SlideShare a Scribd company logo
1 of 2
MS-08




        Management Programme




              ASSIGNMENT
            FIRST SEMESTER
                  2011




     MS-08: QUANTITATIVE ANALYSIS FOR
             MANAGERIAL APPLICATIONS




        School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
    MAIDAN GARHI, NEW DELHI – 110 068
ASSIGNMENTS

Course Code                     :         MS 08
Course Title                    :         Quantitative Analysis for Managerial Applications
Assignment No.                  :         08/TMA-1/SEM-I/2011
Coverage                        :         All Blocks

Note: Assignments Solved by www.distpub.com

1. Calculate the mean, median and mode from the following data relating to production of a steel
   mill for 60 days

                Production (in tons per
                                                21-22 23-24 25-26 27-28         29-30
                day)
                Number of days                    7     13       22      10       8

2. A restaurant is experiencing discontentment among its customers. It analyses that there are three
    factors responsible viz. food quality, service quality and interior décor. By conducting an
    analysis, it assesses the probabilities of discontentment with the three factors as 0.40, 0.35 and
    0.25 respectively. By conducting a survey among the customers, it also evaluated the
    probabilities of a customer going away discontented on account of these factors as 0.6, 0.8 and
    0.5, respectively. With this information, the restaurant wants to know that, if a customer is
    discontented, what are the probabilities that it is so due to food, service or interior décor?

3. The monthly incomes of a group of 10,000 persons were found to be normally distributed with
    mean equal to 15,000 and standard deviation equal to          1000. What is the lowest income
    among the richest 250 persons?

4. Write short notes on the following:

        a. Test of goodness of fit
        b. Critical Region of a test
        c. Exponential Smoothing Method

More Related Content

Similar to Ms 08-2011

Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.
Alexander Decker
 
Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.
Alexander Decker
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizational
IAEME Publication
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizational
IAEME Publication
 
The effect of implementation of iso 9001 2008 qms on the organizational perfo...
The effect of implementation of iso 9001 2008 qms on the organizational perfo...The effect of implementation of iso 9001 2008 qms on the organizational perfo...
The effect of implementation of iso 9001 2008 qms on the organizational perfo...
IAEME Publication
 
The effect of implementation of iso 9001 2008 qms organizational performance
The effect of implementation of iso 9001 2008 qms  organizational performanceThe effect of implementation of iso 9001 2008 qms  organizational performance
The effect of implementation of iso 9001 2008 qms organizational performance
IAEME Publication
 
Six_sigma_paper_with_Cover_Oct_2012
Six_sigma_paper_with_Cover_Oct_2012Six_sigma_paper_with_Cover_Oct_2012
Six_sigma_paper_with_Cover_Oct_2012
Joseph E. Johnson
 
Redesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv methodRedesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv method
eSAT Journals
 

Similar to Ms 08-2011 (20)

Loan Analysis Predicting Defaulters
Loan Analysis Predicting DefaultersLoan Analysis Predicting Defaulters
Loan Analysis Predicting Defaulters
 
Day 1
Day  1Day  1
Day 1
 
Day 1
Day  1Day  1
Day 1
 
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGCUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
 
Scheme g sixth semester (co)
Scheme   g sixth semester (co)Scheme   g sixth semester (co)
Scheme g sixth semester (co)
 
Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.
 
Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.Constructing a musa model to determine priority factor of a servperf model.
Constructing a musa model to determine priority factor of a servperf model.
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizational
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizational
 
The effect of implementation of iso 9001 2008 qms on the organizational perfo...
The effect of implementation of iso 9001 2008 qms on the organizational perfo...The effect of implementation of iso 9001 2008 qms on the organizational perfo...
The effect of implementation of iso 9001 2008 qms on the organizational perfo...
 
