WEAVE | Daniel Hannah | s3490935 | Studio 3 | Overlapping Currents | RMIT City Campus
MASTER PLAN 1:3500 35m 70m 140m
Ascended Floodscapes
The design is intended to connect various systems to create a highly dynamic and changing landscape to create a more iconic Melbourne. It is intended to revitalize the popular Capital
City Trail by providing users with a unique immerse experience not found elsewhere in Victoria. The design is to utilize the large public open spaces Melbourne offers through inte-
grating the existing landscape with the Yarra river, while capturing and recycling water in a more Eco-friendly way.
SCALE 1:1000
35m
10m 20m 40m
1 2 3 4
1:7500
Pathways connect the site and provides a more immersive experience to pedestrians. Different types of ground
conditions result in different materials used as walk paths. This is dependent on different factors including eleva
tion, surface and exposure to different elements.
PATHWAY PLAN
75m 150m 300m
Boardwalks are an essential part of the path
way plan as this allows users to walk over
sections of the river and floodplains without
any chance of being flooded or having direct
contact with water. These are typically at an
elevation of 2m (surface level) and run organi
cally through floodplains.
Exposed Agrigate concrete is generally used in the floodplain
due to providing a grippy surface in an area which is exposed to
flooding. This ensures pedestrian safety when walking these paths.
These are also used throughout the floodplain to keep people from
trampling vegetation. People much prefer to walk on provided paths
then trampling through boggy vegetation. Concrete is also used for
its durable nature and resistance to the elemtents
Stone tile paths are used generally on typical ground
surface level about 2m above sea level. These paths
typically run parallel to the river bank and weaves with
the design. These are used for nice aesthetic appeal
and durability. The slippery surface when wet makes it
not ideal for areas prone to high levels of water expo
sure
Just outside of the main design section of CBG, there is an
artificial wetland connected, made to completely mimic nature. In
the images below, It appears to be a collection of boulders and
stone formation connecting two sections of wetland, including
pooling sections. This is also a flooding preventative measure
by connecting two water sources.
It may come to peoples surprise to learn that this is completely
artificial, with the rocks being concrete formed and textured to
appear like rocks and boulders. This is a very effective tech
nique due to completely mimicing nature, however it provides the
flexibility to form then in any order, sequence and size possible.
This technique will be used for the lining of the floodplains and
catchment layers, acting as a firm defined boundry between layers
Image above shows a section of the 'rock shell' broken off,
revealing the concrete structure underneath. The shell is also
concrete, however textured and pigmented to look like a natural
boulder.
1:7500
Catchments and water trenches are placed at different heights in prime water run off areas with the catchments
decreasing in quantity, but increasing in size as they get closer to sea level. Most storm-water is caught in the
highest catchments (up to 30m above sea level) which without escape, the water is trapped in pools littered with
dense vegetation .
CATCHMENT PLAN
75m 150m 300m
South Yarra
Residential
Housing
Richmond
Industrial
Area
Queen Victoria
Gardens/ Royal
Melbourne Bo-
tanic Gardens
The water will sit in these pools until heavy periods of rain which will make them overflow into flood channels connecting
to the lower pools. This process is repeated 1 - 4 times until reaching the floodplain, dependent on topography with
more catchments located in areas prone to higher water pollution. The floodplain catchments can be filled with either
storm water or flood water of the Yarra river, which the cycle will repeat during every flood as the water flushes out the
clean water back into the system while replacing it with Yarra water.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
3
3
3
3
2
Industrial runoff
Catchment
Oil/Road pollution
Catchment
Organic material
Catchment
Residential Rooftop run-
off catchment
Heavy pollutants are caught
in these catchments such as
industrial waste, storm-water
runoff and chemicals washed
into the system from manufactur-
Catchments placed under busy
roads prone to heavy traffic,
trucks and other vehicles.
Placed underneath bridges
and busy roads to catch oils
Catchments placed at the
bottom of hills containing a lot
of trees, plants and vegetation.
Loose organic material is
flushed into these catchment
Catchments placed in residen-
tial areas to capture rooftop
runoff and other household
contaminants associated with
residential living
1:7500
Various types of vegetation are used throughout the design.
Due to the design revolving around ephemeral wetlands, vegetation used in the floodplains or catchment pools need
to meet a certain criteria. Due to the salinity of the river, vegetation needs to be able to survive in salt water, as well
as fresh water.
Various trees are used in this design for various purposes. Sweet-gums and Blue Spruce trees are used as
Ornamental trees, typically on small islands where they exist purely for aesthetic appeal. Black-Box is used in the
floodplains as they can withstand heavy periods of inundation while English Elms are used primarily as river bed
liners, to continue the existing trend and ease the transition from the old design to the new.
VEGETATION PLAN
Nardoo
Marsilea Mutica
Tangled Lignum
Muehlenbeckia Florentulla
Common Reed
phragmites Australis
Cumbungi
Typha sp
Primary Trees Ornamental Trees
The 4 species listed above all share common traits such as salt/fresh water tolerant, suitable for
Melbourne climate, able to survive in seasonal wetlands and hold water filtering properties. This is
what makes these species ideal for this design. These species will be placed in floodplains and
catchment pools
75m 150m 300m
Sweetgum
Liquidambar Styraciflua
Blue Spruce
Picea Pungens
Black Box
Eucalyptus Largiflorens
English Elm
Ulmus minor 'Atinia'
The Effect:
To create a diverse and visually rich atmo-
sphere through the use of colours
0 45 90 135 180 m.
Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015
Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for
your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data.
Produced on Mon Mar 23 13:50:45 EST 2015
Map Scale 1:5,000
Map created Mon Mar 23 13:50:26 EST 2015
Page 1 of 1
0 45 90 135 180 m.
Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015
Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for
your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data.
Produced on Mon Mar 23 13:50:45 EST 2015
Map Scale 1:5,000
Map created Mon Mar 23 13:50:26 EST 2015
Page 1 of 1
0 45 90 135 180 m.
Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015
Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for
your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data.
Produced on Mon Mar 23 13:50:45 EST 2015
Map Scale 1:5,000
Map created Mon Mar 23 13:50:26 EST 2015
Page 1 of 1
0 45 90 135 180 m.
Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015
Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for
your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data.
Produced on Mon Mar 23 13:50:45 EST 2015
Map Scale 1:5,000
Map created Mon Mar 23 13:50:26 EST 2015
Page 1 of 1
0 45 90 135 180 m.
Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015
Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for
your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data.
Produced on Mon Mar 23 13:50:45 EST 2015
Map Scale 1:5,000
Map created Mon Mar 23 13:50:26 EST 2015
Page 1 of 1
Wider Melbourne Surroundings
1:400000
Catchment areas and connectivity
Wider Melbourne Surroundings
1:400000
Major/Minor water ways
Wider Melbourne Surroundings
1:400000
Rainfall
Melbourne Yarra River - Pre-European wetlands
1:10000
Melbourne Yarra River - River Depth
1:10000
Melbourne Yarra River - Infrastructure
1:10000
Melbourne Yarra River - Recreational public spaces and public land
1:10000
Melbourne Yarra River - River usage plan
1:10000
Human scale - Site ground conditions and textural representation Human scale - Foot traffic congestionPathway congestion
English Elms are widely used
throughout Melbourne with a vast
amount planted as liners along
the Yarra river bed.
Topography of Melbourne Botanic
Gardens shows where the main
catchment areas would be.
The peak of the hill rises up to
40m, allowing plenty of room for
catchment interventions.
This plan shows how the River is currently used for recreational purposes. This section
of the river is a popular kayaking route which has designated turn points throughout.
The river here also sees a lot of tourist boats, generally small in size assumable due to
shallow waters and obstructions such as bridges etc.
The site contains 3 docking points which tourist boats use infrequently.
This map shows that there is a lot of open space and recreational area around
the Melbourne Botanic Gardens with little infrustructure. This makes this location
a prime place for a design due to low budget (minor destruction) and being able
to integrate an aesthetic design into an existing serene and asthetic area.
Most infrastructure is plotted on the eastern side of Morell Bridge. This
includes residential areas, industrial areas and government buildings while little
to no infrastructure lies within the Melbourne Botanic Gardens.
With each contour being less then a meter, this shows that the Yarra River is
actually quite shallow which could be to many peoples surprise. This provides a
better indication of how much water capacity the river holds, and how much water
is flowing down stream.
Image shows a rough guide of the topography around Ornamental Lake. This
provides a good indication of water runoff, and Ornamental Lake is one large
catchment.
Image shows catchment zones of
Melbourne Botanic Gardens and
how water runoff will work with
topography
Shows a simple understanding of ground conditions and a site representation of the CTT on the Western side of Morell bridge. There are a lot of open grass areas
which people use to have picnics on, lies down on and use for other means of relaxation. People tend to sit in the shade or sun Dependant on temperature. Smaller squares represent more people using the space while larger squares represents less people using the area
On a Wednesday, between 3:00pm - 3:40pm, The bike path is very popular with the vast majority of people using the site cyclists. This bike path was
used the most and far more then the footpath running parallel to the bike path, a little further away from the river. I believe people prefer to stick to the
bike path not only for convenience (as it is one long continuous track without breakage) but also due to providing a more serene atmosphere to the site.
the vast majority of people use the low bike trail (Capital City Trail) due to the nice aesthetics of being close to the river. Cyclists dominate the space at
this time with every single one using the CCT and/or Morell bridge to cross.
Comic strip portrays how the Yarra River has
much more then only a few uses, including the
beauty and aesthetic appeal of it. This however,
is compromised through heavy urbanization and
industrialization, stripping the Yarra river of
many values, including it's iconic nature.
"A Place to Remember"
Image on the left shows a representation of the color
contrasting of the vegetation. This picture shows a plan
tation of Liquidambar's and Blue Spruce's sitting on an
'Ornamental Island'. These Trees are used primarily for
aesthetic appeal.
Image on the right shows a lower catchment (0m above
sea level) filled with water. A tunnel is shown in the
background which allows water bodies to travel through
the landform to connect further out areas, usually
obstructed by topography.
This provides more catchment area, as catchments are
also located on the other side of the tunnel. All water
runoff caught in these catchments will be sent to the
large catchment pools displayed in the picture.
The images above show the progression of a wetland strip running parallel to the Yarra, located between floodplains. This shows how the wetlands take a life of their own and generate their own ecosystem after establishment.
This will create more natural wildlife habitats, resulting in more biodiversity and a healthier ecosystem.
This creates circular seating facing
away from the land, submerging
into the Yarra river. The tide would
determine how much seating is
available.
This design looks at creating
short tunnels connecting and
creating a more intimate expe
rience between the land and
the water. This design launched
the tunnels networking idea.
Rounded amphitheater Burrows
This design adds a path running at the level of the Yarra river, partially sub
merged which follows along under the top soil. The soil would need to be concaved
to create this open tunnel for the path, and the surface on top would need to be
reinforced.
Water level pathway
--What--
The design is to create large scale bio filtration system and ephemeral wetlands reliant on storm water run-off, and flooding of the Yarra River. The system is essentially various layers of wetland, floodplains and catchments plotted in relation to
the topography of the land to capture, filter, return floodwater and storm water back into the system. This also acts as a flood preventative measure by connecting various water sources via floodplains, to level out catchments and water bodies.
21.0
2.0 7.05.0
1.0
1.0
1
Yarra extension
2
2.5 3.50.5 5.0
6.83.8
Floodplain Tunnel
systems
71
33
15
8
24
730
Catchment pool cut-out
13.2
2.0
8.0
2.0
Floodplain islands
1.0
4

