Time to Come Clean
How the World Bank Group and International Investors
Can Stop the World’s Most Dangerous Coal Plant
October 2017
Published by Inclusive Development International, Bank Information Center Europe, and Center for Financial Ac-
countability in October 2017.
The research for this report was made possible by the generous support of KR Foundation, with additional funding
from the Climate and Land Use Alliance (CLUA), though the views expressed do not necessarily represent those of
the funders.
This publication was authored by Dustin Roasa. It was edited by David Pred and Natalie Bugalski.
Review Team: Joe Athialy, Kate Geary, Nezir Sinani.
Cover photos by Nicolas Decorte/Shutterstock.com and Joe Athialy of the Center for Financial Accountability
Special thanks to: Anu Muhammad, Coleen Scott, Louie Edelstein, Maha Mirza, Monalisa Barman, Mowdud Rahman,
and all members of the National Committee to Protect Oil, Gas, Mineral Resources, Power and Ports.
The information in this publication was correct at the time of going to press.
Time to Come Clean:
How the World Bank Group and International Investors
Can Stop the World’s Most Dangerous Coal Plant
October 2017
Inclusive Development International
Bank Information Center Europe
Center for Financial Accountability
3
4
importance. It plays a critical role in mitigating
global warming, which threatens low-lying Ban-
gladesh like few other countries. In addition, it is
home to a number of endangered species, includ-
ing the world’s largest remaining population of
Bengal tigers. The Sundarbans is similarly import-
ant to India, where 40% of the forest is located.
But the Sundarbans is at risk, as the Bangladeshi
government opens it up for development. An esti-
mated 150 industrial projects are planned for the
area, local activists say, many of them originating
from neighboring India. “The government wants
to make this area into the Bombay of Bangladesh.
In five to 10 years, it will be unrecognizable,” said
Baki Billah, a member of the National Committee
to Protect Oil, Gas, Mineral Resources, Power and
Ports, a civil society organization.
The cornerstone of these plans is Rampal, a
planned 1,320-megawatt coal-fired power plant
that will sit just 14 kilometers from the edge of the
forest. The plant threatens to cause irreversible
damage to the Sundarbans. It will pollute the for-
est’s air and water with toxic coal ash, disturb its
delicate ecosystem with increased shipping traffic
and river dredging, and expose it to large-scale,
potentially catastrophic industrial accidents, ac-
cording to independent assessments. UNESCO,
which designated a portion of the Sundarbans a
On a hazy afternoon in early September 2017,
a hulking container ship plowed through the
still waters of the Pasur River in rural southern
Bangladesh. The ship towered over the river’s
other traffic, mostly small wooden fishing boats
that bobbed and tilted in its wake.
Akash, a fisherman in his early 30s, dragged a
net onto his rickety boat. He gestured toward the
day’s catch, a modest pile of silver fish glinting in
the sun. “It’s getting more difficult to make a liv-
ing,” said Akash, whose name has been changed
for his protection. He earns about $150 a month,
just enough to support his family. But that way
of life is under threat. “Industrial development
is coming. There will be fewer fish. I don’t know
what I will do,” he said.
Akash is one of 2 million Bangladeshis and In-
dians whose lives depend on the nearby Sund-
arbans, the world’s largest mangrove forest. The
Sundarbans is an important center of small-scale
economic activity. For Akash and other fishermen,
the forest acts as a breeding ground for the fish
that teem in the maze of rivers and tributaries
of the vast Bengal Delta. For thousands of other
people, the forest is a place to grow crops, col-
lect honey and harvest wood.
The Sundarbans also has outsized environmental
The Sundarbans is home to the world’s largest remaining population of Bengal Tigers. Photo by Rudra Narayan Mitra, Shutterstock.com.
5
World Heritage site, has recommended that the
plant be cancelled or relocated, calling it a “seri-
ous threat” to the forest.
In light of these risks, Bangladeshis from all walks
of life have come out against the plant. In Sep-
tember 2013, thousands joined a protest march
from Dhaka to the city of Rampal, a journey of
more than 250 kilometers that made internation-
al headlines. “This movement is unprecedented
in Bangladesh in 40 years. We know that if this
plant is not stopped, millions of people will suf-
fer,” said Anu Muhammad, a leader of the nation-
al committee.
In response, the authorities have cracked down.
Anu Muhammad and other activists have received
death threats, and demonstrators have been beat-
en and intimidated. “There are a lot of people,
even in government, who are against this project.
But people are afraid to speak out. It’s too dan-
gerous,” said Mashfikur Rhman Tuku, a member
of the national committee who lives near Rampal.
The authorities have branded opponents of the
project anti-development, a charge they reject.
“We are not opposed to electricity. We know our
country needs to develop. But once the Sundar-
bans is destroyed, it’s too late,” Mashfikur Rhman
Tuku said.
Ostensibly, Rampal is an Indian project. It is a joint
venture between the Bangladeshi government
and NTPC Ltd., India’s state-controlled thermal
energy company. The Export-Import Bank of India
is providing a $1.6 billion project loan to build
the plant. The New Delhi-based state-controlled
engineering company Bharat Heavy Electrical
Limited won the construction contract. Another
state-controlled entity, Coal India, is reportedly
in talks to supply the plant with cheap coal.
Yet despite India’s key role in developing Rampal,
the project is being quietly backed by some of
the largest players in global finance, who have
poured hundreds of millions of dollars in capital
into the companies developing it, according to an
investigation conducted for this report. Many of
these investors are profiting from the project de-
spite having social and environmental guidelines
that should preclude them from financing compa-
nies like NTPC.
These backers include development finance in-
stitutions whose mandate is to foster sustainable
development and poverty alleviation. The Interna-
tional Finance Corporation (IFC), the World Bank
Group’s private-sector arm, provided half a billion
dollars in loans to six Indian commercial banks,
which have gone on to provide and arrange bil-
lions of dollars of financing to the project’s devel-
opers, NTPC, Exim Bank of India, Bharat Heavy
Electrical Limited and Coal India.
Following an expose by Inclusive Development
International and Bank Information Center in Oc-
tober 2016 that revealed this hidden support for
Rampal and other harmful NTPC projects, the IFC
appears to have quietly taken steps to sever many
of these links. The IFC did this rather than use its
substantial leverage to try to prevent or mitigate
Rampal’s projected harms, as called for by inter-
national standards. Despite these recent moves
to try to extricate itself from these investments,
the IFC remains an indirect backer of the project
through two Indian commercial banks, Yes and
Axis, which are important arrangers of financing
for Rampal’s developers.
In addition to the IFC, the UK’s development fi-
nance institution, the CDC, has similarly funded
financial intermediaries that are helping to bank-
roll Rampal. The CDC owns equity in three Indian
banks, IDFC, HDFC and Kotak Mahindra, through
$83.7 million in investments in two Indian private
equity funds. These banks have gone on to pro-
vide and arrange substantial financing for Ram-
pal’s developers. In an emailed statement, the
CDC acknowledged this exposure to Rampal. The
CDC is gradually exiting from these investments
as a part of a 2012 shift in strategy that will “in-
vest through intermediaries to channel capital in
particular to [small and medium-sized enterpris-
es] and the poorest countries in Africa and South
Quick Facts: Rampal Power Plant
Official Name: Maitree Super
Thermal Power Project
Location: Rampal, Khulna
Division, Bangladesh
Capacity: 1,320 MW
Owners: NTPC Ltd. (50%) and Bangladesh Pow-
er Development Board (50%)
Financiers: India Export-Import Bank ($1.6
billion), NTPC Ltd. ($250 million), Bangladesh
Infrastructure Finance Fund ($250 million)
6
Asia, only,” the statement said.
The World Bank proper, which provides loans to
governments, is indirectly linked with the proj-
ect through its relationship with a Bangladeshi
government-controlled investment fund. In April
2017, the World Bank announced the $357 mil-
lion Investment Promotion and Financing Facility
II. That facility will provide $2 million in techni-
cal assistance to the Bangladesh Infrastructure
Finance Fund, which “will also be eligible” to
receive much larger sums for on-lending to proj-
ect investments, according to World Bank proj-
ect documents. The Bangladesh Infrastructure
Finance Fund is providing the entirety of the Ban-
gladeshi government’s $250 million contribution
to build Rampal.
Despite its support for a primary funder of Ram-
pal, the “World Bank supported Investment Pro-
motion and Financing Facility (IPFF) is in no way
associated with the Rampal Coal Power Plant,”
the World Bank said in an emailed statement.
However, the bank declined to provide further
details before this report went to press.
Meanwhile, the private financial sector is backing
and profiting from Rampal. U.S.-based BlackRock
and Vanguard, the world’s largest asset manag-
ers, own tens of millions of dollars of equity and
debt in NTPC, Exim Bank of India, Bharat Heavy
Electrical Limited and Coal India. They are prof-
iting from the project despite their high-level ex-
ecutives speaking publicly about the dangers of
climate change, which they have called a grave
financial risk to their clients. Dozens of other as-
set managers and investment banks are doing the
same, although on a smaller scale. BlackRock and
Vanguard did not respond to requests for com-
ment.
Moreover, the U.S. pension fund for teachers,
TIAA, along with seven other European and North
American pension funds, hold debt and equity
stakes in the Indian companies developing Ram-
pal. They are profiting from these companies de-
spite managing the retirement savings of teachers
and other public-sector workers, who have voiced
displeasure with TIAA’s irresponsible investment
decisions, including Rampal. TIAA did not re-
spond to requests for comment.
Finally, some of Japan’s largest commercial
banks, including Mizuho and Bank of Tokyo-Mit-
subishi, have provided corporate loans, with few
strings attached, to the Indian companies devel-
oping Rampal. The Japanese banks have provid-
ed this financing despite being signatories of the
Equator Principles, a social and environmental
risk management framework that is touted as the
Members of the national committee prepare to march in Dhaka. Photo by Joe Athialy of the Center for Financial Accountability.
7
gold standard of the financial sector. While the
Equator Principles don’t apply to these types of
corporate loans, signatories promote themselves
as being leaders in responsible lending. Mizuho
and Bank of Tokyo-Mitsubishi did not respond
to requests for comment.
By backing the Indian companies developing Ram-
pal, these investors are complicit in the threat-
ened destruction of the Sundarbans – and the
damage this will cause to a planet already reeling
from climate change and extreme weather.
These international investors are enabling an
overseas push by India’s state-backed coal in-
dustry, which has faced increasing resistance to
its projects at home. India’s urban middle class
is fed up with the smog and pollution caused by
coal plants. A number of planned coal plants have
been cancelled, as India makes a dramatic push
toward renewable energy.
With few options for new business at home, In-
dia’s coal industry has taken its outdated technol-
ogy and cheap coal abroad. Bangladesh, which
has looser environmental regulations than India,
and which the Indian government views as part
of its traditional sphere of influence, fits the bill.
In Bangladeshi Prime Minister Sheikh Hasina, In-
