SlideShare a Scribd company logo
1 of 1
Download to read offline
.t.:mployee: Dayna Poskanzer ACRType: (Annual I 6 Month I Special)
Title: Food Server ACRPeriod: To
Hire Date: 6/312013 Position Date:
SECTION SIX - OVERALL PERFORMANCE RATING/COMMENTS
Directions: This section should assess the employee's overall performance addressing employee's strengths and
areas for improvement. After you have completed the accountability and competency report and arrived at an
overall rating, place a checkmark in the box that best corresponds with the appraisal.
1
o BELOW the expected
performance standards.
Needs improvement.
2
Fully MEETS expected
performance standards.
3
X Consistently EXCEEDS
performance standards.
Employee Strengths: DAYNA IS WONDERFULLY PLEASANT AND ENGAGING; SHE SMILES
FREELY, DEMONSTRATES A TERRIFIC, POSITIVE AND HELPFUL DEMEANOR JUST
ABOUT ALL THE TIME, AND IS ONE OF THE STRONGEST TEAM PLAYERS ON OUR STAFF.
IN ADDITION TO HER WINNING PERSONALITY, DAYNA IS STRONGLY COMMITTED TO
HER DITTIES, EXECUTES THEM WITH GREAT EFFICIENCY, AND, OVERALL, DOES AN
EXEMPLARY JOB IN SERVING HER TABLES. SHE IS A PROMINENT CONTRIBUTOR TO
OUR PRE-MEAL MEETINGS, IS QUICK WITH HER OPENING AND CLOSING SIDEWORK
RESPONSmILITIES, AND STICKS TO HER BUSINESS. IT IS A PLEASURE TO HAVE DAYNA
AS A KEY MEMBER OF OUR OPERATION, AND WE LOOK FORWARD TO HER
I CONTINUED, AND HOPEFULLY ENHANCED, CONTRIBUTIONS AS THE NEXT SCHOOL
YEAR APPROACHES.
Areas Needing Improvement. WHILE DAYNA, AS MENTIONED ABOVE, IS THOROUGH IN
HER SERVICE, THERE IS ALWAYS ROOM FOR IMPROVEMENT WITH REGARD TO
IDTTING ALL THE LITTLE THINGS EACH AND EVERY TIME OUT; THIS WILL BE THE
FOCUS IN THE COMING YEAR. A REDUCTION IN EXTRANEOUS CONVERSATION WILL
I BE ENCOURAGED AS WELL.
___YES, at ___% __NO
"] have reviewed my evaluation and have discussed it with my supervisor. "
Employee Signature:

More Related Content

Viewers also liked

PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...
 PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme... PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...
PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...PrestaShop
 
Intro to How Drones are Shaping the Future of Construction Sites
Intro to How Drones are Shaping the Future of Construction SitesIntro to How Drones are Shaping the Future of Construction Sites
Intro to How Drones are Shaping the Future of Construction SitesColin Snow
 
Retail: nuovi modelli organizzativi
Retail: nuovi modelli organizzativiRetail: nuovi modelli organizzativi
Retail: nuovi modelli organizzativiLargo Consumo
 
MINIMUM VIABLE BURGER - Lean Thinking im klassischen Projektalltag
MINIMUM VIABLE BURGER - Lean Thinking im klassischen ProjektalltagMINIMUM VIABLE BURGER - Lean Thinking im klassischen Projektalltag
MINIMUM VIABLE BURGER - Lean Thinking im klassischen ProjektalltagNiels Anhalt
 
How Drones Reduce Construction Project Waste
How Drones Reduce Construction Project WasteHow Drones Reduce Construction Project Waste
How Drones Reduce Construction Project WasteU.S. CAD
 

Viewers also liked (8)

PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...
 PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme... PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...
PrestaShop Masterclass - 8 cose che devi sapere per migliorare il tuo eComme...
 
