SlideShare a Scribd company logo
1 of 4
CARLOS EDUARDO GUERRERO AGUILAR
PROFILE
Degree: Chemical Engineer “Universidad de los Andes” 2004 Venezuela.
Profession: Process Engineer / Project Engineer
Date of Birth: 09/24/1981
Nationality:Venezuelan
Phone: 00 58 414 7299297
E-mail: GUERREROCN@GMAIL.COM / GUERREROCN@PDVSA.COM
EXPERIENCE
BS in Chemical Engineering w ith all experience in Gas Engineering and Industrial Projects w ith over 10 years of
experience w orking in projects of oil and gas during Planning, Engineering, Procurement, Construction,
precommisioning and commissioning, know ledge of environmental regulations and technologies used for process and
treatment of oil and natural gas. Experience in more than 15 minor and 5 major Projects in oil and gas industries,
experience in development of business portfolio, planning and strategies for oil and gas industries. Leadership skills,
Ability to w ork effectively in teams. Ability to lead a group of engineers, and designers on assigned projects. Ability to
field w ork and open to travel. Organized and efficient in achieving the goals.
ROLES AND RESPONSABILITIES
Department: Major Projects PDVSA (Exploration and Production)
Position: Process Engineering Leader for:
 Basic engineering for multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata.
Year 2010. (PDVSA)
 Details engineering for multiple segregation of natural gas (2500 MMSCFD) MUSCAR resort in Punta de
Mata. Year 2011. (PDVSA).
 Basic engineering increased compression capacity in low and medium pressure Carito Pirital in Punta de
Mata. Year 2012 (PDVSA).
 Basic engineering for the treatment plant and w astewater management in the oil industry. Year 2012.
(PDVSA).
 Implantation of the project Multiple segregation of naturalgas (2500 MMSCFD) MUSCAR Complex in Punta
de Mata. Year 2013. (PDVSA).
 Implantation of the project increased compression capacity in low and medium pressure Carito Pirital in Punta
de Mata. Year 2014 (PDVSA).
 EPC for the Project increase compression capacity in low (60 psig) and medium (450 psig) pressure Carito
Pirital in Punta de Mata. Year 2013-Current (PDVSA).
 EPC for the Gas Lift Plant (4500 psig) in “Complejo Muscar” to increase the capacity for injection in Punta de
Mata. Years: 2015 – current.
 Basic engineering for the project “Increase the capacity of Dehydration in MUSCAR and Amana Complex in
Punta de Mata”. Year 2016 – current
Departament: PDVSA Industry
Position: President in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “
Years: 2009 - 2010
Departament: PDVSA Industry
Position: Manager in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “
Years: 2008 - 2009
Departament: Major Projects PDVSA (Exploration and Production)
Position: Process Engineering Leader for Oil and Gas Projects.
Years: 2007 - 2008
Departament:Engineering and Construction. SOCA Consulting and Engineering for PDVSA Off Shore / On Shore
Position: Process Engineer.
Years: 2006 - 2007
Departament: Engineering and Construction ORICONSULT Consulting and Engineering for PDVSA Off Shore /
On Shore
Position: Process Engineer.
Years: 2005 - 2006
SKILL AND KNOWLEDGES
 Capable of managing technical and administrative aspects of project execution. Participates in planning,
scheduling and supervision activities for major project like Engineering, procurement and construction.
 Technically responsible for all assigned projects and studies. Capable of leading projects throughout the entire
process design effort.
 Advanced knowledge in process and hydraulics simulators: HYSYS, PRO II, ASPEN PLUS, PIPEPHASE,
