Inventory NRC Consignment
By System By MAP
AS-IS PLAN
Total Item 132 150
Total
Value
Rp 756.132.963,00 Rp 850.000.000,00
FactFact
•Total Unit 18 ZY Cat 5, stock plan pertambahan
item ini akan terus bertambah sampai pada HM
unit mencapai 3000, setelahnya adalah
pertambahan untuk forecasting item.
ObstaclesObstacles
•Tidak ada daily unit break down data yang di
share ke department parts.
•No update service (KM) per unit untuk
membantu monitoring kesediaan parts
maintenanced (PM)
•Direct Purchases untuk vendor lain tidak
terrecord, kedepannya akan sulit untuk
menyiapkan barang yang dibutuhkan
SolutionSolution
•Meningkatkan koordinasi untuk preparing
setiap event service
•Pembelian stock suku cadang dari vendor
luar diharapkan di record jika ingin
kedepannya di siapkan oleh department
parts.
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Scatter line untuk cost and frequency of delivery
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Data detail untuk menghitung forecasting dan perkiraan
budget bulanan untuk pembiayaan transportasi support
PMC service NRC Site
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Transportation Cost Calculation
Expedition Comp. CIPTA KRIDA BAHARI
Description Comparing the lowest cost to be
Action Plan :
• Ask Quotation
• Review as is cost
• Proposed to top level management
Plan Activity
• W1 Nov : Send the parts for stock lvl NRC
Consg with new expedition
• W2 Nov : Review current lead time to be to
adjust maximum stock level and get the
highest accuracy for little space of NRC
Consigment
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Resources Issues
Total Team 3 employees
Description Handling supply from Samarinda PT. PPK warehouse to NRC – site warehouse and work
together for control parts – out with admin on site NRC
Action Plan :
• Site Visit (periodically)
• Annual Budgeting for personnel development
• Built a good communication and regularly meeting for
expedition workshop
Plan Activity
• W3 January 2014 : site visiting and control
• W1 Feb 2014: confirm the implementing
new review max and volume business of
transportation issues
Service On
Direct Indirect
Vacan
t
3 1
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Operational IssuesOperational Issues
• Supporting tools, such as:
• Integrated System for site, review for SAP
• Communication Infrastructure.
• 1 Meja untuk admin (Norti)
• 1 Lemari untuk file
• ATK control issue dari Samarinda, reports regularly
• Daily break down and other technical reports
• Warehouseman competency on customer’s site
• Warehouse tools
• Wrapping plastic sangat diperlukan, karena warehouse cc aspect yang kurang
baik di site NRC
• Packing dos, lakban dan lain-lain di prepare dari Samarinda dan perlu di kontrol
oleh admin untuk keperluan seperti ini
• Kekurangan rack untuk storage
• Perlu plastic clip menghindari karat.
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Schedule Chart
SAMARINDA
Berau
(N/A)
KAT
(N/A)
NRC -
SITE
ETD : ?
ETA : ?
ETD : ?
ETA : ?
ETD : ?
ETA : ?
ETD : ?
ETA : ?
FactFact
Now days, we don’t have any regular
transport’s schedule and delivery time.
ProposedProposed
• Pick up consolidation
• Last cut off transfer schedule
• Integrated expedition
Balikpapan
HMSI
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Service Letter Plan – Using CKB Expd. (Proposed) -
Masih menunggu harga penawaran
• Schedule
• Once a Week
• Load Max 100 Kgs (diatas 100 kgs, berpotensi untuk charter saja lebih murah
dalam costnya ketimbang kilo basis)
• Office Hours (tentative)
• Monday-Friday : 08.00 A.M. – 17.00 P.M
• Saturday : 08.00 A.M. – 17.00 P.M (Operation)
• Pick Up Hours (schedule departure) – (tentative)
• ETD : 02.00 WITA - PT. PRIMA PUTRA KALTIM SAMARINDA
• ETA : 14.00 WITA (4 Days) – KM. 9 Warehouse SITE NRC Bulungan
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Warehouse InteriorWarehouse Interior
Plafon
Highlight PointHighlight Point
• Suhu dan angir dari luar bisa masuk
• Keamanan kurang
• Ketinggian ruangan kurang tinggi
• Bisa mengenai lampu
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Warehouse InteriorWarehouse Interior
Racking
Highlight PointHighlight Point
• Space kurang, apalagi akan ada
pertambahan line item seiring dengan naiknya
HM unit, dan lagi sudah tidak bisa lagi ada
hubwarehouse (Cbg Berau)
• Barang terlalu penuh sampai di jalanan rack
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Warehouse InteriorWarehouse Interior
Ruangan Admin
Highlight PointHighlight Point
• Tidak proper, dokumen bisa terkena air
tempias dari hujan
• Barang terlalu penuh sampai di jalanan rack
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Warehouse InteriorWarehouse Interior
Lingkungan
Highlight PointHighlight Point
• Tidak aman dari penjagaan aset perusahaan
• Parts yang bergabung dengan parts dari
perusahaan lain menuntut untuk perhatian
dalam stock check rutin harian dan
pengeluaran serta penerimaan parts yang
baik dan benar.
IMPOSSIBLE MEANT I’M POSSIBLE
IMPOSSIBLE WE DO MIRACLE WE TRY
Kesimpulan
1. Pertambahan line item
2. Setting new delivery routes
3. Review cost transportation to the lowest but still
on good insurance
4. Resourcing issues for roster schedule
5. Also quick responses for operational issues