dia has found a willing partner. As of 2014, a third
of Bangladeshis lacked access to electricity, and
there are short-term political gains to be had in
increasing the country’s generating capacity. It
hasn’t hurt that Indian taxpayers will ultimately
subsidize some $1 billion of the plant’s cost, ac-
cording to a recent analysis by the Institute for
Energy Economics and Financial Analysis. For
Prime Minister Hasina’s government, then, Ram-
pal offers – financially, at least – a short-term win.
Yet in green-lighting Rampal, Prime Minister Ha-
sina is ignoring numerous dire warnings from sci-
entists, diplomats and international bodies. UNE-
SCO has consistently voiced its opposition to the
plant, despite the government’s recent attempts
to distort this message. Leading experts on en-
ergy and pollution control, such as Ranajit Sahu
and Deb Niemeier, have publicly detailed their
concerns.
Former U.S. Vice President and environmental
campaigner Al Gore recently voiced his disap-
proval. Seated next to Prime Minister Hasina at a
climate change panel at the 2017 World Econom-
ic Forum in Davos, Gore called on the Bangla-
deshi government to cancel the project. “My ad-
vice would be, don’t build that dirty coal plant,”
he said.
Prime Minister Hasina stood firm. “We have tak-
en all the steps so that [the] environment should
not be affected,” she said. The prime minister
noted that Bangladesh emits a miniscule percent-
age of the global greenhouse gases responsible
for climate change, estimated to be just 0.3%.
“The main responsibility [for addressing climate
change] lies with developed countries,” she said.
While that may be true, the grave risks facing
Bangladesh in building Rampal are clear – and
borne out by current events. This year, the heavi-
est monsoon rains in a generation deluged South
Asia. Bangladesh, a densely populated country
that is effectively one large floodplain, became
a disaster zone. Water submerged a third of its
territory. More than 8 million people were affect-
ed, and nearly 750,000 homes were damaged or
destroyed, according to the International Feder-
ation of Red Cross and Red Crescent Societies.
Landslides in the hilly southeast killed an esti-
mated 152 people. Villagers in the hard-hit north
boarded makeshift rafts to search for food, water
and shelter. Others simply waded into the pol-
lution-slicked water, dangling their possessions
over their heads. As disease spread and deluged
crops began to fail, the Bangladeshi government,
already stretched thin by the arrival of tens of
thousands of Rohingya refugees fleeing persecu-
tion in Myanmar, scrambled to respond.
“This is fast becoming one of the most serious
humanitarian crises this region has seen in many
years,” Martin Faller, a Red Cross official, told the
German news agency DW.
Bangladesh is no stranger to weather-borne ca-
By backing the Indian
companies developing Rampal,
these investors are complicit
in the threatened destruction
of the Sundarbans -- and the
damage this will cause to a
planet already reeling from
climate change and extreme
weather.
8
lamities. Every year, the monsoon rains join forc-
es with dozens of rivers, swollen by melted Hi-
malayan ice and snow, to submerge large parts
of the country. The monsoon floods in 2007, de-
scribed at the time as the worst in living memory,
killed 1,100 people and damaged or destroyed
1.1 million homes. Cyclones are also a perenni-
al worry. Last year, Cyclone Roanu unleashed a
three-meter-tall wall of water that roared through
seaside villages, killing dozens and causing ex-
tensive damage.
Scientists warn that global warming will make
these storms worse. Experts predict that sea lev-
els in the country could rise by as many as 13 feet
by 2100, exacerbating the effects of cyclones and
floods.
Mangrove forests play a crucial role in counter-
acting these threats: the Sundarbans acts as a
natural buffer to calamitous weather, particularly
cyclones, dampening their intensity and absorb-
ing storm surges.
The forest also plays an outsize role in slowing
global temperature increases. Mangrove forests
can store up to five times the carbon of conven-
tional tropical forests. If global temperatures
continue to rise at projected rates, parts of Ban-
gladesh will become too hot for human surviv-
al, according to scientists at MIT. In the coming
years, tens of millions of Bangladeshis are pro-
jected to become climate refugees, creating a
displacement crisis on a scale the world has never
seen.
Given these risks, it’s difficult for many Bangla-
deshis to understand why their government is so
brazenly putting the Sundarbans at risk. “We’re
already vulnerable to climate change. The Sund-
arbans is our most powerful weapon for fighting
it,” Anu Muhammad said.
In July of 2017, the national committee, the civ-
il society organization leading the resistance
to Rampal, released a draft energy strategy to
counter the government’s Power Sector Master
Plan 2016. By focusing on renewables and nat-
ural gas, the national committee contends that
the alternative plan will meet Bangladesh’s ener-
gy needs, decrease the price of electricity below
government estimates, and head off the country’s
future reliance on coal.
Bangladesh has first-hand experience in imple-
menting economically viable renewable energy
systems. It leads the world, by a wide margin, in
home-based solar power, accounting for 66% of
the systems installed globally. “We know that it’s
possible to have electricity without destroying
the Sundarbans,” Anu Muhammad said.
Back on the Pasur River, the sky quickly turned
gray, and gusts of wind whipped up whitecaps
on the water. The monsoons ravaging the coun-
try showed no signs of abating. Akash, the fish-
erman, pointed in the direction of the Rampal
project site, which hugs the river’s eastern bank.
Construction had begun five months earlier, and
he was worried.
“If Rampal is built, I will have to leave my family
to find work. All will be lost. I will have nothing,”
he said. With that, Akash gathered up his net,
cranked his engine to life, and puttered toward
shore.
One of the most important international inves-
tors backing Rampal is the IFC. Since 2005,
the IFC has provided $520 million in funding to
six large Indian commercial banks: ICICI, HDFC,
IDFC, Kotak Mahindra, Yes and Axis. After receiv-
ing this money and the good publicity that comes
with the IFC’s stamp of approval, these banks
have gone on to arrange and provide substantial
financing to the four Indian companies develop-
ing Rampal.
The IFC’s indirect funding of Rampal fits a global
pattern. Over the past decade, the institution has
increasingly outsourced its funds – and develop-
ment mandate – to for-profit financial intermedi-
aries. These commercial banks and private equity
funds are often afforded carte blanche to use the
Some 2,000 families were displaced to make way for the Rampal
plant. Most have left the area in search of menial work. Photo by Joe
Athialy of the Center for Financial Accountability.
9
money as they see fit, with limited IFC oversight.
The IFC maintains that this type of lending helps
small businesses access credit, thus propelling
economic growth and poverty alleviation in de-
veloping countries.
Some of the IFC’s financial-sector funding no
doubt does reach the corner teashops and small-
scale manufacturers for which it is intended. But
it is also swelling the coffers of some of the larg-
est, most harmful corporations and projects in the
world – ones that are far too controversial for the
IFC to fund directly. And so it has proven with
Rampal, a project so risky that the World Bank
reportedly declined to fund it directly.
Until very recently, the IFC’s exposure to Rampal
was substantial. Its six Indian bank clients provid-
ed and arranged billions of dollars in financing
for the developers of Rampal through bond hold-
ings and underwriting services, corporate loans,
and shareholdings.
The underwriting services provided by these
banks has been particularly important, given the
extent to which large Indian companies rely on
the bond market to raise capital. The six banks
helped shepherd these bonds to market by set-
ting the terms, assuming the financial risk by pur-
chasing them, and then selling them on to buy-
ers in their networks. The six banks have done
more than just act as underwriters: some of them
are also among the largest current holders of the
bonds.
In theory, as IFC clients, the six banks are sup-
posed to apply the institution’s social and envi-
ronmental Performance Standards to their high-
risk activities. In effect, they are supposed to act
as miniature IFCs, amplifying the reach of the
World Bank Group’s due diligence and monitor-
ing systems throughout India’s financial sector.
Yet in funding companies so closely linked with
India’s high-risk coal industry, which is implicated
in a litany of past abuses, all readily available on
the public record, there is little question that the
banks failed to uphold the IFC’s standards.
Despite these failures, the IFC had an opportunity
to rectify the situation. The October 2016 expose
released by Inclusive Development International
and Bank Information Center, “’Disaster for Us
and the Planet’: How the IFC Is Quietly Funding
a Coal Boom,” detailed the IFC’s indirect funding
NTPC’s Dirty Legacy in India
With an installed capacity of more than 50,000 megawatts,
NTPC is the largest power producer in India. Established
in 1975, it stands tall among government-owned corpora-
tions in India for its production and profitability.
However, the social and environmental costs NTPC had
to incur to achieve this distinction are large. Whether land
acquisition, forced evictions, water contamination, issues
related to fly ash and coal dust pollution and their conse-
quent health risks, NTPC epitomizes how so-called devel-
opmental projects can be a bane to local communities.
Fly-ash disposal is one of the biggest environmental chal-
lenges facing coal-based power generation, which supplies around 60% of India’s total power needs.
Singrauli in central India, where NPTC has many thermal projects in a small geographical area, has become a toxic
hotspot, with incremental coal mining activities in the region and the rapid development of coal-based thermal power
plants resulting in acute air and water pollution. This has led to serious health problems among the residents of the area,
apart from issues of forced evictions and absence of any rehabilitation.
NTPCs practice of dumping fly ash on the ground, either as landfill or agricultural manure, poses a serious risk of contam-
ination of ground water with poisonous chemicals.
Areas near NTPC projects were found to have salinized groundwater, contaminated local water bodies, irresponsible
dumping of hot water or pollutants into the sea, and dredging of the sea or riverbeds, seriously impacting the aquatic
ecosystem.
Contributed by Joe Athialy of the Delhi-based Center for Financial Accountability
10
of NTPC and Rampal through the six Indian banks.
In advance of releasing that report, Inclusive De-
velopment International contacted the IFC for a
response. In a July 2016 email, the IFC said that
it was in touch with the financial intermediary cli-
ents identified in the report, and in most cases
it was “working with them on identifying oppor-
tunities for improving their [environmental and
social] management system.” The response indi-
cated that after years of pressure from watchdog
groups, the IFC was beginning to take the prob-
lem of financial-sector lending seriously.
That concern appeared to rise to the highest
level. In April 2017, the new head of the IFC,
Philippe Le Houérou, published a widely circulat-
ed blog post laying out some proposed reforms.
He wrote: “We welcome the scrutiny because get-
ting policies right is critical if we are to meet our
institution’s goals.”
Le Houérou identified four areas of improvement.
One of these was to work closely with existing
clients to address risk: “[W]e will better focus our
environmental and social resources on appraisal,
supervision, and capacity support to our financial
intermediary clients who are deemed higher risk.”
For civil society groups in Bangladesh, this was
