SlideShare a Scribd company logo
1 of 5
Dear Sir,
This is for your kind information that I am a diploma mechanical
engineer having thirty four (34) years of experience on ventilation
air-conditioning and pollution control system fields.
During my working span I have worked five years (5) with M/S United
consultants (I) pvt.ltd. Kolkata and the rest twenty nine (29) years with
M/s M. N. Dastur & Company private limited Kolkata from where I have
retired on January 2015. Now I am working as a freelancer and looking for
a suitable job.
My CV is attached herewith for your kind consideration. Hope you will
find the same in line with your requirement and give me a chance to prove
my efficiency.
With regards.
Barin Kumar Ghosh
Date: 10.02.2016
BARIN KUMAR GHOSH
Present Address:
14/A/1, Rishi Bankim Street,
Post.- Konnagar Dist- Hooghly
Pin. 712235 West Bengal
Date of Birth:21.01.1955
Contact & Email :
99 03 180 102 , 89 81 408 845
ghoshbarin01@gmail.com
EDUCATIONAL QUALIFICATION :
Passed Higher secondary examination in the year 1973 with 44.3 % marks.
Passed diploma in mechanical engineering(L.M.E) in the year 1979 with 64% marks .
CARRIER OBJECTIVE:
Seeking a position in the organization that provides ample opportunity
to explore & excel in the field of engineering & technology working in unison towards
organizational & personal excellence & prosperity.
PROFESSIONAL EXPERIENCE :
Worked at United Consultants India private ltd. Kolkata, as A MECHANICALDRAFTSMAN
from June 1980 to January 1986.
Worked at M.N.DASTUR & CO.PVT.LTD. From February 1986 to January 2015
And“Retired On 31st
January2015” as AdditionalChiefDesigner.
Presently, I am engaged with a organization for design and drawing of air conditioning
system.
SUMMARY OF SKILLS:
(A) SPECILIZATION:
I) Design of ventilation and air conditioning system:
A) HEAT LOAD CALCULATION FOR SELECTION OF EQUIPMENT.
B) PREPERATION OF P & I DIAGRAMFOR AIR CONDITIONING SYSTEM.
C) PREPARATION OF BILL OF QUANTITY FOR AIR CONDITIONING SYSTEM.
D) PREPERATION OF EQUIPMENT & DUCT LAYOUT DRAWING FOR AIR CONDITIONING SYSTEM.
E) CONCEPT ON SELECTION OF DIFFERENT TYPE OF AIR CONDITIONER-PAC, AHU, SAC ETC.AND
DIFFERENT TYPE OF VENTILATION SYSTEMIE DRY AIR ,WASHED AIR ETC.
II) Design of chilled water plant:-
A) DIFFERENT TYPE OF CHILLED WATER PLANT (I.E.OPEN & CLOSE).
B) PREPERATION OF P & I DIAGRAMFOR CHILLED WATER PLANT.
C) PREPARATION OF BILL OF QUANTITY FOR CHILLED WATER PLANT.
D) DESIGN OF PIPE NETWORK FOR CHILLED WATER SYSTEM.
E) CONCEPTON SELECTION OFDIFFERENT TYPE OF CHILLER –CC,SC,RCETC.,
F) PREPERATION OFLAYOUT FORCHILLED WATER PLANT
III) Designof dust extraction system:-
A) SELECTION OF DIFFERENT TYPE OF DE SYSTEM(I.E.BF & ESP).
B) PREPERATION OF P & I DIAGRAMFOR DE SYSTEM.
C) CAPACITY CALCULATION FOR DE SYSTEM
D) PREPERATION OF LAYOUT FOR DE SYSTEM
Responsibility:
Planning, Preparation of drawings for Ventilation
Air Conditioning and Dust Extraction for basic and detail engineering, preparation of
tender drawing, scrutiny of vendor drawings along with site supervision.
Typical Projects Handled Related to HVAC & Pollution control System:
Vizag steel plant (RINL) Visakhapatnam:
Vsp 3.0 & 6.3 Expansion Project(Phase-I &II )MTPA
A) Air conditioning System B) Ventilation System
C) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision
Tata Steel Modernisation &Growth Plan Project ( Jamshedpur):
F-Blast Furnace for Gas Cleaning System
Blast Furnace stock house by ESP
Lime and Coke circuit of RMHS
Sinter Plant-3
6th-Lime Kiln
A) Air conditioning System B) Ventilation System
C) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision
Tar Bonded Dolomite Brick Plant (Phase-I)
Tata Refractory Limited ( Belpahar-Odisha )
A) Ventilation System B) D. E. System C) Site Supervision
Rourkela Steel Plant ( Project):
Steel Melt Shop
Coal Handling Plant at RMHS
A) Air conditioning System B) Ventilation System
B) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision
.
Oman Cement Plant (Oman)
A) Air conditioning System B) Ventilation System
Mandideep Electrical Gr. Plant (Bilaspur)
A) Air conditioning System B) D. E System
AMIL Malayesia:
A) Air conditioning System B) Ventilation System
Alqyaran Steel, KSA, Dammam:
A) Air conditioning System B) Ventilation System
HOBBIES:
READING EDUCATIONAL BOOKS

