SlideShare a Scribd company logo
1 of 30
Download to read offline
D A V I D M O R E N O P O R T F O L I O V O L 0 1
DAVID MORENO GARCÍA
Architect
Barcelona, Spain
As a committed creative individual i have always
had a passion for challenge and uncharted territory
and so architecture allows me to keep exploring
ideas, to grow both personal and professionally.
I can adapt to a wide range of situations and de-
sign procedures ,paying special attention and care
to context.
In my previous experience I tried to make the best
out of my exchange and collaboration with other
talented people and will try to keep doing so.
I also like spending time on other activities such as
playing guitar, piano ,running and football.
EDUCATION EXPERIENCE
BIAW workshop.
Erasmus programme.
Glasgow Strathclyde
Degree in Architecture.
Barcelona ETSAV
Graduated as a Part III
architect obtaining an
excellent for Master
Thesis.
2011
2012
2014
Technical Assistant
Cribilles
Barcelona
Summer internship
Architectural Assistant
TTG Architects
UK London
Collaborated as a Part II tech-
nical assistant helping to deve-
lop many retail based projects
across the UK for 2 years.
SKILLS
Adobe Photoshop
Adobe Illustrator
Adobe Acrobat
Autodesk Revit
Autodesk Autocad
Autodesk Inventor
Autodesk Sketchbook
Sketchup
Vray Rendering Engine
Microsoft Office suite
2013
2014-
2016
P R O F I L E
CONTACT DETAILS
T +44 07 436 843 051
davidmg.architecture@gmail.com
www.dmarchworks.com
I HOSPITAL DEL MAR III COMMUNITY CENTREII BATH HOUSE IV SMAB
Hospitalization areas
refurbishment
Hospital del Mar. Barcelona
Master thesis 2013-2014
Rethinking new conditions for
HDM complex and its thera-
peutic possibilites.
P4 Bath house
Glasgow Green
Studio 4b 2012
New bath house equipment
under the Commonwealth
games programme masterplan
revision.
P10 P14 Community centre for the
elder people
Cuenca
Projects 2011
Development for a new cultu-
ral centre serving local com-
munities in Arco de Bezudo
proximities.
Industrial pavilions refurbi-
shed into music halls
Port of Barcelona
Projects 2010
Re-programming of old indus-
trial pavilions as a complex for
music and artistic production
and display.
P18
C O N T E N T S
I HOSPITAL DEL MAR
Barcelona
design studio // year 2013-2014
Built in the early 20th century as a military
french pavilion type hospital, the current
complex is a result of consecutive refurbi-
shments who tried to address the thera-
peutic needs of their time. This results in
a barely recognisable hospitalization area
which becomes the main element of study
in this proposal.
1920
1950
1989
DOUBLE UNIT SINGLE UNIT
It is only though an accurate historic eva-
luation of the whole complex evolution that
the proposal is able to to supress inneces-
sary duplicities and to establish a clearer
organization of the hospitalization area. The
incoporation of new exterior areas also help
to provide a higher therapeutic value to the
building.
I R E - FORMATTING
spine
cloister
zoning
units
courtyards
a. elements de façana i tabiquería // entramat de
fusta estrat tèrmic
( e = 290,5 u = 0.21 w/m²k )
1. enfoscat de fàbrica existent
2. fàbrica existent de maó català en disposició
anglesa
3. tapeta de pissarra prefabricada
4. reomplert amb morter d'alta resistència
5. perfil ipn 180 doble per al estintolament del
forat de façana ( 2 x 1.6 m )
6. acabat de llistó vertical de làrix 24 mm
7. llistons paral·lels de suport d'avet ( 30 x 50
mm )
8. tauler de suport de mdf ( 15 mm )
9. entramat de fusta vertical de avet de 60 x
160 mm
10. aïllament de fibra de vidre e = 160 mm ; e/i =
0.040 ; r = 16
11. aïllament de fibra de vidre e = 40 mm ; e/i =
0.040 ; r = 16
12. llistons perpendiculars de fusta de làrix
13. acabat de llistó vertical de làrix // placa de
cartró-guix ( 15 mm )
b. elements de forjat // forjat alveolar de fusta es-
trat tèrmic
( e = 290,5 u = 0.21 w/m²k )