HEXTRAN, HTRI and PIPESIM, Prepares and/or review scalculations, simulating, specifications and other
engineering assignments as assigned.
 Design of plants for handling low , medium and high pressure.
 Extensive experience in Design of Gas compressors Plant, Oil Plant, Water treatment plants, Gas treatment plants.
 Responsible for the planning, evaluation and promotion of projects for Petróleos de Venezuela S.A.
 Management Guidelines Management of Capital Investment, development and coordination of FEL, Planning,
Control projects and project management in all phases.
 Experience in developing plans and plant processesPFD PLOT PLAN, Lift isometric draw ings and reading and
management of engineering draw ings.
 Performing Service Agreements (ADS), Views, Decision Support Document (DSD), general know ledge of
administrative procedures in the development of engineering projects.
 Development and evaluation of projects: defining, planning, equipment sizing, paperw ork, quotes, inspections; in
each of the phases of engineering projects.
 Ability to Organize, prioritize, and plan w orkactivities, while using time efficiently.
 Ability for gathers and analyzes information skillfully, w hile developing alternative solutions, if necessary.
 Ability for Understands business implications of decisions.
 Experience Working w ith and communicates effectivelywith customers and vendors.
 Ability for Understands both the technicaland commercial aspects of the organization's projects and proposals
 Proficient in Microsoft Window s, Word, Excel, Pow er Point, Project, Financial data, Internet research.
 Proven effective written and oralcommunication skills in clearly presenting complex data.
 Ability to w orkeffectivelyas a part of a team or individually.
 Facility to w orkunder pressure.
 Willingness to w orkanywhere in the w orld.
TRAINING
 April2015 Analysis, Dimensioning and Multiphase netw orks, PIPEPHASE advanced. PDVSA Maturin,
Monagas. Duration 24 hours.
 April2015 Analysis and Operability Hazard. HAZOP. PDVSA Maturin, Monagas. Duration 16 hours.
 March 2015 Fundaments of Automation, PDVSA Maturin, Monagas. Duration 16 hours.
 Year 2014 English advanced Course. TOP Notch. PDVSA Maturin Monagas. Duration 160 hours
 Nov 2013 Project Planning and Management using Earned Value, PDVSA Maturin, Monagas Duration 40 hours
 July 2013 – March 2014 Advanced Level English Course, Learning Technologies Institute, Maturin Monagas,
Duration 8 Months
 Dic 2013 Modelage advanced process using ASPEN HYSYS, Caracas-Venezuela- HYPROTEC-PDVSA / 40 Hrs ..
 Year 2012 Conflict Management and Negotiations, PDVSA, Punta de Mata July 2012 Duration 16 hours
 Year 2012 Advanced CentrifugalCompressors, USB Caracas July 2012 Duration 16 hours
 Year 2011 Technical Conference Steering And Natural Gas Conditioning – Intevep Duration 24 hours.
 Year 2011 Design And Simulation Of Heat Exchangers, PDVSA, Paraguaná 22 al 23 November 2011 Duration 16
hours.
 Year 2011 Integral Congress XXI Latin American Hydrocarbon And Petroleum Exhibition, Puerto La Cruz 26 al 30
septiembre 2011. Duration 24 hours.
 Year 2010 “Hiring at PDVSA” PDVSA., Caracas 03 y 04 March. Duration 16 hours.
 Year 2009 “Project Management” PDVSA., Caracas 20 y 21 March. Duration 16 hours.
 Year 2008 “Fourth National Symposium and First International Surfactants and Applications”University of los
Andes, Mérida del 27 al 31 October. Duration 40 hours.
 Year 2008 “Primavera for Engineering and Constructions Applied Project Planning and Control”, Caracas 01 to 03
October. Duration 24 hours.
