SlideShare a Scribd company logo
1 of 37
Download to read offline
1
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
A Pure-Play Zinc Producer
July 2018
PROFITABILITY • GROWTH • OPPORTUNITY
2
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Forward Looking Statements
This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within the meaning of applicable Canadian securities legislation. All
information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use
of words such as "plans", "expects", "budget", "guidance", "scheduled", "estimates", "forecasts", "strategy", "target", "intends", "objective", "goal", "understands", "anticipates" and "believes" (and variations of
these or similar words) and statements that certain actions, events or results "may", "could", "would", "should", "might" "occur" or "be achieved" or "will be taken" (and variations of these or similar
expressions). Forward-looking information is also identifiable in statements of currently occurring matters which may continue in the future, such as "providing the Company with", "is currently",
"allows/allowing for", "will advance" or "continues to" or other statements that may be stated in the present tense with future implications. All of the forward-looking information in this presentation is
qualified by this cautionary note.
Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by Ascendant at the date the forward-looking information is
provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the
forward-looking information.
Forward-looking statements involve known and unknown risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or
implied by the forward-looking information. The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking
information may include, but are not limited to, risks generally associated with the mining industry, such as economic factors (including future commodity prices, currency fluctuations, energy prices and
general cost escalation), uncertainties related to the development and operation of Ascendant's projects, dependence on key personnel and employee and union relations, risks related to political or social
unrest or change, rights and title claims, operational risks and hazards, including unanticipated environmental, industrial and geological events and developments and the inability to insure against all risks,
failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, compliance with government and environmental regulations, including permitting requirements and
anti-bribery legislation, volatile financial markets that may affect Ascendant's ability to obtain additional financing on acceptable terms, the failure to obtain required approvals or clearances from government
authorities on a timely basis, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, uncertain
costs of reclamation activities, tax refunds, hedging transactions, as well as the risks discussed in Ascendant's most recent Annual Information Form on file with the Canadian provincial securities regulatory
authorities and available at www.sedar.com. Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary
materially from those expressed or implied in the forward-looking information. Accordingly, the reader should not place undue reliance on forward-looking information. Ascendant does not assume any
obligation to update or revise any forward-looking information after the date of this presentation or to explain any material difference between subsequent actual events and any forward-looking information,
except as required by applicable law.
The information concerning the Company’s mineral properties has been prepared in accordance with National Instrument 43-101 (“NI-43-101”) adopted by the Canadian Securities Administrators. In
accordance with NI-43-101, the terms “Mineral Reserves”, “Proven Mineral Reserve”, “Probable Mineral Reserve”, “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred
Mineral Resource” are defined in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) Definition Standards for Mineral Resources and Mineral Reserves adopted by the CIM Council on May
10, 2014. While the terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are recognized and required by NI 43-101, the U.S. Securities
Exchange Commission (“SEC”) does not recognize them. The reader is cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated
economic value. Inferred Mineral Resources have a high degree of uncertainty as to their existence and as to whether they can be economically or legally mined. It cannot be assumed that all or any part of
any Inferred Mineral Resource will ever be upgraded to a higher category. Therefore, the reader is cautioned not to assume that all or any part of an Inferred Mineral Resource exists, that it can be
economically or legally mined, or that it will ever be upgraded to a higher category. Likewise, you are cautioned not to assume that all or any part of a measured or Indicated Mineral Resource will ever be
upgraded into Mineral Reserves.
Readers should be aware that the Company’s financial statements (and information derived therefrom) have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by
the International Accounting Standards Board and are subject to Canadian auditing and auditor independence standards. IFRS differs in some respects from United States generally accepted accounting
principles and thus the Company’s financial statements (and information derived therefrom) may not be comparable to those of United States companies. Unless otherwise indicated, all dollar values herein
are in US$.
3
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Why Ascendant Resources?
A Compelling Investment Opportunity
A Unique Zinc Opportunity
Long-Term Low Cost Producer
Multiple Avenues for Growth
• The only pure-play junior zinc producer benefiting from
record zinc prices
• 2018 Cost Guidance US$70-80/t with activities underway
for further cost reduction
• Focused on organic growth opportunities within
El Mochito and Honduras as well as accretive growth
opportunities
• US$11.3 million in cash as at June 30, 2018
Deeply Discounted to Peers
• 2018 guidance:
EBITDA US$32-40 million - trading at ~1.7x EBITDA
Free Cash Flow US$14-20 million – trading at ~3.6x FCF
The only junior pure-play
ZINC PRODUCER
4
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Ascendant – Positioned for the Future/Long-Term
Corporate Outlook
2017
2018
2019
RESTRUCTURE: SUCCESSFUL OPERATIONAL TURNAROUND
• Rehabilitation & Optimization of the El Mochito Mine complete
• Generated EBITDA & Free Cash Flow
• Significant exploration work focused on higher-tonnes and higher-grade
PROFITABILITY / RESOURCE GROWTH
• 2018 guidance indicates significant Free Cash Flow & EBITDA
• Added considerable resources and extend LOM beyond 7 years
with updated NI 43-101
• Focus on further cost reductions
LONG-TERM, PROFITABLE MULTI-ASSET PRODUCER
• Maximize long term profitability; ongoing focus on
cost reduction and higher value per tonne
• Accretive growth opportunities in country and globally
5
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Operational Guidance
Putting El Mochito Back on the Map
Operating Data
Contained Metals:
Zinc Equivalent Metal 93 – 109 million lbs
Zinc 65 – 73 million lbs
Lead 24 – 28 million lbs
Silver 0.9 – 1.2 million ozs
Other Operating Assumptions
Direct Operating Costs $70 – $80 / tonne
Capital Expenditure $16 – $18 million
Financial Assumptions
Adjusted EBITDA1
$32 – $40 million
Free Cash Flow $14 – $20 million
Note: Figures are based on assumed metal prices of zinc US$1.50/lb, lead US$1.10/lb and silver US$18.00/oz and 355
operating days in 2018 and are expressed in US dollars. Assumed metal prices are based on the 2018 and 2019 price
forecasts from the BMO Capital Market’s Base Metals and Bulk Commodities Outlook report dated October 18, 2017.
6
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
1.2x
1.7x
2.2x
3.5x
4.9x 4.9x
5.5x
6.2x
Ascendant
Resources Inc.
Atico Mining
Corporation
Trevali Mining
Corporation
Capstone Mining
Corp.
Sierra Metals, Inc. Red River
Resources Ltd.
Copper Mountain
Mining Corp.
Taseko Mines
Limited
EV/EBITDA
Peer Value Comparison
The Rerating Case for ASND
Source: Consensus from Bloomberg as at market close July 18, 2018.
0.42x 0.43x 0.43x
0.48x 0.49x 0.50x 0.51x
0.64x 0.65x
0.69x
0.86x
1.08x
1.50x
Capstone
Mining Corp.
Red River
Resources Ltd.
Tinka
Resources Ltd.
Ascendant
Resources Inc.
Copper
Mountain
Mining Corp.
Taseko Mines
Limited
Atico Mining
Corporation
Trevali Mining
Corporation
Titan Mining
Corporation
Excellon
Resources Inc.
Heron
Resources
Limited
Arizona Mining
Inc.
Sierra Metals,
Inc.
P/NAV
1.6x 1.7x
2.2x 2.3x 2.5x
3.6x
5.1x
5.8x
7.5x
3.6x
Ascendant
Resources Inc.
Atico Mining
Corporation
Trevali Mining
Corporation
Capstone
Mining Corp.
Copper
Mountain
Mining Corp.
Taseko Mines
Limited
Sierra Metals,
Inc.
Excellon
Resources Inc.
Red River
Resources Ltd.
Average
P/CF
ASND appears undervalued on all metrics
relative to its peers.
0.67x
3.8x
Note: ASND 1.2x EV/EBITDA is based on analysts consensus EBITDA for 2018.
Note: ASND 1.6x P/CF is based on analysts consensus of cash flow expectations for 2018.
3.6x
1.60x
7
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc-Lead-Silver Mine
El Mochito
• 100% owned underground Zn/Pb/Ag mine.
• In continuous operation since 1948.
• 2017 Zn/Pb/Ag production of 66 MM lbs
ZnEq. 2018 guidance of 93-109 MM lbs ZnEq.
• Significant Resource base with 7+ year
Reserve mine life.
• 11,000 ha land package; the majority
unexplored.
• Very limited exploration work undertaken by
previous owners in 5+ years.
• Secure 9-year offtake agreement in place with
Nyrstar N.V.
Typical NSR breakdown:
Zn 70% Pb 20% Ag 10%
8
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
New El Mochito Reserve and Resource Estimate
El Mochito Life of Mine Extended Beyond 7 Years
El Mochito Mineral Reserve Statement – Effective 01 January 2018
Category Tonnes Grade Contained Metal
(kt)
Zn
(%)
Pb
(%)
Ag
(g/t)
ZnEq.
(%)
Zn
Mlbs
Pb
Mlbs
Ag
Moz
ZnEq.
Mlbs
Proven Reserves 785 4.7 2.1 54 7.2 81 35 1.4 124
Probable Reserves 4,946 4.7 1.6 36 6.6 516 174 5.8 717
Proven & Probable Reserves 5,731 4.7 1.7 39 6.7 597 209 7.2 841
Notes:
(1) Metal price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/oz Ag.
(2) Zinc equivalent metal grade (ZnEq %) was calculated as follows Zn% +(Pb % x 0.8175) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn, 74.3% Pb and 77.7% Ag metallurgical recoveries.
(3) A cut-off value of 4.76% ZnEq was used to estimate the Mineral Reserve which considered metal price assumptions, metal recoveries, refining charges, concentrate mass pulls, operating costs, royalties, concentrate treatment
charges, payables, penalties and transportation/selling costs.
(4) Mineral Resources are stated inclusive of Mineral Reserves, tonnages, grades and contained metal values have been rounded, totals may vary due to rounding.
(5) The Mineral Reserve and Metallurgical technical contents of this presentation were completed by Eugene Puritch, P.Eng. FEC, CET, James Pearson, P.Eng. and D. Grant Feasby, P.Eng. of P&E Mining Consultants Inc., all
“Independent Qualified Persons” as defined by NI 43-101.
El Mochito Mineral Resource Statement – Effective 01 January 2018
Category Tonnes Grade Contained Metal
(kt)
Zn
(%)
Pb
(%)
Ag
(g/t)
ZnEq.
(%)
Zn
Mlbs
Pb
Mlbs
Ag
Moz
ZnEq.
Mlbs
Measured Resources 1,100 5.5 2.0 65 8.2 134 48 2.3 198
Indicated Resources 6,452 5.2 1.7 41 7.2 735 241 8.4 1,019
Measured & Indicated Resources 7,553 5.2 1.7 44 7.3 869 289 10.7 1,216
Inferred Resources 4,972 5.1 1.4 33 6.7 556 156 5.4 739
Notes:
(1) Mineral Resources are stated inclusive of Mineral Reserves, Tonnage, grade and contained metal values have been rounded, totals may vary due to rounding.
(2) Price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/troy oz Ag. Zinc equivalent metal grade (ZnEq. %) was calculated as follows: Zn% +(Pb % x 0.82) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn
recovery, 74.3% Pb recovery and 77.7% Ag recovery.