14. forjat alveolar de fusta lignatur e= 240 mm
15. sòl tècnic acústic granab amb tac de poli-
propilé i sylomer d'amortiguació h = 360 mm
16. tauler aglomerat + tarima adossada ( 22 +
15 mm )
17. llistons de pi de nivellació de la tarima
exterior
18. tauler de suport aglomerat 15 mm
19. làmina impermeable tyvek
20. aillament rígid de poliestiré extrudit
21. llistons de suport de la tarima de pi de 50 x
50 mm
22. tarima alveolar sintética e = 24 mm
23. fals sostre amb doble placa knauf per rei 90
i subestructura d'alumini
D 1 D 2 D 3I DETAIL
I I B AT H H O U S E
Glasgow green
design studio // year 2012
Glasgow green's south area is full of sports
facilities which expansion keeps on going
as the Hockey Arena is going to be there as
part of the Commonwealth games taking
part in 2014.
Though, the current proposal fails to
understand the site potentials and denies
the original identity of this unique part of
the park, which is the only one that offers
great panoramic views of the city. The
access to the public and the relation with
the current walk paths remains unknown
as well.
The proposal aims to keep a corresponden-
ce with the guidelines of the park, being
an extension of its striped spacing.
This provides clear delineation to the dis-
tinctive areas of the building, separated by
large bars containing both compact spaces
and mechanical services zones.
These separate ambiences are given diffe-
rent heights, pool & ambient temperatures
and overall feeling which the previous
premise also offers.
I I A M B I E N C E
We are located at the highest point of
Cuenca, where Arco de Bezudo arises as
the remains of an old Medieval fortress ,
and also culminates as the ending of of
spatial sequence starting at Parque del
Huècar.
The lack of social interaction facilities
for local inhabitants, mostly of advanced
age, serves as a pretext for making use of
its most important viewpoint for a public
mutifunctional center.
Understanding how inhabitants move and
interact with Cuenca's characteristic urban
configuration becomes the main subject of
study for this intervention, as the result will
form part of its charismatic riverfront.
I I I C O M M U N I T Y C E N T R E
Cuenca
design studio // year 2011
I V S M A B
Port of barcelona
design studio // year 2010
Barcelona urban growth keeps pushing its
logistic activities to the west, as they have
been gradually dissapearing from its main
waterfront area.
In addition, as the Port of Barcelona grows
increasingly fast on its west side sector, re-
sources for moving shipping cargo on the
east side are being shortened, which leads
to a decrease of its shipping activities and
in some cases, leaving large buildings
areas empty.
The exercise explores the chance of
turning some of its 1960s first concrete
industrial pavilions into cultural containers
that absord the cities most noisy activities,
such as musical and night events that are
hardly able tocoexist with residential uses
anymore.
I V S T R AT E G Y
An evaluation of the existing shell condi-
tions is undertaken in order to determine
which elements of the current construc-
tion would be suitable for events such as
concerts and musical venues, taking into
consideration the building transition into a
heavily crowded area.
The current format allows for a clear
customer and staff zone distinction by just
adding two bar-like spaces that will act as
a separator between the circulation areas
and the music halls. These will absorb any
technical spaces, wet areas and rehear-
sal areas, which require more compact
formats to work.
The new roofs will now take advanta-
ge from the arched shape of the roof ,
allowing for a venturi-effect, where hot air
naturally moves to the highest point of the
venue.
convective space
prefab. timber
existing facade
M O R E AT
www.dmarchworks.com
T +44 07 436 843 051
davidmg.architecture@gmail.com
DM_PORTFOLIO Low Res

