Moving Beyond the Shadow of the Rana Plaza Tragedy:
In Search of a Closure and Restructuring Strategy
FOURTH MONITORING REPORT
Dr Khondaker G Moazzem
Additional Research Director, CPD
Presentation by
CPD Dialogue
Rana Plaza Tragedy: Two Years After
21 April, 2015
CPD Study Team
Dr Khondaker G Moazzem
Additional Research Director, CPD
Mr. Ariful Islam
Research Associate, CPD
Authors would like to thank Ms. Farzana Sehrin, Research Associate and Ms. Rehnuma Islam, Research Associate, CPD for
their support on this study.
2
Acknowledgement
The CPD team is grateful to
Professor Rehman Sobhan, Chairman, CPD who came up with the idea of setting up the partnership
initiative and monitoring the implementation of deliverables, and Dr Debapriya Bhattacharya,
Distinguished Fellow, CPD and Professor Mustafizur Rahman, Executive Director, CPD for their guidance in
implementing the initiative
Institute of Architect, Bangladesh (IAB), Aino Salish Kendra (ASK), Dhaka Ahsania Mission, Action Aid
Bangladesh, Gono Shakkhorota Abhijan, Transparency International Bangladesh (TIB), The Daily Star,
Naripokkho, Nijera Kori, ProthomAlo, Bangladesh Environmental Lawyers Association (BELA), Bangladesh
Legal Aid and Services Trust (BLAST), Manusher Jonno Foundation and SHUJAN
Professor Jamilur Reza Chowdhury, Vice Chancellor, University of Asia Pacific and Mr Habibullah N Karim,
Chairman, Terratech Limited for their valuable contribution to the initiative
3
Major Highlighted Issues
1. Number Debate
2. Support for the Victims of Rana Plaza Tragedy
3. Restructuring and Reform in the Garment Sector
4. Initiatives of Accord, Alliance and NTPA
5. Initiatives undertaken by the Development Partners
6. Recent Trends in the Global Apparel Markets
4
Background of the Fourth Monitoring Report
• Two years have elapsed since the Rana Plaza Tragedy
• various measures taken over the last two years, there still remain lots of unresolved issues
• CPD and 13 civil society think-tanks undertook an independent monitoring initiative during the
first year
• It had tracked the progress of various initiatives
• With the end of the second year, CPD considers it pertinent to revisit the level of progress in
those initiatives
• It was expected that the stakeholders would try to fulfill their commitments by the end of the
second year,
• But at present a number of concerns surrounds the commitment of the stakeholders.
• This poses the critical question- How is Bangladesh going to end the adversities of the Rana
Plaza Tragedy?
5
Framework of the Report
• After two years of targeted programs, it appears that the Bangladesh RMG sector is at the
‘midst’ of the reform process.
• This presents an opportunity to evaluate the effectiveness of the initiatives in terms of their
impact on the objectives.
• There is a growing need to designate a timeline for the end of the measures and to
conclude the restructuring process.
• The framework of the study focuses on how Bangladesh’s RMG sector is going to conclude the
Rana Plaza tragedy through various measures
• Present report intends to examine different changes from that framework.
6
Issue 1
Number Debate
• The debate over total number of victims of Rana Plaza
tragedy is still not over
• Out of the 365 workers who were initially not traced, a total
of 206 workers have so far been identified through DNA test
• Another 85 workers are not yet been identified
• Overall, 159 workers have been claimed to be missing which
is currently being verified.
• During the second year, no additional missing workers have
been identified
• Either through use of DNA test or through verification of
documents submitted by victims’ family members.
• MoLE’s efforts to verify missing workers need to be realized
immediately
Source Date Total
Missing
Reported
Identified
so far
Still missing
The Daily Star March 8,
2015
322 200 122
Ministry of
labor and
Employment
February
1, 2015
365 206 159
(Identificatio
n under
way)
BGMEA Not
Reported
206 Not
Reported
Dhaka
Tribune
March
15, 2015
98 of 166 166
Current Status of Missing Workers
Source: Prepared by Authors
7
Snapshot on Current State of Selected Victims and Their Families
• CPD has conducted a telephone interview during April, 2015 with a selected number of victims
and their family members
• Injured (6), deceased (4), Identified (1) and unidentified (1)
• Despite various initiatives, victims and their family members are not at the same level compared
to their condition prior to the collapse of Rana Plaza
• Among the injured workers, few are employed locally in off-farm jobs
• After receiving training under various initiatives founded by different organizations.
• In most cases their income is below what they received earlier.
• Those who are unemployed are due to their inability to engage in daily work
8
Snapshot on Current State of Selected Victims and Their Families
• All the respondent victims are still suffering from various kinds of physical and mental problems
• Spent a significant amount of money for the treatment
• Many of them were constrained by inadequate financial capacities
• The amount of support is varied widely between as low as Tk.75,000 to as high as Tk.12 lakh
• Mainly due to extent of deviation of claimed amount between the number of claimants
and to the amount of money received (in two installments)
• Considerable progress has been made regarding the financial support for families of missing
workers who have been identified through DNA test
• The amount of financial support received by victims and their families so far is insufficient to
meet their needs,
9
Issue 2
Support for the Victims of Rana Plaza Tragedy
Long term Financial Support: How the issue is being settled?
• Long term financial support for the victims and their families is the most important component to
monitor during the second year
• There were two specific initiatives under which long term financial needs have been assessed
• Under the directives of the High Court, a national the committee has estimated the needs of
the victims and their families
• Under private sector initiative: Rana Plaza Trust Fund made another assessment
• The National Committee has submitted its report to the High Court in February, 2014: no progress
has been made since then
• A portion of the victims have received support from Prime Minister’s Relief Fund in the first year
• During second year support provided to families of 67 deceased workers and 164 victims who
have been identified through DNA test
• There is unspent donation at the Prime Ministers’ Fund which could be utilised
10
Issue 2
Support for the Victims of Rana Plaza Tragedy
Long term Financial Support: How the issue is being settled?
• Considerable progress has been made with regard to the commitment of the brands/retailers’
towards providing long term support to the victims
• Initial estimate for requirement of fund was US$40 million but the revised estimate reduced it to
US$30 million
• Includes all authorized payments, income replacement payments and allied care costs
• A total of 5139 victims of 2835 families have received financial support from the Rana Plaza Trust
Fund
• Tk.50000+ 30%+40%=70% of total claim
• Primark has separately disbursed among the victims of two factories located in the Rana Plaza
(US$5 million)
• There is a shortfall of US$9 mil.: it is still not clear how quickly the remaining amount is to be
collected and distributed among the victims
11
Treatment for Victims: Could They Continue Afford Their Treatment?
• During the first year most of the injured workers received immediate treatment from different local
hospitals
• Funding support and medical supplies from various public and private organizations and individual members
• Made significant contribution to ensure at least a minimum level of treatment for injured workers
• During the second year, different organisations have provided long term support for medical
treatment
• BILS Support Center: From April 2014 to March 2015, a total of 792 workers received follow-up treatment facility
which included doctor’s checkup, medicine, diagnosis, pathological test, physiotherapy and psychotherapy
• RPCC, GK: Medical assessment was provided to 1999 victims which was supported by ILO and CRP
• Upazila Health Complex provided long term support to 236 victims
• BGMEA: Support for treatment of 180 victims at NITOR and DMCH for which spent a total of Tk.1.33 lakh taka.
An amputee patient received financial support of Tk. 0.91 lakh for the treatment of cancer at Mohakhali
Cancer Hospital
Issue 2
Support for the Victims of Rana Plaza Tragedy
12
Treatment for Victims: Could They Continue Afford Their Treatment?
• Establishment of a prosthetics and orthotics (P&O) school at CRP, Savar with the support of
German Ministry of Economic Cooperation and Development under GIZ’s project of PSES
• Paved the way to promote employment of persons with disabilities in the RMG factories
• Due to number of reasons the treatment facility provided by different organisations or the
financial support provided for treatment would not be beneficial to all victims.
• It is difficult for remotely located victims to access treatment services
• Injured workers suffering from physical and mental problems have to bear their own expenses
for getting the treatment facility at a local level
• Discontinuation of support services would make problem to chronically ill/injured patients
who requires to undergo treatment on a regular basis for a long period of time.
• It’s not clear whether amputees take proper treatment during this period.
• Artificial limbs have limited use and could not be used for day-to-day activity
Issue 2
Support for the Victims of Rana Plaza Tragedy
13
Issue 2