More Related Content

Viewers also liked

Magazine evaluation q4 & 5
Magazine evaluation q4 & 5Magazine evaluation q4 & 5
Magazine evaluation q4 & 5
whslaura
 
Magazine evaluations
Magazine evaluationsMagazine evaluations
Magazine evaluations
whslaura
 
Music magazine evaluation q6
Music magazine evaluation q6Music magazine evaluation q6
Music magazine evaluation q6
whslaura
 
Q3 evlaution
Q3 evlautionQ3 evlaution
Q3 evlaution
whslaura
 
“...Gülüstan qalası, yoxsa Azərbaycan”
“...Gülüstan qalası, yoxsa Azərbaycan”“...Gülüstan qalası, yoxsa Azərbaycan”
“...Gülüstan qalası, yoxsa Azərbaycan”
mimio_azerbaijan
 

Viewers also liked (17)

Vanguardiassss
VanguardiassssVanguardiassss
Vanguardiassss
 
Gerencia de proyectos de tecnologia educativa
Gerencia de proyectos de tecnologia educativaGerencia de proyectos de tecnologia educativa
Gerencia de proyectos de tecnologia educativa
 
Magazine evaluation q4 & 5
Magazine evaluation q4 & 5Magazine evaluation q4 & 5
Magazine evaluation q4 & 5
 
Magazine evaluations
Magazine evaluationsMagazine evaluations
Magazine evaluations
 
Kalender ma al irsyad
Kalender ma al irsyadKalender ma al irsyad
Kalender ma al irsyad
 
Music magazine evaluation q6
Music magazine evaluation q6Music magazine evaluation q6
Music magazine evaluation q6
 
Photo essay
Photo essayPhoto essay
Photo essay
 
Q3 evlaution
Q3 evlautionQ3 evlaution
Q3 evlaution
 
中文萬歲
中文萬歲中文萬歲
中文萬歲
 
.
..
.
 
Chili Pepper Tasks - MYP 4 Gas Laws
Chili Pepper Tasks - MYP 4 Gas LawsChili Pepper Tasks - MYP 4 Gas Laws
Chili Pepper Tasks - MYP 4 Gas Laws
 
Vernier exploring gas laws lab
Vernier exploring gas laws labVernier exploring gas laws lab
Vernier exploring gas laws lab
 
3 processes
3 processes3 processes
3 processes
 
A Short Note on MARPOL Regulations
A Short Note on MARPOL RegulationsA Short Note on MARPOL Regulations
A Short Note on MARPOL Regulations
 
“...Gülüstan qalası, yoxsa Azərbaycan”
“...Gülüstan qalası, yoxsa Azərbaycan”“...Gülüstan qalası, yoxsa Azərbaycan”
“...Gülüstan qalası, yoxsa Azərbaycan”
 
Modelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsModelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction Contracts
 
3.4 Notes
3.4 Notes3.4 Notes
3.4 Notes
 

Similar to BERAU - NRC REPORTS

Ontario auto parts distribution centre with link
Ontario auto parts distribution centre with linkOntario auto parts distribution centre with link
Ontario auto parts distribution centre with link
Steve Xing
 