More Related Content

Viewers also liked

Food For Thought-1-1
Food For Thought-1-1Food For Thought-1-1
Food For Thought-1-1Bo McMillan
 
innovative lesson segment
innovative lesson segment innovative lesson segment
innovative lesson segment tharamttc
 
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간전 윤희
 
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간전 윤희
 
sistema matemático deductivo
sistema matemático deductivosistema matemático deductivo
sistema matemático deductivomackeybis
 
Proper magazine p45 mieke loncke_ifma_nl
Proper magazine p45 mieke loncke_ifma_nlProper magazine p45 mieke loncke_ifma_nl
Proper magazine p45 mieke loncke_ifma_nlMuriel Walter
 
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simonsMuriel Walter
 
New Features of SQL Server 2016
New Features of SQL Server 2016New Features of SQL Server 2016
New Features of SQL Server 2016Mir Mahmood
 
Berka: Život tam venku
Berka: Život tam venkuBerka: Život tam venku
Berka: Život tam venkuKISK FF MU
 
Yeni metin belgesi (2)
Yeni metin belgesi (2)Yeni metin belgesi (2)
Yeni metin belgesi (2)Ahmet Zengin
 
Actividad 7 eduardo giraldo zapata
Actividad 7 eduardo giraldo zapataActividad 7 eduardo giraldo zapata
Actividad 7 eduardo giraldo zapataJ Eduardo Giraldo
 