The effect of implementation of iso 9001 2008 qms organizational performance
The effect of implementation of iso 9001 2008 qms  organizational performanceThe effect of implementation of iso 9001 2008 qms  organizational performance
The effect of implementation of iso 9001 2008 qms organizational performance
 
Six_sigma_paper_with_Cover_Oct_2012
Six_sigma_paper_with_Cover_Oct_2012Six_sigma_paper_with_Cover_Oct_2012
Six_sigma_paper_with_Cover_Oct_2012
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET- Quality Improvement for LED Lights using Six Sigma
IRJET- Quality Improvement for LED Lights using Six SigmaIRJET- Quality Improvement for LED Lights using Six Sigma
IRJET- Quality Improvement for LED Lights using Six Sigma
 
8 d
8 d8 d
8 d
 
Ijebea14 275
Ijebea14 275Ijebea14 275
Ijebea14 275
 
Operations management (2)
Operations management (2)Operations management (2)
Operations management (2)
 
Redesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv methodRedesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv method
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
 
Smu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentsSmu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignments
 

More from DistPub India

Periyar University MBA Project Report PDF Download Learning and Development a...
Periyar University MBA Project Report PDF Download Learning and Development a...Periyar University MBA Project Report PDF Download Learning and Development a...
Periyar University MBA Project Report PDF Download Learning and Development a...
DistPub India
 

More from DistPub India (20)

Business and Corporate Laws SGVU Exam Question Sampe Paper Infographics.pdf
Business and Corporate Laws SGVU Exam Question Sampe Paper Infographics.pdfBusiness and Corporate Laws SGVU Exam Question Sampe Paper Infographics.pdf
Business and Corporate Laws SGVU Exam Question Sampe Paper Infographics.pdf
 
Accounting & Financial Management SGVU Exam Question Sampe Paper Infographics
Accounting & Financial Management SGVU Exam Question Sampe Paper InfographicsAccounting & Financial Management SGVU Exam Question Sampe Paper Infographics
Accounting & Financial Management SGVU Exam Question Sampe Paper Infographics
 
How to write executive summary in project report and research infographics pdf
How to write executive summary in project report and research infographics pdfHow to write executive summary in project report and research infographics pdf
How to write executive summary in project report and research infographics pdf
 
Management Theory and Practice NMIMS Solved Assignments Infographics Dec 2023...
Management Theory and Practice NMIMS Solved Assignments Infographics Dec 2023...Management Theory and Practice NMIMS Solved Assignments Infographics Dec 2023...
Management Theory and Practice NMIMS Solved Assignments Infographics Dec 2023...
 
How to write the Abstract 5 Steps - ProjectQ Thesis Writing Expert
How to write the Abstract 5 Steps - ProjectQ Thesis Writing ExpertHow to write the Abstract 5 Steps - ProjectQ Thesis Writing Expert
How to write the Abstract 5 Steps - ProjectQ Thesis Writing Expert
 
Different between Project Report vs Thesis Infographics from ProjectQ Team
Different between Project Report vs Thesis Infographics from ProjectQ TeamDifferent between Project Report vs Thesis Infographics from ProjectQ Team
Different between Project Report vs Thesis Infographics from ProjectQ Team
 
How to select a research topic 7 Steps - ProjectQ Thesis Writing Expert
How to select a research topic 7 Steps - ProjectQ Thesis Writing ExpertHow to select a research topic 7 Steps - ProjectQ Thesis Writing Expert
How to select a research topic 7 Steps - ProjectQ Thesis Writing Expert
 
Periyar University MBA Project Report PDF Download Learning and Development a...
Periyar University MBA Project Report PDF Download Learning and Development a...Periyar University MBA Project Report PDF Download Learning and Development a...
Periyar University MBA Project Report PDF Download Learning and Development a...
 
SGVU-Approved-Project-Report-Assessing TQM Effects on Air India's Performance...
SGVU-Approved-Project-Report-Assessing TQM Effects on Air India's Performance...SGVU-Approved-Project-Report-Assessing TQM Effects on Air India's Performance...
SGVU-Approved-Project-Report-Assessing TQM Effects on Air India's Performance...
 
