SAFETY PERFOMANCE REVIEW
SAFETY PERFOMANCE REVIEW
DUABI Projects for the period,
Jan. 2016 – February 2016
Project wise Safety Statistics
Formula used for “Safety
Statistics ”
Incident Rate for the period =
No of reportable incidents during the reporting period * 1000000 / Total Man-hours
completed for the reporting period
Incident Rate – Cumulative =
No of reportable incidents till reporting date since start of project * 1000000 / Total Man-
hours completed till date.
Severity Rate for the period =
No of man-days lost form lost time accident cases during the reporting period *1000000 /
Man-hours completed during the reporting period
Severity Rate – Cumulative =
No of man-days lost form lost time accident cases till date since start of project
*1000000 / Man-hours completed till date.
Fatality frequency Rate for the period = No of fatalities during the reporting period *1000000 / Man-hours completed during the
reporting period
Fatality frequency – Cumulative = No of fatalities till date since start of project *1000000 / Man-hours completed till date.
Projects
Total Man
Hours
Reportable
Incidents
Incident
frequency
Rate
Lost Work
Day Cases
Severity Rate Fatality Fatality Rate
Safety
Inductions
Other
Safety
Trainings
(TBT)
Remarks
DUBAI For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumulati
ve
For
the
Peri
od
Cumul
ative
HAYAAT
9620
17370
0
0
0
0
0
0
0
0
0
0
0
0
5
37
2
5
No Lost time
incidents reported
for the quarter
FALCON
16640
25580
0
0
0
0
0
0
0
0
0
0
0
0
16
64
1
8
No Lost time
incidents reported
for the quarter
ZURICH
4680
4680
0
0
0
0
0
0
0
0
0
0
0
0
8
18
2
3
No Lost time
incidents reported
for the quarter
TOYOTA
6760
9610
0
0
0
0
0
0
0
0
0
0
0
0
3
26
3
4
No Lost time
incidents reported
for the quarter
BOEHRING
ER
14560
18060
0
0
0
0
0
0
0
0
0
0
0
0
39
56
5
10
No Lost time
incidents reported
for the quarter
Project wise Safety Statistics
Projects
Total Man
Hours
Reportable
Incidents
Incident
frequency
Rate
Lost Work
Day Cases
Severity Rate Fatality Fatality Rate
Safety
Inductions
Other Safety
Trainings
(TBT)
Remarks
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
For
the
Period
Cumul
ative
AVAYA
5980
8970
0
0
0
0
0
0
0
0
0
0
0
0
9
23
3
6
KNIPEX
2340
3380
0
0
0
0
0
0
0
0
0
0
0
0
2
9
1
1
PERMASTE
ELISA
17680
24480
0
0
0
0
0
0
0
0
0
0
0
0
2
68
1
12
Project wise Safety Statistics
SAFETY ACTIVITIES
Safety Induction is done for all personnel mobilized to the
projects at all sites.
Regular Tool Box Talks(TBT) are carried out by site foreman
to improve the employee safety awareness on specific job.
Special trainings are conducted for Scaffolders, Carpenters,
painters, Power tools operating, working at height, Fall
Protection & Prevention, Electrical safety etc.,
Safety Awards are given to selected safe working personnel
On every quarter.
SAFETY TRAININGS /
AWARENESS PROGRAMMES
IN HOUSE TRAINING
FIRE MOCK DRILL , WORKING AT HEIGHT TRAINING
&
SAFETY TRAININGS /
AWARENESS PROGRAMMES
BEST SAFETY
PRACTICES
SCAFFOLDING TRAINING BY 3RD
PARTY CONSULTANCY
THANK YOU

More Related Content

Similar to PRM - JAN & FEB - 16

Ministry of Aviation
Ministry of AviationMinistry of Aviation
Ministry of AviationTransformNG
 
#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of AviationFMINigeria
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business PlanAbdi Hussein
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET Journal
 
Technical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNOTechnical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNOLucas Oostrum
 
IRJET- Automatic Braking with Pneumatic Bumper
IRJET- Automatic Braking with Pneumatic BumperIRJET- Automatic Braking with Pneumatic Bumper
IRJET- Automatic Braking with Pneumatic BumperIRJET Journal
 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniANIKET KULKARNI
 
Trends in construction, 20190326 final
Trends in construction, 20190326 finalTrends in construction, 20190326 final
Trends in construction, 20190326 finalJozek Gruskovnjak
 
Infrastructure investments in Japan - Ryuichi Kataoka, Japan
Infrastructure investments in Japan - Ryuichi Kataoka, JapanInfrastructure investments in Japan - Ryuichi Kataoka, Japan
Infrastructure investments in Japan - Ryuichi Kataoka, JapanOECD Governance
 
CSI_Health_Safety_Reporting_Guidelines.pdf
CSI_Health_Safety_Reporting_Guidelines.pdfCSI_Health_Safety_Reporting_Guidelines.pdf
CSI_Health_Safety_Reporting_Guidelines.pdfParmeshworVetwal1
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 
OTT and other ICT sector taxes
OTT and other ICT sector taxesOTT and other ICT sector taxes
OTT and other ICT sector taxesChristoph Stork
 
The Return of Travel
The Return of TravelThe Return of Travel
The Return of TravelI Meet Hotel
 
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01АО НК КТЖ
 

Similar to PRM - JAN & FEB - 16 (20)

Coal
CoalCoal
Coal
 
Ministry of Aviation
Ministry of AviationMinistry of Aviation
Ministry of Aviation
 