More Related Content

Viewers also liked

Office Building in Järnbrott
Office Building in JärnbrottOffice Building in Järnbrott
Office Building in JärnbrottRaul Espasandin
 
Manual de Construccion en Madera, Casas en Madera
Manual de Construccion en Madera, Casas en MaderaManual de Construccion en Madera, Casas en Madera
Manual de Construccion en Madera, Casas en Maderaajedrolico
 
Sistema Estructural - Madera
Sistema Estructural - MaderaSistema Estructural - Madera
Sistema Estructural - MaderaAtielve
 
La madera como material de construcción
La madera como material de construcciónLa madera como material de construcción
La madera como material de construcciónUGC / ULSA / UA
 
Sample Branding Package
Sample Branding PackageSample Branding Package
Sample Branding PackageAmanda King
 
Artículo científico: estructura y partes de un articulo científico
Artículo científico: estructura y partes de un articulo científicoArtículo científico: estructura y partes de un articulo científico
Artículo científico: estructura y partes de un articulo científicounavbiblioteca
 

Viewers also liked (6)

Office Building in Järnbrott
Office Building in JärnbrottOffice Building in Järnbrott
Office Building in Järnbrott
 
Manual de Construccion en Madera, Casas en Madera
Manual de Construccion en Madera, Casas en MaderaManual de Construccion en Madera, Casas en Madera
Manual de Construccion en Madera, Casas en Madera
 
Sistema Estructural - Madera
Sistema Estructural - MaderaSistema Estructural - Madera
Sistema Estructural - Madera
 
La madera como material de construcción
La madera como material de construcciónLa madera como material de construcción
La madera como material de construcción
 
Sample Branding Package
Sample Branding PackageSample Branding Package
Sample Branding Package
 
Artículo científico: estructura y partes de un articulo científico
Artículo científico: estructura y partes de un articulo científicoArtículo científico: estructura y partes de un articulo científico
Artículo científico: estructura y partes de un articulo científico
 

Similar to DM_PORTFOLIO Low Res

Similar to DM_PORTFOLIO Low Res (20)

Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
%100
%100%100
%100
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
 
Book
BookBook
Book
 
Giuseppetti portfolio
Giuseppetti portfolioGiuseppetti portfolio
Giuseppetti portfolio
 
ADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdfADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdf
 
Portfolio castellani claudia
Portfolio castellani claudiaPortfolio castellani claudia
Portfolio castellani claudia
 
Miguel Medina - Architectural Portfolio
Miguel Medina - Architectural PortfolioMiguel Medina - Architectural Portfolio
Miguel Medina - Architectural Portfolio
 
Massimiliano De Crignis_Architecture Portfolio_2019
Massimiliano De Crignis_Architecture Portfolio_2019Massimiliano De Crignis_Architecture Portfolio_2019
Massimiliano De Crignis_Architecture Portfolio_2019
 
Mikulas novotny portfolio 2014
Mikulas novotny portfolio 2014Mikulas novotny portfolio 2014
Mikulas novotny portfolio 2014
 
portfolio 2016
portfolio 2016portfolio 2016
portfolio 2016
 
DSP Portfolio 2012
DSP Portfolio 2012DSP Portfolio 2012
DSP Portfolio 2012
 
LucilleCros_Portfolio_2016_eng
LucilleCros_Portfolio_2016_engLucilleCros_Portfolio_2016_eng
LucilleCros_Portfolio_2016_eng
 
Farid Mahmood TS Portfolio
Farid Mahmood TS PortfolioFarid Mahmood TS Portfolio
Farid Mahmood TS Portfolio
 
PORTFOLIO 2024_ANASTASIYA KUDINOVA / EXTENDED VERSION
PORTFOLIO 2024_ANASTASIYA KUDINOVA / EXTENDED VERSIONPORTFOLIO 2024_ANASTASIYA KUDINOVA / EXTENDED VERSION
PORTFOLIO 2024_ANASTASIYA KUDINOVA / EXTENDED VERSION
 
