1 Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances
Briefing Note
Impact of Rooftop Solar by C&I consumers on
TANGEDCO’s Finances
Date: February 2021
Author: Martin Scherer
Email: martin@aurovilleconsulting.com
To assess the commercial impact of consumer category solar energy systems (rooftop solar under
net feed-in mechanism) by commercial and industrial consumers (C&I) on TANGEDCO as per data
available for FY 2018-19.
All average billing rates for C&I consumers (tariff rates LT V, LT III B, HT I-A and HT II) except for HT
III (commercial) are below TANGEDCO’s average cost of supply.
The current solar net feed-in tariff for consumer category solar energy systems of 2.28 INR/kWh is
60% lower than TANGEDCO’s Average Power Purchase cost with 5.81 INR/kWh (TANGEDCO 2018).
Surplus solar energy from consumer category solar systems avoids transmission costs, contributes
to voltage stability, and possibly defers upgradation of distribution and transmission infrastructure
(CEEW 2019).
Consumer category solar energy systems for all HT and LT C&I consumers reduce TANGEDCO’s cost
of supply. TANGEDCO’s Average Cost of Supply (including Power Purchase Cost, Transmission and
Distribution losses, and fixed costs) for FY 2018-19 stood at INR 8.04 whereas surplus solar energy
supplied to TANGEDCO from consumer category solar energy systems (including Power Purchase
Cost, Distribution losses, and fixed costs) comes at a cost of supply of 3.86 INR/kWh. Solar energy
sourced from consumer category solar energy systems, therefore, represents a reduction in the cost
of supply to TANGEDCO of 52% (refer to Figure 1). This savings are expected to higher in the current
financial year (FY 2020-21) as the Average Cost of Supply for TANGEDCO will have increased. This
assumes that TANGEDCO is recovering its fixed cost of generation for its ongoing power purchase
agreements (PPAs) from demand/fixed charges or that rooftop solar capacity added by C&I consumers
is avoiding the signing of new PPA’s or the addition of TANGEDCO owned new generation capacity.
Purpose
Key messages
2
Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances
Figure 1Comparison average cost of supply vs cost of supply of solar energy export to grid from rooftop solar systems
The Tamil Nadu Solar Energy Policy 2019 excludes HT consumers from availing the net feed-in
metering mechanism. This discourages a large segment of industrial, commercial, and institutional
consumers from installing consumer category solar PV plants. The only option available for these HT
consumers for generating solar energy on their premises is to operate the plant under paralleling, in
which any excess generation has to be either curtailed or stored. Further, the parallel operation of a
rooftop solar plant attracts a monthly parallel operation charge (TNERC 2019).
One key driver for excluding HT consumers from the net feed-in mechanism was a perceived revenue
loss in the case of HT consumers installing rooftop solar energy systems. Under the existing cross-
subsidy scheme higher tariff paying consumers are cross-subsidizing lower tariff paying consumers.
The Indian Electricity Act, 2003 (EA 2003) under section 61(g) states that the appropriate Commission
must be guided with the fact that the tariff progressively reflects the cost of supply of electricity and,
reduces cross-subsidies. Other sections in the Act (38, 39, 40, 42, 178 (2) (k), (m) & (r) 181 (2) (j), (m),
(p) & (zc)) also refer to cross-subsidies pointing out that cross-subsidies shall be progressively reduced
in the manner as may be specified by the Central Commission or State Commission. Similarly, the
National Tariff Policy 2016 under section 8.3 recommends that ‘subsidies should be targeted effectively
and in a transparent manner’(Ministry of Power 2018).
In the period from 2010 to 2020, tariff petitions were not submitted by TANGEDCO to TNERC for the
years 2011, 2015, 2016, and 2020. The TNERC tariff order of 2017 includes tariffs for the years 2018
and 2019 as well. However, the 2017 tariff order has kept energy and demand/fixed charges stable and