(3) A cut-off of 3.1% ZnEq. was used to estimate Mineral Resources and is based on fourth quarter 2017 marginal direct operating costs.
(4) Results of an interpolated bulk density deposit model have been applied, and contributing 5ft downhole assay composites were capped at 38% Zn, 36% Pb and 2000g/t Ag.
(5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
(6) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of
the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.
(7) The Mineral Resource content of this presentation was completed by Michael Cullen, P. Geo. of Mercator Geological Services Limited, Mr. Cullen supervised and is responsible for the Mineral Resource Estimate and is an
“Independent Qualified Person” as defined by NI 43-101.
For further details on the El Mochito Mineral Reserve and Resource Estimate effective January 01, 2018, please refer to the Technical Report on the Company’s website or SEDAR www.sedar.com.
9
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
MILLED
PRODUCTION
81% 31%
DIRECT
OPERATING
COSTS
23%
IMPROVED
VENTILATION
VOLUMES
40%
PRODUCTIVE
WORKING HOURS
Responsible Mining:
9th
Consecutive Annual
Award Received for
Corporate Social
Responsibility
A Successful Turnaround Complete – 2017 Achievements
PROFITABILITY
1. Positive EBITDA since July 2017
3. Free Cash Flow Positive in Q4
2. Net Income in Q3; EPS of $0.01
20%
TRUCK
AVAILABILITY
El Mochito - A Year in Review
Note: All % figures are provided on a full 2017 calendar year basis
from Jan 2017-Dec 2017 expect Direct Operating Costs which are
calculated from Jan 2017 – Sept 2017.
4. Cash Balance of US$8.0M exiting 2017
10
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
38,521 38,866
53,729
49,393
50,597 50,795
57,458
58,978 59,601
64,449 64,327
69,578
30,000
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
7-day work
stoppage.
81%
Production
Increase in
2017
Introduction of
additional
underground shift.
First new Equipment
in rotation.
Positive EBITDA
Free Cash Flow Positive
TPD
Calendar Day
1,243 1,388 1,733 1,646 1,632 1,693 1,853 1,903 1,987 2,079 2,144 2,244
2017 Operational Turnaround Completed
El Mochito Transformed to a Free Cash Flowing Operation
Annual production exceeded 2017 production target.
TonnesMilled
11
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Operational Results
Continuous Improvements at El Mochito
$0.00
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018
Contained Zinc Production (lbs) Contained Lead Production (lbs)
Zinc Equivalent Production (lbs) Direct Operating Costs $/t Ore Milled
12
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
The El Mochito Mine, Honduras
Las Vegas, Honduras
El Mochito Mine, Honduras ( 100% )
Underground Zn/Pb/Ag mine on an 11,000
hectare land package, operating since 1948
Country Snapshot
• 70 years of continuous operations at El Mochito.
• El Mochito represented ~3% of exports in 2014. The
mining industry (2 mines) represented 4% of GDP in 2015.
• Business friendly jurisdiction with a history of mining.
• Overwhelming community support; Las Vegas emerged as
a result of the mine’s existence.
• Stable democratic constitution; Current President was re-
elected for another 4-year term in 2017; focus remains on
security, corruption and business investment.
• Decentralized government; municipalities have autonomy.
• Solid infrastructure; 2 hour drive from international airport
(San Pedro ~1.5M pop.). Paved road to site and reliable
power source.
• 25% Corporate Tax Rate + 5% NSR ($53MM in tax losses
available for 2018/2019).
• Standard & Poor’s raised Honduras’ credit rating in July
2017 from B+ to BB- and changed the country’s risk
outlook from stable to positive.
13
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Honduras
A Beautiful and Growing Tourist Destination
Roatán Island Copán Ruins
Lake Yojoa Tegucigalpa, Capital
14
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Exploration Strategy
El Mochito Mine
• Continually grow high-grade
Reserve/Resource and extend
LOM
• New NI 43-101 defines
significant Reserves &
Resources with 7+ years LOM
Long history of Resource conversion and discovery
New High-
Grade Zones
Grow
El Mochito
Longer-term
Discovery
• Several known targets to
potentially add high-grade
material to mill to improve
grade for the long-term
• Long history of converting
Inferred Resources into
Measured & Indicated
Resources
• Follow up on regional targets
identified by historical drilling
data
• 11,000 ha land package barely
explored
15
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
• Mine extends laterally for around 2 km, open East - West • Combination of lower grade mantos and higher grade chimneys
El Mochito Mine Layout – Long Section
A Long History of Resource Discovery and Conversion
16
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Extensive 2018 Program with Significant Upside Potential
2018 Exploration Program ~40,000 meters:
• ~20,000 m of definition drilling for Resource
conversion
• ~20,000 m of exploration drilling to define additional
material near mine and regional exploration targets
2018 Exploration Initiatives:
• SGH soil geochem survey of El Mochito concession.
• Review and prioritize near-mine targets (Manzanal,
Caliche, Porvenir Trend, Big Fuzzy) as well as other
concessions within Honduras.
• Review of historical mining areas in upper levels
which still contain a number of high-grade targets.
• New NI 43-101 Resource incorporating the bulk of
2017 drilling significantly upgraded and expanded
resource base and defined a Reserve with a 7+ year
LOM.
• Follow up on known ‘chimney’ ore bodies and define
new ‘chimney’ targets (historical grades in excess of
17% ZnEq).
Exploration and Resource Upside
17
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Key Areas Optimizing Existing Development
2018 Exploration Areas – Plan View
Esperanza
Port Royal
Santa Elena
Deep North
Deep East
Nueva Este
Palmar
Dyke TrendDefined Faults Targeted
Exploration Areas
Planned Drill
Holes
Development Planned
Development
Ore Body
Victoria
Niña BlancaNispero and
Upper San Juan
Included in 2017 drill results:
Deep East Manto: 6.4% ZnEq
Deep North Manto: 6.8% ZnEq
Historical Results:
Port Royal Chimney: 17.25% ZnEq
Imperial Trend Targets 8% - 17% ZnEq
Dec 2015 Estimations:
Palmar: 9.1% - 13.8% ZnEq
Victoria: 6.95 – 7.4% ZnEq
18
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Significant High-Grade Mineralized Intercepts
2018 Drill Program Results
40,000 metresStep-out Holes
DDH 10956 – 1.4m at 35.8% ZnEq, 20.1% Zn, 13.4% Pb and 318 g/t Ag (Porvenir)
DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena)
DDH 10949 – 8.6m at 9.6% ZnEq, 5.7% Zn, 3.4% Pb and 75.8 g/t Ag (Esperanza)
and – 7.5m at 8.9% ZnEq, 5.5% Zn, 3.3% Pb and 41.4 g/t Ag
Results continue to support Company’s goals of increasing tonnage for further Mineral Reserve and
Resource growth and identifying higher-grade mineralization at El Mochito:
In-fill Holes
DDH 10957 – 17.7m at 9.1% ZnEq, 5.9% Zn, 2.9% Pb and 59.9 g/t Ag (Esperanza)
DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena)
DDH 10950 – 4.1m at 15.3% ZnEq, 15.1% Zn, 0.1% Pb and 6.4 g/t Ag (Santa Elena)
DDH 10902 – 3.9m at 9.9% ZnEq, 8.0% Zn, 0.6% Pb and 101.6 g/t Ag (Port Royal Manto)
1 Please refer to tables in the press release dated June 14, 2018 for true/apparent widths which are estimated from
actual drilled lengths.
2 ZnEq grades in % represents zinc grade together with the lead and silver grades (zinc equivalent) in terms of zinc
using certain metal price, payable metal, and processing recoveries assumptions: Metal prices - Zn$1.21/lb,
Pb$1.06/lb, Ag$18.00/oz; processing recoveries - Zn 88.9%, Pb 74.3%, Ag 77.7%.
of exploration and definition
drilling is planned at El Mochito
for 2018. All orebodies remain
open along strike and at depth.
Step-out (66%) &
In-fill (34%)
Drill program targets extensions
of four ore bodies, namely
Porvenir, Santa Elena, Port Royal
Manto and Esperanza.
Key Highlights (true/apparent widths) Include:
19
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Victoria
Santo Niño
Porvenir Fault
Planned 2018 Drilling: ~11,000 ft
Surface Exploration Holes:
14-PS-01: 30.7 ft @ 9.9% Zn, 2.0% Pb, 32 g/t Ag. ZnEq= 12.9%
14-PS-02: 27.8 ft @ 5.9% Zn, 3.8% Pb, 35 g/t Ag. ZnEq= 10.7%
14-PS-04A: 13.3 ft @ 12.6% Zn, 0.4% Pb, 27 g/t Ag. ZnEq= 13.9%
L-2790
• Follow up on historical drill
holes along structure.
• Historical holes show high-
grades over meaningful
widths.
• Porvenir fault target
(highlighted here) is one of
several such targets.
• Potential to add meaningful
tonnage/extend mine life if
trends continue which could
support potential mill
expansion.
• Resource Expansion moving
East.
Longer Term Regional Exploration Opportunities
2018 Porvenir Trend Targets Could Add Significant Scope
Plan view
Deep East Manto - ZnEq 6.4%
Deep North Manto - ZnEq 6.8%
1 500 1000ft
20
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Long-Term Growth – Regional Exploration Opportunities
Known Targets Discovered by Past Surface Exploration Activities
N
Lake
Yojoa
Valid
Concessions
Known
Targets
Fault
Lines
Existing Orebodies
Being Mined
Manzanal:
- drillholes
- geochemistry
- trenches
- geophysics
Salva Vida Trend:
- drillholes
Caliche:
- exploration
tunnel
- drillholes
- geochemistry
Soledad:
- exploration tunnel
- drillholes
Big Fuzzy:
- drillholes
- 8m @ 5% Zn
Porvenir Trend:
- drillholes
0 1 2
Km
21
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc Fundamentals
Zinc Fundamentals Remain Strong as Supply Continues to Drive Tightening Market
Key drivers for a sustained and strong zinc price:
• Fundamentals indicate structural deficits due to depleting global inventories.
• Modest global GDP growth (2-3%) implies strengthening demand (400kt pa of additional new supply required).
• Supply deficits will prevail in short and medium term as a result of global mine closures and production cuts.
• Zinc prices are already responding to this pressure; 10 year high of $1.63/lb prevailed on January 30, 2018.
ZINC SPOT PRICE ($/LB)
Source: Bloomberg
Jan 2007 Nov 2017
300,000
600,000
900,000
1, 200,000
0
$0.00
$0.50
$1.00
$1.50
$2.00
LME Zinc Warehouse Stock Levels (T) / Zinc Spot Price ($/Lb)
22
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Pro Forma Capital Structure
Ascendant Resources Inc.
Share Price ($C, as at Jul. 18/18) $0.83
Shares Issued / Outstanding (MM’s) 74.2
Shares Fully Diluted (MM’s) 96.2
Estimated Float ~25%
Market Capitalization (C$MM) $61.9
CQS 18.4%
Steve Laciak 16.5%
Vertex One Asset Management 14.0%
MM Asset Management Inc. 13.8%
Directors and Management approx. 16.4%*
Major Shareholders
Stock Symbol TSX: ASND
*fully diluted basis
Analyst Coverage
Dalton Baretto Canaccord Genuity
Matthew O’Keefe Cantor Fitzgerald
Stefan Ioannou Cormark Securities
Gabriel Gonzalez Echelon Wealth Partners
Jacques P. Wortman Eight Capital
Ian Parkinson GMP Securities
Heiko F. Ihle H.C. Wainwright & Co.
Ryan Hanley Laurentian Bank Securities
23
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Catalysts and Deliverables
A Year of Profitability and Resource Growth
Deliver Meaningful FCF
Guidance and market outlook support robust FCF in 2018; US$14-20 million
Remain focused on operating margins and maximize value per tonne milled
New NI 43-101 Resource Report
Updated Reserve & Resource in April 2018 incorporating all 2017 exploration work
defined significant Resource with 7+ year Reserve life (LOM)
Sustained Higher Production
Rates
2018 expected metal production 41-65% higher than 2017
Mill has demonstrated ability to sustain the newly increased production rates
Increase Ore Head Grades
Focus on increasing high-grade ore to the mill with better dilution control and higher
grade zones now in the mine plan
Optimization Studies Focus on long-term cost reduction opportunities
Extensive Exploration Activities
Maintain aggressive internal and near mine exploration work for near-term resource
growth as well as commence regional exploration for long-term LOM extension
Strategic Opportunities
Pursue and evaluate accretive growth opportunities in country and globally