Educa Digital 2013
Educa Digital 2013Educa Digital 2013
Educa Digital 2013websocialcpe
 

Viewers also liked (20)

Food For Thought-1-1
Food For Thought-1-1Food For Thought-1-1
Food For Thought-1-1
 
Copenhagen
CopenhagenCopenhagen
Copenhagen
 
innovative lesson segment
innovative lesson segment innovative lesson segment
innovative lesson segment
 
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
 
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간시알리스 『 W3.ow.to  』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
시알리스 『 W3.ow.to 』 톡 w2015 ♡ 시알리스판매, 시알리스 효과,시알리스 정품구입,시알리스부작용,시알리스지속시간
 
sistema matemático deductivo
sistema matemático deductivosistema matemático deductivo
sistema matemático deductivo
 
Assesment Report ......vvv
Assesment Report  ......vvvAssesment Report  ......vvv
Assesment Report ......vvv
 
Proper magazine p45 mieke loncke_ifma_nl
Proper magazine p45 mieke loncke_ifma_nlProper magazine p45 mieke loncke_ifma_nl
Proper magazine p45 mieke loncke_ifma_nl
 
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons
04 ifma fm-day 2017_planning entretien pluriannuel pra nen 2767_cedubo_to simons
 
New Features of SQL Server 2016
New Features of SQL Server 2016New Features of SQL Server 2016
New Features of SQL Server 2016
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Berka: Život tam venku
Berka: Život tam venkuBerka: Život tam venku
Berka: Život tam venku
 
Segway
SegwaySegway
Segway
 
Yeni metin belgesi (2)
Yeni metin belgesi (2)Yeni metin belgesi (2)
Yeni metin belgesi (2)
 
Actividad 7 eduardo giraldo zapata
Actividad 7 eduardo giraldo zapataActividad 7 eduardo giraldo zapata
Actividad 7 eduardo giraldo zapata
 
8. crear eventos
8. crear eventos8. crear eventos
8. crear eventos
 
Presentacion
PresentacionPresentacion
Presentacion
 
Sapi potong
Sapi potongSapi potong
Sapi potong
 
Estructuralismo
EstructuralismoEstructuralismo
Estructuralismo
 
Educa Digital 2013
Educa Digital 2013Educa Digital 2013
Educa Digital 2013
 

Similar to Hannah_s3490935_OC_Panels_2015 A

reservoir siltation and desiltation
reservoir siltation and desiltationreservoir siltation and desiltation
reservoir siltation and desiltationajinkya darekar
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban DesignElisa Sutanudjaja
 
Little book of civilization full_colour
Little book of civilization full_colourLittle book of civilization full_colour
Little book of civilization full_colourfahedmaida
 
Little book full_colour
Little book full_colourLittle book full_colour
Little book full_colourfahedmaida
 
Managing Floods
Managing FloodsManaging Floods
Managing FloodsMrs Coles
 
20150615 resilience presentation_noah.compressed (1)
20150615 resilience presentation_noah.compressed (1)20150615 resilience presentation_noah.compressed (1)
20150615 resilience presentation_noah.compressed (1)Paige McWhorter
 
Oyster castle addition at bennett's point
Oyster castle addition at bennett's pointOyster castle addition at bennett's point
Oyster castle addition at bennett's pointMadisonSocha
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for DamsIRJET Journal
 
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...Biocity Studio
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍dreamsion
 
Singapore Managing Stormwater For Water Resource And Flood Control
Singapore   Managing Stormwater For Water Resource And Flood ControlSingapore   Managing Stormwater For Water Resource And Flood Control
Singapore Managing Stormwater For Water Resource And Flood ControlVictor Zapanta Manlapaz
 
Flood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering StrategiesFlood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering Strategiestudorgeog
 
PM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final PlanPM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final PlanPhilip Martinson
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalSyed Salman
 
Impacts of hydel dam projects in world
Impacts of hydel dam projects in worldImpacts of hydel dam projects in world
Impacts of hydel dam projects in worldSoubhagya Tripathy
 
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...IRJET Journal
 
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Satyajit Behera
 

Similar to Hannah_s3490935_OC_Panels_2015 A (20)

reservoir siltation and desiltation
reservoir siltation and desiltationreservoir siltation and desiltation
reservoir siltation and desiltation
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban Design
 
Little book of civilization full_colour
Little book of civilization full_colourLittle book of civilization full_colour
Little book of civilization full_colour
 