now tariff increase was implemented for 2018 and 2019 (TNERC 2017).
Currently, TANGEDCO recovers its cost of supply from a few consumer tariff categories only. For the
majority of consumers, TANGEDCO bears a loss on every kWh of electricity supplied. In the FY 2012-
13 to FY 2017-18, the average billing rate (ABR) has been consistently lower than the average cost of
supply (ACoS) (Auroville Consulting 2020a).
The Tamil Nadu Solar Energy Policy sets a consumer category solar energy target of 3,600 MW by
2023. As of December 2020 6.87% of this target has been achieved. If the target of 3,600 MW is
achieved by 2023 the solar energy from consumer category solar energy will represent an approximate
4% of the total electricity consumption in Tamil Nadu only (Auroville Consulting 2020b).
Background
3 Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances
1 
These values have been derived by taking the average annual consumption for each LT and HT consumer category in the
state and simulating the monthly Average Billing Cost.
The impact on TANGEDCO’s net revenue for different solar energy penetration scenarios (25% 50%
and 100% in energy terms) of CI consumers is explored.
A comparison of the financial impact on TANGEDCO between paralleling mechanism and solar net
feed-in mechanism for HT CI consumers is undertaken.
Zero export of surplus solar energy under the paralleling mechanism is assumed.
As per the TANGEDCO, the Average Cost of Supply for FY 2018-19 stood at 8.04 INR/kWh. Assuming
average LT and HT CI consumers the Average Billing Rate (including energy and fixed/demand
charges) for 2 out of the 4 CI consumer categories (tariff rates LT V, LT III B, HT I-A, and HT II) is
below the Average Cost of Supply (refer to Figure 2). The Average Billing Rate includes both electricity
charges and demand/fixed charges.1
The average revenue loss per kWh supplied is highest for the LT III B consumer category with a loss of
INR 1.67 per kWh. For HT III TANGEDCO receives a net billing gain of 1.16 INR/kWh (refer to Figure 3).
Considerations
Results
Figure 2 Comparison TANGEDCOs Average Cost of Supply (ACoS) vs Average Billing Rate (ABR) for CI consumer categories
Figure 3 TANGEDCO’s average revenue gains/losses per kWh supplied to CI consumer categories
4
Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances
Figure 4 Impact of different solar energy penetrations of CI consumers on TANGEDCO’s net billing revenue
Comparing the financial impacts on TANGEDCO’s billing revenue between supply from the grid only
(BAU), with the currently available paralleling mechanism and with the net feed-in mechanisms for HT
CI consumer categories for the 100% solar energy penetration scenario, indicates that TANGEDCO
clearly benefits from consumer category solar energy systems for CI consumers. The financially least
attractive option to TANGEDCO is the Busines as Usual case (supply from the grid only). The benefits
to TANGEDCO are the highest, if the paralleling mechanism were to be replaced with a net feed-in
mechanism (refer to Figure 5).
If the solar net feed-in mechanism with the current net feed-in tariff of 2.28 INR/kWh were made
available for all CI consumers including the HT consumer categories, then TANGEDCO will benefit
from consumer category solar energy systems installed on the premises of CI consumers by reducing
its Average Cost of Supply and by increasing is net billing revenue. The analysis shows, that the higher
the solar energy penetration, the higher the benefits to TANGEDCO (refer to Figure 4). This is on
account of the fact that:
(i) 
for 2 out of the 4 C I consumer categories the Average Cost of Supply is higher than the
Average Billing Rate,
(ii) 
surplus solar energy exported by consumer category solar systems and delivered to another
consumer comes at a cost of 3.86 INR/kWh. This is 52% % below TANGEDCO’s Average Cost
of Supply of 8.04 INR/kWh (refer to Figure 1).
(iii) 
with higher solar energy penetration the units of surplus solar from the consumer category