Long-term goal of being a multi-asset mid-tier metals producer
24
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
WHY NOW IS THE TIME FOR
ASCENDANT?
Restored
Mine optimization and rehabilitation complete
Profitability
Significant Free Cash Flow in 2018; Rerating expected
Exploration Potential
Updated Reserve & Resource defined significant Resource with 7+ year
Reserve life (LOM); 40,000 m drill program in 2018
Long-term Mid-Tier Producer
Maximize profitability and shareholder value; organic growth and accretive opportunities
25
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Appendices
T S X - V A S N D
26
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Management
CHRIS BUNCIC, MBA, CFA, P. Eng – PRESIDENT, CEO, AND DIRECTOR | Mr. Buncic is one of the founding partners in the
formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in
2016. Prior to cofounding Ascendant, Mr. Buncic served in senior management roles at several Canadian corporations in the
technology and resources sectors. His depth of experience also includes six years in Institutional Equity Research at leading
Canadian independent full service brokerage firms Cormark Securities Inc. and Mackie Research Capital Corporation. Mr. Buncic is
a CFA Charterholder, has a MBA from Schulich School of Business and B.A.Sc. from the University of Toronto. Mr. Buncic is a
member of the Professional Engineers of Ontario and the CFA Society.
CLIFF HALE-SANDERS, MBA, CFA – EXECUTIVE VICE PRESIDENT | Mr. Hale Sanders is one of the founding partners in the
formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in
2016. Mr. Hale Sanders’ career has spanned approximately 20 years in the capital markets industry working as a leading Base
Metals and Bulk Commodities research analyst in Canada working at RBC Capital Markets, TD Securities, CIBC World Markets and
Cormark Securities. During this period, Mr. Hale Sanders visited and reviewed numerous mining operations and corporate
entities around the world. Mr. Hale-Sanders holds a B.Sc. in Geology and Chemistry, an MBA from McMaster University and is a CFA
Charterholder.
NEIL RINGDAHL – CHIEF OPERATING OFFICER | Mr. Ringdahl is a senior mining executive with over 23 years of
international mining, development, and executive management experience. Mr. Ringdahl has a strong technical background in a
career that has been primarily focussed on underground and open pit mining in Latin America and Africa. Previously, Mr. Ringdahl
held the roles of Chief Operating Officer at Orvana Minerals Corp. and Chief Executive Officer at Apogee Silver. At Apogee, he
significantly de-risked the rehabilitation project at the Pulacayo mine in Bolivia while fostering proactive community relations
improvements and agreements. Prior to this, Mr. Ringdahl has held various senior positions with Korea Zinc, Volcan Companía
Minera, Anglo Platinum, and AngloGold. Mr. Ringdahl holds a bachelor's degree with Honors in mining engineering from the
University of the Witwatersrand in South Africa.
ROHAN HAZELTON, CPA, CA – CHIEF FINANCIAL OFFICER | Mr. Hazelton is a Chartered Professional Accountant with
over 20 years of international finance experience including 15 years in the mining sector. Has was formerly Vice President, Strategy
at Goldcorp Inc. where he held a variety of roles including Vice President Finance, Chief Financial Officer of Mexican Operations and
Corporate Controller. He holds a B.A. in Applied Mathematics and Economics from Harvard University.
27
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Board of Directors
MARK BRENNAN
EXECUTIVE CHAIRMAN
Mr. Brennan is a founding partner of
Ascendant Resources Inc. and has over
30 years of financing and operating
experience in North America and
Europe. Mr. Brennan most recently
served as President and CEO of Sierra
Metals Inc. Prior to Sierra Metals, Mr.
Brennan served as President & CEO at
Largo Resources Ltd.
RENAUD ADAMS
DIRECTOR
Mr. Adams recently served as President
and Chief Executive Officer of Richmont
Mines Inc. until it was acquired by
Alamos Gold Inc. Mr. Adams has over
20 years of experience as an executive
and as an operator in the mining
industry.
CHRIS BUNCIC, MBA, CFA, P. Eng
PRESIDENT, CEO, AND
DIRECTOR
PETRA DECHER, CPA
DIRECTOR
Ms. Decher currently serves as
Chairwoman of the Board at Red Pine
Exploration Inc. and recently served
as the Lead Independent Director of
Integra Gold Corp. until its acquisition
by Eldorado Gold Corporation. Ms.
Decher served as the VP, Finance and
Assistant Secretary for Franco-Nevada
Corporation from 2009 to 2016.
GUILLERMO KAELIN
DIRECTOR
Mr. Kaelin is a capital markets
professional with over 18 years of
experience in private equity,
investment banking, research and
public securities and is currently
the Head of Latin America of
Appian Capital Advisory LLP.
KURT MENCHEN
DIRECTOR
Mr. Menchen has over 37 years' of
experience operating and managing
mining projects, including over 20 years
as General Manager at the Jacobina
Gold project in Brazil where he
successfully operated the underground
project for Anglo American, Desert Sun
Mining and eventually Yamana Gold.
STEPHEN SHEFSKY
LEAD DIRECTOR
Mr. Shefsky is the President & CEO,
Founder and Director of James Bay
Resources Ltd. and has over 40 years’
experience in the investment and
mining industry through Canada and
Latin America.
ROBERT CAMPBELL
DIRECTOR
Mr. Campbell is an exploration
geologist with over 40 years experience
in mining and exploration industry
through Canada, United States and
Latin America. Mr. Campbell is
currently VP, Exploration at Largo
Resources Ltd.
28
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2017 Production Summary
El Mochito Operational Results
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Metal Production Profile
Zn lbs Pb lbs Zn Eq. lbs (Production)
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Zinc Production (lbs)
-
500,000
1,000,000
1,500,000
2,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Lead Production (lbs)
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$110.00
$120.00
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Cost Profile
Cash Cost $/t of Ore MilledDirect Operating Cost $/t Ore Milled
29
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Results from 2017 Drill Program
Significant High-Grade Mineralized Intercepts
• Results are targeting the
extensions of four ore bodies;
Palmar Dyke, Santa Elena,
Victoria and Esperanza.
• Three areas are very close to
existing workings and could
be accessed within 6 to 12
months.
• The fourth, the Esperanza
orebody, is already being
mined and this drilling
represents a further
extension showing similar
grades.
Step-out Holes
HOLE 10846 – 17.6m at 5.3% zinc, 3.8% lead and 83 g/t silver (Palmer Dyke) - 10.0% ZnEq
HOLE 10845 – 17.0m at 5.0% zinc, 2.0% lead and 53 g/t silver (Victoria) - 7.7% ZnEq
HOLE 10837 – 5.5m at 17.3% zinc, 3.6% lead and 142 g/t silver (Palmar Dyke) - 23.0% ZnEq
HOLE 10875 – 5.5m at 5.2% zinc, 2.7% lead, 2,297 g/t silver and 0.98% copper (Palmar Dyke) - 45.5% ZnEq
HOLE 10887 – 23.4m at 6.5% zinc, 1.0% lead, and 24 g/t silver (Santa Elena) - 7.7% ZnEq
HOLE 10904 – 12.2m at 6.6% zinc, 5.6% lead, and 81 g/t silver (Esperanza) - 12.6% ZnEq
HOLE 10909 – 3.7m at 19.3% zinc, 15.0% lead and 122 g/t silver (Deep East) - 33.7% ZnEq
HOLE 10941 – 15.2m at 5.8% zinc, 1.4% lead and 61 g/t silver (Esperanza) – 7.9% ZnEq
In-fill Holes
HOLE 10833 – 35.4m at 5.6% zinc, 2.0% lead and 31 g/t silver - 7.8% ZnEq
including 5.4m at 7.8% zinc, 2.6% lead and 35 g/t silver (Santa Elena) - 10.6% ZnEq
HOLE 10847 – 17.5m at 6.2% zinc, 2.2% lead and 41 g/t silver (Esperanza) - 8.8% ZnEq
HOLE 10828 – 26.5m at 5.7% zinc, 0.6% lead and 18 g/t silver (Santa Elena) - 6.5% ZnEq
HOLE 10826 – 17.1m at 5.8% zinc, 1.2% lead and 36 g/t silver (Esperanza) - 7.5% ZnEq
HOLE 10880 – 5.1m at 3.1% zinc, 2.5% lead, 149 g/t silver and 0.55% copper (Palmar Dyke) - 7.6% ZnEq
HOLE 10870 – 4.1m at 10.0% zinc, 1.9% lead, and 95 g/t silver (Victoria) - 12.0% ZnEq
HOLE 10932 – 10.2m at 9.3% zinc, 7.5% lead and 229 g/t silver (Port Royal) – 19.2% ZnEq
HOLE 10936 – 25.6m at 7.4% zinc, 2.5% lead and 27.5 g/t silver (Santa Elena) – 9.9% ZnEq
A few significant results include (true and apparent widths):
Results are significantly
higher grade than
current Reserve and
Resources.
30
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Historical Operating Statistics
El Mochito Back on Track
El Mochito – back on track:
• Historically El Mochito has demonstrated the ability for
sustained annualized production of +90 MM lbs.
• Minimal development and exploration work by previous
operators impacted 2016 operating results
90
2014 2015 2016 2017
Tonnes Milled 756.0 765.9 515.6 656.3
Average tpd 2,071 2,098 1,409 1,889
Average Head Grades
Zinc 4.56% 3.43% 3.40% 3.50%
Lead 2.61% 1.68% 1.16% 1.39%
Silver 85.9 50.1 46.0 43.0
ZnEq 9.5% 6.3% 5.8% 5.63%
Average Recoveries
Zinc 85.6% 87.2% 90.7% 88.9%
Lead 78.7% 75.9% 73.3% 74.3%
Silver 87.4% 88.3% 80.5% 77.7%
Contained Metal Production
Zinc (ktonnes) 29.5 23.0 15.9 20.4
Lead (ktonnes) 15.5 9.8 4.4 6.8
Silver (Kozs) 1,827.0 1,105.0 614.3 698.5
ZnEq (MMlbs) 133.5 90.5 54.8 66.1
60.6
41
24.8
29.9
0
500
1000
1500
2000
0
10
20
30
40
50
60
70
2014 2015 2016 2017
Silver000’sozs
ContainedMetalProduction
Zinc (ktonnes) Lead (ktonnes)
ZnEq (ktonnes) Silver (Kozs)
31
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Process Flow Diagram
El Mochito Processing
32
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
El Mochito Geological Long-Section
El Mochito Mine
33
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Ore Genesis of a Carbonate Replacement Deposit
Representative of the El Mochito Carbonate Replacement Skarn Mineralization
El Mochito
34
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRFEl Mochito Mine Entrance
Las Vegas, Honduras
El Mochito Mine Flotation Circuit
35
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc Basics
Zinc is the 30th element in the periodic table of elements.
Zinc is the fourth most consumed metal
in the world after iron, aluminum and
copper.
The most common and commercial use for zinc is
galvanizing (rust-proofing) steel accounting for
60% of usage.
ZnZinc
30
14 millions tonnes consumed
globally in 2016 75% sourced
from mining.
25% sourced
from recycling.
Fertilizer accounts for
~2% of zinc usage.
36
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Responsible Mining at El Mochito
El Mochito Mine
COMMUNITY
WORKFORCE
ENVIRONMENT
Through various community investments, El Mochito has contributed to local employment generation, infrastructure improvement and
education advancement. El Mochito strives to play an active role in the strengthening of the surrounding community and will continue
to remain a steward of responsibility going forward.
El Mochito’s multiple environmental sustainability programs seek to preserve the region's natural resources and monitor the quality of
soil, water, air and the protection of local wildlife. Through various initiatives, we continue to make environmental protection a core
pillar in our day-to-day operations.
We believe our workforce and their well being are imperative to the success and sustainability of the El Mochito operation. The
continuous commitment to our workforce is reaffirmed through the development of our employees in the areas of workplace and
educational advancement and a strong commitment to the improvement of ongoing health and safety initiatives.
Ascendant Resources continues to make mining responsibly at El Mochito its top priority
as it creates tangible benefits for all our stakeholders, including our employees, the local
communities and the environment in which we operate in.
9x
37
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
79 Wellington St. W., Suite 2100
Toronto, Ontario M5K 1H1
www.ascendantresources.com
Tel: 647-796-0066
Fax: 647-796-0067
T S X A S N D
Investor Contact:
Katherine Pryde, MBA, CPA, CMA
Director, Communications and
Investor Relations
info@ascendantresources.com