More Related Content

Viewers also liked

Aly Sayed CV
Aly Sayed CVAly Sayed CV
Aly Sayed CVAli Said
 
Senior Document Controller
Senior Document ControllerSenior Document Controller
Senior Document ControllerRawan Almasri
 
Karly Kiefer Final SRP
Karly Kiefer Final SRPKarly Kiefer Final SRP
Karly Kiefer Final SRPKarly Kiefer
 
Derecho constitucional.
Derecho constitucional.Derecho constitucional.
Derecho constitucional.EmiFabi
 
Mozammal Haque BD resume 2016.
Mozammal Haque BD resume 2016.Mozammal Haque BD resume 2016.
Mozammal Haque BD resume 2016.Mozammal Haque
 
Aplicaciones móviles
Aplicaciones móvilesAplicaciones móviles
Aplicaciones móvilesAngel Diaz
 
No doctors requried
No doctors requriedNo doctors requried
No doctors requriedAaron Saund
 
Michael Stefan - Actuarial Society 2011 Convention Template
Michael Stefan - Actuarial Society 2011 Convention TemplateMichael Stefan - Actuarial Society 2011 Convention Template
Michael Stefan - Actuarial Society 2011 Convention TemplateMichael Stefan
 
Presentacion Sociología Erika Medina
Presentacion Sociología Erika MedinaPresentacion Sociología Erika Medina
Presentacion Sociología Erika MedinaSherolki
 
Viracopos relatorio final-loteamentos
Viracopos relatorio final-loteamentosViracopos relatorio final-loteamentos
Viracopos relatorio final-loteamentosLaura Magalhães
 

Viewers also liked (13)

Aly Sayed CV
Aly Sayed CVAly Sayed CV
Aly Sayed CV
 
Senior Document Controller
Senior Document ControllerSenior Document Controller
Senior Document Controller
 
Karly Kiefer Final SRP
Karly Kiefer Final SRPKarly Kiefer Final SRP
Karly Kiefer Final SRP
 
Derecho constitucional.
Derecho constitucional.Derecho constitucional.
Derecho constitucional.
 
Mozammal Haque BD resume 2016.
Mozammal Haque BD resume 2016.Mozammal Haque BD resume 2016.
Mozammal Haque BD resume 2016.
 
Pythagore_longueurs
Pythagore_longueursPythagore_longueurs
Pythagore_longueurs
 
bob resume 2
bob resume 2bob resume 2
bob resume 2
 
Aplicaciones móviles
Aplicaciones móvilesAplicaciones móviles
Aplicaciones móviles
 
No doctors requried
No doctors requriedNo doctors requried
No doctors requried
 
Michael Stefan - Actuarial Society 2011 Convention Template
Michael Stefan - Actuarial Society 2011 Convention TemplateMichael Stefan - Actuarial Society 2011 Convention Template
Michael Stefan - Actuarial Society 2011 Convention Template
 
Dpto de rrpp
Dpto de rrppDpto de rrpp
Dpto de rrpp
 
Presentacion Sociología Erika Medina
Presentacion Sociología Erika MedinaPresentacion Sociología Erika Medina
Presentacion Sociología Erika Medina
 
Viracopos relatorio final-loteamentos
Viracopos relatorio final-loteamentosViracopos relatorio final-loteamentos
Viracopos relatorio final-loteamentos
 

Similar to CV-Barin ghosh January 2016

CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)Sukanta Dalai
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam Das
 
Amol Dhobale resume(1)
Amol Dhobale resume(1)Amol Dhobale resume(1)
Amol Dhobale resume(1)DHOBALEA
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experienceSachin Patil
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1Rajendra Yadav
 
ANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMANANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMANAnisur rahman
 

Similar to CV-Barin ghosh January 2016 (20)

Udaya_Resume
Udaya_ResumeUdaya_Resume
Udaya_Resume
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)
 
K RAJ C A
K RAJ C AK RAJ C A
K RAJ C A
 
RESUME_kls
RESUME_klsRESUME_kls
RESUME_kls
 
Karthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical EngineerKarthikeyan B.E Mechanical Engineer
Karthikeyan B.E Mechanical Engineer
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
 
Amol Dhobale resume(1)
Amol Dhobale resume(1)Amol Dhobale resume(1)
Amol Dhobale resume(1)
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
Project Engineer_Ravi
Project Engineer_RaviProject Engineer_Ravi
Project Engineer_Ravi
 
Bhimasen Yadawad-3
Bhimasen Yadawad-3Bhimasen Yadawad-3
Bhimasen Yadawad-3
 
CV copy-2
CV copy-2CV copy-2
CV copy-2
 
Cv copy 2 (1)
Cv copy 2 (1)Cv copy 2 (1)
Cv copy 2 (1)
 
Resume 25-06-2016
Resume 25-06-2016Resume 25-06-2016
Resume 25-06-2016
 
ANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMANANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMAN
 