Aurora ELP Processing System Improvement Project
Aurora ELP Processing System Improvement ProjectAurora ELP Processing System Improvement Project
Aurora ELP Processing System Improvement Project
david sheehan
 
CV_Deepak_Jan15_Updated
CV_Deepak_Jan15_UpdatedCV_Deepak_Jan15_Updated
CV_Deepak_Jan15_Updated
DEEPAK MANDAL
 
Starring sakila my sql university 2009
Starring sakila my sql university 2009Starring sakila my sql university 2009
Starring sakila my sql university 2009
David Paz
 
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLSA MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
Mayur Parvani
 
Gopi -Resume
Gopi -ResumeGopi -Resume
Gopi -Resume
N. GOPI
 

Similar to BERAU - NRC REPORTS (20)

Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 
jitendra kumar
jitendra kumarjitendra kumar
jitendra kumar
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Ontario auto parts distribution centre with link
Ontario auto parts distribution centre with linkOntario auto parts distribution centre with link
Ontario auto parts distribution centre with link
 
Journey toagile published
Journey toagile publishedJourney toagile published
Journey toagile published
 
Aurora ELP Processing System Improvement Project
Aurora ELP Processing System Improvement ProjectAurora ELP Processing System Improvement Project
Aurora ELP Processing System Improvement Project
 
CV_Deepak_Jan15_Updated
CV_Deepak_Jan15_UpdatedCV_Deepak_Jan15_Updated
CV_Deepak_Jan15_Updated
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
Implementing Scrum with Kanban
Implementing Scrum with KanbanImplementing Scrum with Kanban
Implementing Scrum with Kanban
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Starring sakila my sql university 2009
Starring sakila my sql university 2009Starring sakila my sql university 2009
Starring sakila my sql university 2009
 
Introduction to Agile - Scrum, Kanban, and everything in between
Introduction to Agile - Scrum, Kanban, and everything in betweenIntroduction to Agile - Scrum, Kanban, and everything in between
Introduction to Agile - Scrum, Kanban, and everything in between
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
 
Gilmours Inward Goods
Gilmours Inward GoodsGilmours Inward Goods
Gilmours Inward Goods
 
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLSA MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
A MODEL TO MAP THE CUSTOMER SATISFACTION LEVEL USING SCM TOOLS
 
Customer journey mapping in a product service system environment
Customer journey mapping in a product service system environmentCustomer journey mapping in a product service system environment
Customer journey mapping in a product service system environment
 
Argus Industries- Supply Chain Kaizen with SYSPRO ERP
Argus Industries- Supply Chain Kaizen with SYSPRO ERPArgus Industries- Supply Chain Kaizen with SYSPRO ERP
Argus Industries- Supply Chain Kaizen with SYSPRO ERP
 
Agile Approach: How to Identify Requirements, Contain Scope, and Manage Budget
Agile Approach: How to Identify Requirements, Contain Scope, and Manage BudgetAgile Approach: How to Identify Requirements, Contain Scope, and Manage Budget
Agile Approach: How to Identify Requirements, Contain Scope, and Manage Budget
 
