2. Camera Operator
Camera Equipment
Expendables
Lighting Equipment
Lighting Operator
Expendables
All for £300 per day and £900 over the 3 days
http://www.dvcamerahire.co.uk/
hire_a_cameraoperator.html
3. Location Audio Kit
Per day £31.20
3 days hire £93.60
http://www.maniacfilms.com/rental/audio-
audio-kits-c-74_103.html
4. Filming averages around half a day in one location this comes
to £1200 per the 3 days
http://www.shootfactory.co.uk/about-shootfactory-locations.html
5. The insurance for everyone on the set come
around £750.
http://www.mediainsurance.co.uk/student_fa
ctsheet.pdf
6. For all the props and costumes in tis retail
shop is £10 for 2 weeks
http://www.steptoesantiques.co.uk/acatalog/
Props_Rental.html
7. All that is need for still images production is
a camera a cameraman.
Camera – Canon EOS 7D DSLR
£26.40 per day
Around £79 for days hire
http://www.maniacfilms.com/rental/video-cameras-c-23.html
8. 10% of production costs come to
£273.20 to check the re of the research check
the spread sheet
9. Production Company: Other Team Members:
Production Title: Estimated Shooting Dates:
Name: Christian Owens
Account # Category Specifics Actual Cost
001 Script & Rights N/A £ -
002 Producer N/A £ -
003 Director N/A £ -
004 Cast N/A £ -
005 Camera Kit, Expendables £ 300.00
006 Lighting Kit, Expendables £ 300.00
007 Sound Recording Kit Kit, Accessories £ 93.00
008 Locations Fees & Permits £ 1,200.00
009 Art Dept Props, Wardrobe etc. £ 10.00
010 Insurance (if applicable) £ 750.00
011 Still Images of Production £ 79.00
012 Contingency (extra money) 10% of production costs £ 273.20
013 Any Other Costs £ 100.00
£ -
£ -
BUDGET: £ 4,000.00
ACTUAL GRAND TOTAL: £ 3,105.20
I have not filled in the job roles because the cost would go over the budget
And my production group will be filling in the job roles