October 13, 2016
Approximate
Alignment Study
Area
FM2154
• Offset stop controlled intersections at Capstone Drive &
Wellborn Road and Barron Road & Wellborn Road
• Current Population = 107,425
• Projected Population 2030 = 156,436
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
1990 1995 2000 2005 2010 2015 2020 2025 2030
ADT- Average Daily Traffic
Projected Intersection Volume
Cons
1. Above average
construction cost
Cons
1. Above average
construction cost
Cons
1. Public Opposition
2. Negative Impact on
Several Properties
3. Expensive Right-of-Way
Acquisition
Cons
1. Public Opposition
2. Negative Impact on
Several Homesteads
3. Expensive Right-of-Way
Acquisition
4. Highest Total Project Cost
Cons
1. Public Opposition
2. Negative Impact on
Several Homesteads
3. Expensive Right-of-Way
Acquisition
Cons
1. Public Opposition
2. Negative Impact on two
Homesteads
1 2 3 4 5 6
A. Improve Safety -- ++ ++ ++ ++ ++ ++
B. Improve Mobility -- ++ ++ ++ ++ ++ ++
C. Right of Way Impacts ++ + 0 -- - - --
D. Public Comments - + + -- -- -- --
E. Construction Cost ++ - - + + + 0
F. Right of Way Cost* ++ ++ ++ -- -- 0 0
G. Pavement Maintenance 0 ++ ++ -- -- -- 0
*
**
Alignment Alternatives
Existing**Evaluation Criteria
Evaluation Matrix
(-- Major Negative Effect, - Minor Negative Effect, 0 Neutral/No Effect, + Minor Positive Effect, ++ Major Positive Effect)
Right of Way Cost provided by the City of College Station
If roadw ays are rebuilt on existing alignment and offset intersections left in place
Existing 1 2 3 4 5 6
A. Improve Safety 4 -8 8 8 8 8 8 8
B. Improve Mobility 3 -6 6 6 6 6 6 6
C. Right of Way Impacts 3 6 3 0 -6 -3 -3 -6
D. Public Comments 3 -3 3 3 -6 -6 -6 -6
E. Construction Cost 2 4 -2 -2 2 2 2 0
F. Right of Way Cost 2 4 4 4 -4 -4 0 0
G. Pavement Maintenance 1 0 2 2 -2 -2 -2 0
TOTAL: -3 24 21 -2 1 5 2
ALTERNATIVES
WEIGHTINGCRITERIA
Scoring
Barron Road-Capstone Drive Realignment
Barron Road-Capstone Drive Realignment

More Related Content

What's hot

What's hot (20)

Ring road concession conference call
Ring road concession conference callRing road concession conference call
Ring road concession conference call
 
Piven hsc presentation final 3.18.13
Piven hsc presentation   final 3.18.13Piven hsc presentation   final 3.18.13
Piven hsc presentation final 3.18.13
 
Gauteng Freeway Improvement Plan (GFIP) Costs
Gauteng Freeway Improvement Plan (GFIP) CostsGauteng Freeway Improvement Plan (GFIP) Costs
Gauteng Freeway Improvement Plan (GFIP) Costs
 
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates ComparisonTPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
 
Parkland Dedication Amendments
Parkland Dedication AmendmentsParkland Dedication Amendments
Parkland Dedication Amendments
 
Viability Session 2: The role of viability in plan-making and development man...
Viability Session 2: The role of viability in plan-making and development man...Viability Session 2: The role of viability in plan-making and development man...
Viability Session 2: The role of viability in plan-making and development man...
 
Viability Session 4: You have viability evidence – so what?
Viability Session 4: You have viability evidence – so what?Viability Session 4: You have viability evidence – so what?
Viability Session 4: You have viability evidence – so what?
 
Town of Carrboro Financial Status and Budget Development
Town of Carrboro Financial Status and Budget DevelopmentTown of Carrboro Financial Status and Budget Development
Town of Carrboro Financial Status and Budget Development
 
Item 8.5 2014 lua update
Item 8.5   2014 lua updateItem 8.5   2014 lua update
Item 8.5 2014 lua update
 
Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13
 
Land Development Process - Orange County, Florida
Land Development Process - Orange County, FloridaLand Development Process - Orange County, Florida
Land Development Process - Orange County, Florida
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment Plan
 
2015 Bonding List
2015 Bonding List2015 Bonding List
2015 Bonding List
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
City council 9 17-13 budget discussion
City council 9 17-13 budget discussionCity council 9 17-13 budget discussion
City council 9 17-13 budget discussion
 