CV-Barin ghosh January 2016

  • 1. Dear Sir, This is for your kind information that I am a diploma mechanical engineer having thirty four (34) years of experience on ventilation air-conditioning and pollution control system fields. During my working span I have worked five years (5) with M/S United consultants (I) pvt.ltd. Kolkata and the rest twenty nine (29) years with M/s M. N. Dastur & Company private limited Kolkata from where I have retired on January 2015. Now I am working as a freelancer and looking for a suitable job. My CV is attached herewith for your kind consideration. Hope you will find the same in line with your requirement and give me a chance to prove my efficiency. With regards. Barin Kumar Ghosh Date: 10.02.2016
  • 2.
  • 3. BARIN KUMAR GHOSH Present Address: 14/A/1, Rishi Bankim Street, Post.- Konnagar Dist- Hooghly Pin. 712235 West Bengal Date of Birth:21.01.1955 Contact & Email : 99 03 180 102 , 89 81 408 845 ghoshbarin01@gmail.com EDUCATIONAL QUALIFICATION : Passed Higher secondary examination in the year 1973 with 44.3 % marks. Passed diploma in mechanical engineering(L.M.E) in the year 1979 with 64% marks . CARRIER OBJECTIVE: Seeking a position in the organization that provides ample opportunity to explore & excel in the field of engineering & technology working in unison towards organizational & personal excellence & prosperity. PROFESSIONAL EXPERIENCE : Worked at United Consultants India private ltd. Kolkata, as A MECHANICALDRAFTSMAN from June 1980 to January 1986. Worked at M.N.DASTUR & CO.PVT.LTD. From February 1986 to January 2015 And“Retired On 31st January2015” as AdditionalChiefDesigner. Presently, I am engaged with a organization for design and drawing of air conditioning system. SUMMARY OF SKILLS: (A) SPECILIZATION: I) Design of ventilation and air conditioning system: A) HEAT LOAD CALCULATION FOR SELECTION OF EQUIPMENT. B) PREPERATION OF P & I DIAGRAMFOR AIR CONDITIONING SYSTEM. C) PREPARATION OF BILL OF QUANTITY FOR AIR CONDITIONING SYSTEM. D) PREPERATION OF EQUIPMENT & DUCT LAYOUT DRAWING FOR AIR CONDITIONING SYSTEM.
  • 4. E) CONCEPT ON SELECTION OF DIFFERENT TYPE OF AIR CONDITIONER-PAC, AHU, SAC ETC.AND DIFFERENT TYPE OF VENTILATION SYSTEMIE DRY AIR ,WASHED AIR ETC. II) Design of chilled water plant:- A) DIFFERENT TYPE OF CHILLED WATER PLANT (I.E.OPEN & CLOSE). B) PREPERATION OF P & I DIAGRAMFOR CHILLED WATER PLANT. C) PREPARATION OF BILL OF QUANTITY FOR CHILLED WATER PLANT. D) DESIGN OF PIPE NETWORK FOR CHILLED WATER SYSTEM. E) CONCEPTON SELECTION OFDIFFERENT TYPE OF CHILLER –CC,SC,RCETC., F) PREPERATION OFLAYOUT FORCHILLED WATER PLANT III) Designof dust extraction system:- A) SELECTION OF DIFFERENT TYPE OF DE SYSTEM(I.E.BF & ESP). B) PREPERATION OF P & I DIAGRAMFOR DE SYSTEM. C) CAPACITY CALCULATION FOR DE SYSTEM D) PREPERATION OF LAYOUT FOR DE SYSTEM Responsibility: Planning, Preparation of drawings for Ventilation Air Conditioning and Dust Extraction for basic and detail engineering, preparation of tender drawing, scrutiny of vendor drawings along with site supervision. Typical Projects Handled Related to HVAC & Pollution control System: Vizag steel plant (RINL) Visakhapatnam: Vsp 3.0 & 6.3 Expansion Project(Phase-I &II )MTPA A) Air conditioning System B) Ventilation System C) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision Tata Steel Modernisation &Growth Plan Project ( Jamshedpur): F-Blast Furnace for Gas Cleaning System Blast Furnace stock house by ESP Lime and Coke circuit of RMHS Sinter Plant-3 6th-Lime Kiln A) Air conditioning System B) Ventilation System C) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision Tar Bonded Dolomite Brick Plant (Phase-I) Tata Refractory Limited ( Belpahar-Odisha ) A) Ventilation System B) D. E. System C) Site Supervision Rourkela Steel Plant ( Project): Steel Melt Shop Coal Handling Plant at RMHS A) Air conditioning System B) Ventilation System B) D. E. System D) Scrutiny of Vendor Drawing E) Site Supervision .
  • 5. Oman Cement Plant (Oman) A) Air conditioning System B) Ventilation System Mandideep Electrical Gr. Plant (Bilaspur) A) Air conditioning System B) D. E System AMIL Malayesia: A) Air conditioning System B) Ventilation System Alqyaran Steel, KSA, Dammam: A) Air conditioning System B) Ventilation System HOBBIES: READING EDUCATIONAL BOOKS