1. Caleb Stevenson
Houston, TX | (713) 614-6770 | calebstevenson@icloud.com | linkedin.com/in/calebstevenson
_________________________________________________ Summary _________________________________________________
Project leader with 8 years of experience leading high-profile project development at Fortune 500
companies with energy and diligence. Highly motivated and results-driven with excellent
communication and analytical skills.
§ Four BP Recognition Awards
§ Highly organized
§ Outstanding Analytical and Execution skills
§ Project Management Professional (PMP)
§ Microsoft Office proficient
§ Business planning
§ Team building
§ Strong, natural presentation skills
_________________________________________________Experience_________________________________________________
BP North America (2009-2016)
2011- Project Engineer Houston, TX
2016 Managed project to add 100k barrels/day in production by procurement of $100mil in new hardware and $65mil installation
and commissioning activities
• Developed reports and cost reviews, leading to clear communication of status and financial performance
• Independently recognized need for multi-project interface tools, improving communications and schedule
• Implemented new technology for chemical delivery, reducing project by $30 million and 18 months
• Negotiated the use of unused equipment to ensure on-time startup of production
• Simplified project activities and costs, accelerating schedule and reducing risk
Special Projects Port of Spain, Trinidad / Houston, TX
• Oversaw troubleshooting operations resulting in reinstatement of critical fuel supply to the local market
• Led $5mil study to optimize operating parameters and successfully increased production by 10K bopd
• Facilitated monthly leadership team meetings, presentations, and succession planning
• Coordinated new hire visits and hosted Q&A panels to field questions and promote BP to candidates
2011 Concept Development Engineer Houston, TX
Led field development of major hub in the Gulf of Mexico
• Developed standard project documents and requests for project funding, resulting in project sanction
• Created detailed project plans and developed baseline project schedules and cost estimates
2010 Offshore Response Engineer – Deepwater Horizon Gulf of Mexico
Represented BP onshore and aboard offshore construction vessel, leading construction efforts and surface oil mitigation
• Instructed vessel crew for installation and startup of subsea production system, resulting in collection of discharged oil
• Prioritized procedures and last minute changes to offshore coordination efforts, resulting in uninterrupted progress
• Interfaced with EPA and offshore teams, leading to decreased environmental damage and adherence to regulations
• Coordinated offshore response efforts in high stress environment from onshore control center
• Fully engaged crew by leading communication of critical information and forward plans
2009- Operations Engineer Houston, TX
2010 Protected value of assets and production by executing offshore repairs and inspections.
• Developed and implemented solutions to subsea failures, protecting existing and future production through the system
• Created inspection scopes of work and managed offshore crews to successfully inspect equipment and platform
• Optimized development of tools for platform maintenance and modification
2. Caleb Stevenson Page 2
2005- Texas Tech University Senior Research Assistant – Chemistry, Engineering Lubbock, TX
2008 BP Refining Intern in Oil Movements Texas City, TX
3M Intern in Security Products Brownwood, TX
Texas Tech University Assistant TA Lubbock, TX
Lockheed Martin Intern in Flight Operations Fort Worth, TX
_________________________________________________ Education _________________________________________________
2008 Texas Tech University B.S Mechanical Engineering, 3.7 GPA
Minors in Math and Chemistry
Outstanding Achievement Award
Asst. Instructor for Physics, Organic Chem, Anatomy & Phs.
Texas Tech Health Sciences Center Volunteer