good news. The IFC was signaling its willingness
to use its leverage to stop its intermediaries from
financing destructive projects like Rampal, which
are manifestly in breach of its environmental and
social standards.
In practice, however, that has not happened. In-
stead of using its leverage for good, the IFC re-
called $295 million worth of loans to ICICI, HDFC
and Kotak Mahindra. The IFC exited these invest-
ments four years early, an extraordinary move for
a development finance institution – and one that
the IFC has yet to explain publicly. In severing ties
with these clients, the IFC has created distance
between itself and Rampal – and surrendered its
considerable power to mitigate the project’s di-
sastrous impacts.
In an October 2017 email to Inclusive Develop-
ment International, the IFC declined to explain its
reasons for exiting the investments early in ICICI,
HDFC and Kotak Mahindra, citing client confiden-
tiality. “The [Inclusive Development International]
report did not include any additional information
that IFC was not aware of before and did not play
any role in making our decision,” the IFC said in
the emailed statement.
Some of the IFC’s financial-
sector funding no doubt does
reach the corner teashops
and small-scale manufacturers
for which it is intended. But
it is also swelling the coffers
of some of the largest, most
harmful corporations and
projects in the world -- ones
that are far too controversial
for the IFC to fund directly.
IFC
HDFC Axis Yes IDFC
NTPC
ICICI Kotak
Mahindra
Loan Loans Loan (matured
2014)
Loan (recalled
early)
Loan (recalled
early)
Loan (recalled early)
Loans
Bonds
Owns shares
Share issue
Bonds
Owns shares
IFC Links to Rampal
Share issue
Bonds
Share issue
Bonds
Owns shares
Bonds
Share issue
Loans
Bonds
Owns shares
Rampal50% owner
11
“These exits were planned for sometime, follow-
ing improved market conditions in India,” the
statement said. The IFC did not elaborate on
what it meant by improved market conditions, nor
would it specify precisely when it exited the in-
vestments. At the time, however, India’s economy
was in turmoil due to the demonetization crisis.
In the months following the Indian government’s
decision to swap old currency notes for new bills,
on November 8, 2016, the economy suffered a
meltdown that saw contractions in a number of
sectors, including manufacturing and real estate,
and created cash shortages that disproportion-
ately hurt the rural poor.
Divestment, when used properly, can be a power-
ful tool. In 2014, Norway’s sovereign wealth fund
sold its 0.38% equity stake in NTPC, after the
fund’s independent Council on Ethics conducted
a review that found Rampal’s anticipated impacts
to be egregious. This, combined with the fund’s
small ownership stake in NTPC, which would have
given it limited leverage, meant that divestment
was the only sensible option for a fund committed
to ethical investment.
Yet the fund did not go quietly. The Council on
Ethics published a detailed report laying out its
findings and rationale for divestment. This be-
came an important piece of evidence for the
groups opposing Rampal, because it allowed
them to establish a credible counter-narrative to
the government’s insistence that the project was
harmless. “That divestment was a moral victory
for us,” Anu Muhammad said.
Comparatively, the IFC’s silent divestment came
across as a feeble abdication of responsibility,
particularly given its extensive financial links to
Rampal. Yet it was more than that; it also ran con-
trary to accepted international business and hu-
man rights standards, which call on financiers to
use their leverage to prevent foreseeable harms.
The OECD Guidelines for Multinational Enterpris-
es state that enterprises should “[s]eek to prevent
or mitigate an adverse impact,” even when they
haven’t directly caused or contributed to the im-
pact, “when the impact is nevertheless directly
linked to their operations, products or services by
a business relationship.” The UN’s official com-
mentary on the Guiding Principles on Business
and Human Rights states: “If the business enter-
prise has leverage to prevent or mitigate the ad-
verse impact, it should exercise it.”
In calling the loans early, the IFC failed to meet
these responsibilities. Yet despite the divest-
ments, it still has leverage over the project
through two existing clients, Yes and Axis banks,
which have underwritten hundreds of millions of
dollars of active NTPC and Exim Bank of India
bond issues since receiving IFC funding.
The IFC disputes that it is currently exposed to
Rampal through Yes and Axis. “Based on pub-
licly available information, Axis’ exposure to the
Rampal project is potentially at the level of $2.2
Rampal is expected to have disastrous impacts on the 2 million people who depend on the Sundarbans. Photo by Joe Athialy of the Center for
Financial Accountability.
12
million ($1.5 million disbursed and $0.7 million
available) through bondholding of the Exim Bank
bond. Based on our information, the proceeds
from issuance of the Axis Green Infrastructure
Bond in which IFC invested were not used for in-
vestment in the Exim Bank Bond. We also under-
stand from Yes Bank, they do not have exposure
to this project,” the IFC said in the written state-
ment.
Yet this narrow interpretation of exposure leaves
out the essential role that commercial banks play
in helping Indian corporations access the domes-
tic bond market. This can be seen with NTPC. At
present, the corporation carries approximately
$10.5 billion in outstanding debt. The vast ma-
jority of that debt, approximately 81%, takes the
form of bonds. Since November 2008, NTPC has
conducted 37 bond issues. Of these, IFC inter-
mediaries participated in 30 bond issues as joint
book runners. Just five weeks before the release
of this report, Axis and Yes underwrote anoth-
er type of issue for NTPC, a share offering, that
raised $1.5 billion in capital for the company.
It is clear that without the participation of the
IFC’s commercial bank clients, including current
clients Axis and Yes, NTPC would face immense
difficulty in raising the capital it needs to conduct
business. This gives the banks – and, in turn, the
IFC – substantial leverage. As underwriters, they
are in the position to demand the inclusion of so-
cial and environmental covenants in the securities
they are shepherding to market. If NTPC were to
refuse to include such covenants, the banks could
decline to participate as underwriters, severely
diminishing the company’s access to the capital it
needs to operate.
The IFC’s influence doesn’t end with its commer-
cial bank clients. As a global financial leader, the
IFC could coordinate a pushback among the other
shareholders and financiers exposed to Rampal,
including BlackRock and Vanguard, TIAA and the
pension funds, and the Japanese Equator Princi-
ples banks.
It could also work in concert with other develop-
ment finance institutions with leverage over Ram-
pal. This includes not only the CDC and World
Bank, but also the Asian Development Bank,
which recently announced a proposed $700 mil-
lion investment in the power grid in southwest-
ern Bangladesh, where Rampal is being built. This
investment, which will increase much-needed ac-
cess to electricity, gives the ADB substantial influ-
ence over the Bangladeshi power sector.
For the Bangladeshis who will be affected by Ram-
pal, continued inaction by the IFC and these in-
vestors is not an option. “These investors should
care about what is happening. They should use
their influence to put pressure on the companies,”
Mashfikur Rhman Tuku said. He added: “Rampal
might make them money, but it will destroy the
Sundarbans. This is our Amazon.”
By bankrolling Rampal’s developers, interna-
tional investors are exposing themselves to a
range of risks. These risks are not just related to
human rights and the environment; the project
also presents substantial financial risks, according
to an analysis by the Institute for Energy Econom-
ics and Financial Analysis.
Rampal will face inevitable construction delays
and cost increases, driving up the plant’s total
price tag – and the financial burden on the de-
velopers. Rampal is unlikely to meet its projected
load factor, or generating capacity, making it a
“candidate for stranded-asset status,” according
to the analysis. The investors in Exim Bank of In-
The IFC’s silent divestment
came across as a feeble
abdication of responsibility,
particularly given its extensive
financial links to Rampal.
The authorities have cracked down on opponents of Rampal. Photo
by Joe Athialy of the Center for Financial Accountability.
13
dia face particular financial risk: Rampal consti-
tutes an unduly large portion of the bank’s loan
book, which may make it difficult for the bank to
attract future capital.
Since Rampal’s inception, the developers have
sought to downplay the project’s risks. A gov-
ernment-commissioned environmental impact as-
sessment, conducted in 2013, sells the project in
economic terms. The project will reduce poverty
and strengthen the social safety net, create cul-
tural and livelihood improvements, and “trigger
our national economic development.”
Of the plant’s numerous environmental risks, the
assessment is mostly dismissive: “The plant will
be designed in such a way so as it will ensure
minimum environmental pollution.” Air pollution
from the plant “will not cause any affect on Sund-
arbans ecosystem.” Numerous independent as-
sessments have debunked these claims. Yet the
developers have stood by them, promising there
will be no substantial harm.
Shusanta Das, a small business owner who lives
near Rampal, is wary of such promises. He has
heard them before.
In 2010, he learned of Rampal when the author-
ities came to his house to take his land. They
needed his three acres, where he farmed veg-
etables and raised shrimp, to build the 1,834-
acre Rampal complex. They offered him $3,700
per acre, a fraction of what it was worth on the
market. “There was no negotiation. I couldn’t say
no,” he said. “This was my ancestors’ land. It was
very valuable,” he added. The authorities made
similar offers to 2,000 other families.
Shusanta Das has a university degree and owns a
shop selling roofing material. He is part of the ru-
ral middle class. Most of the other families, how-
ever, are extremely poor and marginalized. He
knew that they would be devastated by the loss
of their land. “If I lost my farm, I had my roofing
business, so I knew I could get by. But the small
landholders couldn’t survive on the compensation
alone,” he said.
They needed help. So Shusanta Das helped or-
ganize them into a nonviolent movement, which
eventually attracted 4,000 people. They held
marches, blocked roads and made noise. The au-
thorities suddenly had to pay attention.
He and the movement’s other leaders eventual-
ly secured a meeting with the officials in charge.
Their demands were simple: move the plant to
nearby land owned by the government, which of-
fered sufficient space, so that the 2,000 families
wouldn’t have to leave. To their surprise and re-
lief, the authorities agreed.
That agreement proved short-lived. “The govern-
ment went back on its promise,” Shusanta Das
said. “They told us, ‘This is the prime minister’s
plan. If anyone speaks against it, their tongue will
be cut off.’” The families were evicted in 2011.
Shusanta Das didn’t receive compensation for
four years. He estimates that some 220 families
have yet to receive any compensation at all.
His fears about the families have proven to be
prescient. He’s still in touch with many of them.
Almost all have left the area, scattering to Dha-
ka, Chittagong and across the border to India
in search of menial work. Some have committed
suicide. “These were landholders. They were
proud people. They were humiliated by what hap-
pened,” he said.
The government’s broken promise still haunts him.
He’s aware of the assurances about the Sundar-
bans being offered by the government and de-
velopers. “Based on my experience, we shouldn’t
trust this,” he said. “This project will destroy the
Sundarbans. Everyone knows that.”
Time to Come Clean: How International Investors Can Stop Rampal Power Project, the World’s Most Dangerous Coal Plant

