere/files/2011/06/SQETestIncidentReportTemplate.pdf
  • 5. Q. 97: Which of the following is true about Formal Review or Inspection/ ki mể tr:- i. Led by Trained Moderator (not the author). ii. No Pre Meeting Preparations iii. Formal Follow up process. iv. Main Objective is to find defects A. ii is true and i,iii,iv are false B. i,iii,iv are true and ii is false C. i,iii,iv are false and ii is true D. iii is true and I,ii,iv are false Các phases c a Formal Review bao g mủ ồ 1. Preparation 2. Kick of 3. Review meeting 4. Planning 5. Follow up 6. Rework V yậ ii. No Pre Meeting Preparations là sai => Ch n đáp ánọ C.
  • 6. Q. 98: The Phases of formal review process is mentioned below arrange them in the correct order. i. Planning ii. Review Meeting iii. Rework iv. Individual Preparations v. Kick Off vi. Follow Up A. i,ii,iii,iv,v,vi B. vi,i,ii,iii,iv,v C. i,v,iv,ii,iii,vi D. i,ii,iii,v,iv,vi T m iừ ớ arrange: s p x pắ ế Đáp án C Q. 99: Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is : A. System Level Testing B. Integration Level Testing C. Unit Level Testing D. Component Testing T m iừ ớ expose: l raộ
  • 7. Ch n đáp ánọ B Q. 100: Methodologies adopted/ áp d ng while performing Maintenanceụ Testing:- A. Breadth Test and Depth Test/ test chi u r ng và test chi u sâu.ề ộ ề B. Re-testing C. Confirmation Testing D. Sanity Testing Note: Smoke Testing is Breadth First Testing. Sanity Testing is Depth First Testing. => Ch n đáp ánọ A Q. 101: The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. When the temperature is more than 21. Identify the Equivalance values which belong to the same class. A. 12,16,22 B. 24,27,17 C. 22,23,24 D. 14,15,19 Phân vùng t ng đ ng, d dàng ch n đáp ánươ ươ ễ ọ C Q. 102: What is an equivalence partition (also known as an equivalence class)? A. A set of test cases for testing classes of objects B. An input or output range of values such that only one value in the range becomes a test case
  • 8. C. An input or output range of values such that each value in the range becomes a test case D. An input or output range of values such that every tenth value in the range becomes a test case. V n là mô t v phân vùng t ng đ ng , ch n đáp ánẫ ả ề ươ ươ ọ B Input Ouput giá tr trong m t ph m vi sao cho m i giá tr trong m t ph m vi tr thành m t testcase.ị ộ ạ ỗ ị ộ ạ ở ộ Q. 103: Which of the following is not a part of the Test Implementation and Execution Phase A. Creating test suites from the test cases B. Executing test cases either manually or by using test execution tools C. Comparing actual results D. Designing the Tests Ch n đáp ánọ D, Gi i thích: T t nhiên mu n thi hành test thì ph i thi t k testcase b c tr c r i. V y nên, thi t kả ấ ố ả ế ế ở ướ ướ ồ ậ ế ế tests là đáp án c n ch n.ầ ọ Q. 104: Link Testing is also called as : A. Component Integration testing B. Component System Testing C. Component Sub System Testing D. Maintenance testing Đáp án A Gi i thích:ả As the name suggests, this testing is performed by linking (say modules). Now if we look at the options, only option ‘a’ is performed by linking or integrating modules/components.
  • 9. Q. 105: Who are the persons involved in a Formal Review :- i. Manager ii. Moderator/ ng i đi u hànhườ ề iii. Scribe / Recorder iv. Assistant Manager A. i,ii,iii,iv are true B. i,ii,iii are true and iv is false. C. ii,iii,iv are true and i is false. D. i,iv are true and ii, iii are false. Gi i thích: Ai là ng i có liên quan đ n Forrmal Review, ch n đáp ánả ườ ế ọ B Q. 106: Which of the following statements regarding static testing is false: A. Static testing requires the running of tests through the code B. Static testing includes desk checking C. Static testing includes techniques such as reviews and inspections D. Static testing can give measurements such as cyclomatic complexity Đáp án A Static test là k thu t ki m tra các tài li u (review) và t đ ng phân tích cú pháp ( static analys) c aỹ ậ ể ệ ự ộ ủ code ho c các tài li u khác c a d án mà không c n ch y code.ặ ệ ủ ự ầ ạ
  • 10. Q. 107: Designing the test environment set-up and identifying any required infrastructure/ c s h t ng and tools are a part of which phaseơ ở ạ ầ A. Test Implementation and execution B. Test Analysis and Design C. Evaluating the Exit Criteria and reporting D. Test Closure Activities Đáp án B Q. 108: A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious outsiders. A. Security Testing B. Recovery Testing C. Performance Testing D. Functionality Testing Đáp án A investigates: Đi u traề threats: m i đe d aố ọ malicious: đ c h iộ ạ Gi i thích câu h iả ỏ M t lo i Ki m tra ch c năng, đi u tra các ch c năng liên quan đ n vi c phát hi n các m i đe d a,ộ ạ ể ứ ề ứ ế ệ ệ ố ọ ch ng h n nh vi-rút t nh ng ng i bên ngoài đ c h i.ẳ ạ ư ừ ữ ườ ộ ạ Q. 109: A Person who documents all the issues, problems and open points that were identified during a formal review. A. Moderator.
