SlideShare a Scribd company logo
1 of 3
ASHISH KENCH
Contact No : + 91 9923005958
E-Mail : asshishkench@yahoo.in
Qualification : B.E.Mechanical
Performance-driven Professional in pursuit of challenging & enriching assignments in
Production Planning Control & Supply Chain Management .
Work Experience in Reputed Groups :
Work Experience Summary :
Company Name Designation Period from Period up to Total Period
Carraro India Pvt Ltd,Pune. Dy.Manager-SCM Feb'2011 Till Date 4 Yrs 9 Months
Mahindra Gears & Transmissions
Pvt Ltd,Rajkot. Manager- PPC May'2010 Jan'2011 8 Months
Bharat Gears Ltd,Thane. Sr. Engineer-PPC Jan'2005 May'2010 5 Yrs 5 Months
Sharp Engineering Co,Pune. Sr. Engineer-Production Jan'2003 Jan'2005 2 Yrs
Mahindra & Mahindra
Ltd,FES,Mumbai. Officer-Mfg op. Aug'2000 Dec'2002 2 Yrs 4 Months
RSB Transmissions (I)Pvt Ltd,Pune. Asst. Engineer-Production Dec'1998 Jul'2000 1 Yr 8 Months
SKILLS SUMMARY :
• Over 17 years of rich experience in:
~ Production Planning &
Control
~ Supply Chain Management
~ Warehouse Management
~ Inventory Control
~ Techno Commercial
Operations
~ Lean Manufacturing
~ Plant Operations
~ System improvement
~ Material Handling
~ Vendor Development
~ Cost Control
~ Fabrication knowhow
WORK EXPERIENCE DETAILS
Since Feb 2011 with Carraro India Pvt. Ltd. , Ranjangaon , Pune.
Dy. Manager SCM ( From Feb 2011 to Till date)
Key Result Areas: Logistics & Ware House Dept ( Nov 2013-Till Date )
Storage & Preservation of Bought Out Parts as per ABC analysis
Issue of material to assembly lines & spares as per requirement
Managing Annual Stock checking ( Inventory )
Monitor & Improve ware house efficiency, maintain FIFO
Monitor stock levels of Shelf life items & Bulk material like Loctite, Shim & Washers etc.
Key Result Areas: SCM Dept ( FEB 2011-Nov 2013 )
Ensure On Time supply of components to assembly lines
Handling all gear box components
Monitoring supplier performance in terms of Delivery & Reliability
Achievements :
Improved Supplier Average reliability (performance) from 35 % to 65 %
Reduced Inventory of bought out parts by 15 %
Ensure uninterrupted supply of parts in critical situations at supplier end
Reduced blocked capital of Rs. 3 Lacs by disposing Non Moving stocks
Improved supplier packaging by implementing Returnable packaging
Reduced rejection by improving in house material handling
Reduced transport cost of Job Work up to Rs. 5 Lacs / Annum by reducing no. of trips.
May 2010 – Jan 2011 with Mahindra Gears & Transmissions Pvt. Ltd., Rajkot, Gujarat
Manager – Production Planning & Control
Key Result Areas:
Identified frequent line stoppers eliminate with structured approach
Master Production Scheduling
Inventory calculations & control
Interaction with customers
Achievements :
Improved utilization of Bottleneck machines by 20 %
Jan 2005 –May 2010 with Bharat Gears Limited, Thane.
Leader (Senior Engineer Transmission Division)
Key Result Areas: Transmission Planning Dept ( Aug 2007 – May 2010 )
Master Production Scheduling including New Dev. parts
Quarterly Physical Inventory calculations
Annual Budget Preparation
Monitoring of Bottle neck Machine Utilization
Interaction with customers in case of critical situations
Key Result Areas:Transmission Gear Cutting Dept ( Jan 2005 – July 2007 )
Responsibility of Transmission Gear Manufacturing
Ensuring Daily Production Targets
Achievements :
WIP Reduced from 42 Days to 25 Days
Housekeeping Improvement in Transmission Gear cutting Shop through ACMA Projects.
Jan 2003 – Jan 2005 with Sharp Engineering Co. Pune Senior Engineer (Fabrication components development)
Key Result Areas:
Working as shift in-charge for manufacturing fabrication parts
Handling manufacturing of heavy machinery fabrication components
Management of daily production report
August 2000 - Dec 2002 with Mahindra & Mahindra Ltd. (Tractor Div.) ,Kandivli , Mumbai.
Officer (Manufacturing Operations)
Key Result Areas:
Responsibility of Production of Transmission Drive Shaft & Transmission Case
Monitoring of Daily Production targets
SPC analysis ( Statistical Process Control)
Handling of Cost Cutting Projects
Rework- Rejection Analysis
Achievements :
WIP Reduction of Transmission Drive shafts by Rs. 1 lacs / Annum
Ensured zero production loss due to short supply
Poka Yoke Project on Gear Roll Tester-Avoided incomplete opn. Of parts
Dec 1998 - July 2000 with RSB Transmissions (India) Limited, Pune.
Asst. Engineer (Production)
Key Result Areas:
Production planning of Automotive Components, Gear Box Components
Manpower Management & QS 9000 system maintenance

More Related Content

What's hot (20)

20150815_Cyril
20150815_Cyril20150815_Cyril
20150815_Cyril
 
general tyres production planning and controlling
general tyres production planning and controllinggeneral tyres production planning and controlling
general tyres production planning and controlling
 
ME_currycj
ME_currycjME_currycj
ME_currycj
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
osama cv 2015
osama cv 2015osama cv 2015
osama cv 2015
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
Michael R.3
Michael R.3Michael R.3
Michael R.3
 
RCG resume 2016 IE (2)
RCG resume 2016 IE (2)RCG resume 2016 IE (2)
RCG resume 2016 IE (2)
 
Mohan-PPC
Mohan-PPCMohan-PPC
Mohan-PPC
 
avmResume6515
avmResume6515avmResume6515
avmResume6515
 
AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY_CV.
AJIN VIJAY_CV.
 
Kajal VW QA-QC
Kajal VW QA-QCKajal VW QA-QC
Kajal VW QA-QC
 
Resume Mohit Arora
Resume Mohit AroraResume Mohit Arora
Resume Mohit Arora
 
Gurunath.S.
Gurunath.S.Gurunath.S.
Gurunath.S.
 
Locke Bryan CV3 latest version
Locke Bryan CV3 latest versionLocke Bryan CV3 latest version
Locke Bryan CV3 latest version
 
Muzaffer Updated(24,May,2015)
Muzaffer Updated(24,May,2015)Muzaffer Updated(24,May,2015)
Muzaffer Updated(24,May,2015)
 
Kumaravel_R_Resume-v01b-2015-06-30
Kumaravel_R_Resume-v01b-2015-06-30Kumaravel_R_Resume-v01b-2015-06-30
Kumaravel_R_Resume-v01b-2015-06-30
 
karthik m cv
karthik m cvkarthik m cv
karthik m cv
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2
 
Rajiv cv 170816
Rajiv cv 170816 Rajiv cv 170816
Rajiv cv 170816
 

Viewers also liked

Webinar - December Revenue Proposal Update
Webinar - December Revenue Proposal UpdateWebinar - December Revenue Proposal Update
Webinar - December Revenue Proposal UpdateTransGrid AU
 
Reajustesalarial
ReajustesalarialReajustesalarial
Reajustesalarialo-rodri
 
AssessmentReportSBAPassRatesvs.HSPEMPSPassRates
AssessmentReportSBAPassRatesvs.HSPEMPSPassRatesAssessmentReportSBAPassRatesvs.HSPEMPSPassRates
AssessmentReportSBAPassRatesvs.HSPEMPSPassRatesKenneth Olden
 
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006masaco
 
Simbolos patrios presentacion
Simbolos patrios   presentacionSimbolos patrios   presentacion
Simbolos patrios presentacionyaneliv
 
Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing TransGrid AU
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshopTransGrid AU
 
Capitulo iv. yanelis vargas. prof. hilda
Capitulo iv.  yanelis vargas.  prof. hildaCapitulo iv.  yanelis vargas.  prof. hilda
Capitulo iv. yanelis vargas. prof. hildayaneliv
 
Simbolos patrios presentacion
Simbolos patrios   presentacionSimbolos patrios   presentacion
Simbolos patrios presentacionyaneliv
 
TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015TransGrid AU
 
Câncer colo retal
Câncer colo retalCâncer colo retal
Câncer colo retalkalinine
 
Sugar manufacturing process
Sugar manufacturing processSugar manufacturing process
Sugar manufacturing processNajja Tariq
 
Sugar industry Presentaion
Sugar industry PresentaionSugar industry Presentaion
Sugar industry Presentaionmalikumar242
 
Steps involved in Sugar Production
Steps involved in Sugar ProductionSteps involved in Sugar Production
Steps involved in Sugar Productionmustafeex
 

Viewers also liked (18)

Certificate (1)
Certificate (1)Certificate (1)
Certificate (1)
 
Webinar - December Revenue Proposal Update
Webinar - December Revenue Proposal UpdateWebinar - December Revenue Proposal Update
Webinar - December Revenue Proposal Update
 
Reajustesalarial
ReajustesalarialReajustesalarial
Reajustesalarial
 
BOA_Primary
BOA_PrimaryBOA_Primary
BOA_Primary
 
AssessmentReportSBAPassRatesvs.HSPEMPSPassRates
AssessmentReportSBAPassRatesvs.HSPEMPSPassRatesAssessmentReportSBAPassRatesvs.HSPEMPSPassRates
AssessmentReportSBAPassRatesvs.HSPEMPSPassRates
 
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006
UNIVERSIDADES BOLIVIANAS MÁS DESTACADAS EN INVESTIGACIÓN EN 2005 - 2006
 
Simbolos patrios presentacion
Simbolos patrios   presentacionSimbolos patrios   presentacion
Simbolos patrios presentacion
 
Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
 
Elektrik Potansiyel
Elektrik PotansiyelElektrik Potansiyel
Elektrik Potansiyel
 
Capitulo iv. yanelis vargas. prof. hilda
Capitulo iv.  yanelis vargas.  prof. hildaCapitulo iv.  yanelis vargas.  prof. hilda
Capitulo iv. yanelis vargas. prof. hilda
 
Simbolos patrios presentacion
Simbolos patrios   presentacionSimbolos patrios   presentacion
Simbolos patrios presentacion
 
TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015
 
Tumor do colon
Tumor do colonTumor do colon
Tumor do colon
 
Câncer colo retal
Câncer colo retalCâncer colo retal
Câncer colo retal
 
Sugar manufacturing process
Sugar manufacturing processSugar manufacturing process
Sugar manufacturing process
 
Sugar industry Presentaion
Sugar industry PresentaionSugar industry Presentaion
Sugar industry Presentaion
 
Steps involved in Sugar Production
Steps involved in Sugar ProductionSteps involved in Sugar Production
Steps involved in Sugar Production
 

Similar to Resume (20)

Resume vinayagamurthy
Resume  vinayagamurthyResume  vinayagamurthy
Resume vinayagamurthy
 
Aditya CV
Aditya  CVAditya  CV
Aditya CV
 
Resume
ResumeResume
Resume
 
Doc
DocDoc
Doc
 
Sunild resume
Sunild resumeSunild resume
Sunild resume
 
Sd
SdSd
Sd
 
Urgently looking position in Production / Production Head.pdf
Urgently looking position in Production / Production Head.pdfUrgently looking position in Production / Production Head.pdf
Urgently looking position in Production / Production Head.pdf
 
Urgently looking position in Production / Production Head.pdf
Urgently looking position in Production / Production Head.pdfUrgently looking position in Production / Production Head.pdf
Urgently looking position in Production / Production Head.pdf
 
Resume
ResumeResume
Resume
 
GS Nayer - Resume
GS Nayer - ResumeGS Nayer - Resume
GS Nayer - Resume
 
Prabhakar_Pawar_Resume_(Manager_DESIGN ) 16 Years_Experience
Prabhakar_Pawar_Resume_(Manager_DESIGN ) 16 Years_Experience Prabhakar_Pawar_Resume_(Manager_DESIGN ) 16 Years_Experience
Prabhakar_Pawar_Resume_(Manager_DESIGN ) 16 Years_Experience
 
Mohit Pratap CV
Mohit Pratap CVMohit Pratap CV
Mohit Pratap CV
 
Resume
ResumeResume
Resume
 
Resume SJC
Resume SJCResume SJC
Resume SJC
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
GM-Automotive
GM-AutomotiveGM-Automotive
GM-Automotive
 
Amol lawankar
Amol  lawankarAmol  lawankar
Amol lawankar
 

Resume

  • 1. ASHISH KENCH Contact No : + 91 9923005958 E-Mail : asshishkench@yahoo.in Qualification : B.E.Mechanical Performance-driven Professional in pursuit of challenging & enriching assignments in Production Planning Control & Supply Chain Management . Work Experience in Reputed Groups : Work Experience Summary : Company Name Designation Period from Period up to Total Period Carraro India Pvt Ltd,Pune. Dy.Manager-SCM Feb'2011 Till Date 4 Yrs 9 Months Mahindra Gears & Transmissions Pvt Ltd,Rajkot. Manager- PPC May'2010 Jan'2011 8 Months Bharat Gears Ltd,Thane. Sr. Engineer-PPC Jan'2005 May'2010 5 Yrs 5 Months Sharp Engineering Co,Pune. Sr. Engineer-Production Jan'2003 Jan'2005 2 Yrs Mahindra & Mahindra Ltd,FES,Mumbai. Officer-Mfg op. Aug'2000 Dec'2002 2 Yrs 4 Months RSB Transmissions (I)Pvt Ltd,Pune. Asst. Engineer-Production Dec'1998 Jul'2000 1 Yr 8 Months SKILLS SUMMARY : • Over 17 years of rich experience in: ~ Production Planning & Control ~ Supply Chain Management ~ Warehouse Management ~ Inventory Control ~ Techno Commercial Operations ~ Lean Manufacturing ~ Plant Operations ~ System improvement ~ Material Handling ~ Vendor Development ~ Cost Control ~ Fabrication knowhow WORK EXPERIENCE DETAILS Since Feb 2011 with Carraro India Pvt. Ltd. , Ranjangaon , Pune. Dy. Manager SCM ( From Feb 2011 to Till date) Key Result Areas: Logistics & Ware House Dept ( Nov 2013-Till Date ) Storage & Preservation of Bought Out Parts as per ABC analysis Issue of material to assembly lines & spares as per requirement Managing Annual Stock checking ( Inventory ) Monitor & Improve ware house efficiency, maintain FIFO Monitor stock levels of Shelf life items & Bulk material like Loctite, Shim & Washers etc. Key Result Areas: SCM Dept ( FEB 2011-Nov 2013 ) Ensure On Time supply of components to assembly lines Handling all gear box components Monitoring supplier performance in terms of Delivery & Reliability Achievements : Improved Supplier Average reliability (performance) from 35 % to 65 % Reduced Inventory of bought out parts by 15 % Ensure uninterrupted supply of parts in critical situations at supplier end Reduced blocked capital of Rs. 3 Lacs by disposing Non Moving stocks Improved supplier packaging by implementing Returnable packaging Reduced rejection by improving in house material handling Reduced transport cost of Job Work up to Rs. 5 Lacs / Annum by reducing no. of trips.
  • 2. May 2010 – Jan 2011 with Mahindra Gears & Transmissions Pvt. Ltd., Rajkot, Gujarat Manager – Production Planning & Control Key Result Areas: Identified frequent line stoppers eliminate with structured approach Master Production Scheduling Inventory calculations & control Interaction with customers Achievements : Improved utilization of Bottleneck machines by 20 % Jan 2005 –May 2010 with Bharat Gears Limited, Thane. Leader (Senior Engineer Transmission Division) Key Result Areas: Transmission Planning Dept ( Aug 2007 – May 2010 ) Master Production Scheduling including New Dev. parts Quarterly Physical Inventory calculations Annual Budget Preparation Monitoring of Bottle neck Machine Utilization Interaction with customers in case of critical situations Key Result Areas:Transmission Gear Cutting Dept ( Jan 2005 – July 2007 ) Responsibility of Transmission Gear Manufacturing Ensuring Daily Production Targets Achievements : WIP Reduced from 42 Days to 25 Days Housekeeping Improvement in Transmission Gear cutting Shop through ACMA Projects. Jan 2003 – Jan 2005 with Sharp Engineering Co. Pune Senior Engineer (Fabrication components development) Key Result Areas: Working as shift in-charge for manufacturing fabrication parts Handling manufacturing of heavy machinery fabrication components Management of daily production report August 2000 - Dec 2002 with Mahindra & Mahindra Ltd. (Tractor Div.) ,Kandivli , Mumbai. Officer (Manufacturing Operations) Key Result Areas: Responsibility of Production of Transmission Drive Shaft & Transmission Case Monitoring of Daily Production targets SPC analysis ( Statistical Process Control) Handling of Cost Cutting Projects Rework- Rejection Analysis Achievements : WIP Reduction of Transmission Drive shafts by Rs. 1 lacs / Annum Ensured zero production loss due to short supply Poka Yoke Project on Gear Roll Tester-Avoided incomplete opn. Of parts Dec 1998 - July 2000 with RSB Transmissions (India) Limited, Pune. Asst. Engineer (Production) Key Result Areas: Production planning of Automotive Components, Gear Box Components
  • 3. Manpower Management & QS 9000 system maintenance