 Year 2008 “Project Planning and Control I”. Manny Ron Consultores. CAMO Monagas 10 to 14 March. Duration 40
hours.
 Year 2007 “Management Processes and Change” HIDROEX. CAMO Monagas. 12 al 16 November 2007. Duration
40 hours.
 Year 2007 4tas. Days of PCP "Safety is everyone's responsibility ".. INTEVEP Los Teques Edo. Miranda. 20 to 24
August 2007. Duration 10 hours.
 Year 2007 “ReferentialFramew orkManagement, Planning, Project Management and Control” CVG – EDELCA.
Puerto Ordaz Edo. Bolívar 13 to 15 June. Duration 24 hours.
 Year 2006 “I days Emergent Management in Venezuela” Convenio UDO – University Yacambú completed el 31 de
June. Duration 8 hours.
 Year 2006 “Safety driving” PDVSA – CAMO completed entre el 06 y el 07 Marzo 2006 Duration 16 hours.
 Year 2005 “Treatment of Natural Gas” ICONSA Maracaibo completed 07 to 11 November 2005. Duration 40
hours.
 Year 2004. “Surfactants and their Applications”. Materia Especial. University of los Andes. Laboratory FIRP.
Chemical Engineering School. Duration 6 months.
 Year 2002 – 2004 “Basic English Course - Intermediate - Advanced”. University of los Andes, .Duration 2 Years.
 Year 2003 “Filtration processesusing solid membranes and liquid”. University of los Andes. Duration 6 hours
theoreticalpractices.
COMPUTER SKILL
 HYSYS.
 PRO II.
 ASPEN PLUS.
 PIPEPHASE.
 HEXTRAN.
 HTRI.
 PIPESIM.
 OFFICE.
 LOTUS NOTE.
LANGUAGES
 SPANISH.
 ENGLISH.
MOST RELEVANT PROJECTS
 Conceptual engineering for gas dehydration plant in Orocual Complex. Year 2005. (PDVSA)
 Conceptual Engineering, biphasic pipe until CIGMA in Field Mariscal Sucre Off Shore in Cumana Sucre. Year
2005. (PDVSA).
 Conceptual Engineering management crude by rail from Caripito to CIGMA Year 2005 (PDVSA).
 Basic Engineering for the operational centers of production of oiland gas in San Tomé Year 2006 (PDVSA).
 Conceptual Engineering for Plant Improvement and Gas Processing In CIGMA. Year 2006 (PDVSA GAS).
 Basic Engineering for the operational center of production of oil and gas (NIF) in Punta de Mata. Year 2006
(PDVSA).
 Assignment to the ministry of basic industries such as process engineer for Cement Plant Project in Cerro Azul
Maturin Monagas. Year 2007.
 Conceptual engineering for the installation of factory high-pressure vessels. Year2008. (PDVSA Industrial).
 Conceptual engineering for the installation of a drill factory. Year2008. (PDVSA Industrial).
 Manager in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “. Year 2009. (PDVSA
Industrial).
 Basic engineering for multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year
2010. (PDVSA)
 Details engineering for multiple segregation of natural gas (2500 MMSCFD) MUSCAR resort in Punta de Mata.
Year 2011. (PDVSA).
 Basic engineering increased compression capacity in low and medium pressure Carito Pirital in Punta de Mata.
Year 2012 (PDVSA).
 Basic engineering for the treatment plant and w astewater management in the oil industry. Year 2012. (PDVSA).
 Implantation of the project Multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata.
Year 2013. (PDVSA).
 Implantation of the project increased compression capacity in low and medium pressure Carito Pirital in Punta de
Mata. Year 2014 (PDVSA).
 EPC for the Project increase compression capacity in low (60 psig) and medium (450 psig) pressure Carito Pirital
in Punta de Mata. Year 2013- (PDVSA).
 EPC for the Gas Lift Plant (4500 psig) in “Complejo Muscar” to increase the capacity for injection in Punta de Mata.
Year 2015- (PDVSA).
 Basic engineering for the project “Increase the capacity of Dehydration in MUSCAR and Amana Complex in Punta
de Mata”. Year 2016.