WorkSamples
WorkSamplesWorkSamples
WorkSamples
 
Introduction 2013
Introduction 2013Introduction 2013
Introduction 2013
 
Portfolio
PortfolioPortfolio
Portfolio
 

DM_PORTFOLIO Low Res

  • 1. D A V I D M O R E N O P O R T F O L I O V O L 0 1
  • 2.
  • 3. DAVID MORENO GARCÍA Architect Barcelona, Spain As a committed creative individual i have always had a passion for challenge and uncharted territory and so architecture allows me to keep exploring ideas, to grow both personal and professionally. I can adapt to a wide range of situations and de- sign procedures ,paying special attention and care to context. In my previous experience I tried to make the best out of my exchange and collaboration with other talented people and will try to keep doing so. I also like spending time on other activities such as playing guitar, piano ,running and football.
  • 4. EDUCATION EXPERIENCE BIAW workshop. Erasmus programme. Glasgow Strathclyde Degree in Architecture. Barcelona ETSAV Graduated as a Part III architect obtaining an excellent for Master Thesis. 2011 2012 2014 Technical Assistant Cribilles Barcelona Summer internship Architectural Assistant TTG Architects UK London Collaborated as a Part II tech- nical assistant helping to deve- lop many retail based projects across the UK for 2 years. SKILLS Adobe Photoshop Adobe Illustrator Adobe Acrobat Autodesk Revit Autodesk Autocad Autodesk Inventor Autodesk Sketchbook Sketchup Vray Rendering Engine Microsoft Office suite 2013 2014- 2016 P R O F I L E CONTACT DETAILS T +44 07 436 843 051 davidmg.architecture@gmail.com www.dmarchworks.com
  • 5. I HOSPITAL DEL MAR III COMMUNITY CENTREII BATH HOUSE IV SMAB Hospitalization areas refurbishment Hospital del Mar. Barcelona Master thesis 2013-2014 Rethinking new conditions for HDM complex and its thera- peutic possibilites. P4 Bath house Glasgow Green Studio 4b 2012 New bath house equipment under the Commonwealth games programme masterplan revision. P10 P14 Community centre for the elder people Cuenca Projects 2011 Development for a new cultu- ral centre serving local com- munities in Arco de Bezudo proximities. Industrial pavilions refurbi- shed into music halls Port of Barcelona Projects 2010 Re-programming of old indus- trial pavilions as a complex for music and artistic production and display. P18 C O N T E N T S
  • 6.
  • 7.
  • 8.
  • 9. I HOSPITAL DEL MAR Barcelona design studio // year 2013-2014 Built in the early 20th century as a military french pavilion type hospital, the current complex is a result of consecutive refurbi- shments who tried to address the thera- peutic needs of their time. This results in a barely recognisable hospitalization area which becomes the main element of study in this proposal. 1920 1950 1989
  • 11. It is only though an accurate historic eva- luation of the whole complex evolution that the proposal is able to to supress inneces- sary duplicities and to establish a clearer organization of the hospitalization area. The incoporation of new exterior areas also help to provide a higher therapeutic value to the building. I R E - FORMATTING spine cloister zoning units courtyards
  • 12.
  • 13. a. elements de façana i tabiquería // entramat de fusta estrat tèrmic ( e = 290,5 u = 0.21 w/m²k ) 1. enfoscat de fàbrica existent 2. fàbrica existent de maó català en disposició anglesa 3. tapeta de pissarra prefabricada 4. reomplert amb morter d'alta resistència 5. perfil ipn 180 doble per al estintolament del forat de façana ( 2 x 1.6 m ) 6. acabat de llistó vertical de làrix 24 mm 7. llistons paral·lels de suport d'avet ( 30 x 50 mm ) 8. tauler de suport de mdf ( 15 mm ) 9. entramat de fusta vertical de avet de 60 x 160 mm 10. aïllament de fibra de vidre e = 160 mm ; e/i = 0.040 ; r = 16 11. aïllament de fibra de vidre e = 40 mm ; e/i = 0.040 ; r = 16 12. llistons perpendiculars de fusta de làrix 13. acabat de llistó vertical de làrix // placa de cartró-guix ( 15 mm ) b. elements de forjat // forjat alveolar de fusta es- trat tèrmic ( e = 290,5 u = 0.21 w/m²k ) 14. forjat alveolar de fusta lignatur e= 240 mm 15. sòl tècnic acústic granab amb tac de poli- propilé i sylomer d'amortiguació h = 360 mm 16. tauler aglomerat + tarima adossada ( 22 + 15 mm ) 17. llistons de pi de nivellació de la tarima exterior 18. tauler de suport aglomerat 15 mm 19. làmina impermeable tyvek 20. aillament rígid de poliestiré extrudit 21. llistons de suport de la tarima de pi de 50 x 50 mm 22. tarima alveolar sintética e = 24 mm 23. fals sostre amb doble placa knauf per rei 90 i subestructura d'alumini D 1 D 2 D 3I DETAIL