More Related Content

Similar to Time to Come Clean: How International Investors Can Stop Rampal Power Project, the World’s Most Dangerous Coal Plant

13-9-23.pdf (Daily Current Affairs)
13-9-23.pdf (Daily Current Affairs)13-9-23.pdf (Daily Current Affairs)
13-9-23.pdf (Daily Current Affairs)DEEPAK CHAUHAN
 
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
Ne base 20 april 2018 energy news issue   1162  by khaled al awadiNe base 20 april 2018 energy news issue   1162  by khaled al awadi
Ne base 20 april 2018 energy news issue 1162 by khaled al awadiKhaled Al Awadi
 
(DAILY NEWS ANALYSIS)
(DAILY NEWS ANALYSIS)(DAILY NEWS ANALYSIS)
(DAILY NEWS ANALYSIS)IAS Next
 
G.k. mania-vidya-guru- -dec.--2021
G.k. mania-vidya-guru- -dec.--2021G.k. mania-vidya-guru- -dec.--2021
G.k. mania-vidya-guru- -dec.--2021RevaSharma6
 
Swachh Ganga Abhiyan A Campaign to Control Ganga Pollution
Swachh Ganga Abhiyan A Campaign to Control Ganga PollutionSwachh Ganga Abhiyan A Campaign to Control Ganga Pollution
Swachh Ganga Abhiyan A Campaign to Control Ganga Pollutionijtsrd
 
Worldbank 100827234454 Phpapp01
Worldbank 100827234454 Phpapp01Worldbank 100827234454 Phpapp01
Worldbank 100827234454 Phpapp01Amit Chawla
 
pratham presentation.pptx
pratham presentation.pptxpratham presentation.pptx
pratham presentation.pptxPrathamJani1
 
Dam Sanctioning Process in Nepal
Dam Sanctioning Process in NepalDam Sanctioning Process in Nepal
Dam Sanctioning Process in NepalNabraj Lama
 
Feb vol44 no2
Feb vol44 no2Feb vol44 no2
Feb vol44 no2aliuzgan
 
Information Brochure _ Quality Quest
Information Brochure _ Quality QuestInformation Brochure _ Quality Quest
Information Brochure _ Quality QuestKallol Saha
 
26 10-2021 (Daily News Analysis)
26 10-2021 (Daily News Analysis) 26 10-2021 (Daily News Analysis)
26 10-2021 (Daily News Analysis) IAS Next
 
Geonesis February 2018
Geonesis February 2018Geonesis February 2018
Geonesis February 2018Lijin Sunil
 
Development Challenges, South-South Solutions: February 2011 Issue
Development Challenges, South-South Solutions: February 2011 IssueDevelopment Challenges, South-South Solutions: February 2011 Issue
Development Challenges, South-South Solutions: February 2011 IssueDavid South Consulting
 
Tipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetTipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetM Shahriar Sonet
 
Risky venture The AIIB’s hands off approach to funding infrastructure in India
Risky venture The AIIB’s hands off approach to funding infrastructure in IndiaRisky venture The AIIB’s hands off approach to funding infrastructure in India
Risky venture The AIIB’s hands off approach to funding infrastructure in IndiaCentre for Financial Accountability
 
New base energy news issue 860 dated 29 may 2016
New base energy news issue  860 dated 29 may 2016New base energy news issue  860 dated 29 may 2016
New base energy news issue 860 dated 29 may 2016Khaled Al Awadi
 
Asian bank of development(ADB)
Asian bank of development(ADB)Asian bank of development(ADB)
Asian bank of development(ADB)ramla khan
 

Similar to Time to Come Clean: How International Investors Can Stop Rampal Power Project, the World’s Most Dangerous Coal Plant (20)

13-9-23.pdf (Daily Current Affairs)
13-9-23.pdf (Daily Current Affairs)13-9-23.pdf (Daily Current Affairs)
13-9-23.pdf (Daily Current Affairs)
 
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
Ne base 20 april 2018 energy news issue   1162  by khaled al awadiNe base 20 april 2018 energy news issue   1162  by khaled al awadi
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
 
(DAILY NEWS ANALYSIS)
(DAILY NEWS ANALYSIS)(DAILY NEWS ANALYSIS)
(DAILY NEWS ANALYSIS)
 
G.k. mania-vidya-guru- -dec.--2021
G.k. mania-vidya-guru- -dec.--2021G.k. mania-vidya-guru- -dec.--2021
G.k. mania-vidya-guru- -dec.--2021
 
Swachh Ganga Abhiyan A Campaign to Control Ganga Pollution
Swachh Ganga Abhiyan A Campaign to Control Ganga PollutionSwachh Ganga Abhiyan A Campaign to Control Ganga Pollution
Swachh Ganga Abhiyan A Campaign to Control Ganga Pollution
 
Worldbank 100827234454 Phpapp01
Worldbank 100827234454 Phpapp01Worldbank 100827234454 Phpapp01
Worldbank 100827234454 Phpapp01
 
World bank
World bankWorld bank
World bank
 
pratham presentation.pptx
pratham presentation.pptxpratham presentation.pptx
pratham presentation.pptx
 