solar energy systems injected into the grid are expected to increase, thereby increasing the
volume of low-cost solar energy available to TANGEDCO.
The benefits to TANGDCO are the highest for HT CI Consumers, this is on account of the higher
demand charges levied on HT CI consumers as compared to LT CI consumers.
Additional technical and commercial benefits to TANGEDCO such as voltage improvements,
avoided or deferred infrastructure upgradation, reduced working capital requirement or avoided
generation capacity cost has not been quantified in this note.
5 Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances
Figure 5 Comparison benefits to TANGEDCO for the BAU scenario compared to the 100% solar penetration with paralleling
and with net feed-in mechanism
Under the current schedule of tariffs, the adaptation of consumer category solar energy systems by CI
consumers presents an opportunity rather than a threat to TANGEDCO to reduce its cost of supply and
improve its billing revenue. Therefore, TANGEDCO is advised to actively facilitate consumer category
solar energy systems for all consumer categories.
In order to make consumer category rooftop solar a winning proposition to TANGEDCO the following
is recommended:
• 
Petition with TNERC to permit all consumers at all voltage levels under the net feed-in mechanism;
• Ensure that the fixed/demand charges cover TANGEDCO’s fixed cost for generation and distribution;
• 
Introduced Time of the Day (ToD) tariffs for both generation (export of surplus solar from consumer
category systems) and consumption;
• Develop a methodology to comprehensively assess the locational benefits and costs of consumer
category solar energy on TANGEDCO;
• Develop utility driven or supported rooftop solar programs (e.g. Utility as RESCO for CI consumers);
• Forecast consumer category solar energy capacity addition and including this forecast in the State’s
generation capacity addition planning;
Conclusions  Recommendations:
6
Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances
/ , Auroville Consulting (2020a). Assessing the impact of Tamil Nadu’s tariff policy on TANGECO’s
financial performance. Sustainable Energy Transformation Series. Available at: https://www.
aurovilleconsulting.com/assessing-the-impact-of-tamil-nadus-electricity-tariff-policy-on-tangedos-
financial-performance/ (Accessed on: 12rf January 20201).
0, Auroville Consulting (2020b). Status of Distributed Solar Energy in Tamil Nadu. Challenges
and Roadmap 2025. Sustainable Energy Transformation Series. Available at: https://www.
aurovilleconsulting.com/roadmap-2025-for-distributed-solar-energy-in-tamil-nadu/ (Accessed on:
12rf January 20201).
1, CEEW. Valuing Grid-connected Rooftop Solar. A Framework to Assess Cost and Benefits to
DISCOMS. Available at: https://www.ceew.in/publications/valuing-grid-connected-rooftop-solar-
framework-assess-cost-and-benefits-discoms (Accessed on 20th January 2021)
2, CERC (2003). The Electricity Act 2003. Available at http://www.cercind.gov.in/act-with-amendment.
pdf (Accessed on 14th January 2021.
3, Ministry of Power (2018). Tariff Policy Resolution. Available at: https://powermin.nic.in/sites/ default/
files/webform/notices/Proposed_amendments_in_Tariff_Policy_0.pdf (Accessed on: 12rf c
January 2021).
4, TANGEDCO (2018). Revenue Account for the Year 2017-18 Available at: https://www.tangedco.
gov.in/linkpdf/profitloss2017-18.pdf (Accessed on: 11rf January 2021)
5, TNERC (2017a). Order in T.P. No.1 of 2017. Determination of Tariff for Generation and
Distribution, Chennai. Available at: http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2017/
Tariff Order/TANGEDCO-11-08-2017.pdf (orders/Tariff%20Order%202009/2017/TariffOrder/
TANGEDCO-11-08-2017.pdf (Accessed m
l / 2rf H
_l s_p
w0. 0/ ).
6, TNERC (2019b). Order on generic tariff for solar power and related issues. Order No. 5 of 2019
dated 29-03-2019. Available at: http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/
So¬lar-5-29-03-2019.pdf (accessed on 11rf January 2021)
References