SimpliLearn Project by DistPub - Increasing Hospital POS Collections.pdf
SimpliLearn Project by DistPub - Increasing Hospital POS Collections.pdfSimpliLearn Project by DistPub - Increasing Hospital POS Collections.pdf
SimpliLearn Project by DistPub - Increasing Hospital POS Collections.pdf
 
NMIMS Approved 2023 Project Sample - Performance Appraisal Method at UnitedHe...
NMIMS Approved 2023 Project Sample - Performance Appraisal Method at UnitedHe...NMIMS Approved 2023 Project Sample - Performance Appraisal Method at UnitedHe...
NMIMS Approved 2023 Project Sample - Performance Appraisal Method at UnitedHe...
 
Ignou mba solution dec 2020
Ignou mba solution dec 2020Ignou mba solution dec 2020
Ignou mba solution dec 2020
 
DistPub.com nmims solved assignments for dec18
DistPub.com nmims solved assignments for dec18DistPub.com nmims solved assignments for dec18
DistPub.com nmims solved assignments for dec18
 
AiDLo management program important question bank series-4
AiDLo management program important question bank series-4AiDLo management program important question bank series-4
AiDLo management program important question bank series-4
 
AiDLo management program important question bank series-3
AiDLo management program important question bank series-3AiDLo management program important question bank series-3
AiDLo management program important question bank series-3
 
AiDLo management program important question bank series-2
AiDLo management program important question bank series-2AiDLo management program important question bank series-2
AiDLo management program important question bank series-2
 
DistPub Solved Annamalai Assignments 2018
DistPub Solved Annamalai Assignments 2018DistPub Solved Annamalai Assignments 2018
DistPub Solved Annamalai Assignments 2018
 
Dist pub solved organisational theory and design april 18
Dist pub solved organisational theory and design april 18Dist pub solved organisational theory and design april 18
Dist pub solved organisational theory and design april 18
 
Dist pub solved organisational behaviour nmims april 18
Dist pub solved organisational behaviour nmims april 18Dist pub solved organisational behaviour nmims april 18
Dist pub solved organisational behaviour nmims april 18
 
Dist pub solved organisational behaviour april 18
Dist pub solved organisational behaviour april 18Dist pub solved organisational behaviour april 18
Dist pub solved organisational behaviour april 18
 

Ms 08-2011

  • 1. MS-08 Management Programme ASSIGNMENT FIRST SEMESTER 2011 MS-08: QUANTITATIVE ANALYSIS FOR MANAGERIAL APPLICATIONS School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068
  • 2. ASSIGNMENTS Course Code : MS 08 Course Title : Quantitative Analysis for Managerial Applications Assignment No. : 08/TMA-1/SEM-I/2011 Coverage : All Blocks Note: Assignments Solved by www.distpub.com 1. Calculate the mean, median and mode from the following data relating to production of a steel mill for 60 days Production (in tons per 21-22 23-24 25-26 27-28 29-30 day) Number of days 7 13 22 10 8 2. A restaurant is experiencing discontentment among its customers. It analyses that there are three factors responsible viz. food quality, service quality and interior décor. By conducting an analysis, it assesses the probabilities of discontentment with the three factors as 0.40, 0.35 and 0.25 respectively. By conducting a survey among the customers, it also evaluated the probabilities of a customer going away discontented on account of these factors as 0.6, 0.8 and 0.5, respectively. With this information, the restaurant wants to know that, if a customer is discontented, what are the probabilities that it is so due to food, service or interior décor? 3. The monthly incomes of a group of 10,000 persons were found to be normally distributed with mean equal to 15,000 and standard deviation equal to 1000. What is the lowest income among the richest 250 persons? 4. Write short notes on the following: a. Test of goodness of fit b. Critical Region of a test c. Exponential Smoothing Method