#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business Plan
 
Product Safety Policy in Japan
Product Safety Policy in JapanProduct Safety Policy in Japan
Product Safety Policy in Japan
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
 
Technical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNOTechnical aspects concerning the safe and secure use of drones by TNO
Technical aspects concerning the safe and secure use of drones by TNO
 
IRJET- Automatic Braking with Pneumatic Bumper
IRJET- Automatic Braking with Pneumatic BumperIRJET- Automatic Braking with Pneumatic Bumper
IRJET- Automatic Braking with Pneumatic Bumper
 
Life Saving Rules - HSE
Life Saving Rules - HSELife Saving Rules - HSE
Life Saving Rules - HSE
 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarni
 
Product Safety Regulatory Process in Japan
Product Safety Regulatory Process in JapanProduct Safety Regulatory Process in Japan
Product Safety Regulatory Process in Japan
 
Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard
 
Trends in construction, 20190326 final
Trends in construction, 20190326 finalTrends in construction, 20190326 final
Trends in construction, 20190326 final
 
Infrastructure investments in Japan - Ryuichi Kataoka, Japan
Infrastructure investments in Japan - Ryuichi Kataoka, JapanInfrastructure investments in Japan - Ryuichi Kataoka, Japan
Infrastructure investments in Japan - Ryuichi Kataoka, Japan
 
CSI_Health_Safety_Reporting_Guidelines.pdf
CSI_Health_Safety_Reporting_Guidelines.pdfCSI_Health_Safety_Reporting_Guidelines.pdf
CSI_Health_Safety_Reporting_Guidelines.pdf
 
Rio Tinto Mongolia
Rio Tinto MongoliaRio Tinto Mongolia
Rio Tinto Mongolia
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
OTT and other ICT sector taxes
OTT and other ICT sector taxesOTT and other ICT sector taxes
OTT and other ICT sector taxes
 
The Return of Travel
The Return of TravelThe Return of Travel
The Return of Travel
 
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01
Presentacininfrastructureto2030opportunitiesandchallenges 100506130120-phpapp01
 

PRM - JAN & FEB - 16

  • 1. SAFETY PERFOMANCE REVIEW SAFETY PERFOMANCE REVIEW DUABI Projects for the period, Jan. 2016 – February 2016
  • 2. Project wise Safety Statistics Formula used for “Safety Statistics ” Incident Rate for the period = No of reportable incidents during the reporting period * 1000000 / Total Man-hours completed for the reporting period Incident Rate – Cumulative = No of reportable incidents till reporting date since start of project * 1000000 / Total Man- hours completed till date. Severity Rate for the period = No of man-days lost form lost time accident cases during the reporting period *1000000 / Man-hours completed during the reporting period Severity Rate – Cumulative = No of man-days lost form lost time accident cases till date since start of project *1000000 / Man-hours completed till date. Fatality frequency Rate for the period = No of fatalities during the reporting period *1000000 / Man-hours completed during the reporting period Fatality frequency – Cumulative = No of fatalities till date since start of project *1000000 / Man-hours completed till date.
  • 3. Projects Total Man Hours Reportable Incidents Incident frequency Rate Lost Work Day Cases Severity Rate Fatality Fatality Rate Safety Inductions Other Safety Trainings (TBT) Remarks DUBAI For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumulati ve For the Peri od Cumul ative HAYAAT 9620 17370 0 0 0 0 0 0 0 0 0 0 0 0 5 37 2 5 No Lost time incidents reported for the quarter FALCON 16640 25580 0 0 0 0 0 0 0 0 0 0 0 0 16 64 1 8 No Lost time incidents reported for the quarter ZURICH 4680 4680 0 0 0 0 0 0 0 0 0 0 0 0 8 18 2 3 No Lost time incidents reported for the quarter TOYOTA 6760 9610 0 0 0 0 0 0 0 0 0 0 0 0 3 26 3 4 No Lost time incidents reported for the quarter BOEHRING ER 14560 18060 0 0 0 0 0 0 0 0 0 0 0 0 39 56 5 10 No Lost time incidents reported for the quarter Project wise Safety Statistics
  • 4. Projects Total Man Hours Reportable Incidents Incident frequency Rate Lost Work Day Cases Severity Rate Fatality Fatality Rate Safety Inductions Other Safety Trainings (TBT) Remarks For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative For the Period Cumul ative AVAYA 5980 8970 0 0 0 0 0 0 0 0 0 0 0 0 9 23 3 6 KNIPEX 2340 3380 0 0 0 0 0 0 0 0 0 0 0 0 2 9 1 1 PERMASTE ELISA 17680 24480 0 0 0 0 0 0 0 0 0 0 0 0 2 68 1 12 Project wise Safety Statistics
  • 5. SAFETY ACTIVITIES Safety Induction is done for all personnel mobilized to the projects at all sites. Regular Tool Box Talks(TBT) are carried out by site foreman to improve the employee safety awareness on specific job. Special trainings are conducted for Scaffolders, Carpenters, painters, Power tools operating, working at height, Fall Protection & Prevention, Electrical safety etc., Safety Awards are given to selected safe working personnel On every quarter.
  • 6. SAFETY TRAININGS / AWARENESS PROGRAMMES IN HOUSE TRAINING
  • 7. FIRE MOCK DRILL , WORKING AT HEIGHT TRAINING & SAFETY TRAININGS / AWARENESS PROGRAMMES
  • 8.
  • 10.
  • 11. SCAFFOLDING TRAINING BY 3RD PARTY CONSULTANCY