Support for the Victims of Rana Plaza Tragedy
Reemployment of Workers: Could They Continue New Businesses?
• The initiatives towards the reemployment of the affected workers made progress during the
second year.
• A total 2122 workers have been re-employed up to second year
• A total of 1239 workers have received training on small business/ entrepreneurship
development and have started their businesses (RPCC, CRP, Action Aid, COEL, Adesh,
EMCH, GIZ, Aparazeo, Handicap Int’l )
• Despite that a number of workers who started their business have found different kinds of
difficulty in operating their businesses
• Lack of adequate working capital, lack of demand for such services
• A number of victims are still unemployed as is reported in CPD’s interview as well
• Reemployment is a step forward but would make limited contribution to their long term living if
sufficient income is not ensured
14
Issue 2
Support for the Victims of Rana Plaza Tragedy
Support to Victims Children: Is the Support Adequate?
• 700 children of Rana Plaza victims have been affected by the incident
• During first year, a total of 513 children has been supported by different organizations
• During the second year, most of the organisations have continued their support for the children
• Number of children who received treatment has increased to 621 where an additional 215
children were included in the second year
• BGMEA: Provided support to 45 orphans amongst which 15 boys have been supported at
ORCA Homes, Chittagong, 10 Boys at ORCA Homes, Gaibandha and 20 girls were handed
over to Anjuman Orphanage, Savar respectively
• Prothom Alo: Made a fixed deposit of Tk.50 lakh and interest earned on this deposit will be
spent on educational expenses of 20 orphans till they reached the age of 18.
• BILS: Supports 25 orphan children through ‘BILS Support Center’
15
Support to Rescuers: Did they get adequate support?
• During the first year, 150 rescuers received some financial support from different organisations
including Bangladesh Bank.
• Naripokkho with the help of its supporting partners has also conducted experience sharing sessions with
55 and 3 psycho-social counseling to 75 rescue workers.
• During the second year there has no substantial progress regarding support to rescuers
• Awarding of Tk. 20,000 each as financial support to 11 rescuers through the Labour Welfare Foundation.
• It is urgent to provide the financial and medical support to the rescuers
• To provide them with the incentive to join future rescue mission in the case of national need
16
Issue 2
Support for the Victims of Rana Plaza Tragedy
Legal issues
• During the first year, a total of 14 cases were filed against different accused including owner of
the building under different acts and by different organizations.
• During the second year, progress of those cases were rather limited.
• All those cases are now under trail and the case filed by Rajuk is under investigation.
• CID Police asked for five more weeks from High Court to submit the report in May 21, 2015 for
two cases that was filed at early period of Rana Plaza Collapse (April 15, bdnews24.com).
• Two cases against the parents of Sohel Rana are approved by Anti-corruption Commission due
to illegal acquirement of property estimated to be Tk.17 crore.
17
Issue 2
Support for the Victims of Rana Plaza Tragedy
Issue 3
Restructuring and Reform in the Garment Sector: How we are
proceeding?
USTR Plan of Action
• Undertaking a 16-point plan of action to reinstate the GSP status in the US market
• Among those, substantial progress has been made with regard to 12 activities
• The areas where further progress is required include
• Modification of rules as per the amended labour law, development and implementation of training
programs for the labour inspectors and worker related initiatives in the shrimp sector and public reporting
on anti-union discrimination.
• There are concerns as regards number of activities which have been carried out so far.
• Delaying cabinet approval on rules of amended labour law
• Slowdown of approval of newly registered trade unions & harassment of trade union leaders
• Bangladesh’s performance till date has been quite impressive.
• The USTR should take the recent developments positively and should consider the
reinstatement of the GSP facility for Bangladeshi products in the US market in the near future.
18
EU Sustainability Compact
• A total of thirty (30) different kinds of activities are listed on the EU Sustainability compact
• Out of the thirty, 13 activities can be categorized as either ‘fully’ or ‘substantially’
completed
• 17 of the activities can be evaluated as ‘partly completed/progressed’
• Monitoring of the enforcement of labour law through reports prepared by Bangladesh
government to ILO, implementation of all rules required by law, ILO’s technical assistance
concerning freedom of association, development and adoption of additional legislative
proposals to address ILO convention No. 87 and implementation and follow-up regarding
union related issues
• The list of activities which have yet to take form is sizeable. Concerned stakeholders should take
appropriate measures to speed up the process to complete the remaining activities
19Issue 3
Restructuring and Reform in the Garment Sector: How we are
proceeding?
NTPA
• The NAP enlists 25 commitments that are divided into three categories - a) legislation and policy,
b) administrative and c) practical activities
• As of now, 15 commitments have been implemented or have been substaintially completed.
• Ten activities has been ‘partly’ completed
• Review of relevant laws, rules, and regulations with regard to fire, building chemical safety,
review and adjustment of factory licensing and certification procedures, development and
implementation of a factory fire safety improvement programme, assessment of structural
integrity of all active RMG factories, development of transparent sub-contracting system,
development and delivery of specific training and fire safety, development of mass worker
education tools, development and delivery of specific training on fire safety for factory
inspectors
Partially Substantially/Fully
USTR 04 12
EU Compact 17 13
NAP 10 15
Progress of Various Activities under Different Initiatives
20
Issue 3
Restructuring and Reform in the Garment Sector: How we are
proceeding?
Issue 4
Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the
timeline?
ACCORD Initiative
• More than 1250 factories out of 1400 have now been inspected by the ACCORD.
• ACCORD has identified 52605 different kinds of problems in these factories
• Related to unsafe means of egress, unsafe electrical installations and weak structures.
• Most accord inspected factories face the problem of common safety hazards
• Lack of fire doors in stairwells, inadequate automatic fire alarm systems, inadequate fire separations and
protected exits, lack of lateral stability in structure, lack of accurate structural drawings, inadequate
space for electrical installations such as substations
• Till March 2015, 900 CAPs have been received by Accord and handed over to the respective
factories: Accord has been publishing the CAPs on their website (683)
• Out of the 52605 different kinds of problems, only 782 (1.5 per cent) have so far been corrected,
another 10248 (19.5 per cent) have been pending for verification and the remaining 80 per cent
problems are still in present
21
ALLIANCE Initiative
• Alliance has already inspected all of its 648 factories. Alliance has finalized 300 CAPs till date
• In order to support factory owners to promptly undertake remediation plan as CAPs, Alliance has
arranged low cost financing for factory owners
• Both Alliance and Accord have provided training among the workers on basic fire safety issues.
NTPA Initiative
• NTPA with the support of ILO has targeted to inspect about 1500 factories
• BUET has inspected 500 factories while the rest of the factories are to be inspected by two private
sector companies
• NTPA initiative is currently facing a number of difficulties in conducting the inspection
• Out of 600 factories that have received UD certification for export, 450 factories have wrong
addresses listed with the BGMEA/BKMEA. Another 500 factories are non-existent
• An updated and verified list is necessary to complete survey of these categories of factories
22
Issue 4
Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the
timeline?
Organiza
tions
Submiss
ion to
Review
Panel
Factori
es
remain
closed
Workers
’ dues
settled
in
factorie
s
Discussio
ns on
going
regardin
g
workers’
dues
Accord 35 12 07 05
Alliance 19 05 - -
Table 12: Payment of Workers’ Dues in Closed Factories
Source: Prepared by authors
• About 800 firms exists which are not member of any
organizations such as BGMEA and BKMEA
• These factories need to be internalized in the
formalization process and need to be inspected properly
• A total of 32 factories have been closed because of safety
concerns and several thousand workers being affected.
• In most cases workers received necessary financial
benefits from the factory owners and other sources
• A number of cases workers have not yet received their
proper dues.
• A major concern in this regard is to ensure there
reemployment in the RMG sector.
23
Issue 4
Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the
timeline?
Issue 5
Initiatives undertaken by the Development Partners
ILO Initiatives
• ILO is currently carrying out 20 different programmes related to the RMG sector of Bangladesh
with the support of development partners and other international development agencies.
• Conducting a series of fresher’s training courses for 110 newly recruited labour inspectors