More Related Content

Similar to PROCESS ENGINEER CARLOS GUERRERO sep 2016

Similar to PROCESS ENGINEER CARLOS GUERRERO sep 2016 (20)

Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
CV-JPMS-English_version
CV-JPMS-English_versionCV-JPMS-English_version
CV-JPMS-English_version
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 
CV_NOREN 2017 Malaysia
CV_NOREN 2017 MalaysiaCV_NOREN 2017 Malaysia
CV_NOREN 2017 Malaysia
 
Arthur Gaspari _ Curriculum _ Oct2016
Arthur Gaspari _ Curriculum _ Oct2016Arthur Gaspari _ Curriculum _ Oct2016
Arthur Gaspari _ Curriculum _ Oct2016
 
RESUME ( Salman Khanzada)
RESUME ( Salman Khanzada)RESUME ( Salman Khanzada)
RESUME ( Salman Khanzada)
 
DCG_CV
DCG_CVDCG_CV
DCG_CV
 
Resume_Neander Alessandro da Silva PaulaRev1
Resume_Neander Alessandro da Silva PaulaRev1Resume_Neander Alessandro da Silva PaulaRev1
Resume_Neander Alessandro da Silva PaulaRev1
 
CV-DF-15
CV-DF-15CV-DF-15
CV-DF-15
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
20161206CJRogers
20161206CJRogers20161206CJRogers
20161206CJRogers
 
Chris dixon cv met nl overzicht
Chris dixon cv met nl overzichtChris dixon cv met nl overzicht
Chris dixon cv met nl overzicht
 
MARIANELA MARTÍN BETANCOURT
MARIANELA MARTÍN BETANCOURTMARIANELA MARTÍN BETANCOURT
MARIANELA MARTÍN BETANCOURT
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
ResUSAjobsEng
ResUSAjobsEngResUSAjobsEng
ResUSAjobsEng
 
SIMPLE Resume 2015
SIMPLE Resume 2015SIMPLE Resume 2015
SIMPLE Resume 2015
 
CV Daniel Zuniga (English Rev11)
CV Daniel Zuniga (English Rev11)CV Daniel Zuniga (English Rev11)
CV Daniel Zuniga (English Rev11)
 
Cv Olc In
Cv Olc InCv Olc In
Cv Olc In
 
CV-Ulises Cortes Gomez-English
CV-Ulises Cortes Gomez-EnglishCV-Ulises Cortes Gomez-English
CV-Ulises Cortes Gomez-English
 