Teebay Los Angeles County
Teebay Los Angeles CountyTeebay Los Angeles County
Teebay Los Angeles County
 
Water Demand Forecasting Audit
Water Demand Forecasting AuditWater Demand Forecasting Audit
Water Demand Forecasting Audit
 
BIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium ConstructionBIM Show Live 2015: Man City Stadium Construction
BIM Show Live 2015: Man City Stadium Construction
 
2013 Bond Sale and Refunding
2013 Bond Sale and Refunding 2013 Bond Sale and Refunding
2013 Bond Sale and Refunding
 
City Council 02.18.2014 Agenda Item #5.1
City Council 02.18.2014 Agenda Item #5.1City Council 02.18.2014 Agenda Item #5.1
City Council 02.18.2014 Agenda Item #5.1
 

Viewers also liked

Viewers also liked (20)

Redmond Terrace Easement Abandonment
Redmond Terrace Easement AbandonmentRedmond Terrace Easement Abandonment
Redmond Terrace Easement Abandonment
 
Northgate Mobile Food Court
Northgate Mobile Food CourtNorthgate Mobile Food Court
Northgate Mobile Food Court
 
Tarrow Townhomes Rezoning
Tarrow Townhomes RezoningTarrow Townhomes Rezoning
Tarrow Townhomes Rezoning
 
City of College Station Legislative Update
City of College Station Legislative UpdateCity of College Station Legislative Update
City of College Station Legislative Update
 
Wellborn SUD Rezoning
Wellborn SUD RezoningWellborn SUD Rezoning
Wellborn SUD Rezoning
 
A&M Church of Christ Easement Abandonment
A&M Church of Christ Easement AbandonmentA&M Church of Christ Easement Abandonment
A&M Church of Christ Easement Abandonment
 
School Site Easement Abandonments
School Site Easement AbandonmentsSchool Site Easement Abandonments
School Site Easement Abandonments
 
Summit Crossing Rezoning
Summit Crossing RezoningSummit Crossing Rezoning
Summit Crossing Rezoning
 
Louise Townhomes Parking Removal
Louise Townhomes Parking RemovalLouise Townhomes Parking Removal
Louise Townhomes Parking Removal
 
1720 Harvey Mitchell Parkway Rezoning
1720 Harvey Mitchell Parkway Rezoning1720 Harvey Mitchell Parkway Rezoning
1720 Harvey Mitchell Parkway Rezoning
 
Deacon Drive West Rezoning
Deacon Drive West RezoningDeacon Drive West Rezoning
Deacon Drive West Rezoning
 
Comp Plan Amendment - Bicycle, Pedestrian, Greenways
Comp Plan Amendment  - Bicycle, Pedestrian, GreenwaysComp Plan Amendment  - Bicycle, Pedestrian, Greenways
Comp Plan Amendment - Bicycle, Pedestrian, Greenways
 
Roadway Maintenance Fee
Roadway Maintenance FeeRoadway Maintenance Fee
Roadway Maintenance Fee
 
State Highway 30 Comp Plan Amendment
State Highway 30 Comp Plan AmendmentState Highway 30 Comp Plan Amendment
State Highway 30 Comp Plan Amendment
 
State Highway 30 Rezoning
State Highway 30 RezoningState Highway 30 Rezoning
State Highway 30 Rezoning
 
Spring Creek Rezoning
Spring Creek RezoningSpring Creek Rezoning
Spring Creek Rezoning
 
Williams Creek Lake Estates Rezoning
Williams Creek Lake Estates RezoningWilliams Creek Lake Estates Rezoning
Williams Creek Lake Estates Rezoning
 
No Parking for Subdivisions behind Fire Station No. 6
No Parking for Subdivisions behind Fire Station No. 6No Parking for Subdivisions behind Fire Station No. 6
No Parking for Subdivisions behind Fire Station No. 6
 
College Hills Rezoning
College Hills RezoningCollege Hills Rezoning
College Hills Rezoning
 
BCAD Building Project
BCAD Building ProjectBCAD Building Project
BCAD Building Project
 

Similar to Barron Road-Capstone Drive Realignment

DPW sidewalk repair plan update 07/30/2013
DPW sidewalk repair plan update 07/30/2013DPW sidewalk repair plan update 07/30/2013
DPW sidewalk repair plan update 07/30/2013
PEDS
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review
Tom Atkinson
 
Florida International University .docx
Florida International University                              .docxFlorida International University                              .docx
Florida International University .docx
AKHIL969626
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 Supernova
Robert Fohrenbach
 