More Related Content

What's hot

What's hot (20)

Investor day presentation
Investor day presentation Investor day presentation
Investor day presentation
 
Acquisition of Gryphon Minerals
Acquisition of Gryphon MineralsAcquisition of Gryphon Minerals
Acquisition of Gryphon Minerals
 
Troilus Gold Corp. - Corporate Presentation - January 2019
Troilus Gold Corp. - Corporate Presentation - January 2019Troilus Gold Corp. - Corporate Presentation - January 2019
Troilus Gold Corp. - Corporate Presentation - January 2019
 
ATAC Resources Ltd. Corporate Presentation March 2022
ATAC Resources Ltd. Corporate Presentation March 2022ATAC Resources Ltd. Corporate Presentation March 2022
ATAC Resources Ltd. Corporate Presentation March 2022
 
ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021
 
ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021
 
Entree gold presentation14
Entree gold presentation14Entree gold presentation14
Entree gold presentation14
 
White Gold Corp. Company Presentation
White Gold Corp. Company PresentationWhite Gold Corp. Company Presentation
White Gold Corp. Company Presentation
 
ATAC Resources Ltd. Corporate Presentation March 2021
ATAC Resources Ltd. Corporate Presentation March 2021ATAC Resources Ltd. Corporate Presentation March 2021
ATAC Resources Ltd. Corporate Presentation March 2021
 
Investor Presentation - January 2017
Investor Presentation - January 2017Investor Presentation - January 2017
Investor Presentation - January 2017
 
ATAC Resources Ltd. Corporate Presentation July 2020
ATAC Resources Ltd. Corporate Presentation July 2020ATAC Resources Ltd. Corporate Presentation July 2020
ATAC Resources Ltd. Corporate Presentation July 2020
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project Update
 
Ur-Energy December 2016 Corporate Presentation
Ur-Energy December 2016 Corporate PresentationUr-Energy December 2016 Corporate Presentation
Ur-Energy December 2016 Corporate Presentation
 
ATAC Resources Ltd. Corporate Presentation August 2020
ATAC Resources Ltd. Corporate Presentation August 2020ATAC Resources Ltd. Corporate Presentation August 2020
ATAC Resources Ltd. Corporate Presentation August 2020
 
ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021
 
Atac corporate ppt_july_2021
Atac corporate ppt_july_2021Atac corporate ppt_july_2021
Atac corporate ppt_july_2021
 
ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021
 
2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation final2021.07.22 probe corporate presentation final
2021.07.22 probe corporate presentation final
 
ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020
 
Troilus Gold Corp. - Corporate Presentation - February 2019
Troilus Gold Corp. - Corporate Presentation - February 2019Troilus Gold Corp. - Corporate Presentation - February 2019
Troilus Gold Corp. - Corporate Presentation - February 2019
 

Similar to Ascendant Corporate Presentation - July 2018

Aura Minerals Corporate Presentation- May 2014
Aura Minerals Corporate Presentation- May 2014Aura Minerals Corporate Presentation- May 2014
Aura Minerals Corporate Presentation- May 2014
DeniseFlo
 
Solaris Resources - December 2023 Investor Presentation
Solaris Resources - December 2023 Investor PresentationSolaris Resources - December 2023 Investor Presentation
Solaris Resources - December 2023 Investor Presentation
JacquelineWagenaar1
 

Similar to Ascendant Corporate Presentation - July 2018 (20)

Osisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 ResultsOsisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 Results
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
Osisko Gold Royalties - Q4 and Year 2016 Results Conference Call
Osisko Gold Royalties - Q4 and Year 2016 Results Conference CallOsisko Gold Royalties - Q4 and Year 2016 Results Conference Call
Osisko Gold Royalties - Q4 and Year 2016 Results Conference Call
 
Aura Minerals Corporate Presentation- May 2014
Aura Minerals Corporate Presentation- May 2014Aura Minerals Corporate Presentation- May 2014
Aura Minerals Corporate Presentation- May 2014
 
International Lithium Presentation January 2018.
International Lithium Presentation January 2018.International Lithium Presentation January 2018.
International Lithium Presentation January 2018.
 