organized jointly with GIZ in collaboration with Establishments (DIFE)
• Extended support to develop a road map of labour inspection Plan for 2015 for the DIFE
• In collaboration with its Bureau for Workers Activities (ACTRAV) is carrying out a series of
capacity building activities
• Currently undertaking the initiative to build health and safety skills in the RMG sector with the
support of Canada, the Netherlands and UK
• Recently established a workers’ helpline at Ashulia funded by Royal Norwegian
Government
• Better Work Bangladesh (BWB) is advancing steadily: Till date, a total of 30 factories are
working under BWB
24
Other Initiatives by Development Partners
• The major projects currently active in Bangladesh are directed at improving working conditions in the Ready-made
Garments Sector funded by ILO, UK, Netherlands, Canada (2013-2016), Better work and Standards (BEST) funded by
European Union, Germany, Norway and UNIDO (2008-2015), Technical and Vocational Education and Training (TVET)
programmes funded by European Union (2007-2015), Centre for Disability in Development (CDD) funded by European Union
(2010-2014), European Commission’s Humanitarian aid and Civil Protection Directorate General-Disaster Preparedness
(DIPECHO) V and VI projects funded by European Union, Building safety by Denmark, CSR child Labour project Phase II by
Denmark, Promotion of Social and Environmental Standard in Industries (PSES) funded by Germany and European Union,
Compliance in factories supplying for LIDL and C&A funded by Germany Private funding, Capacity building labour NGOs
funded by Netherlands (2012-2015), Bangladesh Water PaCT (Partnership for Cleaner Textile) funded by Netherlands, Health
Enables Returns (HER) project funded by Sweden, Centre of Excellence for the RMG Sector funded by Sweden UK support to
Bangladesh funded by UK, New phase of the rights and Governance Challenge Fund called Creating Opportunities for the
Poor and Excluded in Bangladesh (COPE) funded by UK, Strengthening the Capacity of Independent Workers’ Organizations
in Bangladesh’s Readymade Garment Sectors and Export Processing Zones funded US, Empowering workers to negotiate
building and fire safety funded by US, Fire & Building Safety Project funded by US, Improving Fire & Building Safety for
Bangladesh’s RMG Workers Project funded by US, Fundamental Principles & Rights at Work Project (FPRW) funded by US,
Combating Labor Trafficking Program funded by US (2013-2015), Global Labour Program funded by US (2011-2016),Fire and
Building Safety Project funded by US, Better Work Bangladesh (BWB) funded by US, Mediation and Conciliation funded by US
and EHS+ Centre – Centre of Excellence for the RMG sector funded by US and Sweden.
25
Issue 5
Initiatives undertaken by the Development Partners
Issue 6
Recent Trends in the Global Apparel Markets
• A market-wise analysis has been carried out for Bangladesh and its major competing countries
• India, Vietnam, Cambodia, Indonesia, Pakistan and Sri Lanka for the export of knit (HS code
61) and woven (HS code 62) products for pre- and post-Rana Plaza collapse periods.
• No strong association is found in major markets: USA, EU and Canada
• A product wise analysis reveals that growth of Bangladesh’s top 10 exports to respective
markets of USA, EU and Canada are not vastly different from that of its competitor for the same
set of products
• Very high growth rate of export of competing countries for products which are also
Bangladesh’s top exportable products during post-Rana plaza period may have some
association with the tragedy.
• There might have marginal implications for export of few specific products but not for all
kinds of products
26
Concluding Remarks: Moving beyond the Shadow of the Rana Plaza
Tragedy
• This monitoring report focuses on how Bangladesh will recuperate from the tragic past and
rebuild its image as one of the ‘most compliant’ apparel sources in the world
Victims of the Rana Plaza Tragedy
• Missing Workers: Based on the available information, it needs to identify families of missing
workers whose information meet the sufficient requirements.
• For those whose information does not comply with those requirements, MoLE may request for
additional information in support of their claim.
• Long term Financial Support for Victims and their Family Members: Given the urgency of the
financial support, the shortfall of fund for compensation must be met immediately. In this case,
the remaining amount could be provided from the Prime Minister’s Relief Fund.
• There should have a sufficient provision of funds for the remaining missing workers (159) in
the Rana Plaza Trust Fund
27
Treatment for Injured Workers
• It is important to prepare a list of victims who are remotely located
• There should have necessary treatment arrangement for them in the nearby public or
reputed private hospital/clinic to get the required medical support free of cost and
reimbursement of expenses on medicine and commute to and from the hospitals.
• Government may consider allocating additional funds to the specialized medical institutes, to
provide free of cost services not only for the main treatment but also for the accompanying
treatments and medications.
• Government should also allocate fund for these specialized medical institutes to ensure the
provision of those facilities in the future to ensure appropriate rehabilitation of the victims.
• Given the usability of artificial limbs provided to the victims, better artificial instruments need
to be provided which would enable them to engage in normal economic activity.
28
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
Reemployment
• Although, it is admirable that the workers are taking necessary entrepreneurial steps to earn a
modest but volatile living, it is difficult to maneuver the challenges they face to ensure sustained
development of their standard of living.
• Small entrepreneurs need greater access to low cost credit for properly operating their businesses
Restructuring the RMG Sector
Reinstatement of GSP Facility in the US Market:
• The USTR should take note of the recent developments and consider the reinstatement of the GSP
facility for Bangladeshi products in the US market in the near future
• If Bangladesh outdoes the present rate of achievements in terms of implementation of reforms.
Implementation of the EU Sustainability Compact:
• Government should ensure that all relevant stakeholders complete the remaining activities within
the scheduled timeline.
29
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
Timely Implementation of CAPs by the Owners of RMG Factories
• It appears that remediation of various problems could not be within the directed timeline in the
CAPs
• There are cases where entrepreneurs are not cooperating for the successful implementation of the CAPs.
Inspection of NTPA supported Firms
• BGMEA/BKMEA should use their expertise to identify proper addresses of unidentified firms as soon
as possible.
• Remediation of these firms seems to be more challenging given their poor compliance standard
as they are indirectly involved with major buyers.
• Allocation of funds for implementing CAPs is crucial
• Government should initiate a discussion with development partners with regard to the necessary
fund for remediation work.
30
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
Initiate Process of Identifying Non-member Firms for Inspection
• Identification of these firms by the DIFE should be completed immediately
• DIFE needs to ensure that they obtain membership under any of the authorized organization.
• Subsequently, these firms need to be inspected and remediated
Development of the Local Inspection and Monitoring Process
• Regular upgrades of capacity and skill of local authorities become essential to sustain the
improvement of compliance standard
• MoLE has already initiated a number of programmes for capacity development.
• Better result could be accrued through transfer of technology from the international experts and
technicians who are currently engaged under the initiatives of Accord and Alliance.
• Government in cooperation with ILO should develop a programme for skill development of the
local authorities mainly that of field level staffs for efficient monitoring and proper implementation
of the remediation measures
31
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
Further Research will be Needed
• The sector has transformed significantly due to domestic and external factors.
• The restructuring of the sector would provide it improved competitiveness which would be
beneficial for the sector.
• New competitors are emerging in the global market which would change the global
souring dynamics.
• Bangladesh itself is progressing towards the upper level of development trajectory where
current level of comparative advantages would not be sufficient.
• Further research will be needed
• To evaluate the changing dynamics of competitiveness, physical and social compliances,
sourcing pattern, market and product diversification among a wide variety of factors.
32
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
• There is already a sign of positive changes in all areas- ranging from improved support to the
victims to the development of the sector.
• The changes are at the ‘midst’ stage and need to continue to ensure a successful
implementation of the reforms.
• It is necessary for all stakeholders to monitor and extensively assist in the proper completion of
the remaining initiatives
• To move beyond the shadow of the Rana Plaza Tragedy and to rebuild the image of the
RMG sector at the global scale.
33
Concluding Remarks: Moving beyond the Shadow of the
Rana Plaza Tragedy
Thank you.
<moazzemcpd@gmail.com>
34