Coralerp weaving
Coralerp weavingCoralerp weaving
Coralerp weaving
 
Gopi -Resume
Gopi -ResumeGopi -Resume
Gopi -Resume
 

BERAU - NRC REPORTS

  • 1. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY VISIT REPORTS BERAU Danni H Inventory and Logistic Parts and Sales Department October 2013 Consignment NRC Issues
  • 2. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY C O N T E N T
  • 3. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Inventory NRC Consignment By System By MAP AS-IS PLAN Total Item 132 150 Total Value Rp 756.132.963,00 Rp 850.000.000,00 FactFact •Total Unit 18 ZY Cat 5, stock plan pertambahan item ini akan terus bertambah sampai pada HM unit mencapai 3000, setelahnya adalah pertambahan untuk forecasting item. ObstaclesObstacles •Tidak ada daily unit break down data yang di share ke department parts. •No update service (KM) per unit untuk membantu monitoring kesediaan parts maintenanced (PM) •Direct Purchases untuk vendor lain tidak terrecord, kedepannya akan sulit untuk menyiapkan barang yang dibutuhkan SolutionSolution •Meningkatkan koordinasi untuk preparing setiap event service •Pembelian stock suku cadang dari vendor luar diharapkan di record jika ingin kedepannya di siapkan oleh department parts.
  • 4. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Scatter line untuk cost and frequency of delivery
  • 5. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Data detail untuk menghitung forecasting dan perkiraan budget bulanan untuk pembiayaan transportasi support PMC service NRC Site
  • 6. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Transportation Cost Calculation Expedition Comp. CIPTA KRIDA BAHARI Description Comparing the lowest cost to be Action Plan : • Ask Quotation • Review as is cost • Proposed to top level management Plan Activity • W1 Nov : Send the parts for stock lvl NRC Consg with new expedition • W2 Nov : Review current lead time to be to adjust maximum stock level and get the highest accuracy for little space of NRC Consigment
  • 7. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Resources Issues Total Team 3 employees Description Handling supply from Samarinda PT. PPK warehouse to NRC – site warehouse and work together for control parts – out with admin on site NRC Action Plan : • Site Visit (periodically) • Annual Budgeting for personnel development • Built a good communication and regularly meeting for expedition workshop Plan Activity • W3 January 2014 : site visiting and control • W1 Feb 2014: confirm the implementing new review max and volume business of transportation issues Service On Direct Indirect Vacan t 3 1
  • 8. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Operational IssuesOperational Issues • Supporting tools, such as: • Integrated System for site, review for SAP • Communication Infrastructure. • 1 Meja untuk admin (Norti) • 1 Lemari untuk file • ATK control issue dari Samarinda, reports regularly • Daily break down and other technical reports • Warehouseman competency on customer’s site • Warehouse tools • Wrapping plastic sangat diperlukan, karena warehouse cc aspect yang kurang baik di site NRC • Packing dos, lakban dan lain-lain di prepare dari Samarinda dan perlu di kontrol oleh admin untuk keperluan seperti ini • Kekurangan rack untuk storage • Perlu plastic clip menghindari karat.
  • 9. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Schedule Chart SAMARINDA Berau (N/A) KAT (N/A) NRC - SITE ETD : ? ETA : ? ETD : ? ETA : ? ETD : ? ETA : ? ETD : ? ETA : ? FactFact Now days, we don’t have any regular transport’s schedule and delivery time. ProposedProposed • Pick up consolidation • Last cut off transfer schedule • Integrated expedition Balikpapan HMSI
  • 10. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Service Letter Plan – Using CKB Expd. (Proposed) - Masih menunggu harga penawaran • Schedule • Once a Week • Load Max 100 Kgs (diatas 100 kgs, berpotensi untuk charter saja lebih murah dalam costnya ketimbang kilo basis) • Office Hours (tentative) • Monday-Friday : 08.00 A.M. – 17.00 P.M • Saturday : 08.00 A.M. – 17.00 P.M (Operation) • Pick Up Hours (schedule departure) – (tentative) • ETD : 02.00 WITA - PT. PRIMA PUTRA KALTIM SAMARINDA • ETA : 14.00 WITA (4 Days) – KM. 9 Warehouse SITE NRC Bulungan
  • 11. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Warehouse InteriorWarehouse Interior Plafon Highlight PointHighlight Point • Suhu dan angir dari luar bisa masuk • Keamanan kurang • Ketinggian ruangan kurang tinggi • Bisa mengenai lampu
  • 12. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Warehouse InteriorWarehouse Interior Racking Highlight PointHighlight Point • Space kurang, apalagi akan ada pertambahan line item seiring dengan naiknya HM unit, dan lagi sudah tidak bisa lagi ada hubwarehouse (Cbg Berau) • Barang terlalu penuh sampai di jalanan rack
  • 13. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Warehouse InteriorWarehouse Interior Ruangan Admin Highlight PointHighlight Point • Tidak proper, dokumen bisa terkena air tempias dari hujan • Barang terlalu penuh sampai di jalanan rack
  • 14. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Warehouse InteriorWarehouse Interior Lingkungan Highlight PointHighlight Point • Tidak aman dari penjagaan aset perusahaan • Parts yang bergabung dengan parts dari perusahaan lain menuntut untuk perhatian dalam stock check rutin harian dan pengeluaran serta penerimaan parts yang baik dan benar.
  • 15. IMPOSSIBLE MEANT I’M POSSIBLE IMPOSSIBLE WE DO MIRACLE WE TRY Kesimpulan 1. Pertambahan line item 2. Setting new delivery routes 3. Review cost transportation to the lowest but still on good insurance 4. Resourcing issues for roster schedule 5. Also quick responses for operational issues