PROCESS ENGINEER CARLOS GUERRERO sep 2016

  • 1. CARLOS EDUARDO GUERRERO AGUILAR PROFILE Degree: Chemical Engineer “Universidad de los Andes” 2004 Venezuela. Profession: Process Engineer / Project Engineer Date of Birth: 09/24/1981 Nationality:Venezuelan Phone: 00 58 414 7299297 E-mail: GUERREROCN@GMAIL.COM / GUERREROCN@PDVSA.COM EXPERIENCE BS in Chemical Engineering w ith all experience in Gas Engineering and Industrial Projects w ith over 10 years of experience w orking in projects of oil and gas during Planning, Engineering, Procurement, Construction, precommisioning and commissioning, know ledge of environmental regulations and technologies used for process and treatment of oil and natural gas. Experience in more than 15 minor and 5 major Projects in oil and gas industries, experience in development of business portfolio, planning and strategies for oil and gas industries. Leadership skills, Ability to w ork effectively in teams. Ability to lead a group of engineers, and designers on assigned projects. Ability to field w ork and open to travel. Organized and efficient in achieving the goals. ROLES AND RESPONSABILITIES Department: Major Projects PDVSA (Exploration and Production) Position: Process Engineering Leader for:  Basic engineering for multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year 2010. (PDVSA)  Details engineering for multiple segregation of natural gas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year 2011. (PDVSA).  Basic engineering increased compression capacity in low and medium pressure Carito Pirital in Punta de Mata. Year 2012 (PDVSA).  Basic engineering for the treatment plant and w astewater management in the oil industry. Year 2012. (PDVSA).  Implantation of the project Multiple segregation of naturalgas (2500 MMSCFD) MUSCAR Complex in Punta de Mata. Year 2013. (PDVSA).  Implantation of the project increased compression capacity in low and medium pressure Carito Pirital in Punta de Mata. Year 2014 (PDVSA).  EPC for the Project increase compression capacity in low (60 psig) and medium (450 psig) pressure Carito Pirital in Punta de Mata. Year 2013-Current (PDVSA).  EPC for the Gas Lift Plant (4500 psig) in “Complejo Muscar” to increase the capacity for injection in Punta de Mata. Years: 2015 – current.  Basic engineering for the project “Increase the capacity of Dehydration in MUSCAR and Amana Complex in Punta de Mata”. Year 2016 – current Departament: PDVSA Industry Position: President in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “ Years: 2009 - 2010 Departament: PDVSA Industry Position: Manager in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “ Years: 2008 - 2009 Departament: Major Projects PDVSA (Exploration and Production) Position: Process Engineering Leader for Oil and Gas Projects. Years: 2007 - 2008
  • 2. Departament:Engineering and Construction. SOCA Consulting and Engineering for PDVSA Off Shore / On Shore Position: Process Engineer. Years: 2006 - 2007 Departament: Engineering and Construction ORICONSULT Consulting and Engineering for PDVSA Off Shore / On Shore Position: Process Engineer. Years: 2005 - 2006 SKILL AND KNOWLEDGES  Capable of managing technical and administrative aspects of project execution. Participates in planning, scheduling and supervision activities for major project like Engineering, procurement and construction.  Technically responsible for all assigned projects and studies. Capable of leading projects throughout the entire process design effort.  Advanced knowledge in process and hydraulics simulators: HYSYS, PRO II, ASPEN PLUS, PIPEPHASE, HEXTRAN, HTRI and PIPESIM, Prepares and/or review scalculations, simulating, specifications and other engineering assignments as assigned.  Design of plants for handling low , medium and high pressure.  Extensive experience in Design of Gas compressors Plant, Oil Plant, Water treatment plants, Gas treatment plants.  Responsible for the planning, evaluation and promotion of projects for Petróleos de Venezuela S.A.  Management Guidelines Management of Capital Investment, development and coordination of FEL, Planning, Control projects and project management in all phases.  Experience in developing plans and plant processesPFD PLOT PLAN, Lift isometric draw ings and reading and management of engineering draw ings.  Performing Service Agreements (ADS), Views, Decision Support Document (DSD), general know ledge of administrative procedures in the development of engineering projects.  Development and evaluation of projects: defining, planning, equipment sizing, paperw ork, quotes, inspections; in each of the phases of engineering projects.  Ability to Organize, prioritize, and plan w orkactivities, while using time efficiently.  Ability for gathers and analyzes information skillfully, w hile developing alternative solutions, if necessary.  Ability for Understands business implications of decisions.  Experience Working w ith and communicates effectivelywith customers and vendors.  Ability for Understands both the technicaland commercial aspects of the organization's projects and proposals  Proficient in Microsoft Window s, Word, Excel, Pow er Point, Project, Financial data, Internet research.  Proven effective written and oralcommunication skills in clearly presenting complex data.  Ability to w orkeffectivelyas a part of a team or individually.  Facility to w orkunder pressure.  