More Related Content

Similar to BRIEFING NOTE: IMPACT OF ROOFTOP SOLAR BY C&I CONSUMERS ON TANGEDCO’S FINANCES

2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...
2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...
2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...AurovilleConsulting
 
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...MURALIDHAR R
 
PPA Conference 2015 Paper Final
PPA Conference 2015 Paper FinalPPA Conference 2015 Paper Final
PPA Conference 2015 Paper FinalAjith Fernando
 
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...AurovilleConsulting
 
Pakistan 2013 - Ministry Power & Water - Roadmap to reform Power & Utility s...
Pakistan 2013 -  Ministry Power & Water - Roadmap to reform Power & Utility s...Pakistan 2013 -  Ministry Power & Water - Roadmap to reform Power & Utility s...
Pakistan 2013 - Ministry Power & Water - Roadmap to reform Power & Utility s...Atif Ahmad
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy OverviewJustin Bean
 
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...IRJET Journal
 
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET Journal
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Power System Operation
 
It approach for energy management in electrical demand
It approach for energy management in electrical demandIt approach for energy management in electrical demand
It approach for energy management in electrical demandiaemedu
 
Energy (in) efficiency for energy & environment management
Energy (in) efficiency for energy & environment managementEnergy (in) efficiency for energy & environment management
Energy (in) efficiency for energy & environment managementY P Chawla
 
Stellaris Covid-19 Nigeria energy update 2020
Stellaris Covid-19 Nigeria energy update 2020Stellaris Covid-19 Nigeria energy update 2020
Stellaris Covid-19 Nigeria energy update 2020Chinedu Igbokwe
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET Journal
 
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS”
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS” ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS”
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS” IAEME Publication
 
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGSENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGSIAEME Publication
 

Similar to BRIEFING NOTE: IMPACT OF ROOFTOP SOLAR BY C&I CONSUMERS ON TANGEDCO’S FINANCES (20)

2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...
2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...
2021 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR H...
 
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...
ARTIFICIAL INTELLIGENCE TO SUPPORT THE INTEGRATION OF VARIABLE RENEWABLE ENER...
 
PPA Conference 2015 Paper Final
PPA Conference 2015 Paper FinalPPA Conference 2015 Paper Final
PPA Conference 2015 Paper Final
 
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...
2020 SOLAR PLUS ENERGY STORAGE: FEASIBILITY OF BEHIND-THE-METER SYSTEMS FOR L...
 
Pakistan 2013 - Ministry Power & Water - Roadmap to reform Power & Utility s...
Pakistan 2013 -  Ministry Power & Water - Roadmap to reform Power & Utility s...Pakistan 2013 -  Ministry Power & Water - Roadmap to reform Power & Utility s...
Pakistan 2013 - Ministry Power & Water - Roadmap to reform Power & Utility s...
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy Overview
 
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...
Analysis of Maximum Demand of Educational Buildings and its Impact on Electri...
 
power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
 
Power plus distribution high res
Power plus distribution high resPower plus distribution high res
Power plus distribution high res
 
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
IRJET- Demand Response Optimization using Genetic Algorithm and Particle Swar...
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
 
It approach for energy management in electrical demand
It approach for energy management in electrical demandIt approach for energy management in electrical demand
It approach for energy management in electrical demand
 
Energy (in) efficiency for energy & environment management
Energy (in) efficiency for energy & environment managementEnergy (in) efficiency for energy & environment management
Energy (in) efficiency for energy & environment management
 
Stellaris Covid-19 Nigeria energy update 2020
Stellaris Covid-19 Nigeria energy update 2020Stellaris Covid-19 Nigeria energy update 2020
Stellaris Covid-19 Nigeria energy update 2020
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
 
Data
DataData
Data
 
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS”
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS” ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS”
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS”
 
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGSENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS
ENHANCEMENT OF ELECTRICAL ENERGY EFFICIENCY BY “INTERNET OF THINGS
 
ECONOMICS OF POWER GENERATION- TARIFF METHODS
ECONOMICS OF POWER GENERATION-  TARIFF METHODSECONOMICS OF POWER GENERATION-  TARIFF METHODS
ECONOMICS OF POWER GENERATION- TARIFF METHODS
 
CAPSTONE FINAL VERSION
CAPSTONE FINAL VERSIONCAPSTONE FINAL VERSION
CAPSTONE FINAL VERSION
 

More from AurovilleConsulting

Modelling Time-of-Use Electricity Tariffs for Tamil Nadu
Modelling Time-of-Use Electricity Tariffs for Tamil NaduModelling Time-of-Use Electricity Tariffs for Tamil Nadu
Modelling Time-of-Use Electricity Tariffs for Tamil NaduAurovilleConsulting
 
Auroville Consulting Annual Sustainability Report (FY 2022-2023)
Auroville Consulting Annual Sustainability Report (FY 2022-2023)Auroville Consulting Annual Sustainability Report (FY 2022-2023)
Auroville Consulting Annual Sustainability Report (FY 2022-2023)AurovilleConsulting
 
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)AurovilleConsulting
 
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADU
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADUELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADU
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADUAurovilleConsulting
 