Little book full_colour
Little book full_colourLittle book full_colour
Little book full_colour
 
Managing Floods
Managing FloodsManaging Floods
Managing Floods
 
20150615 resilience presentation_noah.compressed (1)
20150615 resilience presentation_noah.compressed (1)20150615 resilience presentation_noah.compressed (1)
20150615 resilience presentation_noah.compressed (1)
 
Ec rmx cs_ky_waterfront_park
Ec rmx cs_ky_waterfront_parkEc rmx cs_ky_waterfront_park
Ec rmx cs_ky_waterfront_park
 
Oyster castle addition at bennett's point
Oyster castle addition at bennett's pointOyster castle addition at bennett's point
Oyster castle addition at bennett's point
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for Dams
 
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...
Water / Wastewater - groundwater levels, dry land salinity and drought in Ade...
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
 
Singapore Managing Stormwater For Water Resource And Flood Control
Singapore   Managing Stormwater For Water Resource And Flood ControlSingapore   Managing Stormwater For Water Resource And Flood Control
Singapore Managing Stormwater For Water Resource And Flood Control
 
Flood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering StrategiesFlood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering Strategies
 
Sedimentation.ppt
Sedimentation.pptSedimentation.ppt
Sedimentation.ppt
 
PM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final PlanPM.10-EXAMPLE-River Stabilization-Final Plan
PM.10-EXAMPLE-River Stabilization-Final Plan
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
 
Impacts of hydel dam projects in world
Impacts of hydel dam projects in worldImpacts of hydel dam projects in world
Impacts of hydel dam projects in world
 
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...
IRJET- Prevention of Salt Water Intrusion to Coastal Area Wells by Biomateria...
 