CIBC Roadshow
CIBC RoadshowCIBC Roadshow
CIBC Roadshow
 
Osisko Gold Royalties - Q1 2018 Results
Osisko Gold Royalties - Q1 2018 ResultsOsisko Gold Royalties - Q1 2018 Results
Osisko Gold Royalties - Q1 2018 Results
 
Osisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 ResultsOsisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 Results
 
denver gold forum
denver gold forumdenver gold forum
denver gold forum
 
Great panther silver_limited_corporate_presentation_january_16_2017
Great panther silver_limited_corporate_presentation_january_16_2017Great panther silver_limited_corporate_presentation_january_16_2017
Great panther silver_limited_corporate_presentation_january_16_2017
 
Solaris Resources - December 2023 Investor Presentation
Solaris Resources - December 2023 Investor PresentationSolaris Resources - December 2023 Investor Presentation
Solaris Resources - December 2023 Investor Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
TNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project PresentationTNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project Presentation
 
TNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project PresentationTNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project Presentation
 
TNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project PresentationTNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project Presentation
 
January Presentation
January PresentationJanuary Presentation
January Presentation
 
Great panther silver_limited_corporate_presentation_january_11_2017 (1)
Great panther silver_limited_corporate_presentation_january_11_2017 (1)Great panther silver_limited_corporate_presentation_january_11_2017 (1)
Great panther silver_limited_corporate_presentation_january_11_2017 (1)
 
Q3 2016 Results Conference Call
Q3 2016 Results Conference CallQ3 2016 Results Conference Call
Q3 2016 Results Conference Call
 
Great panther silver_limited_corporate_presentation_january_11_2017_qr
Great panther silver_limited_corporate_presentation_january_11_2017_qrGreat panther silver_limited_corporate_presentation_january_11_2017_qr
Great panther silver_limited_corporate_presentation_january_11_2017_qr
 

Recently uploaded

一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
dyuozua
 
皇后大学毕业证
皇后大学毕业证皇后大学毕业证
皇后大学毕业证
dyuozua
 
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
lezegu21r
 
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
dyuozua
 

Recently uploaded (20)

Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
 
Importance of financial management for managing financial resources effective...
Importance of financial management for managing financial resources effective...Importance of financial management for managing financial resources effective...
Importance of financial management for managing financial resources effective...
 
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
一比一原版(UofG毕业证书)圭尔夫大学毕业证成绩单原件一模一样
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
一比一原版(MU毕业证书)梅努斯大学毕业证成绩单原件一模一样
 
皇后大学毕业证
皇后大学毕业证皇后大学毕业证
皇后大学毕业证
 
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
原件一样(USC毕业证)南加州大学毕业证成绩单留信学历认证可查
 
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
一比一原版(Mac毕业证书)麦克马斯特大学毕业证成绩单原件一模一样
 
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
 
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
 
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
 
Teck Sustainability Leadership, April 26, 2024
Teck Sustainability Leadership, April 26, 2024Teck Sustainability Leadership, April 26, 2024
Teck Sustainability Leadership, April 26, 2024
 
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
 
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
一比一原版(UofT毕业证书)多伦多大学毕业证成绩单原件一模一样
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
 
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
 
BofA Securities GMM and Steel Conference
BofA Securities GMM and Steel ConferenceBofA Securities GMM and Steel Conference
BofA Securities GMM and Steel Conference
 

