3rd May 2016
Volker Fitzpatrick / Cross Rail
Dear Sir
Ref: C11187 Ilford Rail Depot, Ley Street, Ilford, Essex IG1 4BL
We write with reference to our recent site meeting to view and inspect the Kingspan
composite wall panels which have been supplied to the above project.
The site visit was undertaken to comment upon repair works which had been carried
out by CJ Coatings to the wall panels following various degrees of damage.
C J Coating is a company used by Kingspan and their work is carried out fully to
Kingspan specifications.
Please be advised that the work carried out by them at the above site is covered under
the Comprehensive Kingspan Product Guarantee.
We would confirm that the remedial works carried out by CJ Coatings had been
carried out to a high standard at a number of locations on all elevations.
We would comment that due to the nature of on site spraying it is not possible to
replicate perfectly the texture and consistency of factory coated coil and it is always
going to be possible when viewing newly painted panels at certain angles and in
certain light conditions to note shade variation and surface gloss levels. This will also
be affected when viewing panels which have been recently coated against panels
which have been subject to UV exposure and natural weathering.
Of course it is also possible to note slight imperfections at the site of the repair if
viewed at close proximity depending upon the profile of the steel substrate and level
of damage sustained. Industry standards and Kingspan specification state that repairs
should be viewed while standing directly in front of the panel at a distance of 3 metres.
In conclusion we would confirm that the remedial repair works which have been
carried out are deemed to be of a high standard, the visual affect which can at present
be seen when viewing the panels at certain angles and in certain light conditions will
not be visible following natural weathering and UV exposure.
We would also confirm that the remedial works undertaken by CJ Coatings will not
affect the performance of the product in any way and the panels are of course still
fully covered by the comprehensive Kingspan guarantee.
We hope this confirms the position but if you or your client wish to discuss this matter
in further detail then please do not hesitate to contact us.
Yours Sincerely,
Paul Thorpe
Paul Thorpe
Regional Contracts Manager.
Kingspan Ltd

More Related Content

Similar to Kingspan Panel Repair Works

Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionSimply Marcomms
 
Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionCathy Baillie
 
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumCoatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumGreg Caswell
 
Repair_of_damaged_concrete_structures.pptx
Repair_of_damaged_concrete_structures.pptxRepair_of_damaged_concrete_structures.pptx
Repair_of_damaged_concrete_structures.pptxGnanaDoss2
 
Commercial Sales Package
Commercial Sales PackageCommercial Sales Package
Commercial Sales Packageomniplayer
 
Goel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific
 
Welded mesh in turkey
Welded mesh in turkeyWelded mesh in turkey
Welded mesh in turkeyAsfence
 
Conductive Flooring
Conductive FlooringConductive Flooring
Conductive FlooringRana Imran
 
Kodi Klip Rebar Connecting
Kodi Klip Rebar ConnectingKodi Klip Rebar Connecting
Kodi Klip Rebar ConnectingAirmatic
 
WaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebWaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebJeff Heath
 
Compost Toilets Design & Access Statement
Compost Toilets Design & Access StatementCompost Toilets Design & Access Statement
Compost Toilets Design & Access StatementSusy Feltham
 

Similar to Kingspan Panel Repair Works (15)

Training PPT
Training PPTTraining PPT
Training PPT
 
Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for construction
 
Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for construction
 
Issue 15
Issue 15Issue 15
Issue 15
 
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumCoatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
 
Repair_of_damaged_concrete_structures.pptx
Repair_of_damaged_concrete_structures.pptxRepair_of_damaged_concrete_structures.pptx
Repair_of_damaged_concrete_structures.pptx
 
Commercial Sales Package
Commercial Sales PackageCommercial Sales Package
Commercial Sales Package
 
Goel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific General information and introduction
Goel Scientific General information and introduction
 
Welded mesh in turkey
Welded mesh in turkeyWelded mesh in turkey
Welded mesh in turkey
 
Conductive Flooring
Conductive FlooringConductive Flooring
Conductive Flooring
 
Kodi Klip Rebar Connecting
Kodi Klip Rebar ConnectingKodi Klip Rebar Connecting
Kodi Klip Rebar Connecting
 
WaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebWaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - Web
 
CEMflex VB Plate TDS
CEMflex VB Plate TDSCEMflex VB Plate TDS
CEMflex VB Plate TDS
 
PermaClean 100
PermaClean 100PermaClean 100
PermaClean 100
 
Compost Toilets Design & Access Statement
Compost Toilets Design & Access StatementCompost Toilets Design & Access Statement
Compost Toilets Design & Access Statement
 

Kingspan Panel Repair Works

  • 1. Kingspan Limited Greenfield Business Park No 2, Greenfield, Holywell, Flintshire CH8 7GJ Tel: +44 (0) 1352 716100 Fax: +44 (0) 1352 710161 3rd May 2016 Volker Fitzpatrick / Cross Rail Dear Sir Ref: C11187 Ilford Rail Depot, Ley Street, Ilford, Essex IG1 4BL We write with reference to our recent site meeting to view and inspect the Kingspan composite wall panels which have been supplied to the above project. The site visit was undertaken to comment upon repair works which had been carried out by CJ Coatings to the wall panels following various degrees of damage. C J Coating is a company used by Kingspan and their work is carried out fully to Kingspan specifications. Please be advised that the work carried out by them at the above site is covered under the Comprehensive Kingspan Product Guarantee. We would confirm that the remedial works carried out by CJ Coatings had been carried out to a high standard at a number of locations on all elevations. We would comment that due to the nature of on site spraying it is not possible to replicate perfectly the texture and consistency of factory coated coil and it is always going to be possible when viewing newly painted panels at certain angles and in certain light conditions to note shade variation and surface gloss levels. This will also be affected when viewing panels which have been recently coated against panels which have been subject to UV exposure and natural weathering.
  • 2. Of course it is also possible to note slight imperfections at the site of the repair if viewed at close proximity depending upon the profile of the steel substrate and level of damage sustained. Industry standards and Kingspan specification state that repairs should be viewed while standing directly in front of the panel at a distance of 3 metres. In conclusion we would confirm that the remedial repair works which have been carried out are deemed to be of a high standard, the visual affect which can at present be seen when viewing the panels at certain angles and in certain light conditions will not be visible following natural weathering and UV exposure. We would also confirm that the remedial works undertaken by CJ Coatings will not affect the performance of the product in any way and the panels are of course still fully covered by the comprehensive Kingspan guarantee. We hope this confirms the position but if you or your client wish to discuss this matter in further detail then please do not hesitate to contact us. Yours Sincerely, Paul Thorpe Paul Thorpe Regional Contracts Manager. Kingspan Ltd