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...AurovilleConsulting
 
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATION
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATIONMAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATION
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATIONAurovilleConsulting
 
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLE
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLETHE CARBON SEQUESTRATION POTENTIAL OF AUROVILLE
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLEAurovilleConsulting
 
REACHING 50% ENERGY FROM RENEWABLES BY 2030
REACHING 50% ENERGY FROM RENEWABLES BY 2030REACHING 50% ENERGY FROM RENEWABLES BY 2030
REACHING 50% ENERGY FROM RENEWABLES BY 2030AurovilleConsulting
 
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMES
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMESCLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMES
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMESAurovilleConsulting
 
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICT
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICTLAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICT
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICTAurovilleConsulting
 
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...AurovilleConsulting
 
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADU
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADULAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADU
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADUAurovilleConsulting
 
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...AurovilleConsulting
 
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...AurovilleConsulting
 
UNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUUNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUAurovilleConsulting
 
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...AurovilleConsulting
 
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADU
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADUBRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADU
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADUAurovilleConsulting
 
AUROVILLE SMART MINI-GRID | PHASE 2
AUROVILLE SMART MINI-GRID | PHASE 2AUROVILLE SMART MINI-GRID | PHASE 2
AUROVILLE SMART MINI-GRID | PHASE 2AurovilleConsulting
 
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCO
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCOMONITORING KEY PERFORMANCE INDICATORS OF TANGEDCO
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCOAurovilleConsulting
 
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORT
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORTLEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORT
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORTAurovilleConsulting
 

More from AurovilleConsulting (20)

Modelling Time-of-Use Electricity Tariffs for Tamil Nadu
Modelling Time-of-Use Electricity Tariffs for Tamil NaduModelling Time-of-Use Electricity Tariffs for Tamil Nadu
Modelling Time-of-Use Electricity Tariffs for Tamil Nadu
 
Auroville Consulting Annual Sustainability Report (FY 2022-2023)
Auroville Consulting Annual Sustainability Report (FY 2022-2023)Auroville Consulting Annual Sustainability Report (FY 2022-2023)
Auroville Consulting Annual Sustainability Report (FY 2022-2023)
 
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)
Rajapalayam LPA GHG Emissions Inventory (FY 2021-22)
 
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADU
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADUELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADU
ELECTRICITY SUBSIDY AND A JUST ENERGY TRANSITION IN TAMIL NADU
 
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...
LAND SUITABILITY ASSESSMENT FOR STORMWATER MANAGEMENT, MAYILADUTHURAI DISTRIC...
 
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATION
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATIONMAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATION
MAXIMISING THE BENEFITS OF DISTRIBUTED SOLAR ENERGY: AN EVALUATION
 
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLE
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLETHE CARBON SEQUESTRATION POTENTIAL OF AUROVILLE
THE CARBON SEQUESTRATION POTENTIAL OF AUROVILLE
 
REACHING 50% ENERGY FROM RENEWABLES BY 2030
REACHING 50% ENERGY FROM RENEWABLES BY 2030REACHING 50% ENERGY FROM RENEWABLES BY 2030
REACHING 50% ENERGY FROM RENEWABLES BY 2030
 
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMES
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMESCLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMES
CLEAN ENERGY ACCESS FOR TAMIL NADU’S MSMES
 
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICT
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICTLAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICT
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY, VILLUPURAM DISTRICT
 
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...
THE SOLAR ENERGY-LAND NEXUS SUSTAINABLE LAND USE STRATEGY FOR SOLAR ENERGY IN...
 
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADU
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADULAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADU
LAND SUITABILITY ASSESSMENT FOR FORESTATION, MAYILADUTHURAI DISTRICT, TAMIL NADU
 
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...
PATHWAYS TO DECARBONISATION – MODELLING TAMIL NADU’S POWER SECTOR DECARBONISA...
 
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...
LAND SUITABILITY ASSESSMENT FOR DISTRIBUTED SOLAR ENERGY MAYILADUTHURAI DISTR...
 
UNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADUUNLOCKING OFFSHORE WIND IN TAMIL NADU
UNLOCKING OFFSHORE WIND IN TAMIL NADU
 
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...
BATTERY ENERGY STORAGE SYSTEMS AS AN ALTERNATIVE TO DIESEL GENERATORS – A COM...
 