Ascendant Corporate Presentation - July 2018

  • 1. 1 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF A Pure-Play Zinc Producer July 2018 PROFITABILITY • GROWTH • OPPORTUNITY
  • 2. 2 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Forward Looking Statements This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within the meaning of applicable Canadian securities legislation. All information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects", "budget", "guidance", "scheduled", "estimates", "forecasts", "strategy", "target", "intends", "objective", "goal", "understands", "anticipates" and "believes" (and variations of these or similar words) and statements that certain actions, events or results "may", "could", "would", "should", "might" "occur" or "be achieved" or "will be taken" (and variations of these or similar expressions). Forward-looking information is also identifiable in statements of currently occurring matters which may continue in the future, such as "providing the Company with", "is currently", "allows/allowing for", "will advance" or "continues to" or other statements that may be stated in the present tense with future implications. All of the forward-looking information in this presentation is qualified by this cautionary note. Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by Ascendant at the date the forward-looking information is provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information. Forward-looking statements involve known and unknown risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information. The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may include, but are not limited to, risks generally associated with the mining industry, such as economic factors (including future commodity prices, currency fluctuations, energy prices and general cost escalation), uncertainties related to the development and operation of Ascendant's projects, dependence on key personnel and employee and union relations, risks related to political or social unrest or change, rights and title claims, operational risks and hazards, including unanticipated environmental, industrial and geological events and developments and the inability to insure against all risks, failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, compliance with government and environmental regulations, including permitting requirements and anti-bribery legislation, volatile financial markets that may affect Ascendant's ability to obtain additional financing on acceptable terms, the failure to obtain required approvals or clearances from government authorities on a timely basis, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, uncertain costs of reclamation activities, tax refunds, hedging transactions, as well as the risks discussed in Ascendant's most recent Annual Information Form on file with the Canadian provincial securities regulatory authorities and available at www.sedar.com. Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, the reader should not place undue reliance on forward-looking information. Ascendant does not assume any obligation to update or revise any forward-looking information after the date of this presentation or to explain any material difference between subsequent actual events and any forward-looking information, except as required by applicable law. The information concerning the Company’s mineral properties has been prepared in accordance with National Instrument 43-101 (“NI-43-101”) adopted by the Canadian Securities Administrators. In accordance with NI-43-101, the terms “Mineral Reserves”, “Proven Mineral Reserve”, “Probable Mineral Reserve”, “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are defined in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) Definition Standards for Mineral Resources and Mineral Reserves adopted by the CIM Council on May 10, 2014. While the terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are recognized and required by NI 43-101, the U.S. Securities Exchange Commission (“SEC”) does not recognize them. The reader is cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Inferred Mineral Resources have a high degree of uncertainty as to their existence and as to whether they can be economically or legally mined. It cannot be assumed that all or any part of any Inferred Mineral Resource will ever be upgraded to a higher category. Therefore, the reader is cautioned not to assume that all or any part of an Inferred Mineral Resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category. Likewise, you are cautioned not to assume that all or any part of a measured or Indicated Mineral Resource will ever be upgraded into Mineral Reserves. Readers should be aware that the Company’s financial statements (and information derived therefrom) have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board and are subject to Canadian auditing and auditor independence standards. IFRS differs in some respects from United States generally accepted accounting principles and thus the Company’s financial statements (and information derived therefrom) may not be comparable to those of United States companies. Unless otherwise indicated, all dollar values herein are in US$.
  • 3. 3 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Why Ascendant Resources? A Compelling Investment Opportunity A Unique Zinc Opportunity Long-Term Low Cost Producer Multiple Avenues for Growth • The only pure-play junior zinc producer benefiting from record zinc prices • 2018 Cost Guidance US$70-80/t with activities underway for further cost reduction • Focused on organic growth opportunities within El Mochito and Honduras as well as accretive growth opportunities • US$11.3 million in cash as at June 30, 2018 Deeply Discounted to Peers • 2018 guidance: EBITDA US$32-40 million - trading at ~1.7x EBITDA Free Cash Flow US$14-20 million – trading at ~3.6x FCF The only junior pure-play ZINC PRODUCER
  • 4. 4 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Ascendant – Positioned for the Future/Long-Term Corporate Outlook 2017 2018 2019 RESTRUCTURE: SUCCESSFUL OPERATIONAL TURNAROUND • Rehabilitation & Optimization of the El Mochito Mine complete • Generated EBITDA & Free Cash Flow • Significant exploration work focused on higher-tonnes and higher-grade PROFITABILITY / RESOURCE GROWTH • 2018 guidance indicates significant Free Cash Flow & EBITDA • Added considerable resources and extend LOM beyond 7 years with updated NI 43-101 • Focus on further cost reductions LONG-TERM, PROFITABLE MULTI-ASSET PRODUCER • Maximize long term profitability; ongoing focus on cost reduction and higher value per tonne • Accretive growth opportunities in country and globally
  • 5. 5 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 2018 Operational Guidance Putting El Mochito Back on the Map Operating Data Contained Metals: Zinc Equivalent Metal 93 – 109 million lbs Zinc 65 – 73 million lbs Lead 24 – 28 million lbs Silver 0.9 – 1.2 million ozs Other Operating Assumptions Direct Operating Costs $70 – $80 / tonne Capital Expenditure $16 – $18 million Financial Assumptions Adjusted EBITDA1 $32 – $40 million Free Cash Flow $14 – $20 million Note: Figures are based on assumed metal prices of zinc US$1.50/lb, lead US$1.10/lb and silver US$18.00/oz and 355 operating days in 2018 and are expressed in US dollars. Assumed metal prices are based on the 2018 and 2019 price forecasts from the BMO Capital Market’s Base Metals and Bulk Commodities Outlook report dated October 18, 2017.
  • 6. 6 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 1.2x 1.7x 2.2x 3.5x 4.9x 4.9x 5.5x 6.2x Ascendant Resources Inc. Atico Mining Corporation Trevali Mining Corporation Capstone Mining Corp. Sierra Metals, Inc. Red River Resources Ltd. Copper Mountain Mining Corp. Taseko Mines Limited EV/EBITDA Peer Value Comparison The Rerating Case for ASND Source: Consensus from Bloomberg as at market close July 18, 2018. 0.42x 0.43x 0.43x 0.48x 0.49x 0.50x 0.51x 0.64x 0.65x 0.69x 0.86x 1.08x 1.50x Capstone Mining Corp. Red River Resources Ltd. Tinka Resources Ltd. Ascendant Resources Inc. Copper Mountain Mining Corp. Taseko Mines Limited Atico Mining Corporation Trevali Mining Corporation Titan Mining Corporation Excellon Resources Inc. Heron Resources Limited Arizona Mining Inc. Sierra Metals, Inc. P/NAV 1.6x 1.7x 2.2x 2.3x 2.5x 3.6x 5.1x 5.8x 7.5x 3.6x Ascendant Resources Inc. Atico Mining Corporation Trevali Mining Corporation Capstone Mining Corp. Copper Mountain Mining Corp. Taseko Mines Limited Sierra Metals, Inc. Excellon Resources Inc. Red River Resources Ltd. Average P/CF ASND appears undervalued on all metrics relative to its peers. 0.67x 3.8x Note: ASND 1.2x EV/EBITDA is based on analysts consensus EBITDA for 2018. Note: ASND 1.6x P/CF is based on analysts consensus of cash flow expectations for 2018. 3.6x 1.60x
  • 7. 7 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Zinc-Lead-Silver Mine El Mochito • 100% owned underground Zn/Pb/Ag mine. • In continuous operation since 1948. • 2017 Zn/Pb/Ag production of 66 MM lbs ZnEq. 2018 guidance of 93-109 MM lbs ZnEq. • Significant Resource base with 7+ year Reserve mine life. • 11,000 ha land package; the majority unexplored. • Very limited exploration work undertaken by previous owners in 5+ years. • Secure 9-year offtake agreement in place with Nyrstar N.V. Typical NSR breakdown: Zn 70% Pb 20% Ag 10%
  • 8. 8 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF New El Mochito Reserve and Resource Estimate El Mochito Life of Mine Extended Beyond 7 Years El Mochito Mineral Reserve Statement – Effective 01 January 2018 Category Tonnes Grade Contained Metal (kt) Zn (%) Pb (%) Ag (g/t) ZnEq. (%) Zn Mlbs Pb Mlbs Ag Moz ZnEq. Mlbs Proven Reserves 785 4.7 2.1 54 7.2 81 35 1.4 124 Probable Reserves 4,946 4.7 1.6 36 6.6 516 174 5.8 717 Proven & Probable Reserves 5,731 4.7 1.7 39 6.7 597 209 7.2 841 Notes: (1) Metal price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/oz Ag. (2) Zinc equivalent metal grade (ZnEq %) was calculated as follows Zn% +(Pb % x 0.8175) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn, 74.3% Pb and 77.7% Ag metallurgical recoveries. (3) A cut-off value of 4.76% ZnEq was used to estimate the Mineral Reserve which considered metal price assumptions, metal recoveries, refining charges, concentrate mass pulls, operating costs, royalties, concentrate treatment charges, payables, penalties and transportation/selling costs. (4) Mineral Resources are stated inclusive of Mineral Reserves, tonnages, grades and contained metal values have been rounded, totals may vary due to rounding. (5) The Mineral Reserve and Metallurgical technical contents of this presentation were completed by Eugene Puritch, P.Eng. FEC, CET, James Pearson, P.Eng. and D. Grant Feasby, P.Eng. of P&E Mining Consultants Inc., all “Independent Qualified Persons” as defined by NI 43-101. El Mochito Mineral Resource Statement – Effective 01 January 2018 Category Tonnes Grade Contained Metal (kt) Zn (%) Pb (%) Ag (g/t) ZnEq. (%) Zn Mlbs Pb Mlbs Ag Moz ZnEq. Mlbs Measured Resources 1,100 5.5 2.0 65 8.2 134 48 2.3 198 Indicated Resources 6,452 5.2 1.7 41 7.2 735 241 8.4 1,019 Measured & Indicated Resources 7,553 5.2 1.7 44 7.3 869 289 10.7 1,216 Inferred Resources 4,972 5.1 1.4 33 6.7 556 156 5.4 739 Notes: (1) Mineral Resources are stated inclusive of Mineral Reserves, Tonnage, grade and contained metal values have been rounded, totals may vary due to rounding. (2) Price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/troy oz Ag. Zinc equivalent metal grade (ZnEq. %) was calculated as follows: Zn% +(Pb % x 0.82) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn recovery, 74.3% Pb recovery and 77.7% Ag recovery. (3) A cut-off of 3.1% ZnEq. was used to estimate Mineral Resources and is based on fourth quarter 2017 marginal direct operating costs. (4) Results of an interpolated bulk density deposit model have been applied, and contributing 5ft downhole assay composites were capped at 38% Zn, 36% Pb and 2000g/t Ag. (5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. (6) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration. (7) The Mineral Resource content of this presentation was completed by Michael Cullen, P. Geo. of Mercator Geological Services Limited, Mr. Cullen supervised and is responsible for the Mineral Resource Estimate and is an “Independent Qualified Person” as defined by NI 43-101. For further details on the El Mochito Mineral Reserve and Resource Estimate effective January 01, 2018, please refer to the Technical Report on the Company’s website or SEDAR www.sedar.com.
  • 9. 9 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF MILLED PRODUCTION 81% 31% DIRECT OPERATING COSTS 23% IMPROVED VENTILATION VOLUMES 40% PRODUCTIVE WORKING HOURS Responsible Mining: 9th Consecutive Annual Award Received for Corporate Social Responsibility A Successful Turnaround Complete – 2017 Achievements PROFITABILITY 1. Positive EBITDA since July 2017 3. Free Cash Flow Positive in Q4 2. Net Income in Q3; EPS of $0.01 20% TRUCK AVAILABILITY El Mochito - A Year in Review Note: All % figures are provided on a full 2017 calendar year basis from Jan 2017-Dec 2017 expect Direct Operating Costs which are calculated from Jan 2017 – Sept 2017. 4. Cash Balance of US$8.0M exiting 2017
  • 10. 10 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 38,521 38,866 53,729 49,393 50,597 50,795 57,458 58,978 59,601 64,449 64,327 69,578 30,000 35,000 40,000 45,000 50,000 55,000 60,000 65,000 70,000 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 7-day work stoppage. 81% Production Increase in 2017 Introduction of additional underground shift. First new Equipment in rotation. Positive EBITDA Free Cash Flow Positive TPD Calendar Day 1,243 1,388 1,733 1,646 1,632 1,693 1,853 1,903 1,987 2,079 2,144 2,244 2017 Operational Turnaround Completed El Mochito Transformed to a Free Cash Flowing Operation Annual production exceeded 2017 production target. TonnesMilled
  • 11. 11 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Operational Results Continuous Improvements at El Mochito $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Contained Zinc Production (lbs) Contained Lead Production (lbs) Zinc Equivalent Production (lbs) Direct Operating Costs $/t Ore Milled
  • 12. 12 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF The El Mochito Mine, Honduras Las Vegas, Honduras El Mochito Mine, Honduras ( 100% ) Underground Zn/Pb/Ag mine on an 11,000 hectare land package, operating since 1948 Country Snapshot • 70 years of continuous operations at El Mochito. • El Mochito represented ~3% of exports in 2014. The mining industry (2 mines) represented 4% of GDP in 2015. • Business friendly jurisdiction with a history of mining. • Overwhelming community support; Las Vegas emerged as a result of the mine’s existence. • Stable democratic constitution; Current President was re- elected for another 4-year term in 2017; focus remains on security, corruption and business investment. • Decentralized government; municipalities have autonomy. • Solid infrastructure; 2 hour drive from international airport (San Pedro ~1.5M pop.). Paved road to site and reliable power source. • 25% Corporate Tax Rate + 5% NSR ($53MM in tax losses available for 2018/2019). • Standard & Poor’s raised Honduras’ credit rating in July 2017 from B+ to BB- and changed the country’s risk outlook from stable to positive.
  • 13. 13 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Honduras A Beautiful and Growing Tourist Destination Roatán Island Copán Ruins Lake Yojoa Tegucigalpa, Capital
  • 14. 14 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Exploration Strategy El Mochito Mine • Continually grow high-grade Reserve/Resource and extend LOM • New NI 43-101 defines significant Reserves & Resources with 7+ years LOM Long history of Resource conversion and discovery New High- Grade Zones Grow El Mochito Longer-term Discovery • Several known targets to potentially add high-grade material to mill to improve grade for the long-term • Long history of converting Inferred Resources into Measured & Indicated Resources • Follow up on regional targets identified by historical drilling data • 11,000 ha land package barely explored
  • 15. 15 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF • Mine extends laterally for around 2 km, open East - West • Combination of lower grade mantos and higher grade chimneys El Mochito Mine Layout – Long Section A Long History of Resource Discovery and Conversion
  • 16. 16 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Extensive 2018 Program with Significant Upside Potential 2018 Exploration Program ~40,000 meters: • ~20,000 m of definition drilling for Resource conversion • ~20,000 m of exploration drilling to define additional material near mine and regional exploration targets 2018 Exploration Initiatives: • SGH soil geochem survey of El Mochito concession. • Review and prioritize near-mine targets (Manzanal, Caliche, Porvenir Trend, Big Fuzzy) as well as other concessions within Honduras. • Review of historical mining areas in upper levels which still contain a number of high-grade targets. • New NI 43-101 Resource incorporating the bulk of 2017 drilling significantly upgraded and expanded resource base and defined a Reserve with a 7+ year LOM. • Follow up on known ‘chimney’ ore bodies and define new ‘chimney’ targets (historical grades in excess of 17% ZnEq). Exploration and Resource Upside
  • 17. 17 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Key Areas Optimizing Existing Development 2018 Exploration Areas – Plan View Esperanza Port Royal Santa Elena Deep North Deep East Nueva Este Palmar Dyke TrendDefined Faults Targeted Exploration Areas Planned Drill Holes Development Planned Development Ore Body Victoria Niña BlancaNispero and Upper San Juan Included in 2017 drill results: Deep East Manto: 6.4% ZnEq Deep North Manto: 6.8% ZnEq Historical Results: Port Royal Chimney: 17.25% ZnEq Imperial Trend Targets 8% - 17% ZnEq Dec 2015 Estimations: Palmar: 9.1% - 13.8% ZnEq Victoria: 6.95 – 7.4% ZnEq
  • 18. 18 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Significant High-Grade Mineralized Intercepts 2018 Drill Program Results 40,000 metresStep-out Holes DDH 10956 – 1.4m at 35.8% ZnEq, 20.1% Zn, 13.4% Pb and 318 g/t Ag (Porvenir) DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena) DDH 10949 – 8.6m at 9.6% ZnEq, 5.7% Zn, 3.4% Pb and 75.8 g/t Ag (Esperanza) and – 7.5m at 8.9% ZnEq, 5.5% Zn, 3.3% Pb and 41.4 g/t Ag Results continue to support Company’s goals of increasing tonnage for further Mineral Reserve and Resource growth and identifying higher-grade mineralization at El Mochito: In-fill Holes DDH 10957 – 17.7m at 9.1% ZnEq, 5.9% Zn, 2.9% Pb and 59.9 g/t Ag (Esperanza) DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena) DDH 10950 – 4.1m at 15.3% ZnEq, 15.1% Zn, 0.1% Pb and 6.4 g/t Ag (Santa Elena) DDH 10902 – 3.9m at 9.9% ZnEq, 8.0% Zn, 0.6% Pb and 101.6 g/t Ag (Port Royal Manto) 1 Please refer to tables in the press release dated June 14, 2018 for true/apparent widths which are estimated from actual drilled lengths. 2 ZnEq grades in % represents zinc grade together with the lead and silver grades (zinc equivalent) in terms of zinc using certain metal price, payable metal, and processing recoveries assumptions: Metal prices - Zn$1.21/lb, Pb$1.06/lb, Ag$18.00/oz; processing recoveries - Zn 88.9%, Pb 74.3%, Ag 77.7%. of exploration and definition drilling is planned at El Mochito for 2018. All orebodies remain open along strike and at depth. Step-out (66%) & In-fill (34%) Drill program targets extensions of four ore bodies, namely Porvenir, Santa Elena, Port Royal Manto and Esperanza. Key Highlights (true/apparent widths) Include:
  • 19. 19 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Victoria Santo Niño Porvenir Fault Planned 2018 Drilling: ~11,000 ft Surface Exploration Holes: 14-PS-01: 30.7 ft @ 9.9% Zn, 2.0% Pb, 32 g/t Ag. ZnEq= 12.9% 14-PS-02: 27.8 ft @ 5.9% Zn, 3.8% Pb, 35 g/t Ag. ZnEq= 10.7% 14-PS-04A: 13.3 ft @ 12.6% Zn, 0.4% Pb, 27 g/t Ag. ZnEq= 13.9% L-2790 • Follow up on historical drill holes along structure. • Historical holes show high- grades over meaningful widths. • Porvenir fault target (highlighted here) is one of several such targets. • Potential to add meaningful tonnage/extend mine life if trends continue which could support potential mill expansion. • Resource Expansion moving East. Longer Term Regional Exploration Opportunities 2018 Porvenir Trend Targets Could Add Significant Scope Plan view Deep East Manto - ZnEq 6.4% Deep North Manto - ZnEq 6.8% 1 500 1000ft
  • 20. 20 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Long-Term Growth – Regional Exploration Opportunities Known Targets Discovered by Past Surface Exploration Activities N Lake Yojoa Valid Concessions Known Targets Fault Lines Existing Orebodies Being Mined Manzanal: - drillholes - geochemistry - trenches - geophysics Salva Vida Trend: - drillholes Caliche: - exploration tunnel - drillholes - geochemistry Soledad: - exploration tunnel - drillholes Big Fuzzy: - drillholes - 8m @ 5% Zn Porvenir Trend: - drillholes 0 1 2 Km
  • 21. 21 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Zinc Fundamentals Zinc Fundamentals Remain Strong as Supply Continues to Drive Tightening Market Key drivers for a sustained and strong zinc price: • Fundamentals indicate structural deficits due to depleting global inventories. • Modest global GDP growth (2-3%) implies strengthening demand (400kt pa of additional new supply required). • Supply deficits will prevail in short and medium term as a result of global mine closures and production cuts. • Zinc prices are already responding to this pressure; 10 year high of $1.63/lb prevailed on January 30, 2018. ZINC SPOT PRICE ($/LB) Source: Bloomberg Jan 2007 Nov 2017 300,000 600,000 900,000 1, 200,000 0 $0.00 $0.50 $1.00 $1.50 $2.00 LME Zinc Warehouse Stock Levels (T) / Zinc Spot Price ($/Lb)
  • 22. 22 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Pro Forma Capital Structure Ascendant Resources Inc. Share Price ($C, as at Jul. 18/18) $0.83 Shares Issued / Outstanding (MM’s) 74.2 Shares Fully Diluted (MM’s) 96.2 Estimated Float ~25% Market Capitalization (C$MM) $61.9 CQS 18.4% Steve Laciak 16.5% Vertex One Asset Management 14.0% MM Asset Management Inc. 13.8% Directors and Management approx. 16.4%* Major Shareholders Stock Symbol TSX: ASND *fully diluted basis Analyst Coverage Dalton Baretto Canaccord Genuity Matthew O’Keefe Cantor Fitzgerald Stefan Ioannou Cormark Securities Gabriel Gonzalez Echelon Wealth Partners Jacques P. Wortman Eight Capital Ian Parkinson GMP Securities Heiko F. Ihle H.C. Wainwright & Co. Ryan Hanley Laurentian Bank Securities
  • 23. 23 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 2018 Catalysts and Deliverables A Year of Profitability and Resource Growth Deliver Meaningful FCF Guidance and market outlook support robust FCF in 2018; US$14-20 million Remain focused on operating margins and maximize value per tonne milled New NI 43-101 Resource Report Updated Reserve & Resource in April 2018 incorporating all 2017 exploration work defined significant Resource with 7+ year Reserve life (LOM) Sustained Higher Production Rates 2018 expected metal production 41-65% higher than 2017 Mill has demonstrated ability to sustain the newly increased production rates Increase Ore Head Grades Focus on increasing high-grade ore to the mill with better dilution control and higher grade zones now in the mine plan Optimization Studies Focus on long-term cost reduction opportunities Extensive Exploration Activities Maintain aggressive internal and near mine exploration work for near-term resource growth as well as commence regional exploration for long-term LOM extension Strategic Opportunities Pursue and evaluate accretive growth opportunities in country and globally Long-term goal of being a multi-asset mid-tier metals producer