More Related Content

Similar to Moving Beyond the Shadow of the Rana Plaza Tragedy

Sarah Hurcombe- Urgent Care
Sarah Hurcombe- Urgent CareSarah Hurcombe- Urgent Care
Sarah Hurcombe- Urgent Caremckenln
 
Fulfilling lives (multiple needs) evaluation annual report 2016
Fulfilling lives (multiple needs) evaluation annual report 2016Fulfilling lives (multiple needs) evaluation annual report 2016
Fulfilling lives (multiple needs) evaluation annual report 2016Jon Adamson
 
West Midlands Cluster Group 2: Independent Supporters slides
West Midlands Cluster Group 2: Independent Supporters slidesWest Midlands Cluster Group 2: Independent Supporters slides
West Midlands Cluster Group 2: Independent Supporters slidesFiona Holmes
 
cnguyen_mac_final
cnguyen_mac_finalcnguyen_mac_final
cnguyen_mac_finalChi Nguyen
 
ケアプロについての国際学会発表資料
ケアプロについての国際学会発表資料ケアプロについての国際学会発表資料
ケアプロについての国際学会発表資料Takashi Kawazoe
 
CCI: update on the activities under SanFin action-research Dec 2014
CCI: update on the activities under SanFin action-research Dec 2014CCI: update on the activities under SanFin action-research Dec 2014
CCI: update on the activities under SanFin action-research Dec 2014TrĂŠmolet Consulting
 
Discharge Follow-Up Appointment Webinar Slide Deck
Discharge Follow-Up Appointment Webinar Slide DeckDischarge Follow-Up Appointment Webinar Slide Deck
Discharge Follow-Up Appointment Webinar Slide Deckhealth2dev
 
Michigan's Integrated Care Plan for People who are Medicare-Medicaid Eligible
Michigan's Integrated Care Plan for People who are Medicare-Medicaid EligibleMichigan's Integrated Care Plan for People who are Medicare-Medicaid Eligible
Michigan's Integrated Care Plan for People who are Medicare-Medicaid EligibleMichigan Primary Care Association
 
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...Paul Astley
 
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...UNDP Policy Centre
 
A new model of care for general practice, pop up uni, 10am, 2 september 2015
A new model of care for general practice, pop up uni, 10am, 2 september 2015A new model of care for general practice, pop up uni, 10am, 2 september 2015
A new model of care for general practice, pop up uni, 10am, 2 september 2015NHS England
 
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...RuthEvansPEN
 
Glen mason-enfield-adults-2014-11-21
Glen mason-enfield-adults-2014-11-21Glen mason-enfield-adults-2014-11-21
Glen mason-enfield-adults-2014-11-21Claudia Megele
 
Evaluation of the Integrated Care and Support Pioneers Programme
Evaluation of the Integrated Care and Support Pioneers ProgrammeEvaluation of the Integrated Care and Support Pioneers Programme
Evaluation of the Integrated Care and Support Pioneers ProgrammeNuffield Trust
 
Day 1 sat presentation re nfm feb 28
Day 1 sat presentation re nfm feb 28 Day 1 sat presentation re nfm feb 28
Day 1 sat presentation re nfm feb 28 clac.cab
 
First Narrative Project Report - Reversing Resource Curse - PWYP Indonesia
First Narrative Project Report - Reversing Resource Curse - PWYP IndonesiaFirst Narrative Project Report - Reversing Resource Curse - PWYP Indonesia
First Narrative Project Report - Reversing Resource Curse - PWYP IndonesiaPublish What You Pay (PWYP) Indonesia
 
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...RuthEvansPEN
 

Similar to Moving Beyond the Shadow of the Rana Plaza Tragedy (20)

Sarah Hurcombe- Urgent Care
Sarah Hurcombe- Urgent CareSarah Hurcombe- Urgent Care
Sarah Hurcombe- Urgent Care
 
Fulfilling lives (multiple needs) evaluation annual report 2016
Fulfilling lives (multiple needs) evaluation annual report 2016Fulfilling lives (multiple needs) evaluation annual report 2016
Fulfilling lives (multiple needs) evaluation annual report 2016
 
West Midlands Cluster Group 2: Independent Supporters slides
West Midlands Cluster Group 2: Independent Supporters slidesWest Midlands Cluster Group 2: Independent Supporters slides
West Midlands Cluster Group 2: Independent Supporters slides
 
cnguyen_mac_final
cnguyen_mac_finalcnguyen_mac_final
cnguyen_mac_final
 
ケアプロについての国際学会発表資料
ケアプロについての国際学会発表資料ケアプロについての国際学会発表資料
ケアプロについての国際学会発表資料
 
Global Financing Facility (GFF) in Support of Every Woman Every Child Worksho...
Global Financing Facility (GFF) in Support of Every Woman Every Child Worksho...Global Financing Facility (GFF) in Support of Every Woman Every Child Worksho...
Global Financing Facility (GFF) in Support of Every Woman Every Child Worksho...
 
CCI: update on the activities under SanFin action-research Dec 2014
CCI: update on the activities under SanFin action-research Dec 2014CCI: update on the activities under SanFin action-research Dec 2014
CCI: update on the activities under SanFin action-research Dec 2014
 
Discharge Follow-Up Appointment Webinar Slide Deck
Discharge Follow-Up Appointment Webinar Slide DeckDischarge Follow-Up Appointment Webinar Slide Deck
Discharge Follow-Up Appointment Webinar Slide Deck
 
Michigan's Integrated Care Plan for People who are Medicare-Medicaid Eligible
Michigan's Integrated Care Plan for People who are Medicare-Medicaid EligibleMichigan's Integrated Care Plan for People who are Medicare-Medicaid Eligible
Michigan's Integrated Care Plan for People who are Medicare-Medicaid Eligible
 
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...
Workshop For Voluntary Sector To Meet The Needs Of Older People In Stoke on T...
 
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...
Carlos Chiapa & Silvia Prina: Impact evaluation of oportunidades and producti...
 