Marianeves2
Marianeves2Marianeves2
Marianeves2
 
CV
CVCV
CV
 
Intro to How Drones are Shaping the Future of Construction Sites
Intro to How Drones are Shaping the Future of Construction SitesIntro to How Drones are Shaping the Future of Construction Sites
Intro to How Drones are Shaping the Future of Construction Sites
 
Retail: nuovi modelli organizzativi
Retail: nuovi modelli organizzativiRetail: nuovi modelli organizzativi
Retail: nuovi modelli organizzativi
 
Plexo braquial
Plexo braquialPlexo braquial
Plexo braquial
 
MINIMUM VIABLE BURGER - Lean Thinking im klassischen Projektalltag
MINIMUM VIABLE BURGER - Lean Thinking im klassischen ProjektalltagMINIMUM VIABLE BURGER - Lean Thinking im klassischen Projektalltag
MINIMUM VIABLE BURGER - Lean Thinking im klassischen Projektalltag
 
How Drones Reduce Construction Project Waste
How Drones Reduce Construction Project WasteHow Drones Reduce Construction Project Waste
How Drones Reduce Construction Project Waste
 

Similar to Beverwyck evaluation for Dayna

S Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IHS Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IHSuzanne Goldsberry
 
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docx
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docxSITXHRM006A – Monitor staff performance - Assessment 1Student na.docx
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docxbudabrooks46239
 
PerformanceEvaluation_31May_2010
PerformanceEvaluation_31May_2010PerformanceEvaluation_31May_2010
PerformanceEvaluation_31May_2010DEREK FOLLEY
 
Employee Performance Review
Employee Performance ReviewEmployee Performance Review
Employee Performance ReviewMindy Bates
 
Personal appraisal form
Personal appraisal formPersonal appraisal form
Personal appraisal formLuther Akyoo
 
Professional Unbranded Performance Appraisal Form
Professional Unbranded Performance Appraisal FormProfessional Unbranded Performance Appraisal Form
Professional Unbranded Performance Appraisal FormOleksiy Kuryliak
 
Virtual assessment centre sample report
Virtual assessment centre  sample reportVirtual assessment centre  sample report
Virtual assessment centre sample reportThink Talent Services
 
Glassdoor Best Places to Work Awards Methodology
Glassdoor Best Places to Work Awards MethodologyGlassdoor Best Places to Work Awards Methodology
Glassdoor Best Places to Work Awards MethodologyMatt Charney
 
Bf Hr Performance Evaluation
Bf Hr Performance EvaluationBf Hr Performance Evaluation
Bf Hr Performance EvaluationConfidential
 
PerformanceEvaluation_28Aug_2008
PerformanceEvaluation_28Aug_2008PerformanceEvaluation_28Aug_2008
PerformanceEvaluation_28Aug_2008DEREK FOLLEY
 
Performance Appraisal
Performance AppraisalPerformance Appraisal
Performance Appraisalrose4samad
 
Strategies for Employee Retention
Strategies for Employee RetentionStrategies for Employee Retention
Strategies for Employee RetentionDhiraj Agarwal
 
Employee+review+template
Employee+review+templateEmployee+review+template
Employee+review+templateConfidential
 
Berger MasterCard Mid-Summer Eval
Berger MasterCard Mid-Summer EvalBerger MasterCard Mid-Summer Eval
Berger MasterCard Mid-Summer EvalNicholas Berger
 
Performance evaluation report template
Performance evaluation report templatePerformance evaluation report template
Performance evaluation report templateCourtney Doutherd
 
Talent Management In Organization PowerPoint Presentation Slides
Talent Management In Organization PowerPoint Presentation SlidesTalent Management In Organization PowerPoint Presentation Slides
Talent Management In Organization PowerPoint Presentation SlidesSlideTeam
 
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...Steven Brothers
 
9 box matrix
9 box matrix9 box matrix
9 box matrixshakib362
 

Similar to Beverwyck evaluation for Dayna (20)

S Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IHS Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IH
 
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docx
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docxSITXHRM006A – Monitor staff performance - Assessment 1Student na.docx
SITXHRM006A – Monitor staff performance - Assessment 1Student na.docx
 
PerformanceEvaluation_31May_2010
PerformanceEvaluation_31May_2010PerformanceEvaluation_31May_2010
PerformanceEvaluation_31May_2010
 
Employee Performance Review
Employee Performance ReviewEmployee Performance Review
Employee Performance Review
 
Personal appraisal form
Personal appraisal formPersonal appraisal form
Personal appraisal form
 
Professional Unbranded Performance Appraisal Form
Professional Unbranded Performance Appraisal FormProfessional Unbranded Performance Appraisal Form
Professional Unbranded Performance Appraisal Form
 