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADU
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADUBRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADU
BRIEFING NOTE: ELECTRIFICATION OF TOP-PERFORMING INDUSTRIES IN TAMIL NADU
 
AUROVILLE SMART MINI-GRID | PHASE 2
AUROVILLE SMART MINI-GRID | PHASE 2AUROVILLE SMART MINI-GRID | PHASE 2
AUROVILLE SMART MINI-GRID | PHASE 2
 
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCO
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCOMONITORING KEY PERFORMANCE INDICATORS OF TANGEDCO
MONITORING KEY PERFORMANCE INDICATORS OF TANGEDCO
 
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORT
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORTLEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORT
LEVELISED COST OF BTM STORAGE IN INDIA 2021 – A STATUS REPORT
 

Recently uploaded

(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 

Recently uploaded (20)

(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 

BRIEFING NOTE: IMPACT OF ROOFTOP SOLAR BY C&I CONSUMERS ON TANGEDCO’S FINANCES

  • 1. 1 Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances Briefing Note Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances Date: February 2021 Author: Martin Scherer Email: martin@aurovilleconsulting.com To assess the commercial impact of consumer category solar energy systems (rooftop solar under net feed-in mechanism) by commercial and industrial consumers (C&I) on TANGEDCO as per data available for FY 2018-19. All average billing rates for C&I consumers (tariff rates LT V, LT III B, HT I-A and HT II) except for HT III (commercial) are below TANGEDCO’s average cost of supply. The current solar net feed-in tariff for consumer category solar energy systems of 2.28 INR/kWh is 60% lower than TANGEDCO’s Average Power Purchase cost with 5.81 INR/kWh (TANGEDCO 2018). Surplus solar energy from consumer category solar systems avoids transmission costs, contributes to voltage stability, and possibly defers upgradation of distribution and transmission infrastructure (CEEW 2019). Consumer category solar energy systems for all HT and LT C&I consumers reduce TANGEDCO’s cost of supply. TANGEDCO’s Average Cost of Supply (including Power Purchase Cost, Transmission and Distribution losses, and fixed costs) for FY 2018-19 stood at INR 8.04 whereas surplus solar energy supplied to TANGEDCO from consumer category solar energy systems (including Power Purchase Cost, Distribution losses, and fixed costs) comes at a cost of supply of 3.86 INR/kWh. Solar energy sourced from consumer category solar energy systems, therefore, represents a reduction in the cost of supply to TANGEDCO of 52% (refer to Figure 1). This savings are expected to higher in the current financial year (FY 2020-21) as the Average Cost of Supply for TANGEDCO will have increased. This assumes that TANGEDCO is recovering its fixed cost of generation for its ongoing power purchase agreements (PPAs) from demand/fixed charges or that rooftop solar capacity added by C&I consumers is avoiding the signing of new PPA’s or the addition of TANGEDCO owned new generation capacity. Purpose Key messages
  • 2. 2 Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances Figure 1Comparison average cost of supply vs cost of supply of solar energy export to grid from rooftop solar systems The Tamil Nadu Solar Energy Policy 2019 excludes HT consumers from availing the net feed-in metering mechanism. This discourages a large segment of industrial, commercial, and institutional consumers from installing consumer category solar PV plants. The only option available for these HT consumers for generating solar energy on their premises is to operate the plant under paralleling, in which any excess generation has to be either curtailed or stored. Further, the parallel operation of a rooftop solar plant attracts a monthly parallel operation charge (TNERC 2019). One key driver for excluding HT consumers from the net feed-in mechanism was a perceived revenue loss in the case of HT consumers installing rooftop solar energy systems. Under the existing cross- subsidy scheme higher tariff paying consumers are cross-subsidizing lower tariff paying consumers. The Indian Electricity Act, 2003 (EA 2003) under section 61(g) states that the appropriate Commission must be guided with the fact that the tariff progressively reflects the cost of supply of electricity and, reduces cross-subsidies. Other sections in the Act (38, 39, 40, 42, 178 (2) (k), (m) & (r) 181 (2) (j), (m), (p) & (zc)) also refer to cross-subsidies pointing out that cross-subsidies shall be progressively reduced in the manner as may be specified by the Central Commission or State Commission. Similarly, the National Tariff Policy 2016 under section 8.3 recommends that ‘subsidies should be targeted effectively and in a transparent manner’(Ministry of Power 2018). In the period from 2010 to 2020, tariff petitions were not submitted by TANGEDCO to TNERC for the years 2011, 2015, 2016, and 2020. The TNERC tariff order of 2017 includes tariffs for the years 2018 and 2019 as well. However, the 2017 tariff order has kept energy and demand/fixed charges stable and now tariff increase was implemented for 2018 and 2019 (TNERC 2017). Currently, TANGEDCO recovers its cost of supply from a few consumer tariff categories only. For the majority of consumers, TANGEDCO bears a loss on every kWh of electricity supplied. In the FY 2012- 13 to FY 2017-18, the average billing rate (ABR) has been consistently lower than the average cost of supply (ACoS) (Auroville Consulting 2020a). The Tamil Nadu Solar Energy Policy sets a consumer category solar energy target of 3,600 MW by 2023. As of December 2020 6.87% of this target has been achieved. If the target of 3,600 MW is achieved by 2023 the solar energy from consumer category solar energy will represent an approximate 4% of the total electricity consumption in Tamil Nadu only (Auroville Consulting 2020b). Background
  • 3. 3 Briefing Note : Impact of Rooftop Solar by C&I consumers on TANGEDCO’s Finances 1 These values have been derived by taking the average annual consumption for each LT and HT consumer category in the state and simulating the monthly Average Billing Cost. The impact on TANGEDCO’s net revenue for different solar energy penetration scenarios (25% 50% and 100% in energy terms) of CI consumers is explored. A comparison of the financial impact on TANGEDCO between paralleling mechanism and solar net feed-in mechanism for HT CI consumers is undertaken. Zero export of surplus solar energy under the paralleling mechanism is assumed. As per the TANGEDCO, the Average Cost of Supply for FY 2018-19 stood at 8.04 INR/kWh. Assuming average LT and HT CI consumers the Average Billing Rate (including energy and fixed/demand charges) for 2 out of the 4 CI consumer categories (tariff rates LT V, LT III B, HT I-A, and HT II) is below the Average Cost of Supply (refer to Figure 2). The Average Billing Rate includes both electricity charges and demand/fixed charges.1 The average revenue loss per kWh supplied is highest for the LT III B consumer category with a loss of INR 1.67 per kWh. For HT III TANGEDCO receives a net billing gain of 1.16 INR/kWh (refer to Figure 3). Considerations Results Figure 2 Comparison TANGEDCOs Average Cost of Supply (ACoS) vs Average Billing Rate (ABR) for CI consumer categories Figure 3 TANGEDCO’s average revenue gains/losses per kWh supplied to CI consumer categories
  • 4. 4 Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances Figure 4 Impact of different solar energy penetrations of CI consumers on TANGEDCO’s net billing revenue Comparing the financial impacts on TANGEDCO’s billing revenue between supply from the grid only (BAU), with the currently available paralleling mechanism and with the net feed-in mechanisms for HT CI consumer categories for the 100% solar energy penetration scenario, indicates that TANGEDCO clearly benefits from consumer category solar energy systems for CI consumers. The financially least attractive option to TANGEDCO is the Busines as Usual case (supply from the grid only). The benefits to TANGEDCO are the highest, if the paralleling mechanism were to be replaced with a net feed-in mechanism (refer to Figure 5). If the solar net feed-in mechanism with the current net feed-in tariff of 2.28 INR/kWh were made available for all CI consumers including the HT consumer categories, then TANGEDCO will benefit from consumer category solar energy systems installed on the premises of CI consumers by reducing its Average Cost of Supply and by increasing is net billing revenue. The analysis shows, that the higher the solar energy penetration, the higher the benefits to TANGEDCO (refer to Figure 4). This is on account of the fact that: (i) for 2 out of the 4 C I consumer categories the Average Cost of