Dam Sanctioning Process in Nepal
Dam Sanctioning Process in NepalDam Sanctioning Process in Nepal
Dam Sanctioning Process in Nepal
 
Feb vol44 no2
Feb vol44 no2Feb vol44 no2
Feb vol44 no2
 
Information Brochure _ Quality Quest
Information Brochure _ Quality QuestInformation Brochure _ Quality Quest
Information Brochure _ Quality Quest
 
26 10-2021 (Daily News Analysis)
26 10-2021 (Daily News Analysis) 26 10-2021 (Daily News Analysis)
26 10-2021 (Daily News Analysis)
 
Geonesis February 2018
Geonesis February 2018Geonesis February 2018
Geonesis February 2018
 
Development Challenges, South-South Solutions: February 2011 Issue
Development Challenges, South-South Solutions: February 2011 IssueDevelopment Challenges, South-South Solutions: February 2011 Issue
Development Challenges, South-South Solutions: February 2011 Issue
 
Tipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetTipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar Sonet
 
Risky venture The AIIB’s hands off approach to funding infrastructure in India
Risky venture The AIIB’s hands off approach to funding infrastructure in IndiaRisky venture The AIIB’s hands off approach to funding infrastructure in India
Risky venture The AIIB’s hands off approach to funding infrastructure in India
 
New base energy news issue 860 dated 29 may 2016
New base energy news issue  860 dated 29 may 2016New base energy news issue  860 dated 29 may 2016
New base energy news issue 860 dated 29 may 2016
 
Multilateral Newsletter, August 2014
Multilateral Newsletter, August 2014Multilateral Newsletter, August 2014
Multilateral Newsletter, August 2014
 
Asian bank of development(ADB)
Asian bank of development(ADB)Asian bank of development(ADB)
Asian bank of development(ADB)
 
Cir 36 2014
Cir  36 2014Cir  36 2014
Cir 36 2014
 

More from Centre for Financial Accountability

Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...
Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...
Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...Centre for Financial Accountability
 
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषण
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषणतीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषण
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषणCentre for Financial Accountability
 
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance SectorCentre for Financial Accountability
 
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...Centre for Financial Accountability
 
Riding on Debt: Financial Assessment of Delhi Metro After Phase III
Riding on Debt: Financial Assessment of Delhi Metro After Phase IIIRiding on Debt: Financial Assessment of Delhi Metro After Phase III
Riding on Debt: Financial Assessment of Delhi Metro After Phase IIICentre for Financial Accountability
 
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...An Indian Perspective on New Development Bank & Asian Infrastructure Investme...
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...Centre for Financial Accountability
 
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...Centre for Financial Accountability
 
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Centre for Financial Accountability
 
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...Centre for Financial Accountability
 
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण Centre for Financial Accountability
 
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...Centre for Financial Accountability
 
Financial Analysis of the Blue Economy: Sagarmala’s Case in Point
Financial Analysis of the Blue Economy: Sagarmala’s Case in PointFinancial Analysis of the Blue Economy: Sagarmala’s Case in Point
Financial Analysis of the Blue Economy: Sagarmala’s Case in PointCentre for Financial Accountability
 
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचना
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचनाफिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचना
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचनाCentre for Financial Accountability
 

More from Centre for Financial Accountability (20)

Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...
Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...
Encroachment of Nature, People and Livelihoods: A Case of Amaravati Capital C...
 
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषण
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषणतीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषण
तीसरे चरण के बाद दिल्ली मेट्रो का वित्तीय विश्लेषण
 
Report: History RePPPeated: How PPPs are Failing
Report: History RePPPeated: How PPPs are FailingReport: History RePPPeated: How PPPs are Failing
Report: History RePPPeated: How PPPs are Failing
 
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector
5 Years Of Achhe Din: A Quick Analysis of Banking and Finance Sector
 
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...
What’s Simmering Under The Blue Green City: The case study on Amaravati Susta...
 
Riding on Debt: Financial Assessment of Delhi Metro After Phase III
Riding on Debt: Financial Assessment of Delhi Metro After Phase IIIRiding on Debt: Financial Assessment of Delhi Metro After Phase III
Riding on Debt: Financial Assessment of Delhi Metro After Phase III
 
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...An Indian Perspective on New Development Bank & Asian Infrastructure Investme...
An Indian Perspective on New Development Bank & Asian Infrastructure Investme...
 
Citizens Report on the Four Years of the Modi Government
Citizens Report on the Four Years of the Modi GovernmentCitizens Report on the Four Years of the Modi Government
Citizens Report on the Four Years of the Modi Government
 
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...
एशियन इंफ़्रास्ट्रक्चर इन्वेस्टमेंट बैंक और भारत का नेशनल इन्वेस्टमेंट एंड इं...
 
FAQ on BRICS, NDB & AIIB
FAQ on BRICS, NDB & AIIBFAQ on BRICS, NDB & AIIB
FAQ on BRICS, NDB & AIIB
 
The New Development Banks: Why AIIB and NDB should be Monitored
The New Development Banks: Why AIIB and NDB should be MonitoredThe New Development Banks: Why AIIB and NDB should be Monitored
The New Development Banks: Why AIIB and NDB should be Monitored
 
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
Financing the future? The Asian Infrastructure Investment Bank and India’s Na...
 
Union budget 2018-19: Issues of Marginalised Sections
Union budget 2018-19: Issues of Marginalised SectionsUnion budget 2018-19: Issues of Marginalised Sections
Union budget 2018-19: Issues of Marginalised Sections
 
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...
Parliamentary Supremacy Undermined? An Analysis of Parliamentary Debates in I...
 
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण
क्लीन लीन एंड ग्रीन? एशिया इन्फ़्रस्ट्रक्चर बैंक के बारे में संक्षिप्त विवरण
 
Coal Currency: Mapping Coal Project Finances in India
Coal Currency: Mapping Coal Project Finances in IndiaCoal Currency: Mapping Coal Project Finances in India
Coal Currency: Mapping Coal Project Finances in India
 
Big Pie – Analysis of major sectors’ share in NPAs
Big Pie – Analysis of major sectors’ share in NPAsBig Pie – Analysis of major sectors’ share in NPAs
Big Pie – Analysis of major sectors’ share in NPAs
 
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...
Clean Lean And Green? A Short Briefing on the Asian Infrastructure Investment...
 
Financial Analysis of the Blue Economy: Sagarmala’s Case in Point
Financial Analysis of the Blue Economy: Sagarmala’s Case in PointFinancial Analysis of the Blue Economy: Sagarmala’s Case in Point
Financial Analysis of the Blue Economy: Sagarmala’s Case in Point
 
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचना
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचनाफिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचना
फिनांशियल रेजॉल्युशन एंड डिपॉजिट इंश्योरेंस (एफआरडीआई) बिल, 2017 की एक आलोचना
 

Recently uploaded

Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Vinodha Devi
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfSaviRakhecha1
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 

Recently uploaded (20)

Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdf
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 

Time to Come Clean: How International Investors Can Stop Rampal Power Project, the World’s Most Dangerous Coal Plant

