In the early days of cloud computing, moving a simple, isolated workload to the cloud was relatively easy for an organisation. These test projects tended to be small and contained, and carried low risk, because the application was usually selected on the basis of being non-critical to the core business. The rise of hybrid IT has changed that picture dramatically.