Similar to Barron Road-Capstone Drive Realignment (20)

Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
October 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM PowerpointOctober 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM Powerpoint
 
DPW sidewalk repair plan update 07/30/2013
DPW sidewalk repair plan update 07/30/2013DPW sidewalk repair plan update 07/30/2013
DPW sidewalk repair plan update 07/30/2013
 
North Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyNorth Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements Study
 
Multi-Criteria Assessment
Multi-Criteria AssessmentMulti-Criteria Assessment
Multi-Criteria Assessment
 
Meeting minutes for brossard good neighbourly relations committee september...
Meeting minutes for brossard good neighbourly relations committee   september...Meeting minutes for brossard good neighbourly relations committee   september...
Meeting minutes for brossard good neighbourly relations committee september...
 
June 23, 2020 BPAC Virtual Meeting
June 23, 2020 BPAC Virtual MeetingJune 23, 2020 BPAC Virtual Meeting
June 23, 2020 BPAC Virtual Meeting
 
Trench vs reroute of i 70
Trench vs reroute of i 70Trench vs reroute of i 70
Trench vs reroute of i 70
 
Sharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemSharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation System
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
 
Presentation on DMRC
Presentation on DMRCPresentation on DMRC
Presentation on DMRC
 
Item 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinanceItem 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinance
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review
 
Florida International University .docx
Florida International University                              .docxFlorida International University                              .docx
Florida International University .docx
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
 
Session B2 - Project Cost Control
Session B2 - Project Cost ControlSession B2 - Project Cost Control
Session B2 - Project Cost Control
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
CapstonePoster 36x48 Supernova
CapstonePoster 36x48 SupernovaCapstonePoster 36x48 Supernova
CapstonePoster 36x48 Supernova
 

More from City of College Station

More from City of College Station (20)

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
 

Recently uploaded

Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 

Recently uploaded (20)

Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize
 
3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 

Barron Road-Capstone Drive Realignment

  • 2.
  • 4. • Offset stop controlled intersections at Capstone Drive & Wellborn Road and Barron Road & Wellborn Road
  • 5.
  • 6.
  • 7. • Current Population = 107,425 • Projected Population 2030 = 156,436 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 1990 1995 2000 2005 2010 2015 2020 2025 2030
  • 8. ADT- Average Daily Traffic Projected Intersection Volume
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 16.
  • 18.
  • 19. Cons 1. Public Opposition 2. Negative Impact on Several Properties 3. Expensive Right-of-Way Acquisition
  • 20.
  • 21. Cons 1. Public Opposition 2. Negative Impact on Several Homesteads 3. Expensive Right-of-Way Acquisition 4. Highest Total Project Cost
  • 22.
  • 23. Cons 1. Public Opposition 2. Negative Impact on Several Homesteads 3. Expensive Right-of-Way Acquisition
  • 24.
  • 25. Cons 1. Public Opposition 2. Negative Impact on two Homesteads
  • 26.
  • 27. 1 2 3 4 5 6 A. Improve Safety -- ++ ++ ++ ++ ++ ++ B. Improve Mobility -- ++ ++ ++ ++ ++ ++ C. Right of Way Impacts ++ + 0 -- - - -- D. Public Comments - + + -- -- -- -- E. Construction Cost ++ - - + + + 0 F. Right of Way Cost* ++ ++ ++ -- -- 0 0 G. Pavement Maintenance 0 ++ ++ -- -- -- 0 * ** Alignment Alternatives Existing**Evaluation Criteria Evaluation Matrix (-- Major Negative Effect, - Minor Negative Effect, 0 Neutral/No Effect, + Minor Positive Effect, ++ Major Positive Effect) Right of Way Cost provided by the City of College Station If roadw ays are rebuilt on existing alignment and offset intersections left in place
  • 28. Existing 1 2 3 4 5 6 A. Improve Safety 4 -8 8 8 8 8 8 8 B. Improve Mobility 3 -6 6 6 6 6 6 6 C. Right of Way Impacts 3 6 3 0 -6 -3 -3 -6 D. Public Comments 3 -3 3 3 -6 -6 -6 -6 E. Construction Cost 2 4 -2 -2 2 2 2 0 F. Right of Way Cost 2 4 4 4 -4 -4 0 0 G. Pavement Maintenance 1 0 2 2 -2 -2 -2 0 TOTAL: -3 24 21 -2 1 5 2 ALTERNATIVES WEIGHTINGCRITERIA Scoring