A new model of care for general practice, pop up uni, 10am, 2 september 2015
A new model of care for general practice, pop up uni, 10am, 2 september 2015A new model of care for general practice, pop up uni, 10am, 2 september 2015
A new model of care for general practice, pop up uni, 10am, 2 september 2015
 
2.pptx
2.pptx2.pptx
2.pptx
 
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
 
Glen mason-enfield-adults-2014-11-21
Glen mason-enfield-adults-2014-11-21Glen mason-enfield-adults-2014-11-21
Glen mason-enfield-adults-2014-11-21
 
Evaluation of the Integrated Care and Support Pioneers Programme
Evaluation of the Integrated Care and Support Pioneers ProgrammeEvaluation of the Integrated Care and Support Pioneers Programme
Evaluation of the Integrated Care and Support Pioneers Programme
 
Engaging Public and Patient Partners in Rapid Reviews
Engaging Public and Patient Partners in Rapid ReviewsEngaging Public and Patient Partners in Rapid Reviews
Engaging Public and Patient Partners in Rapid Reviews
 
Day 1 sat presentation re nfm feb 28
Day 1 sat presentation re nfm feb 28 Day 1 sat presentation re nfm feb 28
Day 1 sat presentation re nfm feb 28
 
First Narrative Project Report - Reversing Resource Curse - PWYP Indonesia
First Narrative Project Report - Reversing Resource Curse - PWYP IndonesiaFirst Narrative Project Report - Reversing Resource Curse - PWYP Indonesia
First Narrative Project Report - Reversing Resource Curse - PWYP Indonesia
 
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
Leicester City CCG- Engaging with asylum seekers and the homeless to commissi...
 

More from Centre for Policy Dialogue (CPD)

National Budget for FY2019-20: An Analytical Perspective
National Budget for FY2019-20: An Analytical PerspectiveNational Budget for FY2019-20: An Analytical Perspective
National Budget for FY2019-20: An Analytical PerspectiveCentre for Policy Dialogue (CPD)
 
State of the Bangladesh Economy and the Budget Challenges FY2019-20
State of the Bangladesh Economy and the Budget Challenges FY2019-20State of the Bangladesh Economy and the Budget Challenges FY2019-20
State of the Bangladesh Economy and the Budget Challenges FY2019-20Centre for Policy Dialogue (CPD)
 
Banking sector in bangladesh moving from diagnosis to action
Banking sector in bangladesh moving from diagnosis to actionBanking sector in bangladesh moving from diagnosis to action
Banking sector in bangladesh moving from diagnosis to actionCentre for Policy Dialogue (CPD)
 
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...Centre for Policy Dialogue (CPD)
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationCentre for Policy Dialogue (CPD)
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationCentre for Policy Dialogue (CPD)
 
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...Fostering Connectivity and Economic Integration in South Asia: Role of Privat...
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...Centre for Policy Dialogue (CPD)
 
Financing Development in South Asia: Avenues and Institutional Arrangements
Financing Development in South Asia: Avenues and Institutional ArrangementsFinancing Development in South Asia: Avenues and Institutional Arrangements
Financing Development in South Asia: Avenues and Institutional ArrangementsCentre for Policy Dialogue (CPD)
 
SDG Implementation Challenges in South Asia and Role of Global Partnerships
SDG Implementation Challenges in South Asia and Role of Global PartnershipsSDG Implementation Challenges in South Asia and Role of Global Partnerships
SDG Implementation Challenges in South Asia and Role of Global PartnershipsCentre for Policy Dialogue (CPD)
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationCentre for Policy Dialogue (CPD)
 
CPD Dialogue on Analysis of the National Budget FY2016
CPD Dialogue on Analysis of the National Budget FY2016CPD Dialogue on Analysis of the National Budget FY2016
CPD Dialogue on Analysis of the National Budget FY2016Centre for Policy Dialogue (CPD)
 
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015Centre for Policy Dialogue (CPD)
 

More from Centre for Policy Dialogue (CPD) (20)

CPD's Budget Analysis FY2021
CPD's Budget Analysis FY2021CPD's Budget Analysis FY2021
CPD's Budget Analysis FY2021
 
CPD Budget Analysis FY2021
CPD Budget Analysis FY2021CPD Budget Analysis FY2021
CPD Budget Analysis FY2021
 
CPD Annual Report 2017
CPD Annual Report 2017CPD Annual Report 2017
CPD Annual Report 2017
 
CPD Annual Report 2018
CPD Annual Report 2018CPD Annual Report 2018
CPD Annual Report 2018
 
CPD Budget Dialogue 2019
CPD Budget Dialogue 2019CPD Budget Dialogue 2019
CPD Budget Dialogue 2019
 
National Budget for FY2019-20: An Analytical Perspective
National Budget for FY2019-20: An Analytical PerspectiveNational Budget for FY2019-20: An Analytical Perspective
National Budget for FY2019-20: An Analytical Perspective
 
State of the Bangladesh Economy and the Budget Challenges FY2019-20
State of the Bangladesh Economy and the Budget Challenges FY2019-20State of the Bangladesh Economy and the Budget Challenges FY2019-20
State of the Bangladesh Economy and the Budget Challenges FY2019-20
 
Banking sector in bangladesh moving from diagnosis to action
Banking sector in bangladesh moving from diagnosis to actionBanking sector in bangladesh moving from diagnosis to action
Banking sector in bangladesh moving from diagnosis to action
 
South Asia Access of Electricity
South Asia Access of ElectricitySouth Asia Access of Electricity
South Asia Access of Electricity
 
South asia control of corruption
South asia control of corruptionSouth asia control of corruption
South asia control of corruption
 
South asia gender inequality index
South asia gender inequality indexSouth asia gender inequality index
South asia gender inequality index
 
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...
Reducing Inequality in South Asia: Critical Issues and Policy Choices: Moving...
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
 
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...Fostering Connectivity and Economic Integration in South Asia: Role of Privat...
Fostering Connectivity and Economic Integration in South Asia: Role of Privat...
 
Financing Development in South Asia: Avenues and Institutional Arrangements
Financing Development in South Asia: Avenues and Institutional ArrangementsFinancing Development in South Asia: Avenues and Institutional Arrangements
Financing Development in South Asia: Avenues and Institutional Arrangements
 
SDG Implementation Challenges in South Asia and Role of Global Partnerships
SDG Implementation Challenges in South Asia and Role of Global PartnershipsSDG Implementation Challenges in South Asia and Role of Global Partnerships
SDG Implementation Challenges in South Asia and Role of Global Partnerships
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
 
CPD Dialogue on Analysis of the National Budget FY2016
CPD Dialogue on Analysis of the National Budget FY2016CPD Dialogue on Analysis of the National Budget FY2016
CPD Dialogue on Analysis of the National Budget FY2016
 
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015
Centre for policy dialogue cpd analysis national budget fy2015 16 june 2015
 

Recently uploaded

Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Christina Parmionova
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Moving Beyond the Shadow of the Rana Plaza Tragedy

