SlideShare a Scribd company logo
1 of 13
Download to read offline
2 0 1 7
C O N T E C H C A L E N D A R
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
D E C E M B E R | 2 0 1 6
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J A N U A RY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS »
TRANSMISSION LINE SYSTEM
IMPROVEMENT
PIPE SOLUTIONS
DECEMBER 2016
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
FEBRUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
NEWYEAR’S DAY
MARTIN LUTHER
KING DAY
Reynolds, Indiana
HEL-COR®
CMP, 12 GA, 5x1 with
MOBILE PIPE®
Mill
4,400 LF of 92-in. through 116-in.
Installation Date: July 2016
Utilizing the MOBILE PIPE mill to manufacture the
pipe needed for caissons to stabilize utility poles, the
contractor was able to avoid freighting and unloading
any truckloads of pipe. A dedicated Contech crew
travels with the mill to efficiently manufacture quality
pipe for every job.
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
F E B R U A RY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
STRUCTURES SOLUTIONS »
WEST DOWLING ROAD
EXTENSION PHASE II
JANUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
MARCH 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
PRESIDENTS’ DAY
VALENTINE’S DAY
Anchorage, Alaska
BridgeCor®
Structural Plate
50’-1” span x 27’ rise x 155’ length
Installation Date: July 2015
As the best solution, a 50’-1” x 27’ BridgeCor
Structural Plate, 155’ in length, was selected and
installed. The BridgeCor structure was more cost
effective than a traditional girder bridge. Its ease of
installation was a plus on the curved, super elevated
road over the structure.
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M A R C H 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
STORMWATER SOLUTIONS »
Villanova, Pennsylvania
Villanova University constructed a large garage to
increase parking capacity for a nearby stadium. A
treatment train consisting of a Vortechs hydrodynamic
separator, a Terre Arch concrete detention system,
and a Jellyfish Filter were selected to effectively treat
stormwater in a compact system with a small footprint.
12’ dia. Jellyfish®
Filter with 18 high flow
cartridges & 4 drain down cartridges
Also Included: Terre Arch™
Detention &
Vortechs®
Hydrodynamic Separator
Installation Date: March 2016
VILLANOVA UNIVERSITY –
PIKE FIELD GARAGE
Filter
FEBRUARY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
APRIL 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
ST. PATRICK’S DAY
SPRING EQUINOX
DAYLIGHT SAVINGTIME
BEGINS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A P R I L 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
STRUCTURES SOLUTIONS »
Ocala, Florida
On Top of the World Community is a premier 55+
active adult community in Ocala, Florida; known for its
dedication to quality. When looking for a solution for a
bridge overpass, the developer’s passion for creativity
in development and excellence in home building made
Keystone Stonegate Country Manor the right choice.
Keystone Retaining Wall Systems®
Stonegate®
Country Manor®
1,000 SF
Installation Date: July 2014
ONTOP OFTHE WORLD
HOME COMMUNITY
MARCH 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
MAY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
TAX DAY EARTH DAY
GOOD FRIDAY
EASTER SUNDAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M AY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
PIPE SOLUTIONS »
Westminster, Colorado
A reinforced concrete pipe (RCP) draining Karen’s Pond and
running below Pecos Street was showing signs of distress in
the deep cover situation. The structural cracks along the
invert and crown of the RCP meant it needed to be replaced
or relined. DuroMaxx Steel Reinforced Polyethylene (SRPE)
pipe was selected to slip line the RCP for its ability to carry
the entire load without any contribution from the failing RCP.
DuroMaxx®
SRPE Liner Pipe
168 LF of 54-in.
Installation Date: August 2016
PECOS STREET CULVERT
IMPROVEMENT
STEEL REINFORCED PE TECHNOLOGY
APRIL 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
JUNE 2017
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
MEMORIAL DAY
MOTHER’S DAY
PIPE SOLUTIONS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U N E 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
STRUCTURES SOLUTIONS »
Mesquite, Nevada
Originally designed as a two-span girder bridge, the
Exit 118 project allowed alternative conceptual designs
to be submitted for approval. Working closely with the
design team, Contech proposed twin BEBO arches for
the project. Garnering enthusiastic reviews from the
city, the proposal was accepted.
BEBO®
Precast Bridge System
E-Series
78’ twin spans x 27’-10” rise x 152’ length
Installation Date: July 2016
EXIT 118 INTERCHANGE
EXPANSION
MAY 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
JULY 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
FATHER’S DAY SUMMER SOLSTICE
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U LY 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
STORMWATER SOLUTIONS »
Tacoma, Washington
This innovative facility provides treatment for 754 acres
in a footprint of only 5,550 square feet using a series
of cascade pools, distribution channels, and Filterra
treatment cells. The system can treat up to eight
million gallons of stormwater per day; capturing the
worst pollutants from entering Puget Sound.
Filterra®
Bioscape with 5,550 SF of
Filterra media, a CDS®
hydrodynamic
separator for pretreatment, and
StormGate®
high flow bypass structure
Installation Date: December 2015
POINT DEFIANCE REGIONAL
TREATMENT RETROFIT
®
JUNE 2017
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
AUGUST 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
INDEPENDENCE DAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A U G U S T 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
PIPE SOLUTIONS »
Houston, Texas
Improvements to the terminal area at the George
Bush Intercontinental Airport included storm water
and surface water drainage and treatment. Contech
Slotted Drain with CDS®
pretreatment was selected as
the optimal solution providing a practical, aesthetically
pleasing system.
Contech Slotted Drain™ and CDS®
Pretreatment (3 - 10’ units)
1,980 LF of 24-in. Slotted Drain
Installation Date: October 2016
IAH AIRPORTTERMINAL C
IMPROVEMENTS
PIPE SOLUTIONS
JULY 2017
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
SEPTEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
S E P T E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
STRUCTURES SOLUTIONS »
Columbia, South Carolina
This Continental Pedestrian Truss bridge spans over an
active rail line that was previously posing a serious safety
concern to the general public visiting the zoo. Trains
utilized this route multiple times a day traveling at high
rates of speed. The beautifully designed bridge now
safely links the parking lot directly to the remodeled zoo.
Continental®
Pedestrian Truss Bridge
Keystone®
style
115’ span x 12’ width
Installation Date: May 2016
RIVERBANKS ZOO
PEDESTRIAN CROSSWALK
AUGUST 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
OCTOBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
LABOR DAY
FALL EQUINOX
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
O C TO B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS »
Monmouth, Oregon
The Monmouth Main Street Park uses an UrbanGreen
Rainwater Harvesting System to collect water from
a splash pad which is then filtered, stored, and
disinfected before being used for spray irrigation of the
park grass and landscaping. The system is saving the
City hundreds of thousands of gallons of potable water.
UrbanGreen®
Rainwater Harvesting
System with a 20,000 gal. SRPE Tank,
mechanical system, and a CDS®
hydrodynamic separator for pretreatment
Installation Date: May 2016
CITY OF MONMOUTH
MAIN STREET PARK
Stormwater Solutions from Contech®
SEPTEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
NOVEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
COLUMBUS DAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
N OV E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
STRUCTURES SOLUTIONS »
Lewiston, Idaho
The Spalding Bridge Scour Repair Project, winner of the
AASHTO President’s Transportation Award, was rated
among the top 10 most scour-critical bridges in the
state. Several piers of the 1,200-ft bridge built in 1962
were in danger of undermining. A-Jacks concrete armor
units were installed in high flowing water conditions to
stabilize the piers without needing to dewater or divert
the river while protecting the sensitive habitat.
A-Jacks®
Concrete Armor Units
14,982 24-in. units
Installation Date: July 2015
SPALDING BRIDGE SCOUR
MITIGATION PROJECT
OCTOBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
DECEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
VETERANS DAY
DAYLIGHT SAVINGTIME
ENDS
THANKSGIVING
WINNER OF THE
PRESIDENT’S AWARD
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 31 25 26 27 28 29 30
9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069
Bridges & Structures
Erosion Control
Pipe
Retaining Walls
Stormwater Management
© 2016 Contech Engineered Solutions LLC
ENGINEERED SOLUTIONS
D E C E M B E R 2 0 1 7
ENGINEERED SOLUTIONS
COMPLETE SITE SOLUTIONS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER SOLUTIONS »
Jalisco, Mexico
The local regulating water authority requires new
developments to retain their stormwater on site. This
helps control flooding in the area due to the increased
runoff that the existing infrastructure can no longer
handle. Contech provided the most cost-effective
solution through the use of 2 perforated CMP systems.
Contech CMP Infiltration System
System 1 - 814 LF of 72” and 78” CMP
System 2 - 715 LF of 78” and 84” CMP
Installation Date: June 2016
ELEMENT RESIDENTIAL
DEVELOPMENT
NOVEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
JANUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
WINTER SOLSTICE
CHRISTMAS DAY
CHRISTMAS
EVE
NEW YEAR’S
EVE

More Related Content

Viewers also liked (10)

Evento alpine 1
Evento alpine 1Evento alpine 1
Evento alpine 1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Principio
PrincipioPrincipio
Principio
 
Allied american university isy 101 module 7
Allied american university isy 101 module 7Allied american university isy 101 module 7
Allied american university isy 101 module 7
 
GenRe to School di Pamekasan
GenRe to School di PamekasanGenRe to School di Pamekasan
GenRe to School di Pamekasan
 
Ii ejbrn 2013
Ii ejbrn 2013Ii ejbrn 2013
Ii ejbrn 2013
 
Test
TestTest
Test
 
Page One Engine
Page One EnginePage One Engine
Page One Engine
 
Volunteer Start Up
Volunteer Start UpVolunteer Start Up
Volunteer Start Up
 
Letter Of Recommendation
Letter Of RecommendationLetter Of Recommendation
Letter Of Recommendation
 

Similar to 2017 Contech Calendar

Similar to 2017 Contech Calendar (8)

2015 Contech Calendar
2015 Contech Calendar2015 Contech Calendar
2015 Contech Calendar
 
MPTC South 2023 Calendar
MPTC South 2023 CalendarMPTC South 2023 Calendar
MPTC South 2023 Calendar
 
2016 Calendar_1
2016 Calendar_12016 Calendar_1
2016 Calendar_1
 
OXY May Pit
OXY May PitOXY May Pit
OXY May Pit
 
TR_Calendar_FINAL
TR_Calendar_FINALTR_Calendar_FINAL
TR_Calendar_FINAL
 
Alumat Almax Group Calendar 2017
Alumat Almax Group Calendar 2017Alumat Almax Group Calendar 2017
Alumat Almax Group Calendar 2017
 
DC Water - Don't Take a Leak
DC Water - Don't Take a LeakDC Water - Don't Take a Leak
DC Water - Don't Take a Leak
 
USBridge_Calendar
USBridge_CalendarUSBridge_Calendar
USBridge_Calendar
 

More from Contech Engineered Solutions

Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Contech Engineered Solutions
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...Contech Engineered Solutions
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Contech Engineered Solutions
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sContech Engineered Solutions
 

More from Contech Engineered Solutions (15)

Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
 
How Rainwater Harvesting Works
How Rainwater Harvesting WorksHow Rainwater Harvesting Works
How Rainwater Harvesting Works
 
Maximizing Phosphorus Load Reduction
Maximizing Phosphorus Load ReductionMaximizing Phosphorus Load Reduction
Maximizing Phosphorus Load Reduction
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Rainwater Harvesting Answer Book
Rainwater Harvesting Answer BookRainwater Harvesting Answer Book
Rainwater Harvesting Answer Book
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 

Recently uploaded (20)

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 

2017 Contech Calendar

  • 1. 2 0 1 7 C O N T E C H C A L E N D A R SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 D E C E M B E R | 2 0 1 6
  • 2. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 J A N U A RY 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PIPE SOLUTIONS » TRANSMISSION LINE SYSTEM IMPROVEMENT PIPE SOLUTIONS DECEMBER 2016 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FEBRUARY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NEWYEAR’S DAY MARTIN LUTHER KING DAY Reynolds, Indiana HEL-COR® CMP, 12 GA, 5x1 with MOBILE PIPE® Mill 4,400 LF of 92-in. through 116-in. Installation Date: July 2016 Utilizing the MOBILE PIPE mill to manufacture the pipe needed for caissons to stabilize utility poles, the contractor was able to avoid freighting and unloading any truckloads of pipe. A dedicated Contech crew travels with the mill to efficiently manufacture quality pipe for every job.
  • 3. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 F E B R U A RY 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STRUCTURES SOLUTIONS » WEST DOWLING ROAD EXTENSION PHASE II JANUARY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MARCH 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PRESIDENTS’ DAY VALENTINE’S DAY Anchorage, Alaska BridgeCor® Structural Plate 50’-1” span x 27’ rise x 155’ length Installation Date: July 2015 As the best solution, a 50’-1” x 27’ BridgeCor Structural Plate, 155’ in length, was selected and installed. The BridgeCor structure was more cost effective than a traditional girder bridge. Its ease of installation was a plus on the curved, super elevated road over the structure.
  • 4. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 M A R C H 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 STORMWATER SOLUTIONS » Villanova, Pennsylvania Villanova University constructed a large garage to increase parking capacity for a nearby stadium. A treatment train consisting of a Vortechs hydrodynamic separator, a Terre Arch concrete detention system, and a Jellyfish Filter were selected to effectively treat stormwater in a compact system with a small footprint. 12’ dia. Jellyfish® Filter with 18 high flow cartridges & 4 drain down cartridges Also Included: Terre Arch™ Detention & Vortechs® Hydrodynamic Separator Installation Date: March 2016 VILLANOVA UNIVERSITY – PIKE FIELD GARAGE Filter FEBRUARY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 APRIL 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 ST. PATRICK’S DAY SPRING EQUINOX DAYLIGHT SAVINGTIME BEGINS
  • 5. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 A P R I L 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 STRUCTURES SOLUTIONS » Ocala, Florida On Top of the World Community is a premier 55+ active adult community in Ocala, Florida; known for its dedication to quality. When looking for a solution for a bridge overpass, the developer’s passion for creativity in development and excellence in home building made Keystone Stonegate Country Manor the right choice. Keystone Retaining Wall Systems® Stonegate® Country Manor® 1,000 SF Installation Date: July 2014 ONTOP OFTHE WORLD HOME COMMUNITY MARCH 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MAY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TAX DAY EARTH DAY GOOD FRIDAY EASTER SUNDAY
  • 6. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 M AY 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PIPE SOLUTIONS » Westminster, Colorado A reinforced concrete pipe (RCP) draining Karen’s Pond and running below Pecos Street was showing signs of distress in the deep cover situation. The structural cracks along the invert and crown of the RCP meant it needed to be replaced or relined. DuroMaxx Steel Reinforced Polyethylene (SRPE) pipe was selected to slip line the RCP for its ability to carry the entire load without any contribution from the failing RCP. DuroMaxx® SRPE Liner Pipe 168 LF of 54-in. Installation Date: August 2016 PECOS STREET CULVERT IMPROVEMENT STEEL REINFORCED PE TECHNOLOGY APRIL 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 JUNE 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MEMORIAL DAY MOTHER’S DAY PIPE SOLUTIONS
  • 7. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 J U N E 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 STRUCTURES SOLUTIONS » Mesquite, Nevada Originally designed as a two-span girder bridge, the Exit 118 project allowed alternative conceptual designs to be submitted for approval. Working closely with the design team, Contech proposed twin BEBO arches for the project. Garnering enthusiastic reviews from the city, the proposal was accepted. BEBO® Precast Bridge System E-Series 78’ twin spans x 27’-10” rise x 152’ length Installation Date: July 2016 EXIT 118 INTERCHANGE EXPANSION MAY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 JULY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24/31 25 26 27 28 29 FATHER’S DAY SUMMER SOLSTICE
  • 8. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 J U LY 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24/31 25 26 27 28 29 STORMWATER SOLUTIONS » Tacoma, Washington This innovative facility provides treatment for 754 acres in a footprint of only 5,550 square feet using a series of cascade pools, distribution channels, and Filterra treatment cells. The system can treat up to eight million gallons of stormwater per day; capturing the worst pollutants from entering Puget Sound. Filterra® Bioscape with 5,550 SF of Filterra media, a CDS® hydrodynamic separator for pretreatment, and StormGate® high flow bypass structure Installation Date: December 2015 POINT DEFIANCE REGIONAL TREATMENT RETROFIT ® JUNE 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AUGUST 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 INDEPENDENCE DAY
  • 9. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 A U G U S T 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PIPE SOLUTIONS » Houston, Texas Improvements to the terminal area at the George Bush Intercontinental Airport included storm water and surface water drainage and treatment. Contech Slotted Drain with CDS® pretreatment was selected as the optimal solution providing a practical, aesthetically pleasing system. Contech Slotted Drain™ and CDS® Pretreatment (3 - 10’ units) 1,980 LF of 24-in. Slotted Drain Installation Date: October 2016 IAH AIRPORTTERMINAL C IMPROVEMENTS PIPE SOLUTIONS JULY 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24/31 25 26 27 28 29 SEPTEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 10. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 S E P T E M B E R 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 STRUCTURES SOLUTIONS » Columbia, South Carolina This Continental Pedestrian Truss bridge spans over an active rail line that was previously posing a serious safety concern to the general public visiting the zoo. Trains utilized this route multiple times a day traveling at high rates of speed. The beautifully designed bridge now safely links the parking lot directly to the remodeled zoo. Continental® Pedestrian Truss Bridge Keystone® style 115’ span x 12’ width Installation Date: May 2016 RIVERBANKS ZOO PEDESTRIAN CROSSWALK AUGUST 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 OCTOBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 LABOR DAY FALL EQUINOX
  • 11. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 O C TO B E R 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PIPE SOLUTIONS » Monmouth, Oregon The Monmouth Main Street Park uses an UrbanGreen Rainwater Harvesting System to collect water from a splash pad which is then filtered, stored, and disinfected before being used for spray irrigation of the park grass and landscaping. The system is saving the City hundreds of thousands of gallons of potable water. UrbanGreen® Rainwater Harvesting System with a 20,000 gal. SRPE Tank, mechanical system, and a CDS® hydrodynamic separator for pretreatment Installation Date: May 2016 CITY OF MONMOUTH MAIN STREET PARK Stormwater Solutions from Contech® SEPTEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NOVEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 COLUMBUS DAY
  • 12. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 N OV E M B E R 2 0 1 7 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 STRUCTURES SOLUTIONS » Lewiston, Idaho The Spalding Bridge Scour Repair Project, winner of the AASHTO President’s Transportation Award, was rated among the top 10 most scour-critical bridges in the state. Several piers of the 1,200-ft bridge built in 1962 were in danger of undermining. A-Jacks concrete armor units were installed in high flowing water conditions to stabilize the piers without needing to dewater or divert the river while protecting the sensitive habitat. A-Jacks® Concrete Armor Units 14,982 24-in. units Installation Date: July 2015 SPALDING BRIDGE SCOUR MITIGATION PROJECT OCTOBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DECEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24/31 25 26 27 28 29 30 VETERANS DAY DAYLIGHT SAVINGTIME ENDS THANKSGIVING WINNER OF THE PRESIDENT’S AWARD
  • 13. SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 31 25 26 27 28 29 30 9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069 Bridges & Structures Erosion Control Pipe Retaining Walls Stormwater Management © 2016 Contech Engineered Solutions LLC ENGINEERED SOLUTIONS D E C E M B E R 2 0 1 7 ENGINEERED SOLUTIONS COMPLETE SITE SOLUTIONS w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STORMWATER SOLUTIONS » Jalisco, Mexico The local regulating water authority requires new developments to retain their stormwater on site. This helps control flooding in the area due to the increased runoff that the existing infrastructure can no longer handle. Contech provided the most cost-effective solution through the use of 2 perforated CMP systems. Contech CMP Infiltration System System 1 - 814 LF of 72” and 78” CMP System 2 - 715 LF of 78” and 84” CMP Installation Date: June 2016 ELEMENT RESIDENTIAL DEVELOPMENT NOVEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 JANUARY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 WINTER SOLSTICE CHRISTMAS DAY CHRISTMAS EVE NEW YEAR’S EVE