Willingness to w orkanywhere in the w orld. TRAINING  April2015 Analysis, Dimensioning and Multiphase netw orks, PIPEPHASE advanced. PDVSA Maturin, Monagas. Duration 24 hours.  April2015 Analysis and Operability Hazard. HAZOP. PDVSA Maturin, Monagas. Duration 16 hours.  March 2015 Fundaments of Automation, PDVSA Maturin, Monagas. Duration 16 hours.  Year 2014 English advanced Course. TOP Notch. PDVSA Maturin Monagas. Duration 160 hours  Nov 2013 Project Planning and Management using Earned Value, PDVSA Maturin, Monagas Duration 40 hours  July 2013 – March 2014 Advanced Level English Course, Learning Technologies Institute, Maturin Monagas, Duration 8 Months  Dic 2013 Modelage advanced process using ASPEN HYSYS, Caracas-Venezuela- HYPROTEC-PDVSA / 40 Hrs ..  Year 2012 Conflict Management and Negotiations, PDVSA, Punta de Mata July 2012 Duration 16 hours  Year 2012 Advanced CentrifugalCompressors, USB Caracas July 2012 Duration 16 hours
  • 3.  Year 2011 Technical Conference Steering And Natural Gas Conditioning – Intevep Duration 24 hours.  Year 2011 Design And Simulation Of Heat Exchangers, PDVSA, Paraguaná 22 al 23 November 2011 Duration 16 hours.  Year 2011 Integral Congress XXI Latin American Hydrocarbon And Petroleum Exhibition, Puerto La Cruz 26 al 30 septiembre 2011. Duration 24 hours.  Year 2010 “Hiring at PDVSA” PDVSA., Caracas 03 y 04 March. Duration 16 hours.  Year 2009 “Project Management” PDVSA., Caracas 20 y 21 March. Duration 16 hours.  Year 2008 “Fourth National Symposium and First International Surfactants and Applications”University of los Andes, Mérida del 27 al 31 October. Duration 40 hours.  Year 2008 “Primavera for Engineering and Constructions Applied Project Planning and Control”, Caracas 01 to 03 October. Duration 24 hours.  Year 2008 “Project Planning and Control I”. Manny Ron Consultores. CAMO Monagas 10 to 14 March. Duration 40 hours.  Year 2007 “Management Processes and Change” HIDROEX. CAMO Monagas. 12 al 16 November 2007. Duration 40 hours.  Year 2007 4tas. Days of PCP "Safety is everyone's responsibility ".. INTEVEP Los Teques Edo. Miranda. 20 to 24 August 2007. Duration 10 hours.  Year 2007 “ReferentialFramew orkManagement, Planning, Project Management and Control” CVG – EDELCA. Puerto Ordaz Edo. Bolívar 13 to 15 June. Duration 24 hours.  Year 2006 “I days Emergent Management in Venezuela” Convenio UDO – University Yacambú completed el 31 de June. Duration 8 hours.  Year 2006 “Safety driving” PDVSA – CAMO completed entre el 06 y el 07 Marzo 2006 Duration 16 hours.  Year 2005 “Treatment of Natural Gas” ICONSA Maracaibo completed 07 to 11 November 2005. Duration 40 hours.  Year 2004. “Surfactants and their Applications”. Materia Especial. University of los Andes. Laboratory FIRP. Chemical Engineering School. Duration 6 months.  Year 2002 – 2004 “Basic English Course - Intermediate - Advanced”. University of los Andes, .Duration 2 Years.  Year 2003 “Filtration processesusing solid membranes and liquid”. University of los Andes. Duration 6 hours theoreticalpractices. COMPUTER SKILL  HYSYS.  PRO II.  ASPEN PLUS.  PIPEPHASE.  HEXTRAN.  HTRI.  PIPESIM.  OFFICE.  LOTUS NOTE. LANGUAGES  SPANISH.  ENGLISH. MOST RELEVANT PROJECTS  Conceptual engineering for gas dehydration plant in Orocual Complex. Year 2005. (PDVSA)
  • 4.  Conceptual Engineering, biphasic pipe until CIGMA in Field Mariscal Sucre Off Shore in Cumana Sucre. Year 2005. (PDVSA).  Conceptual Engineering management crude by rail from Caripito to CIGMA Year 2005 (PDVSA).  Basic Engineering for the operational centers of production of oiland gas in San Tomé Year 2006 (PDVSA).  Conceptual Engineering for Plant Improvement and Gas Processing In CIGMA. Year 2006 (PDVSA GAS).  Basic Engineering for the operational center of production of oil and gas (NIF) in Punta de Mata. Year 2006 (PDVSA).  Assignment to the ministry of basic industries such as process engineer for Cement Plant Project in Cerro Azul Maturin Monagas. Year 2007.  Conceptual engineering for the installation of factory high-pressure vessels. Year2008. (PDVSA Industrial).  Conceptual engineering for the installation of a drill factory. Year2008. (PDVSA Industrial).  Manager in joint venture w ith Hungary Company PLES ZRT “Venezuela Mobile Plant “. Year 2009. (PDVSA Industrial).  Basic engineering for multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year 2010. (PDVSA)  Details engineering for multiple segregation of natural gas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year 2011. (PDVSA).  Basic engineering increased compression capacity in low and medium pressure Carito Pirital in Punta de Mata. Year 2012 (PDVSA).  Basic engineering for the treatment plant and w astewater management in the oil industry. Year 2012. (PDVSA).  Implantation of the project Multiple segregation of naturalgas (2500 MMSCFD) MUSCAR resort in Punta de Mata. Year 2013. (PDVSA).  Implantation of the project increased compression capacity in low and medium pressure Carito Pirital in Punta de Mata. Year 2014 (PDVSA).  EPC for the Project increase compression capacity in low (60 psig) and medium (450 psig) pressure Carito Pirital in Punta de Mata. Year 2013- (PDVSA).  EPC for the Gas Lift Plant (4500 psig) in “Complejo Muscar” to increase the capacity for injection in Punta de Mata. Year 2015- (PDVSA).  Basic engineering for the project “Increase the capacity of Dehydration in MUSCAR and Amana Complex in Punta de Mata”. Year 2016.