2015 Annual Review
2015 Annual Review2015 Annual Review
2015 Annual Review
 
Virtual assessment centre sample report
Virtual assessment centre  sample reportVirtual assessment centre  sample report
Virtual assessment centre sample report
 
kendra repay
kendra repaykendra repay
kendra repay
 
Glassdoor Best Places to Work Awards Methodology
Glassdoor Best Places to Work Awards MethodologyGlassdoor Best Places to Work Awards Methodology
Glassdoor Best Places to Work Awards Methodology
 
Bf Hr Performance Evaluation
Bf Hr Performance EvaluationBf Hr Performance Evaluation
Bf Hr Performance Evaluation
 
PerformanceEvaluation_28Aug_2008
PerformanceEvaluation_28Aug_2008PerformanceEvaluation_28Aug_2008
PerformanceEvaluation_28Aug_2008
 
Performance Appraisal
Performance AppraisalPerformance Appraisal
Performance Appraisal
 
Strategies for Employee Retention
Strategies for Employee RetentionStrategies for Employee Retention
Strategies for Employee Retention
 
Employee+review+template
Employee+review+templateEmployee+review+template
Employee+review+template
 
Berger MasterCard Mid-Summer Eval
Berger MasterCard Mid-Summer EvalBerger MasterCard Mid-Summer Eval
Berger MasterCard Mid-Summer Eval
 
Performance evaluation report template
Performance evaluation report templatePerformance evaluation report template
Performance evaluation report template
 
Talent Management In Organization PowerPoint Presentation Slides
Talent Management In Organization PowerPoint Presentation SlidesTalent Management In Organization PowerPoint Presentation Slides
Talent Management In Organization PowerPoint Presentation Slides
 
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...
#NG753902 (Resilience and Risk Reduction Program Coordinator GS-11, Jefferson...
 
9 box matrix
9 box matrix9 box matrix
9 box matrix
 

Beverwyck evaluation for Dayna

  • 1. .t.:mployee: Dayna Poskanzer ACRType: (Annual I 6 Month I Special) Title: Food Server ACRPeriod: To Hire Date: 6/312013 Position Date: SECTION SIX - OVERALL PERFORMANCE RATING/COMMENTS Directions: This section should assess the employee's overall performance addressing employee's strengths and areas for improvement. After you have completed the accountability and competency report and arrived at an overall rating, place a checkmark in the box that best corresponds with the appraisal. 1 o BELOW the expected performance standards. Needs improvement. 2 Fully MEETS expected performance standards. 3 X Consistently EXCEEDS performance standards. Employee Strengths: DAYNA IS WONDERFULLY PLEASANT AND ENGAGING; SHE SMILES FREELY, DEMONSTRATES A TERRIFIC, POSITIVE AND HELPFUL DEMEANOR JUST ABOUT ALL THE TIME, AND IS ONE OF THE STRONGEST TEAM PLAYERS ON OUR STAFF. IN ADDITION TO HER WINNING PERSONALITY, DAYNA IS STRONGLY COMMITTED TO HER DITTIES, EXECUTES THEM WITH GREAT EFFICIENCY, AND, OVERALL, DOES AN EXEMPLARY JOB IN SERVING HER TABLES. SHE IS A PROMINENT CONTRIBUTOR TO OUR PRE-MEAL MEETINGS, IS QUICK WITH HER OPENING AND CLOSING SIDEWORK RESPONSmILITIES, AND STICKS TO HER BUSINESS. IT IS A PLEASURE TO HAVE DAYNA AS A KEY MEMBER OF OUR OPERATION, AND WE LOOK FORWARD TO HER I CONTINUED, AND HOPEFULLY ENHANCED, CONTRIBUTIONS AS THE NEXT SCHOOL YEAR APPROACHES. Areas Needing Improvement. WHILE DAYNA, AS MENTIONED ABOVE, IS THOROUGH IN HER SERVICE, THERE IS ALWAYS ROOM FOR IMPROVEMENT WITH REGARD TO IDTTING ALL THE LITTLE THINGS EACH AND EVERY TIME OUT; THIS WILL BE THE FOCUS IN THE COMING YEAR. A REDUCTION IN EXTRANEOUS CONVERSATION WILL I BE ENCOURAGED AS WELL. ___YES, at ___% __NO "] have reviewed my evaluation and have discussed it with my supervisor. " Employee Signature: