Berger's Paint Guide is an overview of what the process is. Broken down into three key segments, the guide provides a high-level understanding of the painting process. Created by Berger Paints Bangladesh Limited.
2. Why is it important?
Before we start off with understanding the process of Painting Interior Walls, its
important we know why we should know the whole process.
Paint, like any other part of your home, serves a protective and decorative purpose.
Painting is not an instantaneous process but rather a build up.
Which is why steps such as pre-painting & surface preparation are crucial to
understand.
We believe our customers need to have such understanding so that they can
themselves understand their paint-related needs.
4. Pre-Painting
Always check the wall
for dampness or water
leakage
Rectify any water leakage
or dampness. To remove
dampness, use Mr. Expert
Damp Stop
Checkfor any loose plaster. An
easy way to find loose plaster is
by tapping on the walls. If there is
a hollow sound, it indicates loose
plaster
Propermasonry work
must be done to fill up
cracks or you can use
Mr. Expert CrackFiller
Allow enoughtime for
the wall to mature (7-
21 days)
1 2 3
4 5
5. Surface Preparation
Allow newly plastered
walls to mature for at
least 6 months
Remove any loose
particles with
sandpaper
Ensure that the wall is
dry and free from dust,
dirt, or grease
Remove any previous
coatings if not in good
condition
Remove any cracked
or flaked paint
1 2 3
4 5
6. Painting
On a clean and dry
surfaceapply
Robbialac WaterBased
Sealer thinned with
water100%
1 After drying of wall,
apply two coats of
Robbialac Wall Putty
with 6-8 hrs interval
2 After 24 hrs of proper
drying, smoothenthe
surfacewith sandpaper
to provide a sound
surfacefor paint.
3
Apply one coat of
Robbialac WaterSealer
thinned with water
100%
4 Apply paint as the
instruction given. Best
if you apply two coats
for perfectfinish.
5
7. Would you like to know more?
Call our Toll-Free Numberfor more
information
Visit our Home Décor Branch to avail
our services