10 c-draft-earthsoft-project management-detailed-experience based
Chad fields results snapshot
1. Chad Fields
Procurement Management Expert | Savvy Negotiator
Adept at understanding
business strategy and
translating into effective
tactical plans that serve as
Revenue Generators while
Minimizing Costs.
3. INCREASING EFFICIENCY &
PRODUCTIVITY
Challenge:
• Projects were being delayed due
to inventory shortages.
What I did:
• Designed and built project rack to
hold each part for a total of 30
projects. Material was pulled
from inventory and put in the
appropriate rack.
Result:
• Lead time was decreased from
33% (from 6 weeks to 4 weeks).
4. 5 S / Lean Manufacturing
• Sort
• Set In Order
• Standardize
• Shine
• Sustain
5. RESULTS AFTER IMPLEMENTING
5 S / Lean Manufacturing Principles
• Cut labor costs 40%
by eliminating waste
and increasing
efficiency
• Weekly 5 S audits to
improve
sustainability
6. SAMPLE PROJECT
Sugar Mill Mailbox & Street Sign Replacement Duluth, GA
Before
• Total cost of project = $230,000
• Project completed on time and
under budget.
After
• 497 Mailboxes & 63 Street Signs