  • 1. Moving Beyond the Shadow of the Rana Plaza Tragedy: In Search of a Closure and Restructuring Strategy FOURTH MONITORING REPORT Dr Khondaker G Moazzem Additional Research Director, CPD Presentation by CPD Dialogue Rana Plaza Tragedy: Two Years After 21 April, 2015
  • 2. CPD Study Team Dr Khondaker G Moazzem Additional Research Director, CPD Mr. Ariful Islam Research Associate, CPD Authors would like to thank Ms. Farzana Sehrin, Research Associate and Ms. Rehnuma Islam, Research Associate, CPD for their support on this study. 2
  • 3. Acknowledgement The CPD team is grateful to Professor Rehman Sobhan, Chairman, CPD who came up with the idea of setting up the partnership initiative and monitoring the implementation of deliverables, and Dr Debapriya Bhattacharya, Distinguished Fellow, CPD and Professor Mustafizur Rahman, Executive Director, CPD for their guidance in implementing the initiative Institute of Architect, Bangladesh (IAB), Aino Salish Kendra (ASK), Dhaka Ahsania Mission, Action Aid Bangladesh, Gono Shakkhorota Abhijan, Transparency International Bangladesh (TIB), The Daily Star, Naripokkho, Nijera Kori, ProthomAlo, Bangladesh Environmental Lawyers Association (BELA), Bangladesh Legal Aid and Services Trust (BLAST), Manusher Jonno Foundation and SHUJAN Professor Jamilur Reza Chowdhury, Vice Chancellor, University of Asia Pacific and Mr Habibullah N Karim, Chairman, Terratech Limited for their valuable contribution to the initiative 3
  • 4. Major Highlighted Issues 1. Number Debate 2. Support for the Victims of Rana Plaza Tragedy 3. Restructuring and Reform in the Garment Sector 4. Initiatives of Accord, Alliance and NTPA 5. Initiatives undertaken by the Development Partners 6. Recent Trends in the Global Apparel Markets 4
  • 5. Background of the Fourth Monitoring Report • Two years have elapsed since the Rana Plaza Tragedy • various measures taken over the last two years, there still remain lots of unresolved issues • CPD and 13 civil society think-tanks undertook an independent monitoring initiative during the first year • It had tracked the progress of various initiatives • With the end of the second year, CPD considers it pertinent to revisit the level of progress in those initiatives • It was expected that the stakeholders would try to fulfill their commitments by the end of the second year, • But at present a number of concerns surrounds the commitment of the stakeholders. • This poses the critical question- How is Bangladesh going to end the adversities of the Rana Plaza Tragedy? 5
  • 6. Framework of the Report • After two years of targeted programs, it appears that the Bangladesh RMG sector is at the ‘midst’ of the reform process. • This presents an opportunity to evaluate the effectiveness of the initiatives in terms of their impact on the objectives. • There is a growing need to designate a timeline for the end of the measures and to conclude the restructuring process. • The framework of the study focuses on how Bangladesh’s RMG sector is going to conclude the Rana Plaza tragedy through various measures • Present report intends to examine different changes from that framework. 6
  • 7. Issue 1 Number Debate • The debate over total number of victims of Rana Plaza tragedy is still not over • Out of the 365 workers who were initially not traced, a total of 206 workers have so far been identified through DNA test • Another 85 workers are not yet been identified • Overall, 159 workers have been claimed to be missing which is currently being verified. • During the second year, no additional missing workers have been identified • Either through use of DNA test or through verification of documents submitted by victims’ family members. • MoLE’s efforts to verify missing workers need to be realized immediately Source Date Total Missing Reported Identified so far Still missing The Daily Star March 8, 2015 322 200 122 Ministry of labor and Employment February 1, 2015 365 206 159 (Identificatio n under way) BGMEA Not Reported 206 Not Reported Dhaka Tribune March 15, 2015 98 of 166 166 Current Status of Missing Workers Source: Prepared by Authors 7
  • 8. Snapshot on Current State of Selected Victims and Their Families • CPD has conducted a telephone interview during April, 2015 with a selected number of victims and their family members • Injured (6), deceased (4), Identified (1) and unidentified (1) • Despite various initiatives, victims and their family members are not at the same level compared to their condition prior to the collapse of Rana Plaza • Among the injured workers, few are employed locally in off-farm jobs • After receiving training under various initiatives founded by different organizations. • In most cases their income is below what they received earlier. • Those who are unemployed are due to their inability to engage in daily work 8
  • 9. Snapshot on Current State of Selected Victims and Their Families • All the respondent victims are still suffering from various kinds of physical and mental problems • Spent a significant amount of money for the treatment • Many of them were constrained by inadequate financial capacities • The amount of support is varied widely between as low as Tk.75,000 to as high as Tk.12 lakh • Mainly due to extent of deviation of claimed amount between the number of claimants and to the amount of money received (in two installments) • Considerable progress has been made regarding the financial support for families of missing workers who have been identified through DNA test • The amount of financial support received by victims and their families so far is insufficient to meet their needs, 9
  • 10. Issue 2 Support for the Victims of Rana Plaza Tragedy Long term Financial Support: How the issue is being settled? • Long term financial support for the victims and their families is the most important component to monitor during the second year • There were two specific initiatives under which long term financial needs have been assessed • Under the directives of the High Court, a national the committee has estimated the needs of the victims and their families • Under private sector initiative: Rana Plaza Trust Fund made another assessment • The National Committee has submitted its report to the High Court in February, 2014: no progress has been made since then • A portion of the victims have received support from Prime Minister’s Relief Fund in the first year • During second year support provided to families of 67 deceased workers and 164 victims who have been identified through DNA test • There is unspent donation at the Prime Ministers’ Fund which could be utilised 10
  • 11. Issue 2 Support for the Victims of Rana Plaza Tragedy Long term Financial Support: How the issue is being settled? • Considerable progress has been made with regard to the commitment of the brands/retailers’ towards providing long term support to the victims • Initial estimate for requirement of fund was US$40 million but the revised estimate reduced it to US$30 million • Includes all authorized payments, income replacement payments and allied care costs • A total of 5139 victims of 2835 families have received financial support from the Rana Plaza Trust Fund • Tk.50000+ 30%+40%=70% of total claim • Primark has separately disbursed among the victims of two factories located in the Rana Plaza (US$5 million) • There is a shortfall of US$9 mil.: it is still not clear how quickly the remaining amount is to be collected and distributed among the victims 11
  • 12. Treatment for Victims: Could They Continue Afford Their Treatment? • During the first year most of the injured workers received immediate treatment from different local hospitals • Funding support and medical supplies from various public and private organizations and individual members • Made significant contribution to ensure at least a minimum level of treatment for injured workers • During the second year, different organisations have provided long term support for medical treatment • BILS Support Center: From April 2014 to March 2015, a total of 792 workers received follow-up treatment facility which included doctor’s checkup, medicine, diagnosis, pathological test, physiotherapy and psychotherapy • RPCC, GK: Medical assessment was provided to 1999 victims which was supported by ILO and CRP • Upazila Health Complex provided long term support to 236 victims • BGMEA: Support for treatment of 180 victims at NITOR and DMCH for which spent a total of Tk.1.33 lakh taka. An amputee patient received financial support of Tk. 0.91 lakh for the treatment of cancer at Mohakhali Cancer Hospital Issue 2 Support for the Victims of Rana Plaza Tragedy 12
  • 13. Treatment for Victims: Could They Continue Afford Their Treatment? • Establishment of a prosthetics and orthotics (P&O) school at CRP, Savar with the support of German Ministry of Economic Cooperation and Development under GIZ’s project of PSES • Paved the way to promote employment of persons with disabilities in the RMG factories • Due to number of reasons the treatment facility provided by different organisations or the financial support provided for treatment would not be beneficial to all victims. • It is difficult for remotely located victims to access treatment services • Injured workers suffering from physical and mental problems have to bear their own expenses for getting the treatment facility at a local level • Discontinuation of support services would make problem to chronically ill/injured patients who requires to undergo treatment on a regular basis for a long period of time. • It’s not clear whether amputees take proper treatment during this period. • Artificial limbs have limited use and could not be used for day-to-day activity Issue 2 Support for the Victims of Rana Plaza Tragedy 13