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
 

Hannah_s3490935_OC_Panels_2015 A

  • 1. 2 3 4 1 1 2 3 4 WEAVE | Daniel Hannah | s3490935 | Studio 3 | Overlapping Currents | RMIT City Campus MASTER PLAN 1:3500 35m 70m 140m Ascended Floodscapes The design is intended to connect various systems to create a highly dynamic and changing landscape to create a more iconic Melbourne. It is intended to revitalize the popular Capital City Trail by providing users with a unique immerse experience not found elsewhere in Victoria. The design is to utilize the large public open spaces Melbourne offers through inte- grating the existing landscape with the Yarra river, while capturing and recycling water in a more Eco-friendly way. SCALE 1:1000 35m 10m 20m 40m 1 2 3 4
  • 2. 1:7500 Pathways connect the site and provides a more immersive experience to pedestrians. Different types of ground conditions result in different materials used as walk paths. This is dependent on different factors including eleva tion, surface and exposure to different elements. PATHWAY PLAN 75m 150m 300m Boardwalks are an essential part of the path way plan as this allows users to walk over sections of the river and floodplains without any chance of being flooded or having direct contact with water. These are typically at an elevation of 2m (surface level) and run organi cally through floodplains. Exposed Agrigate concrete is generally used in the floodplain due to providing a grippy surface in an area which is exposed to flooding. This ensures pedestrian safety when walking these paths. These are also used throughout the floodplain to keep people from trampling vegetation. People much prefer to walk on provided paths then trampling through boggy vegetation. Concrete is also used for its durable nature and resistance to the elemtents Stone tile paths are used generally on typical ground surface level about 2m above sea level. These paths typically run parallel to the river bank and weaves with the design. These are used for nice aesthetic appeal and durability. The slippery surface when wet makes it not ideal for areas prone to high levels of water expo sure Just outside of the main design section of CBG, there is an artificial wetland connected, made to completely mimic nature. In the images below, It appears to be a collection of boulders and stone formation connecting two sections of wetland, including pooling sections. This is also a flooding preventative measure by connecting two water sources. It may come to peoples surprise to learn that this is completely artificial, with the rocks being concrete formed and textured to appear like rocks and boulders. This is a very effective tech nique due to completely mimicing nature, however it provides the flexibility to form then in any order, sequence and size possible. This technique will be used for the lining of the floodplains and catchment layers, acting as a firm defined boundry between layers Image above shows a section of the 'rock shell' broken off, revealing the concrete structure underneath. The shell is also concrete, however textured and pigmented to look like a natural boulder.
  • 3. 1:7500 Catchments and water trenches are placed at different heights in prime water run off areas with the catchments decreasing in quantity, but increasing in size as they get closer to sea level. Most storm-water is caught in the highest catchments (up to 30m above sea level) which without escape, the water is trapped in pools littered with dense vegetation . CATCHMENT PLAN 75m 150m 300m South Yarra Residential Housing Richmond Industrial Area Queen Victoria Gardens/ Royal Melbourne Bo- tanic Gardens The water will sit in these pools until heavy periods of rain which will make them overflow into flood channels connecting to the lower pools. This process is repeated 1 - 4 times until reaching the floodplain, dependent on topography with more catchments located in areas prone to higher water pollution. The floodplain catchments can be filled with either storm water or flood water of the Yarra river, which the cycle will repeat during every flood as the water flushes out the clean water back into the system while replacing it with Yarra water. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 2 Industrial runoff Catchment Oil/Road pollution Catchment Organic material Catchment Residential Rooftop run- off catchment Heavy pollutants are caught in these catchments such as industrial waste, storm-water runoff and chemicals washed into the system from manufactur- Catchments placed under busy roads prone to heavy traffic, trucks and other vehicles. Placed underneath bridges and busy roads to catch oils Catchments placed at the bottom of hills containing a lot of trees, plants and vegetation. Loose organic material is flushed into these catchment Catchments placed in residen- tial areas to capture rooftop runoff and other household contaminants associated with residential living
  • 4. 1:7500 Various types of vegetation are used throughout the design. Due to the design revolving around ephemeral wetlands, vegetation used in the floodplains or catchment pools need to meet a certain criteria. Due to the salinity of the river, vegetation needs to be able to survive in salt water, as well as fresh water. Various trees are used in this design for various purposes. Sweet-gums and Blue Spruce trees are used as Ornamental trees, typically on small islands where they exist purely for aesthetic appeal. Black-Box is used in the floodplains as they can withstand heavy periods of inundation while English Elms are used primarily as river bed liners, to continue the existing trend and ease the transition from the old design to the new. VEGETATION PLAN Nardoo Marsilea Mutica Tangled Lignum Muehlenbeckia Florentulla Common Reed phragmites Australis Cumbungi Typha sp Primary Trees Ornamental Trees The 4 species listed above all share common traits such as salt/fresh water tolerant, suitable for Melbourne climate, able to survive in seasonal wetlands and hold water filtering properties. This is what makes these species ideal for this design. These species will be placed in floodplains and catchment pools 75m 150m 300m Sweetgum Liquidambar Styraciflua Blue Spruce Picea Pungens Black Box Eucalyptus Largiflorens English Elm Ulmus minor 'Atinia' The Effect: To create a diverse and visually rich atmo- sphere through the use of colours