  • 1. Time to Come Clean How the World Bank Group and International Investors Can Stop the World’s Most Dangerous Coal Plant October 2017
  • 2. Published by Inclusive Development International, Bank Information Center Europe, and Center for Financial Ac- countability in October 2017. The research for this report was made possible by the generous support of KR Foundation, with additional funding from the Climate and Land Use Alliance (CLUA), though the views expressed do not necessarily represent those of the funders. This publication was authored by Dustin Roasa. It was edited by David Pred and Natalie Bugalski. Review Team: Joe Athialy, Kate Geary, Nezir Sinani. Cover photos by Nicolas Decorte/Shutterstock.com and Joe Athialy of the Center for Financial Accountability Special thanks to: Anu Muhammad, Coleen Scott, Louie Edelstein, Maha Mirza, Monalisa Barman, Mowdud Rahman, and all members of the National Committee to Protect Oil, Gas, Mineral Resources, Power and Ports. The information in this publication was correct at the time of going to press.
  • 3. Time to Come Clean: How the World Bank Group and International Investors Can Stop the World’s Most Dangerous Coal Plant October 2017 Inclusive Development International Bank Information Center Europe Center for Financial Accountability 3
  • 4. 4 importance. It plays a critical role in mitigating global warming, which threatens low-lying Ban- gladesh like few other countries. In addition, it is home to a number of endangered species, includ- ing the world’s largest remaining population of Bengal tigers. The Sundarbans is similarly import- ant to India, where 40% of the forest is located. But the Sundarbans is at risk, as the Bangladeshi government opens it up for development. An esti- mated 150 industrial projects are planned for the area, local activists say, many of them originating from neighboring India. “The government wants to make this area into the Bombay of Bangladesh. In five to 10 years, it will be unrecognizable,” said Baki Billah, a member of the National Committee to Protect Oil, Gas, Mineral Resources, Power and Ports, a civil society organization. The cornerstone of these plans is Rampal, a planned 1,320-megawatt coal-fired power plant that will sit just 14 kilometers from the edge of the forest. The plant threatens to cause irreversible damage to the Sundarbans. It will pollute the for- est’s air and water with toxic coal ash, disturb its delicate ecosystem with increased shipping traffic and river dredging, and expose it to large-scale, potentially catastrophic industrial accidents, ac- cording to independent assessments. UNESCO, which designated a portion of the Sundarbans a On a hazy afternoon in early September 2017, a hulking container ship plowed through the still waters of the Pasur River in rural southern Bangladesh. The ship towered over the river’s other traffic, mostly small wooden fishing boats that bobbed and tilted in its wake. Akash, a fisherman in his early 30s, dragged a net onto his rickety boat. He gestured toward the day’s catch, a modest pile of silver fish glinting in the sun. “It’s getting more difficult to make a liv- ing,” said Akash, whose name has been changed for his protection. He earns about $150 a month, just enough to support his family. But that way of life is under threat. “Industrial development is coming. There will be fewer fish. I don’t know what I will do,” he said. Akash is one of 2 million Bangladeshis and In- dians whose lives depend on the nearby Sund- arbans, the world’s largest mangrove forest. The Sundarbans is an important center of small-scale economic activity. For Akash and other fishermen, the forest acts as a breeding ground for the fish that teem in the maze of rivers and tributaries of the vast Bengal Delta. For thousands of other people, the forest is a place to grow crops, col- lect honey and harvest wood. The Sundarbans also has outsized environmental The Sundarbans is home to the world’s largest remaining population of Bengal Tigers. Photo by Rudra Narayan Mitra, Shutterstock.com.
  • 5. 5 World Heritage site, has recommended that the plant be cancelled or relocated, calling it a “seri- ous threat” to the forest. In light of these risks, Bangladeshis from all walks of life have come out against the plant. In Sep- tember 2013, thousands joined a protest march from Dhaka to the city of Rampal, a journey of more than 250 kilometers that made internation- al headlines. “This movement is unprecedented in Bangladesh in 40 years. We know that if this plant is not stopped, millions of people will suf- fer,” said Anu Muhammad, a leader of the nation- al committee. In response, the authorities have cracked down. Anu Muhammad and other activists have received death threats, and demonstrators have been beat- en and intimidated. “There are a lot of people, even in government, who are against this project. But people are afraid to speak out. It’s too dan- gerous,” said Mashfikur Rhman Tuku, a member of the national committee who lives near Rampal. The authorities have branded opponents of the project anti-development, a charge they reject. “We are not opposed to electricity. We know our country needs to develop. But once the Sundar- bans is destroyed, it’s too late,” Mashfikur Rhman Tuku said. Ostensibly, Rampal is an Indian project. It is a joint venture between the Bangladeshi government and NTPC Ltd., India’s state-controlled thermal energy company. The Export-Import Bank of India is providing a $1.6 billion project loan to build the plant. The New Delhi-based state-controlled engineering company Bharat Heavy Electrical Limited won the construction contract. Another state-controlled entity, Coal India, is reportedly in talks to supply the plant with cheap coal. Yet despite India’s key role in developing Rampal, the project is being quietly backed by some of the largest players in global finance, who have poured hundreds of millions of dollars in capital into the companies developing it, according to an investigation conducted for this report. Many of these investors are profiting from the project de- spite having social and environmental guidelines that should preclude them from financing compa- nies like NTPC. These backers include development finance in- stitutions whose mandate is to foster sustainable development and poverty alleviation. The Interna- tional Finance Corporation (IFC), the World Bank Group’s private-sector arm, provided half a billion dollars in loans to six Indian commercial banks, which have gone on to provide and arrange bil- lions of dollars of financing to the project’s devel- opers, NTPC, Exim Bank of India, Bharat Heavy Electrical Limited and Coal India. Following an expose by Inclusive Development International and Bank Information Center in Oc- tober 2016 that revealed this hidden support for Rampal and other harmful NTPC projects, the IFC appears to have quietly taken steps to sever many of these links. The IFC did this rather than use its substantial leverage to try to prevent or mitigate Rampal’s projected harms, as called for by inter- national standards. Despite these recent moves to try to extricate itself from these investments, the IFC remains an indirect backer of the project through two Indian commercial banks, Yes and Axis, which are important arrangers of financing for Rampal’s developers. In addition to the IFC, the UK’s development fi- nance institution, the CDC, has similarly funded financial intermediaries that are helping to bank- roll Rampal. The CDC owns equity in three Indian banks, IDFC, HDFC and Kotak Mahindra, through $83.7 million in investments in two Indian private equity funds. These banks have gone on to pro- vide and arrange substantial financing for Ram- pal’s developers. In an emailed statement, the CDC acknowledged this exposure to Rampal. The CDC is gradually exiting from these investments as a part of a 2012 shift in strategy that will “in- vest through intermediaries to channel capital in particular to [small and medium-sized enterpris- es] and the poorest countries in Africa and South Quick Facts: Rampal Power Plant Official Name: Maitree Super Thermal Power Project Location: Rampal, Khulna Division, Bangladesh Capacity: 1,320 MW Owners: NTPC Ltd. (50%) and Bangladesh Pow- er Development Board (50%) Financiers: India Export-Import Bank ($1.6 billion), NTPC Ltd. ($250 million), Bangladesh Infrastructure Finance Fund ($250 million)
  • 6. 6 Asia, only,” the statement said. The World Bank proper, which provides loans to governments, is indirectly linked with the proj- ect through its relationship with a Bangladeshi government-controlled investment fund. In April 2017, the World Bank announced the $357 mil- lion Investment Promotion and Financing Facility II. That facility will provide $2 million in techni- cal assistance to the Bangladesh Infrastructure Finance Fund, which “will also be eligible” to receive much larger sums for on-lending to proj- ect investments, according to World Bank proj- ect documents. The Bangladesh Infrastructure Finance Fund is providing the entirety of the Ban- gladeshi government’s $250 million contribution to build Rampal. Despite its support for a primary funder of Ram- pal, the “World Bank supported Investment Pro- motion and Financing Facility (IPFF) is in no way associated with the Rampal Coal Power Plant,” the World Bank said in an emailed statement. However, the bank declined to provide further details before this report went to press. Meanwhile, the private financial sector is backing and profiting from Rampal. U.S.-based BlackRock and Vanguard, the world’s largest asset manag- ers, own tens of millions of dollars of equity and debt in NTPC, Exim Bank of India, Bharat Heavy Electrical Limited and Coal India. They are prof- iting from the project despite their high-level ex- ecutives speaking publicly about the dangers of climate change, which they have called a grave financial risk to their clients. Dozens of other as- set managers and investment banks are doing the same, although on a smaller scale. BlackRock and Vanguard did not respond to requests for com- ment. Moreover, the U.S. pension fund for teachers, TIAA, along with seven other European and North American pension funds, hold debt and equity stakes in the Indian companies developing Ram- pal. They are profiting from these companies de- spite managing the retirement savings of teachers and other public-sector workers, who have voiced displeasure with TIAA’s irresponsible investment decisions, including Rampal. TIAA did not re- spond to requests for comment. Finally, some of Japan’s largest commercial banks, including Mizuho and Bank of Tokyo-Mit- subishi, have provided corporate loans, with few strings attached, to the Indian companies devel- oping Rampal. The Japanese banks have provid- ed this financing despite being signatories of the Equator Principles, a social and environmental risk management framework that is touted as the Members of the national committee prepare to march in Dhaka. Photo by Joe Athialy of the Center for Financial Accountability.