  • 24. 24 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF WHY NOW IS THE TIME FOR ASCENDANT? Restored Mine optimization and rehabilitation complete Profitability Significant Free Cash Flow in 2018; Rerating expected Exploration Potential Updated Reserve & Resource defined significant Resource with 7+ year Reserve life (LOM); 40,000 m drill program in 2018 Long-term Mid-Tier Producer Maximize profitability and shareholder value; organic growth and accretive opportunities
  • 25. 25 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Appendices T S X - V A S N D
  • 26. 26 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Management CHRIS BUNCIC, MBA, CFA, P. Eng – PRESIDENT, CEO, AND DIRECTOR | Mr. Buncic is one of the founding partners in the formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in 2016. Prior to cofounding Ascendant, Mr. Buncic served in senior management roles at several Canadian corporations in the technology and resources sectors. His depth of experience also includes six years in Institutional Equity Research at leading Canadian independent full service brokerage firms Cormark Securities Inc. and Mackie Research Capital Corporation. Mr. Buncic is a CFA Charterholder, has a MBA from Schulich School of Business and B.A.Sc. from the University of Toronto. Mr. Buncic is a member of the Professional Engineers of Ontario and the CFA Society. CLIFF HALE-SANDERS, MBA, CFA – EXECUTIVE VICE PRESIDENT | Mr. Hale Sanders is one of the founding partners in the formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in 2016. Mr. Hale Sanders’ career has spanned approximately 20 years in the capital markets industry working as a leading Base Metals and Bulk Commodities research analyst in Canada working at RBC Capital Markets, TD Securities, CIBC World Markets and Cormark Securities. During this period, Mr. Hale Sanders visited and reviewed numerous mining operations and corporate entities around the world. Mr. Hale-Sanders holds a B.Sc. in Geology and Chemistry, an MBA from McMaster University and is a CFA Charterholder. NEIL RINGDAHL – CHIEF OPERATING OFFICER | Mr. Ringdahl is a senior mining executive with over 23 years of international mining, development, and executive management experience. Mr. Ringdahl has a strong technical background in a career that has been primarily focussed on underground and open pit mining in Latin America and Africa. Previously, Mr. Ringdahl held the roles of Chief Operating Officer at Orvana Minerals Corp. and Chief Executive Officer at Apogee Silver. At Apogee, he significantly de-risked the rehabilitation project at the Pulacayo mine in Bolivia while fostering proactive community relations improvements and agreements. Prior to this, Mr. Ringdahl has held various senior positions with Korea Zinc, Volcan Companía Minera, Anglo Platinum, and AngloGold. Mr. Ringdahl holds a bachelor's degree with Honors in mining engineering from the University of the Witwatersrand in South Africa. ROHAN HAZELTON, CPA, CA – CHIEF FINANCIAL OFFICER | Mr. Hazelton is a Chartered Professional Accountant with over 20 years of international finance experience including 15 years in the mining sector. Has was formerly Vice President, Strategy at Goldcorp Inc. where he held a variety of roles including Vice President Finance, Chief Financial Officer of Mexican Operations and Corporate Controller. He holds a B.A. in Applied Mathematics and Economics from Harvard University.
  • 27. 27 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Board of Directors MARK BRENNAN EXECUTIVE CHAIRMAN Mr. Brennan is a founding partner of Ascendant Resources Inc. and has over 30 years of financing and operating experience in North America and Europe. Mr. Brennan most recently served as President and CEO of Sierra Metals Inc. Prior to Sierra Metals, Mr. Brennan served as President & CEO at Largo Resources Ltd. RENAUD ADAMS DIRECTOR Mr. Adams recently served as President and Chief Executive Officer of Richmont Mines Inc. until it was acquired by Alamos Gold Inc. Mr. Adams has over 20 years of experience as an executive and as an operator in the mining industry. CHRIS BUNCIC, MBA, CFA, P. Eng PRESIDENT, CEO, AND DIRECTOR PETRA DECHER, CPA DIRECTOR Ms. Decher currently serves as Chairwoman of the Board at Red Pine Exploration Inc. and recently served as the Lead Independent Director of Integra Gold Corp. until its acquisition by Eldorado Gold Corporation. Ms. Decher served as the VP, Finance and Assistant Secretary for Franco-Nevada Corporation from 2009 to 2016. GUILLERMO KAELIN DIRECTOR Mr. Kaelin is a capital markets professional with over 18 years of experience in private equity, investment banking, research and public securities and is currently the Head of Latin America of Appian Capital Advisory LLP. KURT MENCHEN DIRECTOR Mr. Menchen has over 37 years' of experience operating and managing mining projects, including over 20 years as General Manager at the Jacobina Gold project in Brazil where he successfully operated the underground project for Anglo American, Desert Sun Mining and eventually Yamana Gold. STEPHEN SHEFSKY LEAD DIRECTOR Mr. Shefsky is the President & CEO, Founder and Director of James Bay Resources Ltd. and has over 40 years’ experience in the investment and mining industry through Canada and Latin America. ROBERT CAMPBELL DIRECTOR Mr. Campbell is an exploration geologist with over 40 years experience in mining and exploration industry through Canada, United States and Latin America. Mr. Campbell is currently VP, Exploration at Largo Resources Ltd.
  • 28. 28 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 2017 Production Summary El Mochito Operational Results - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Contained Metal Production Profile Zn lbs Pb lbs Zn Eq. lbs (Production) - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Contained Zinc Production (lbs) - 500,000 1,000,000 1,500,000 2,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Contained Lead Production (lbs) $50.00 $60.00 $70.00 $80.00 $90.00 $100.00 $110.00 $120.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Cost Profile Cash Cost $/t of Ore MilledDirect Operating Cost $/t Ore Milled
  • 29. 29 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Results from 2017 Drill Program Significant High-Grade Mineralized Intercepts • Results are targeting the extensions of four ore bodies; Palmar Dyke, Santa Elena, Victoria and Esperanza. • Three areas are very close to existing workings and could be accessed within 6 to 12 months. • The fourth, the Esperanza orebody, is already being mined and this drilling represents a further extension showing similar grades. Step-out Holes HOLE 10846 – 17.6m at 5.3% zinc, 3.8% lead and 83 g/t silver (Palmer Dyke) - 10.0% ZnEq HOLE 10845 – 17.0m at 5.0% zinc, 2.0% lead and 53 g/t silver (Victoria) - 7.7% ZnEq HOLE 10837 – 5.5m at 17.3% zinc, 3.6% lead and 142 g/t silver (Palmar Dyke) - 23.0% ZnEq HOLE 10875 – 5.5m at 5.2% zinc, 2.7% lead, 2,297 g/t silver and 0.98% copper (Palmar Dyke) - 45.5% ZnEq HOLE 10887 – 23.4m at 6.5% zinc, 1.0% lead, and 24 g/t silver (Santa Elena) - 7.7% ZnEq HOLE 10904 – 12.2m at 6.6% zinc, 5.6% lead, and 81 g/t silver (Esperanza) - 12.6% ZnEq HOLE 10909 – 3.7m at 19.3% zinc, 15.0% lead and 122 g/t silver (Deep East) - 33.7% ZnEq HOLE 10941 – 15.2m at 5.8% zinc, 1.4% lead and 61 g/t silver (Esperanza) – 7.9% ZnEq In-fill Holes HOLE 10833 – 35.4m at 5.6% zinc, 2.0% lead and 31 g/t silver - 7.8% ZnEq including 5.4m at 7.8% zinc, 2.6% lead and 35 g/t silver (Santa Elena) - 10.6% ZnEq HOLE 10847 – 17.5m at 6.2% zinc, 2.2% lead and 41 g/t silver (Esperanza) - 8.8% ZnEq HOLE 10828 – 26.5m at 5.7% zinc, 0.6% lead and 18 g/t silver (Santa Elena) - 6.5% ZnEq HOLE 10826 – 17.1m at 5.8% zinc, 1.2% lead and 36 g/t silver (Esperanza) - 7.5% ZnEq HOLE 10880 – 5.1m at 3.1% zinc, 2.5% lead, 149 g/t silver and 0.55% copper (Palmar Dyke) - 7.6% ZnEq HOLE 10870 – 4.1m at 10.0% zinc, 1.9% lead, and 95 g/t silver (Victoria) - 12.0% ZnEq HOLE 10932 – 10.2m at 9.3% zinc, 7.5% lead and 229 g/t silver (Port Royal) – 19.2% ZnEq HOLE 10936 – 25.6m at 7.4% zinc, 2.5% lead and 27.5 g/t silver (Santa Elena) – 9.9% ZnEq A few significant results include (true and apparent widths): Results are significantly higher grade than current Reserve and Resources.
  • 30. 30 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Historical Operating Statistics El Mochito Back on Track El Mochito – back on track: • Historically El Mochito has demonstrated the ability for sustained annualized production of +90 MM lbs. • Minimal development and exploration work by previous operators impacted 2016 operating results 90 2014 2015 2016 2017 Tonnes Milled 756.0 765.9 515.6 656.3 Average tpd 2,071 2,098 1,409 1,889 Average Head Grades Zinc 4.56% 3.43% 3.40% 3.50% Lead 2.61% 1.68% 1.16% 1.39% Silver 85.9 50.1 46.0 43.0 ZnEq 9.5% 6.3% 5.8% 5.63% Average Recoveries Zinc 85.6% 87.2% 90.7% 88.9% Lead 78.7% 75.9% 73.3% 74.3% Silver 87.4% 88.3% 80.5% 77.7% Contained Metal Production Zinc (ktonnes) 29.5 23.0 15.9 20.4 Lead (ktonnes) 15.5 9.8 4.4 6.8 Silver (Kozs) 1,827.0 1,105.0 614.3 698.5 ZnEq (MMlbs) 133.5 90.5 54.8 66.1 60.6 41 24.8 29.9 0 500 1000 1500 2000 0 10 20 30 40 50 60 70 2014 2015 2016 2017 Silver000’sozs ContainedMetalProduction Zinc (ktonnes) Lead (ktonnes) ZnEq (ktonnes) Silver (Kozs)
  • 31. 31 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Process Flow Diagram El Mochito Processing
  • 32. 32 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF El Mochito Geological Long-Section El Mochito Mine
  • 33. 33 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Ore Genesis of a Carbonate Replacement Deposit Representative of the El Mochito Carbonate Replacement Skarn Mineralization El Mochito
  • 34. 34 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRFEl Mochito Mine Entrance Las Vegas, Honduras El Mochito Mine Flotation Circuit
  • 35. 35 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Zinc Basics Zinc is the 30th element in the periodic table of elements. Zinc is the fourth most consumed metal in the world after iron, aluminum and copper. The most common and commercial use for zinc is galvanizing (rust-proofing) steel accounting for 60% of usage. ZnZinc 30 14 millions tonnes consumed globally in 2016 75% sourced from mining. 25% sourced from recycling. Fertilizer accounts for ~2% of zinc usage.
  • 36. 36 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF Responsible Mining at El Mochito El Mochito Mine COMMUNITY WORKFORCE ENVIRONMENT Through various community investments, El Mochito has contributed to local employment generation, infrastructure improvement and education advancement. El Mochito strives to play an active role in the strengthening of the surrounding community and will continue to remain a steward of responsibility going forward. El Mochito’s multiple environmental sustainability programs seek to preserve the region's natural resources and monitor the quality of soil, water, air and the protection of local wildlife. Through various initiatives, we continue to make environmental protection a core pillar in our day-to-day operations. We believe our workforce and their well being are imperative to the success and sustainability of the El Mochito operation. The continuous commitment to our workforce is reaffirmed through the development of our employees in the areas of workplace and educational advancement and a strong commitment to the improvement of ongoing health and safety initiatives. Ascendant Resources continues to make mining responsibly at El Mochito its top priority as it creates tangible benefits for all our stakeholders, including our employees, the local communities and the environment in which we operate in. 9x
  • 37. 37 w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF 79 Wellington St. W., Suite 2100 Toronto, Ontario M5K 1H1 www.ascendantresources.com Tel: 647-796-0066 Fax: 647-796-0067 T S X A S N D Investor Contact: Katherine Pryde, MBA, CPA, CMA Director, Communications and Investor Relations info@ascendantresources.com