  • 5. 0 45 90 135 180 m. Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015 Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data. Produced on Mon Mar 23 13:50:45 EST 2015 Map Scale 1:5,000 Map created Mon Mar 23 13:50:26 EST 2015 Page 1 of 1 0 45 90 135 180 m. Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015 Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data. Produced on Mon Mar 23 13:50:45 EST 2015 Map Scale 1:5,000 Map created Mon Mar 23 13:50:26 EST 2015 Page 1 of 1 0 45 90 135 180 m. Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015 Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data. Produced on Mon Mar 23 13:50:45 EST 2015 Map Scale 1:5,000 Map created Mon Mar 23 13:50:26 EST 2015 Page 1 of 1 0 45 90 135 180 m. Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015 Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data. Produced on Mon Mar 23 13:50:45 EST 2015 Map Scale 1:5,000 Map created Mon Mar 23 13:50:26 EST 2015 Page 1 of 1 0 45 90 135 180 m. Biodiversity Interactive Map A3 Landscape (c) The State of Victoria Department of Environment, Land, Water & Planning 2015 Disclaimer: This map is a snapshot generated from Victorian Government data. This material may be of assistance to you but the State of Victoria does not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for error, loss or damage which may arise from reliance upon it. All persons accessing this information should make appropriate enquiries to assess the currency of the data. Produced on Mon Mar 23 13:50:45 EST 2015 Map Scale 1:5,000 Map created Mon Mar 23 13:50:26 EST 2015 Page 1 of 1 Wider Melbourne Surroundings 1:400000 Catchment areas and connectivity Wider Melbourne Surroundings 1:400000 Major/Minor water ways Wider Melbourne Surroundings 1:400000 Rainfall Melbourne Yarra River - Pre-European wetlands 1:10000 Melbourne Yarra River - River Depth 1:10000 Melbourne Yarra River - Infrastructure 1:10000 Melbourne Yarra River - Recreational public spaces and public land 1:10000 Melbourne Yarra River - River usage plan 1:10000 Human scale - Site ground conditions and textural representation Human scale - Foot traffic congestionPathway congestion English Elms are widely used throughout Melbourne with a vast amount planted as liners along the Yarra river bed. Topography of Melbourne Botanic Gardens shows where the main catchment areas would be. The peak of the hill rises up to 40m, allowing plenty of room for catchment interventions. This plan shows how the River is currently used for recreational purposes. This section of the river is a popular kayaking route which has designated turn points throughout. The river here also sees a lot of tourist boats, generally small in size assumable due to shallow waters and obstructions such as bridges etc. The site contains 3 docking points which tourist boats use infrequently. This map shows that there is a lot of open space and recreational area around the Melbourne Botanic Gardens with little infrustructure. This makes this location a prime place for a design due to low budget (minor destruction) and being able to integrate an aesthetic design into an existing serene and asthetic area. Most infrastructure is plotted on the eastern side of Morell Bridge. This includes residential areas, industrial areas and government buildings while little to no infrastructure lies within the Melbourne Botanic Gardens. With each contour being less then a meter, this shows that the Yarra River is actually quite shallow which could be to many peoples surprise. This provides a better indication of how much water capacity the river holds, and how much water is flowing down stream. Image shows a rough guide of the topography around Ornamental Lake. This provides a good indication of water runoff, and Ornamental Lake is one large catchment. Image shows catchment zones of Melbourne Botanic Gardens and how water runoff will work with topography Shows a simple understanding of ground conditions and a site representation of the CTT on the Western side of Morell bridge. There are a lot of open grass areas which people use to have picnics on, lies down on and use for other means of relaxation. People tend to sit in the shade or sun Dependant on temperature. Smaller squares represent more people using the space while larger squares represents less people using the area On a Wednesday, between 3:00pm - 3:40pm, The bike path is very popular with the vast majority of people using the site cyclists. This bike path was used the most and far more then the footpath running parallel to the bike path, a little further away from the river. I believe people prefer to stick to the bike path not only for convenience (as it is one long continuous track without breakage) but also due to providing a more serene atmosphere to the site. the vast majority of people use the low bike trail (Capital City Trail) due to the nice aesthetics of being close to the river. Cyclists dominate the space at this time with every single one using the CCT and/or Morell bridge to cross.
  • 6. Comic strip portrays how the Yarra River has much more then only a few uses, including the beauty and aesthetic appeal of it. This however, is compromised through heavy urbanization and industrialization, stripping the Yarra river of many values, including it's iconic nature. "A Place to Remember" Image on the left shows a representation of the color contrasting of the vegetation. This picture shows a plan tation of Liquidambar's and Blue Spruce's sitting on an 'Ornamental Island'. These Trees are used primarily for aesthetic appeal. Image on the right shows a lower catchment (0m above sea level) filled with water. A tunnel is shown in the background which allows water bodies to travel through the landform to connect further out areas, usually obstructed by topography. This provides more catchment area, as catchments are also located on the other side of the tunnel. All water runoff caught in these catchments will be sent to the large catchment pools displayed in the picture. The images above show the progression of a wetland strip running parallel to the Yarra, located between floodplains. This shows how the wetlands take a life of their own and generate their own ecosystem after establishment. This will create more natural wildlife habitats, resulting in more biodiversity and a healthier ecosystem. This creates circular seating facing away from the land, submerging into the Yarra river. The tide would determine how much seating is available. This design looks at creating short tunnels connecting and creating a more intimate expe rience between the land and the water. This design launched the tunnels networking idea. Rounded amphitheater Burrows This design adds a path running at the level of the Yarra river, partially sub merged which follows along under the top soil. The soil would need to be concaved to create this open tunnel for the path, and the surface on top would need to be reinforced. Water level pathway --What-- The design is to create large scale bio filtration system and ephemeral wetlands reliant on storm water run-off, and flooding of the Yarra River. The system is essentially various layers of wetland, floodplains and catchments plotted in relation to the topography of the land to capture, filter, return floodwater and storm water back into the system. This also acts as a flood preventative measure by connecting various water sources via floodplains, to level out catchments and water bodies.
  • 7.