VIP Call Girls in Cuttack Aarohi 8250192130 Independent Escort Service Cuttack
Ali elsharkawy - CV - Cost Control
1. Ali Abd El Rahman Mohammed El Sharkawy
PERSONAL DATA
Address: 32 Hedar Street - Helwan - Cairo - Egypt.
Nationality: Egyptian.
Date of birth: 22/09/1989.
Marital status: Married.
Military status: Served.
Driver’s License: Yes.
Mobile: (002)01069647447 – (002)01064663188.
Email: eng.ali.elsharkawy@gmail.com
EDUCATION
Degree: B.Sc. of Civil Engineering, Al-Azhar University in Cairo.
Graduation date: May 2013.
Cumulative grade: Good.
Final year grade: Very Good.
Project Title: Projects Management with Dr. Hatem El Behary at Gulsan Factory project, the
consult ECG and the main contractor Hassan Allam.
Project grade: Excellent.
TECHNICAL SKILLS
Computer:
o AutoCAD (all versions).
o Primavera (Very Professionally in all versions).
o AutoCAD Structure Detailing 2014.
o Revit Structure (Basic Knowledge).
o MS Project.
o Sap2000.
o CSI COLUMN.
o Microsoft Office 2013: Professionally in (Word, Excel and power point).
o Very Professionally about general software & hardware with a Computer.
Site: Certifying for "Site Engineering Diploma", producer by Eng. Hassan Kandil.
SAFTY: Certifying from Economics and Political Science University & Knowledge Academy for
"OSHA".
HR: Certifying form dream infinity company for "HR resources"
Surving: Certifying from Road and Bridges Association for “the training of Total station,
Theodolite and Leveling Devices “.
2. Management
o PMP Preparation Course in Expert Center in Oct. 2015.
o Making Delay Analysis for The Time & Cost.
o Making Time and cost Schedule for any project as A Freelancer.
o Study tenders and bids for any project.
CURRENT JOBS
Cost Control Engineer: Worked in ECIP Company (Engineering Company for Integrated Projects)
from Sep. 2015 until NOW in two Project:
1) Chipsy Our Planet Factory –El Obor City Budget 160 Million Pounds as a Cost Controller
& Planner from Sep.2015 until NOW the Following:
Calculation Variation Order.
Submit Claims to the consultant.
Prepare the Cash Flow, Cash in & Cash Out.
Earned Value Report.
Prediction Report, to be on Schedule and behind cost
Review Purchasing Orders.
Connect with Accounting Dep. in all Processes.
Review All Quantity Survey and Making Sure that is according to Executing.
Calculation for Wages of Labours every.
Review the time line.
Making Issue Log with All Problems are faces the Project.
Calculate the Productivity for Labours and Materials.
Making All Owner and Sub-Contractors Invoices.
Compare Between Offers for Subcontractors and Making Report for This Study.
Audit All Materials Store Dep.
PREVIOUS JOBS
From Oct. 2014 Till Sep. 2015
2) Project Control Engineer: Worked in ECIP Company in “Marvel City Project” in Fifth
District Budget of Total Works 30 Million Pounds with the Following:
Making Update the time line as a Scheduler.
Calculate the Material’s Cost.
Submit All Quantity Survey and Making Sure that is according to Executing.
Making All Sub-Contractors Invoices.
Prepare Shop drawing for Civil Works.
3. PREVIOUS JOBS
From Nov. 2013 Till Jan. 2014
Site Engineer : As Site Engineer of Based Signal Corps of the Military Engineering
Department Mohamed Abdel Wahab Company’s for General Contracting
from Nov 2013 until Jan 2014.
SUMMER TRAINING
Training in Ashraf Zaid Company in summer 2011.
Training in Metro Station (Ard El Marred) in summer 2010.
OTHER TRAINING
A seminar in Project Management at Anwar Resala Nasr city Branch in July 2015.
Hr Diploma from Dreamy Infinity.
An Active volunteer in “Masr EL Mahrousa”.
LANGUAGES
o Arabic language: (mother tongue).
o English language: Very Good (reading, speaking and writing).