  • 11. B. Scribe C. Author D. Manager D ch là ra đáp ánị B ^^ Q. 110: The Test Cases Derived from use cases A. Are most useful in uncovering defects in the process flows during real world use of the system B. Are most useful in uncovering defects in the process flows during the testing use of the system C. Are most useful in covering the defects in the process flows during real world use of the system D. Are most useful in covering the defects at the Integration Level Derived: ngu n g cồ ố useful: h u íchữ => Đáp án A Gi i thích: ch c n d ch đ c ra ti ng vi t là làm m t ngay :Dả ỉ ầ ị ượ ế ệ ượ Q. 110: Các tr ng h p th nghi m B t ngu n t các tr ng h p s d ng là….ườ ợ ử ệ ắ ồ ừ ườ ợ ử ụ A. Có ích nh t trong vi c phát hi n ra các khi m khuy t trong dòng quy trình trong quá trình sấ ệ ệ ế ế ử d ng h th ng trong th gi i th cụ ệ ố ế ớ ự B. Có ích nh t trong vi c phát hi n ra các khi m khuy t trong dòng quy trình trong quá trình sấ ệ ệ ế ế ử d ng th nghi m h th ngụ ử ệ ệ ố C. Có ích nh t trong vi c bao g m các khi m khuy t trong dòng quy trình trong quá trình s d ngấ ệ ồ ế ế ử ụ h th ng trong th gi i th cệ ố ế ớ ự D. Có ích nh t trong vi c kh c ph c các khi m khuy t C p đ Tích h pấ ệ ắ ụ ế ế ở ấ ộ ợ
  • 12. Q. 121: Test Implementation and execution has which of the following major tasks? i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test harnesses and writing automated test scripts. ii. Creating the test suite from the test cases for efficient test execution. iii. Verifying that the test environment has been set up correctly. iv. Determining the exit criteria. A. i,ii,iii are true and iv is false B. i,,iv are true and ii is false C. i,ii are true and iii,iv are false D. ii,iii,iv are true and i is false => Ch n đáp ánọ A Q. 122: One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Identify the invalid Equivalance class A. 17 B. 19 C. 24 D. 21 => Ch n đáp ánọ A Q. 123: Exhaustive Testing is A. Is impractical but possible B. Is practically possible C. Is impractical and impossible D. Is always possible => Ch n đáp ánọ C Q. 124: Which tool needs to interface with other office automation software in order to generate reports in the format required by the organization? A. Progress tracking tools B. Test management tools C. Metrics management tools D. Test execution tools => Ch n đáp ánọ B Q. 125: Which one is not comes under international standard A. IEC B. IEEE C. ISO D. All of the above
  • 13. => Ch n đáp ánọ B Q. 126: In which phase static tests are used A. Requirements B. Design C. Coding D. All of the above => Ch n đáp ánọ D Q. 127: What’s the disadvantage of Black Box Testing A. Chances of having repetition of tests that are already done by programmer. B. The test inputs needs to be from large sample space. C. It is difficult to identify all possible inputs in limited testing time. So writing test cases is slow and difficult D. All above => Ch nọ D Q. 128: What is the process of analyzing and removing causes of failures in software? A. Validation B. Testing C. Debugging D. Verification => Ch n đáp án Cọ Q. 129: Majority of system errors occur in the _________ phase A. Requirements Phase. B. Analysis and Design Phase C. Development Phase D. Testing Phase => Ch n đáp ánọ A Q. 130: Which of the following is a MAJOR task when evaluating the exit criteria? A. Creating test suites and cases for efficient execution B. Writing a test summary report for stakeholders
  • 14. C. Handing the testware to the maintenance organization D. Identifying any required infrastructure and tools stakeholders: Các bên liên quan => Ch n đáp ánọ B Q. 131: How much percentage of the life cycle costs of a software are spent on maintenance. A. 10% B. 30% C. 50% D. 70% => Đáp án D nhé Q. 132: When a defect is detected and fixed then the software should be retested to confirm that the original defect has been successfully removed. This is called A. Regression testing B. Maintenance testing C. Confirmation testing D. None of the above => Đáp án C Q. 133: Which of the following is a valid objective of an incident report? A. Prove that the tester is contributing to the quality of the system. B. Provides test management ideas for test process improvement. C. Gives a statistical way to determine which modules to redesign. D. Provides developers a way to critique their individual work processes. Objective: m c đích, m c tiêuụ ụ Prove: ch ng minh, ch ng tứ ứ ỏ Contributing: đóng góp Provides: Cung c pấ improvement: C i thi nả ệ statistical: th ng kêố redesign: thi t k l iế ế ạ critique: phê bình individual: cá nhân