  • 7. 7 gold standard of the financial sector. While the Equator Principles don’t apply to these types of corporate loans, signatories promote themselves as being leaders in responsible lending. Mizuho and Bank of Tokyo-Mitsubishi did not respond to requests for comment. By backing the Indian companies developing Ram- pal, these investors are complicit in the threat- ened destruction of the Sundarbans – and the damage this will cause to a planet already reeling from climate change and extreme weather. These international investors are enabling an overseas push by India’s state-backed coal in- dustry, which has faced increasing resistance to its projects at home. India’s urban middle class is fed up with the smog and pollution caused by coal plants. A number of planned coal plants have been cancelled, as India makes a dramatic push toward renewable energy. With few options for new business at home, In- dia’s coal industry has taken its outdated technol- ogy and cheap coal abroad. Bangladesh, which has looser environmental regulations than India, and which the Indian government views as part of its traditional sphere of influence, fits the bill. In Bangladeshi Prime Minister Sheikh Hasina, In- dia has found a willing partner. As of 2014, a third of Bangladeshis lacked access to electricity, and there are short-term political gains to be had in increasing the country’s generating capacity. It hasn’t hurt that Indian taxpayers will ultimately subsidize some $1 billion of the plant’s cost, ac- cording to a recent analysis by the Institute for Energy Economics and Financial Analysis. For Prime Minister Hasina’s government, then, Ram- pal offers – financially, at least – a short-term win. Yet in green-lighting Rampal, Prime Minister Ha- sina is ignoring numerous dire warnings from sci- entists, diplomats and international bodies. UNE- SCO has consistently voiced its opposition to the plant, despite the government’s recent attempts to distort this message. Leading experts on en- ergy and pollution control, such as Ranajit Sahu and Deb Niemeier, have publicly detailed their concerns. Former U.S. Vice President and environmental campaigner Al Gore recently voiced his disap- proval. Seated next to Prime Minister Hasina at a climate change panel at the 2017 World Econom- ic Forum in Davos, Gore called on the Bangla- deshi government to cancel the project. “My ad- vice would be, don’t build that dirty coal plant,” he said. Prime Minister Hasina stood firm. “We have tak- en all the steps so that [the] environment should not be affected,” she said. The prime minister noted that Bangladesh emits a miniscule percent- age of the global greenhouse gases responsible for climate change, estimated to be just 0.3%. “The main responsibility [for addressing climate change] lies with developed countries,” she said. While that may be true, the grave risks facing Bangladesh in building Rampal are clear – and borne out by current events. This year, the heavi- est monsoon rains in a generation deluged South Asia. Bangladesh, a densely populated country that is effectively one large floodplain, became a disaster zone. Water submerged a third of its territory. More than 8 million people were affect- ed, and nearly 750,000 homes were damaged or destroyed, according to the International Feder- ation of Red Cross and Red Crescent Societies. Landslides in the hilly southeast killed an esti- mated 152 people. Villagers in the hard-hit north boarded makeshift rafts to search for food, water and shelter. Others simply waded into the pol- lution-slicked water, dangling their possessions over their heads. As disease spread and deluged crops began to fail, the Bangladeshi government, already stretched thin by the arrival of tens of thousands of Rohingya refugees fleeing persecu- tion in Myanmar, scrambled to respond. “This is fast becoming one of the most serious humanitarian crises this region has seen in many years,” Martin Faller, a Red Cross official, told the German news agency DW. Bangladesh is no stranger to weather-borne ca- By backing the Indian companies developing Rampal, these investors are complicit in the threatened destruction of the Sundarbans -- and the damage this will cause to a planet already reeling from climate change and extreme weather.
  • 8. 8 lamities. Every year, the monsoon rains join forc- es with dozens of rivers, swollen by melted Hi- malayan ice and snow, to submerge large parts of the country. The monsoon floods in 2007, de- scribed at the time as the worst in living memory, killed 1,100 people and damaged or destroyed 1.1 million homes. Cyclones are also a perenni- al worry. Last year, Cyclone Roanu unleashed a three-meter-tall wall of water that roared through seaside villages, killing dozens and causing ex- tensive damage. Scientists warn that global warming will make these storms worse. Experts predict that sea lev- els in the country could rise by as many as 13 feet by 2100, exacerbating the effects of cyclones and floods. Mangrove forests play a crucial role in counter- acting these threats: the Sundarbans acts as a natural buffer to calamitous weather, particularly cyclones, dampening their intensity and absorb- ing storm surges. The forest also plays an outsize role in slowing global temperature increases. Mangrove forests can store up to five times the carbon of conven- tional tropical forests. If global temperatures continue to rise at projected rates, parts of Ban- gladesh will become too hot for human surviv- al, according to scientists at MIT. In the coming years, tens of millions of Bangladeshis are pro- jected to become climate refugees, creating a displacement crisis on a scale the world has never seen. Given these risks, it’s difficult for many Bangla- deshis to understand why their government is so brazenly putting the Sundarbans at risk. “We’re already vulnerable to climate change. The Sund- arbans is our most powerful weapon for fighting it,” Anu Muhammad said. In July of 2017, the national committee, the civ- il society organization leading the resistance to Rampal, released a draft energy strategy to counter the government’s Power Sector Master Plan 2016. By focusing on renewables and nat- ural gas, the national committee contends that the alternative plan will meet Bangladesh’s ener- gy needs, decrease the price of electricity below government estimates, and head off the country’s future reliance on coal. Bangladesh has first-hand experience in imple- menting economically viable renewable energy systems. It leads the world, by a wide margin, in home-based solar power, accounting for 66% of the systems installed globally. “We know that it’s possible to have electricity without destroying the Sundarbans,” Anu Muhammad said. Back on the Pasur River, the sky quickly turned gray, and gusts of wind whipped up whitecaps on the water. The monsoons ravaging the coun- try showed no signs of abating. Akash, the fish- erman, pointed in the direction of the Rampal project site, which hugs the river’s eastern bank. Construction had begun five months earlier, and he was worried. “If Rampal is built, I will have to leave my family to find work. All will be lost. I will have nothing,” he said. With that, Akash gathered up his net, cranked his engine to life, and puttered toward shore. One of the most important international inves- tors backing Rampal is the IFC. Since 2005, the IFC has provided $520 million in funding to six large Indian commercial banks: ICICI, HDFC, IDFC, Kotak Mahindra, Yes and Axis. After receiv- ing this money and the good publicity that comes with the IFC’s stamp of approval, these banks have gone on to arrange and provide substantial financing to the four Indian companies develop- ing Rampal. The IFC’s indirect funding of Rampal fits a global pattern. Over the past decade, the institution has increasingly outsourced its funds – and develop- ment mandate – to for-profit financial intermedi- aries. These commercial banks and private equity funds are often afforded carte blanche to use the Some 2,000 families were displaced to make way for the Rampal plant. Most have left the area in search of menial work. Photo by Joe Athialy of the Center for Financial Accountability.
  • 9. 9 money as they see fit, with limited IFC oversight. The IFC maintains that this type of lending helps small businesses access credit, thus propelling economic growth and poverty alleviation in de- veloping countries. Some of the IFC’s financial-sector funding no doubt does reach the corner teashops and small- scale manufacturers for which it is intended. But it is also swelling the coffers of some of the larg- est, most harmful corporations and projects in the world – ones that are far too controversial for the IFC to fund directly. And so it has proven with Rampal, a project so risky that the World Bank reportedly declined to fund it directly. Until very recently, the IFC’s exposure to Rampal was substantial. Its six Indian bank clients provid- ed and arranged billions of dollars in financing for the developers of Rampal through bond hold- ings and underwriting services, corporate loans, and shareholdings. The underwriting services provided by these banks has been particularly important, given the extent to which large Indian companies rely on the bond market to raise capital. The six banks helped shepherd these bonds to market by set- ting the terms, assuming the financial risk by pur- chasing them, and then selling them on to buy- ers in their networks. The six banks have done more than just act as underwriters: some of them are also among the largest current holders of the bonds. In theory, as IFC clients, the six banks are sup- posed to apply the institution’s social and envi- ronmental Performance Standards to their high- risk activities. In effect, they are supposed to act as miniature IFCs, amplifying the reach of the World Bank Group’s due diligence and monitor- ing systems throughout India’s financial sector. Yet in funding companies so closely linked with India’s high-risk coal industry, which is implicated in a litany of past abuses, all readily available on the public record, there is little question that the banks failed to uphold the IFC’s standards. Despite these failures, the IFC had an opportunity to rectify the situation. The October 2016 expose released by Inclusive Development International and Bank Information Center, “’Disaster for Us and the Planet’: How the IFC Is Quietly Funding a Coal Boom,” detailed the IFC’s indirect funding NTPC’s Dirty Legacy in India With an installed capacity of more than 50,000 megawatts, NTPC is the largest power producer in India. Established in 1975, it stands tall among government-owned corpora- tions in India for its production and profitability. However, the social and environmental costs NTPC had to incur to achieve this distinction are large. Whether land acquisition, forced evictions, water contamination, issues related to fly ash and coal dust pollution and their conse- quent health risks, NTPC epitomizes how so-called devel- opmental projects can be a bane to local communities. Fly-ash disposal is one of the biggest environmental chal- lenges facing coal-based power generation, which supplies around 60% of India’s total power needs. Singrauli in central India, where NPTC has many thermal projects in a small geographical area, has become a toxic hotspot, with incremental coal mining activities in the region and the rapid development of coal-based thermal power plants resulting in acute air and water pollution. This has led to serious health problems among the residents of the area, apart from issues of forced evictions and absence of any rehabilitation. NTPCs practice of dumping fly ash on the ground, either as landfill or agricultural manure, poses a serious risk of contam- ination of ground water with poisonous chemicals. Areas near NTPC projects were found to have salinized groundwater, contaminated local water bodies, irresponsible dumping of hot water or pollutants into the sea, and dredging of the sea or riverbeds, seriously impacting the aquatic ecosystem. Contributed by Joe Athialy of the Delhi-based Center for Financial Accountability