  • 14. Issue 2 Support for the Victims of Rana Plaza Tragedy Reemployment of Workers: Could They Continue New Businesses? • The initiatives towards the reemployment of the affected workers made progress during the second year. • A total 2122 workers have been re-employed up to second year • A total of 1239 workers have received training on small business/ entrepreneurship development and have started their businesses (RPCC, CRP, Action Aid, COEL, Adesh, EMCH, GIZ, Aparazeo, Handicap Int’l ) • Despite that a number of workers who started their business have found different kinds of difficulty in operating their businesses • Lack of adequate working capital, lack of demand for such services • A number of victims are still unemployed as is reported in CPD’s interview as well • Reemployment is a step forward but would make limited contribution to their long term living if sufficient income is not ensured 14
  • 15. Issue 2 Support for the Victims of Rana Plaza Tragedy Support to Victims Children: Is the Support Adequate? • 700 children of Rana Plaza victims have been affected by the incident • During first year, a total of 513 children has been supported by different organizations • During the second year, most of the organisations have continued their support for the children • Number of children who received treatment has increased to 621 where an additional 215 children were included in the second year • BGMEA: Provided support to 45 orphans amongst which 15 boys have been supported at ORCA Homes, Chittagong, 10 Boys at ORCA Homes, Gaibandha and 20 girls were handed over to Anjuman Orphanage, Savar respectively • Prothom Alo: Made a fixed deposit of Tk.50 lakh and interest earned on this deposit will be spent on educational expenses of 20 orphans till they reached the age of 18. • BILS: Supports 25 orphan children through ‘BILS Support Center’ 15
  • 16. Support to Rescuers: Did they get adequate support? • During the first year, 150 rescuers received some financial support from different organisations including Bangladesh Bank. • Naripokkho with the help of its supporting partners has also conducted experience sharing sessions with 55 and 3 psycho-social counseling to 75 rescue workers. • During the second year there has no substantial progress regarding support to rescuers • Awarding of Tk. 20,000 each as financial support to 11 rescuers through the Labour Welfare Foundation. • It is urgent to provide the financial and medical support to the rescuers • To provide them with the incentive to join future rescue mission in the case of national need 16 Issue 2 Support for the Victims of Rana Plaza Tragedy
  • 17. Legal issues • During the first year, a total of 14 cases were filed against different accused including owner of the building under different acts and by different organizations. • During the second year, progress of those cases were rather limited. • All those cases are now under trail and the case filed by Rajuk is under investigation. • CID Police asked for five more weeks from High Court to submit the report in May 21, 2015 for two cases that was filed at early period of Rana Plaza Collapse (April 15, bdnews24.com). • Two cases against the parents of Sohel Rana are approved by Anti-corruption Commission due to illegal acquirement of property estimated to be Tk.17 crore. 17 Issue 2 Support for the Victims of Rana Plaza Tragedy
  • 18. Issue 3 Restructuring and Reform in the Garment Sector: How we are proceeding? USTR Plan of Action • Undertaking a 16-point plan of action to reinstate the GSP status in the US market • Among those, substantial progress has been made with regard to 12 activities • The areas where further progress is required include • Modification of rules as per the amended labour law, development and implementation of training programs for the labour inspectors and worker related initiatives in the shrimp sector and public reporting on anti-union discrimination. • There are concerns as regards number of activities which have been carried out so far. • Delaying cabinet approval on rules of amended labour law • Slowdown of approval of newly registered trade unions & harassment of trade union leaders • Bangladesh’s performance till date has been quite impressive. • The USTR should take the recent developments positively and should consider the reinstatement of the GSP facility for Bangladeshi products in the US market in the near future. 18
  • 19. EU Sustainability Compact • A total of thirty (30) different kinds of activities are listed on the EU Sustainability compact • Out of the thirty, 13 activities can be categorized as either ‘fully’ or ‘substantially’ completed • 17 of the activities can be evaluated as ‘partly completed/progressed’ • Monitoring of the enforcement of labour law through reports prepared by Bangladesh government to ILO, implementation of all rules required by law, ILO’s technical assistance concerning freedom of association, development and adoption of additional legislative proposals to address ILO convention No. 87 and implementation and follow-up regarding union related issues • The list of activities which have yet to take form is sizeable. Concerned stakeholders should take appropriate measures to speed up the process to complete the remaining activities 19Issue 3 Restructuring and Reform in the Garment Sector: How we are proceeding?
  • 20. NTPA • The NAP enlists 25 commitments that are divided into three categories - a) legislation and policy, b) administrative and c) practical activities • As of now, 15 commitments have been implemented or have been substaintially completed. • Ten activities has been ‘partly’ completed • Review of relevant laws, rules, and regulations with regard to fire, building chemical safety, review and adjustment of factory licensing and certification procedures, development and implementation of a factory fire safety improvement programme, assessment of structural integrity of all active RMG factories, development of transparent sub-contracting system, development and delivery of specific training and fire safety, development of mass worker education tools, development and delivery of specific training on fire safety for factory inspectors Partially Substantially/Fully USTR 04 12 EU Compact 17 13 NAP 10 15 Progress of Various Activities under Different Initiatives 20 Issue 3 Restructuring and Reform in the Garment Sector: How we are proceeding?
  • 21. Issue 4 Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the timeline? ACCORD Initiative • More than 1250 factories out of 1400 have now been inspected by the ACCORD. • ACCORD has identified 52605 different kinds of problems in these factories • Related to unsafe means of egress, unsafe electrical installations and weak structures. • Most accord inspected factories face the problem of common safety hazards • Lack of fire doors in stairwells, inadequate automatic fire alarm systems, inadequate fire separations and protected exits, lack of lateral stability in structure, lack of accurate structural drawings, inadequate space for electrical installations such as substations • Till March 2015, 900 CAPs have been received by Accord and handed over to the respective factories: Accord has been publishing the CAPs on their website (683) • Out of the 52605 different kinds of problems, only 782 (1.5 per cent) have so far been corrected, another 10248 (19.5 per cent) have been pending for verification and the remaining 80 per cent problems are still in present 21
  • 22. ALLIANCE Initiative • Alliance has already inspected all of its 648 factories. Alliance has finalized 300 CAPs till date • In order to support factory owners to promptly undertake remediation plan as CAPs, Alliance has arranged low cost financing for factory owners • Both Alliance and Accord have provided training among the workers on basic fire safety issues. NTPA Initiative • NTPA with the support of ILO has targeted to inspect about 1500 factories • BUET has inspected 500 factories while the rest of the factories are to be inspected by two private sector companies • NTPA initiative is currently facing a number of difficulties in conducting the inspection • Out of 600 factories that have received UD certification for export, 450 factories have wrong addresses listed with the BGMEA/BKMEA. Another 500 factories are non-existent • An updated and verified list is necessary to complete survey of these categories of factories 22 Issue 4 Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the timeline?
  • 23. Organiza tions Submiss ion to Review Panel Factori es remain closed Workers ’ dues settled in factorie s Discussio ns on going regardin g workers’ dues Accord 35 12 07 05 Alliance 19 05 - - Table 12: Payment of Workers’ Dues in Closed Factories Source: Prepared by authors • About 800 firms exists which are not member of any organizations such as BGMEA and BKMEA • These factories need to be internalized in the formalization process and need to be inspected properly • A total of 32 factories have been closed because of safety concerns and several thousand workers being affected. • In most cases workers received necessary financial benefits from the factory owners and other sources • A number of cases workers have not yet received their proper dues. • A major concern in this regard is to ensure there reemployment in the RMG sector. 23 Issue 4 Initiatives of Accord, Alliance and NTPA: Where will we stand at the end of the timeline?