  • 15. => Ch n đáp ánọ B Q. 134: When to stop Testing? A. Stop when scheduled time for testing expires B. Stop if 75% of the pre-defined number of errors is detected. C. Stop when all the test cases execute with detecting few errors. D. None above => Ch n đáp ánọ A Q. 135: Which of the following are success factors for reviews? I. Clear objectives for each review. II. Checklists and/or roles are used to increase effectiveness of defect identification. III. There is an emphasis on process improvement. IV. People issues and psychological aspects are not reviewed. A. I and III B. II, III and IV C. I, II and III D. IV emphasis: nh n m nhấ ạ aspects: khía c nhạ reviewed: xem xét => Ch n đáp ánọ C Q. 136: Structure is unknown for which type of development project A. Traditional system development B. Iterative development C. System maintenance D. Purchased/contracted software => Ch n đáp ánọ D Q. 137: ________indicates how important it is to fix the bug and when it should be fixed A. Severity B. Priority
  • 16. C. All of the above D. None of the above => Ch n đáp ánọ C Q. 138: The person who leads the review of the document(s), planning the review,running the meeting and follow-up after the meeting A. Reviewer B. Author C. Moderator D. Auditor follow-up: theo sát => Ch n đáp án C, ng i đi u hànhọ ườ ề Q. 139: Performs sufficient testing to evaluate every possible path and condition in the application system. The only test method that guarantees the proper functioning of the application system is called as _____________ A. Regression Testing B. Exhaustive Testing C. Basic Path Testing D. Branch Testing sufficient: đ y đầ ủ guarantees: đ m b oả ả proper: thích h pợ => Ch nọ C Q. 140: Which of the following statements contains a valuable objective for a test team? A. Prove that the remaining defects will not cause any additional failures. B. Run all of the tests that are defined for the test object as quickly as possible. C. Prove that all faults have been identified through thorough testing. D. Cause as many failures as possible so that faults can be identified and corrected. Thorough: k l ngỹ ưỡ =>Ch n đáp ánọ D, gây ra càng nhi u l i càng t t đ đ nh nghĩa và s a chúng.ề ỗ ố ể ị ử
  • 17. Q. 141: A formal assessment of a work product conducted by one or more qualified independent reviewer to detect defects. A. Inspection. ki m treể B. Walkthrough. C. Review D. Non Conformance => Ch n đáp án Aọ assessment: đánh giá Q. 142: Which of the following are MAJOR test implementation and execution tasks? I. Repeating test activities II. Creating test suites III. Reporting discrepancies IV. Logging the outcome V. Analyzing lessons learned. phân tích bài h c kinh nghi mọ ệ A. II, III and IV B. I, III, IV and V C. I, II, III and IV D. III, IV and V => Ch n Cọ Q. 143: Which tasks are performed by a test leader versus. so v i a tester?ớ S. Writing a project test strategy. chi n l cế ượ T. Selecting tools to support testing U. Preparing and acquiring data V. Scheduling tests A. Test leader: S and V; Tester: T and U B. Test leader: S, T and V; Tester: U C. Test leader: S, U and V; Tester: T D. Test leader: S; Tester: T, U and V => Ch n đáp án Bọ Q. 144: What type of tools to be used for Regression Testing A. Performance B. Record/Playback C. A. & B. D. None => Ch n đáp án Bọ
  • 18. Q. 145: System Integration testing should be done after A. Integration testing B. System testing C. Unit testing D. Component integration testing => Ch n Cọ Q. 146: During this event the entire. toàn b system is tested to verify that allộ functional information structural and quality requirements have been met. A predetermined combination of tests is designed that when executed successfully satisfy management that the system meets specifications A. Validation Testing B. Integration Testing C. User Acceptance Testing D. System Testing => Ch n đáp án Cọ Q. 147: What is the normal order of activities in which software testing is organized? A. Unit, integration, system, validation B. System, integration, unit, validation C. Unit, integration, validation, system D. None of the above => Ch n Aọ Q. 148: During testing, a defect was found in which the system crashed when the network got disconnected while receiving data from the server. The defect was fixed by correcting functionality which checks the network availability during data transfer. Existing test cases did cover 100% of the module statements. To verify the fix and ensure more extensive coverage, some tests were designed and added to the test suite. What types of testing are mentioned above? I. Functional testing II. Structural testing III. Confirmation testing IV. Performance testing A. I, III and IV
  • 19. B. I and III C. II and IV D. I, II and III => Ch n đáp án Dọ Q. 149: What is a scripting technique that uses data files to contain not only test data and expected results, but also keywords related to the application being tested? A. Automation technique B. Scripting language C. Process-driven testing D. Keyword-driven testing => Ch n đáp án D.ọ Q. 150: The principal. ch y u attributes of tools and automation areủ ế A. Speed & efficiency B. Accuracy. đ chính xác & precisionộ C. All of the above D. None of the above => Ch n Cọ