  • 10. 10 of NTPC and Rampal through the six Indian banks. In advance of releasing that report, Inclusive De- velopment International contacted the IFC for a response. In a July 2016 email, the IFC said that it was in touch with the financial intermediary cli- ents identified in the report, and in most cases it was “working with them on identifying oppor- tunities for improving their [environmental and social] management system.” The response indi- cated that after years of pressure from watchdog groups, the IFC was beginning to take the prob- lem of financial-sector lending seriously. That concern appeared to rise to the highest level. In April 2017, the new head of the IFC, Philippe Le Houérou, published a widely circulat- ed blog post laying out some proposed reforms. He wrote: “We welcome the scrutiny because get- ting policies right is critical if we are to meet our institution’s goals.” Le Houérou identified four areas of improvement. One of these was to work closely with existing clients to address risk: “[W]e will better focus our environmental and social resources on appraisal, supervision, and capacity support to our financial intermediary clients who are deemed higher risk.” For civil society groups in Bangladesh, this was good news. The IFC was signaling its willingness to use its leverage to stop its intermediaries from financing destructive projects like Rampal, which are manifestly in breach of its environmental and social standards. In practice, however, that has not happened. In- stead of using its leverage for good, the IFC re- called $295 million worth of loans to ICICI, HDFC and Kotak Mahindra. The IFC exited these invest- ments four years early, an extraordinary move for a development finance institution – and one that the IFC has yet to explain publicly. In severing ties with these clients, the IFC has created distance between itself and Rampal – and surrendered its considerable power to mitigate the project’s di- sastrous impacts. In an October 2017 email to Inclusive Develop- ment International, the IFC declined to explain its reasons for exiting the investments early in ICICI, HDFC and Kotak Mahindra, citing client confiden- tiality. “The [Inclusive Development International] report did not include any additional information that IFC was not aware of before and did not play any role in making our decision,” the IFC said in the emailed statement. Some of the IFC’s financial- sector funding no doubt does reach the corner teashops and small-scale manufacturers for which it is intended. But it is also swelling the coffers of some of the largest, most harmful corporations and projects in the world -- ones that are far too controversial for the IFC to fund directly. IFC HDFC Axis Yes IDFC NTPC ICICI Kotak Mahindra Loan Loans Loan (matured 2014) Loan (recalled early) Loan (recalled early) Loan (recalled early) Loans Bonds Owns shares Share issue Bonds Owns shares IFC Links to Rampal Share issue Bonds Share issue Bonds Owns shares Bonds Share issue Loans Bonds Owns shares Rampal50% owner
  • 11. 11 “These exits were planned for sometime, follow- ing improved market conditions in India,” the statement said. The IFC did not elaborate on what it meant by improved market conditions, nor would it specify precisely when it exited the in- vestments. At the time, however, India’s economy was in turmoil due to the demonetization crisis. In the months following the Indian government’s decision to swap old currency notes for new bills, on November 8, 2016, the economy suffered a meltdown that saw contractions in a number of sectors, including manufacturing and real estate, and created cash shortages that disproportion- ately hurt the rural poor. Divestment, when used properly, can be a power- ful tool. In 2014, Norway’s sovereign wealth fund sold its 0.38% equity stake in NTPC, after the fund’s independent Council on Ethics conducted a review that found Rampal’s anticipated impacts to be egregious. This, combined with the fund’s small ownership stake in NTPC, which would have given it limited leverage, meant that divestment was the only sensible option for a fund committed to ethical investment. Yet the fund did not go quietly. The Council on Ethics published a detailed report laying out its findings and rationale for divestment. This be- came an important piece of evidence for the groups opposing Rampal, because it allowed them to establish a credible counter-narrative to the government’s insistence that the project was harmless. “That divestment was a moral victory for us,” Anu Muhammad said. Comparatively, the IFC’s silent divestment came across as a feeble abdication of responsibility, particularly given its extensive financial links to Rampal. Yet it was more than that; it also ran con- trary to accepted international business and hu- man rights standards, which call on financiers to use their leverage to prevent foreseeable harms. The OECD Guidelines for Multinational Enterpris- es state that enterprises should “[s]eek to prevent or mitigate an adverse impact,” even when they haven’t directly caused or contributed to the im- pact, “when the impact is nevertheless directly linked to their operations, products or services by a business relationship.” The UN’s official com- mentary on the Guiding Principles on Business and Human Rights states: “If the business enter- prise has leverage to prevent or mitigate the ad- verse impact, it should exercise it.” In calling the loans early, the IFC failed to meet these responsibilities. Yet despite the divest- ments, it still has leverage over the project through two existing clients, Yes and Axis banks, which have underwritten hundreds of millions of dollars of active NTPC and Exim Bank of India bond issues since receiving IFC funding. The IFC disputes that it is currently exposed to Rampal through Yes and Axis. “Based on pub- licly available information, Axis’ exposure to the Rampal project is potentially at the level of $2.2 Rampal is expected to have disastrous impacts on the 2 million people who depend on the Sundarbans. Photo by Joe Athialy of the Center for Financial Accountability.
  • 12. 12 million ($1.5 million disbursed and $0.7 million available) through bondholding of the Exim Bank bond. Based on our information, the proceeds from issuance of the Axis Green Infrastructure Bond in which IFC invested were not used for in- vestment in the Exim Bank Bond. We also under- stand from Yes Bank, they do not have exposure to this project,” the IFC said in the written state- ment. Yet this narrow interpretation of exposure leaves out the essential role that commercial banks play in helping Indian corporations access the domes- tic bond market. This can be seen with NTPC. At present, the corporation carries approximately $10.5 billion in outstanding debt. The vast ma- jority of that debt, approximately 81%, takes the form of bonds. Since November 2008, NTPC has conducted 37 bond issues. Of these, IFC inter- mediaries participated in 30 bond issues as joint book runners. Just five weeks before the release of this report, Axis and Yes underwrote anoth- er type of issue for NTPC, a share offering, that raised $1.5 billion in capital for the company. It is clear that without the participation of the IFC’s commercial bank clients, including current clients Axis and Yes, NTPC would face immense difficulty in raising the capital it needs to conduct business. This gives the banks – and, in turn, the IFC – substantial leverage. As underwriters, they are in the position to demand the inclusion of so- cial and environmental covenants in the securities they are shepherding to market. If NTPC were to refuse to include such covenants, the banks could decline to participate as underwriters, severely diminishing the company’s access to the capital it needs to operate. The IFC’s influence doesn’t end with its commer- cial bank clients. As a global financial leader, the IFC could coordinate a pushback among the other shareholders and financiers exposed to Rampal, including BlackRock and Vanguard, TIAA and the pension funds, and the Japanese Equator Princi- ples banks. It could also work in concert with other develop- ment finance institutions with leverage over Ram- pal. This includes not only the CDC and World Bank, but also the Asian Development Bank, which recently announced a proposed $700 mil- lion investment in the power grid in southwest- ern Bangladesh, where Rampal is being built. This investment, which will increase much-needed ac- cess to electricity, gives the ADB substantial influ- ence over the Bangladeshi power sector. For the Bangladeshis who will be affected by Ram- pal, continued inaction by the IFC and these in- vestors is not an option. “These investors should care about what is happening. They should use their influence to put pressure on the companies,” Mashfikur Rhman Tuku said. He added: “Rampal might make them money, but it will destroy the Sundarbans. This is our Amazon.” By bankrolling Rampal’s developers, interna- tional investors are exposing themselves to a range of risks. These risks are not just related to human rights and the environment; the project also presents substantial financial risks, according to an analysis by the Institute for Energy Econom- ics and Financial Analysis. Rampal will face inevitable construction delays and cost increases, driving up the plant’s total price tag – and the financial burden on the de- velopers. Rampal is unlikely to meet its projected load factor, or generating capacity, making it a “candidate for stranded-asset status,” according to the analysis. The investors in Exim Bank of In- The IFC’s silent divestment came across as a feeble abdication of responsibility, particularly given its extensive financial links to Rampal. The authorities have cracked down on opponents of Rampal. Photo by Joe Athialy of the Center for Financial Accountability.
  • 13. 13 dia face particular financial risk: Rampal consti- tutes an unduly large portion of the bank’s loan book, which may make it difficult for the bank to attract future capital. Since Rampal’s inception, the developers have sought to downplay the project’s risks. A gov- ernment-commissioned environmental impact as- sessment, conducted in 2013, sells the project in economic terms. The project will reduce poverty and strengthen the social safety net, create cul- tural and livelihood improvements, and “trigger our national economic development.” Of the plant’s numerous environmental risks, the assessment is mostly dismissive: “The plant will be designed in such a way so as it will ensure minimum environmental pollution.” Air pollution from the plant “will not cause any affect on Sund- arbans ecosystem.” Numerous independent as- sessments have debunked these claims. Yet the developers have stood by them, promising there will be no substantial harm. Shusanta Das, a small business owner who lives near Rampal, is wary of such promises. He has heard them before. In 2010, he learned of Rampal when the author- ities came to his house to take his land. They needed his three acres, where he farmed veg- etables and raised shrimp, to build the 1,834- acre Rampal complex. They offered him $3,700 per acre, a fraction of what it was worth on the market. “There was no negotiation. I couldn’t say no,” he said. “This was my ancestors’ land. It was very valuable,” he added. The authorities made similar offers to 2,000 other families. Shusanta Das has a university degree and owns a shop selling roofing material. He is part of the ru- ral middle class. Most of the other families, how- ever, are extremely poor and marginalized. He knew that they would be devastated by the loss of their land. “If I lost my farm, I had my roofing business, so I knew I could get by. But the small landholders couldn’t survive on the compensation alone,” he said. They needed help. So Shusanta Das helped or- ganize them into a nonviolent movement, which eventually attracted 4,000 people. They held marches, blocked roads and made noise. The au- thorities suddenly had to pay attention. He and the movement’s other leaders eventual- ly secured a meeting with the officials in charge. Their demands were simple: move the plant to nearby land owned by the government, which of- fered sufficient space, so that the 2,000 families wouldn’t have to leave. To their surprise and re- lief, the authorities agreed. That agreement proved short-lived. “The govern- ment went back on its promise,” Shusanta Das said. “They told us, ‘This is the prime minister’s plan. If anyone speaks against it, their tongue will be cut off.’” The families were evicted in 2011. Shusanta Das didn’t receive compensation for four years. He estimates that some 220 families have yet to receive any compensation at all. His fears about the families have proven to be prescient. He’s still in touch with many of them. Almost all have left the area, scattering to Dha- ka, Chittagong and across the border to India in search of menial work. Some have committed suicide. “These were landholders. They were proud people. They were humiliated by what hap- pened,” he said. The government’s broken promise still haunts him. He’s aware of the assurances about the Sundar- bans being offered by the government and de- velopers. “Based on my experience, we shouldn’t trust this,” he said. “This project will destroy the Sundarbans. Everyone knows that.”