Supply is higher than the Average Billing Rate, (ii) surplus solar energy exported by consumer category solar systems and delivered to another consumer comes at a cost of 3.86 INR/kWh. This is 52% % below TANGEDCO’s Average Cost of Supply of 8.04 INR/kWh (refer to Figure 1). (iii) with higher solar energy penetration the units of surplus solar from the consumer category solar energy systems injected into the grid are expected to increase, thereby increasing the volume of low-cost solar energy available to TANGEDCO. The benefits to TANGDCO are the highest for HT CI Consumers, this is on account of the higher demand charges levied on HT CI consumers as compared to LT CI consumers. Additional technical and commercial benefits to TANGEDCO such as voltage improvements, avoided or deferred infrastructure upgradation, reduced working capital requirement or avoided generation capacity cost has not been quantified in this note.
  • 5. 5 Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances Figure 5 Comparison benefits to TANGEDCO for the BAU scenario compared to the 100% solar penetration with paralleling and with net feed-in mechanism Under the current schedule of tariffs, the adaptation of consumer category solar energy systems by CI consumers presents an opportunity rather than a threat to TANGEDCO to reduce its cost of supply and improve its billing revenue. Therefore, TANGEDCO is advised to actively facilitate consumer category solar energy systems for all consumer categories. In order to make consumer category rooftop solar a winning proposition to TANGEDCO the following is recommended: • Petition with TNERC to permit all consumers at all voltage levels under the net feed-in mechanism; • Ensure that the fixed/demand charges cover TANGEDCO’s fixed cost for generation and distribution; • Introduced Time of the Day (ToD) tariffs for both generation (export of surplus solar from consumer category systems) and consumption; • Develop a methodology to comprehensively assess the locational benefits and costs of consumer category solar energy on TANGEDCO; • Develop utility driven or supported rooftop solar programs (e.g. Utility as RESCO for CI consumers); • Forecast consumer category solar energy capacity addition and including this forecast in the State’s generation capacity addition planning; Conclusions Recommendations:
  • 6. 6 Briefing Note : Impact of Rooftop Solar by CI consumers on TANGEDCO’s Finances / , Auroville Consulting (2020a). Assessing the impact of Tamil Nadu’s tariff policy on TANGECO’s financial performance. Sustainable Energy Transformation Series. Available at: https://www. aurovilleconsulting.com/assessing-the-impact-of-tamil-nadus-electricity-tariff-policy-on-tangedos- financial-performance/ (Accessed on: 12rf January 20201). 0, Auroville Consulting (2020b). Status of Distributed Solar Energy in Tamil Nadu. Challenges and Roadmap 2025. Sustainable Energy Transformation Series. Available at: https://www. aurovilleconsulting.com/roadmap-2025-for-distributed-solar-energy-in-tamil-nadu/ (Accessed on: 12rf January 20201). 1, CEEW. Valuing Grid-connected Rooftop Solar. A Framework to Assess Cost and Benefits to DISCOMS. Available at: https://www.ceew.in/publications/valuing-grid-connected-rooftop-solar- framework-assess-cost-and-benefits-discoms (Accessed on 20th January 2021) 2, CERC (2003). The Electricity Act 2003. Available at http://www.cercind.gov.in/act-with-amendment. pdf (Accessed on 14th January 2021. 3, Ministry of Power (2018). Tariff Policy Resolution. Available at: https://powermin.nic.in/sites/ default/ files/webform/notices/Proposed_amendments_in_Tariff_Policy_0.pdf (Accessed on: 12rf c January 2021). 4, TANGEDCO (2018). Revenue Account for the Year 2017-18 Available at: https://www.tangedco. gov.in/linkpdf/profitloss2017-18.pdf (Accessed on: 11rf January 2021) 5, TNERC (2017a). Order in T.P. No.1 of 2017. Determination of Tariff for Generation and Distribution, Chennai. Available at: http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2017/ Tariff Order/TANGEDCO-11-08-2017.pdf (orders/Tariff%20Order%202009/2017/TariffOrder/ TANGEDCO-11-08-2017.pdf (Accessed m l / 2rf H _l s_p w0. 0/ ). 6, TNERC (2019b). Order on generic tariff for solar power and related issues. Order No. 5 of 2019 dated 29-03-2019. Available at: http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/ So¬lar-5-29-03-2019.pdf (accessed on 11rf January 2021) References