  • 24. Issue 5 Initiatives undertaken by the Development Partners ILO Initiatives • ILO is currently carrying out 20 different programmes related to the RMG sector of Bangladesh with the support of development partners and other international development agencies. • Conducting a series of fresher’s training courses for 110 newly recruited labour inspectors organized jointly with GIZ in collaboration with Establishments (DIFE) • Extended support to develop a road map of labour inspection Plan for 2015 for the DIFE • In collaboration with its Bureau for Workers Activities (ACTRAV) is carrying out a series of capacity building activities • Currently undertaking the initiative to build health and safety skills in the RMG sector with the support of Canada, the Netherlands and UK • Recently established a workers’ helpline at Ashulia funded by Royal Norwegian Government • Better Work Bangladesh (BWB) is advancing steadily: Till date, a total of 30 factories are working under BWB 24
  • 25. Other Initiatives by Development Partners • The major projects currently active in Bangladesh are directed at improving working conditions in the Ready-made Garments Sector funded by ILO, UK, Netherlands, Canada (2013-2016), Better work and Standards (BEST) funded by European Union, Germany, Norway and UNIDO (2008-2015), Technical and Vocational Education and Training (TVET) programmes funded by European Union (2007-2015), Centre for Disability in Development (CDD) funded by European Union (2010-2014), European Commission’s Humanitarian aid and Civil Protection Directorate General-Disaster Preparedness (DIPECHO) V and VI projects funded by European Union, Building safety by Denmark, CSR child Labour project Phase II by Denmark, Promotion of Social and Environmental Standard in Industries (PSES) funded by Germany and European Union, Compliance in factories supplying for LIDL and C&A funded by Germany Private funding, Capacity building labour NGOs funded by Netherlands (2012-2015), Bangladesh Water PaCT (Partnership for Cleaner Textile) funded by Netherlands, Health Enables Returns (HER) project funded by Sweden, Centre of Excellence for the RMG Sector funded by Sweden UK support to Bangladesh funded by UK, New phase of the rights and Governance Challenge Fund called Creating Opportunities for the Poor and Excluded in Bangladesh (COPE) funded by UK, Strengthening the Capacity of Independent Workers’ Organizations in Bangladesh’s Readymade Garment Sectors and Export Processing Zones funded US, Empowering workers to negotiate building and fire safety funded by US, Fire & Building Safety Project funded by US, Improving Fire & Building Safety for Bangladesh’s RMG Workers Project funded by US, Fundamental Principles & Rights at Work Project (FPRW) funded by US, Combating Labor Trafficking Program funded by US (2013-2015), Global Labour Program funded by US (2011-2016),Fire and Building Safety Project funded by US, Better Work Bangladesh (BWB) funded by US, Mediation and Conciliation funded by US and EHS+ Centre – Centre of Excellence for the RMG sector funded by US and Sweden. 25 Issue 5 Initiatives undertaken by the Development Partners
  • 26. Issue 6 Recent Trends in the Global Apparel Markets • A market-wise analysis has been carried out for Bangladesh and its major competing countries • India, Vietnam, Cambodia, Indonesia, Pakistan and Sri Lanka for the export of knit (HS code 61) and woven (HS code 62) products for pre- and post-Rana Plaza collapse periods. • No strong association is found in major markets: USA, EU and Canada • A product wise analysis reveals that growth of Bangladesh’s top 10 exports to respective markets of USA, EU and Canada are not vastly different from that of its competitor for the same set of products • Very high growth rate of export of competing countries for products which are also Bangladesh’s top exportable products during post-Rana plaza period may have some association with the tragedy. • There might have marginal implications for export of few specific products but not for all kinds of products 26
  • 27. Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy • This monitoring report focuses on how Bangladesh will recuperate from the tragic past and rebuild its image as one of the ‘most compliant’ apparel sources in the world Victims of the Rana Plaza Tragedy • Missing Workers: Based on the available information, it needs to identify families of missing workers whose information meet the sufficient requirements. • For those whose information does not comply with those requirements, MoLE may request for additional information in support of their claim. • Long term Financial Support for Victims and their Family Members: Given the urgency of the financial support, the shortfall of fund for compensation must be met immediately. In this case, the remaining amount could be provided from the Prime Minister’s Relief Fund. • There should have a sufficient provision of funds for the remaining missing workers (159) in the Rana Plaza Trust Fund 27
  • 28. Treatment for Injured Workers • It is important to prepare a list of victims who are remotely located • There should have necessary treatment arrangement for them in the nearby public or reputed private hospital/clinic to get the required medical support free of cost and reimbursement of expenses on medicine and commute to and from the hospitals. • Government may consider allocating additional funds to the specialized medical institutes, to provide free of cost services not only for the main treatment but also for the accompanying treatments and medications. • Government should also allocate fund for these specialized medical institutes to ensure the provision of those facilities in the future to ensure appropriate rehabilitation of the victims. • Given the usability of artificial limbs provided to the victims, better artificial instruments need to be provided which would enable them to engage in normal economic activity. 28 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy
  • 29. Reemployment • Although, it is admirable that the workers are taking necessary entrepreneurial steps to earn a modest but volatile living, it is difficult to maneuver the challenges they face to ensure sustained development of their standard of living. • Small entrepreneurs need greater access to low cost credit for properly operating their businesses Restructuring the RMG Sector Reinstatement of GSP Facility in the US Market: • The USTR should take note of the recent developments and consider the reinstatement of the GSP facility for Bangladeshi products in the US market in the near future • If Bangladesh outdoes the present rate of achievements in terms of implementation of reforms. Implementation of the EU Sustainability Compact: • Government should ensure that all relevant stakeholders complete the remaining activities within the scheduled timeline. 29 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy
  • 30. Timely Implementation of CAPs by the Owners of RMG Factories • It appears that remediation of various problems could not be within the directed timeline in the CAPs • There are cases where entrepreneurs are not cooperating for the successful implementation of the CAPs. Inspection of NTPA supported Firms • BGMEA/BKMEA should use their expertise to identify proper addresses of unidentified firms as soon as possible. • Remediation of these firms seems to be more challenging given their poor compliance standard as they are indirectly involved with major buyers. • Allocation of funds for implementing CAPs is crucial • Government should initiate a discussion with development partners with regard to the necessary fund for remediation work. 30 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy
  • 31. Initiate Process of Identifying Non-member Firms for Inspection • Identification of these firms by the DIFE should be completed immediately • DIFE needs to ensure that they obtain membership under any of the authorized organization. • Subsequently, these firms need to be inspected and remediated Development of the Local Inspection and Monitoring Process • Regular upgrades of capacity and skill of local authorities become essential to sustain the improvement of compliance standard • MoLE has already initiated a number of programmes for capacity development. • Better result could be accrued through transfer of technology from the international experts and technicians who are currently engaged under the initiatives of Accord and Alliance. • Government in cooperation with ILO should develop a programme for skill development of the local authorities mainly that of field level staffs for efficient monitoring and proper implementation of the remediation measures 31 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy
  • 32. Further Research will be Needed • The sector has transformed significantly due to domestic and external factors. • The restructuring of the sector would provide it improved competitiveness which would be beneficial for the sector. • New competitors are emerging in the global market which would change the global souring dynamics. • Bangladesh itself is progressing towards the upper level of development trajectory where current level of comparative advantages would not be sufficient. • Further research will be needed • To evaluate the changing dynamics of competitiveness, physical and social compliances, sourcing pattern, market and product diversification among a wide variety of factors. 32 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy
  • 33. • There is already a sign of positive changes in all areas- ranging from improved support to the victims to the development of the sector. • The changes are at the ‘midst’ stage and need to continue to ensure a successful implementation of the reforms. • It is necessary for all stakeholders to monitor and extensively assist in the proper completion of the remaining initiatives • To move beyond the shadow of the Rana Plaza Tragedy and to rebuild the image of the RMG sector at the global scale. 33 Concluding Remarks: Moving beyond the Shadow of the Rana Plaza Tragedy