  • 14.
  • 15. I I B AT H H O U S E Glasgow green design studio // year 2012 Glasgow green's south area is full of sports facilities which expansion keeps on going as the Hockey Arena is going to be there as part of the Commonwealth games taking part in 2014. Though, the current proposal fails to understand the site potentials and denies the original identity of this unique part of the park, which is the only one that offers great panoramic views of the city. The access to the public and the relation with the current walk paths remains unknown as well.
  • 16.
  • 17. The proposal aims to keep a corresponden- ce with the guidelines of the park, being an extension of its striped spacing. This provides clear delineation to the dis- tinctive areas of the building, separated by large bars containing both compact spaces and mechanical services zones. These separate ambiences are given diffe- rent heights, pool & ambient temperatures and overall feeling which the previous premise also offers. I I A M B I E N C E
  • 18.
  • 19. We are located at the highest point of Cuenca, where Arco de Bezudo arises as the remains of an old Medieval fortress , and also culminates as the ending of of spatial sequence starting at Parque del Huècar. The lack of social interaction facilities for local inhabitants, mostly of advanced age, serves as a pretext for making use of its most important viewpoint for a public mutifunctional center. Understanding how inhabitants move and interact with Cuenca's characteristic urban configuration becomes the main subject of study for this intervention, as the result will form part of its charismatic riverfront. I I I C O M M U N I T Y C E N T R E Cuenca design studio // year 2011
  • 20.
  • 21.
  • 22.
  • 23. I V S M A B Port of barcelona design studio // year 2010 Barcelona urban growth keeps pushing its logistic activities to the west, as they have been gradually dissapearing from its main waterfront area. In addition, as the Port of Barcelona grows increasingly fast on its west side sector, re- sources for moving shipping cargo on the east side are being shortened, which leads to a decrease of its shipping activities and in some cases, leaving large buildings areas empty. The exercise explores the chance of turning some of its 1960s first concrete industrial pavilions into cultural containers that absord the cities most noisy activities, such as musical and night events that are hardly able tocoexist with residential uses anymore.
  • 24.
  • 25. I V S T R AT E G Y An evaluation of the existing shell condi- tions is undertaken in order to determine which elements of the current construc- tion would be suitable for events such as concerts and musical venues, taking into consideration the building transition into a heavily crowded area. The current format allows for a clear customer and staff zone distinction by just adding two bar-like spaces that will act as a separator between the circulation areas and the music halls. These will absorb any technical spaces, wet areas and rehear- sal areas, which require more compact formats to work. The new roofs will now take advanta- ge from the arched shape of the roof , allowing for a venturi-effect, where hot air naturally moves to the highest point of the venue. convective space prefab. timber existing facade
  • 26.
  • 27.
  • 28.
  • 29. M O R E AT www.dmarchworks.com T +44 07 436 843 051 davidmg.architecture@gmail.com