Ascendant Resources is a pure-play zinc producer focused on its flagship El Mochito mine in Honduras. In 2017, operational improvements at El Mochito transformed the mine into a free cash flow generating operation, exceeding production targets. For 2018, Ascendant guidance includes zinc equivalent production of 85-95 million pounds at direct operating costs of $70-80 per tonne and adjusted EBITDA of $23-28 million. The company aims to continue operational improvements at El Mochito following its 2017 turnaround.
This document provides an overview of Ascendant Resources, a pure-play zinc mining company. Key points include:
- Ascendant's flagship asset is the 100% owned El Mochito zinc/lead/silver mine in Honduras, which has been in continuous operation since 1948.
- In 2017, operational improvements transformed El Mochito into a free cash flow generating mine, exceeding production targets. Guidance for 2018 forecasts further production increases.
- A new reserve and resource estimate extended El Mochito's mine life to over 7 years, with significant additional exploration potential on its 11,000 hectare land package.
- Management believes Ascendant offers a compelling investment opportunity as the only junior pure
This document provides an overview of Ascendant Resources, a pure-play zinc mining company. It discusses Ascendant's flagship El Mochito zinc-lead-silver mine in Honduras, which has been in continuous operation since 1948. The document highlights Ascendant's 2018 operational guidance of producing 85-95 million pounds of zinc equivalent metal at a direct operating cost of $70-80 per tonne. It also provides details on Ascendant's new reserve and resource estimates for El Mochito, which extend the mine life to over 7 years.
1. The document provides information about Ascendant Resources, a pure-play zinc producer. It summarizes Ascendant's flagship El Mochito zinc-lead-silver mine in Honduras, which has been in continuous operation since 1948.
2. In 2017, Ascendant transformed El Mochito into a free cash flow generating operation through operational improvements. Production exceeded targets and direct operating costs decreased. Guidance for 2018 is 85-95 million pounds of zinc equivalent production at a cost of $70-80 per ton.
3. A new reserve and resource estimate extended El Mochito's mine life to over 7 years. Proven and probable reserves contain 597 million pounds of zinc and 209 million pounds
Ascendant Resources is a pure-play zinc producer with its flagship El Mochito mine in Honduras. In 2017, production at El Mochito increased 81% over 2016 and the mine became cash flow positive. For 2018, Ascendant is guiding zinc-lead-silver production of 85-95 million pounds and continued cost reductions to below $70 per ton. Ascendant aims to grow organically at El Mochito and through acquisitions of assets like Lagoa Salgada to become the only junior pure-play zinc producer.
1. Ascendant Resources is a pure-play zinc producer focused on its El Mochito mine in Honduras, which has been in continuous operation since 1948.
2. The document provides Ascendant's 2018 operational guidance, which forecasts producing 93-109 million pounds of zinc equivalent metal at a direct operating cost of $70-80 per tonne and capital expenditures of $16-18 million.
3. Ascendant also discloses an updated NI 43-101 reserve and resource estimate for El Mochito that extends the mine life beyond 7 years, with proven and probable reserves of 5.7 million tonnes grading 4.7% zinc and 1.7% lead.
Alamos Corporate Presentation - March 2016alamosgoldinc
This corporate presentation provides an overview of Alamos Gold Inc., including cautionary notes about forward-looking statements, non-GAAP measures, and technical information. It highlights Alamos Gold's diversified gold production from three North American mines, peer-leading growth portfolio, and strong balance sheet with $320 million in cash and securities. The core strategy involves near-term focus on ramping up underground production at Young-Davidson and developing satellite deposits at Mulatos, utilizing cash flow to fund future growth projects with highest returns.
- Agnico Eagle exceeded gold production guidance for the fourth consecutive year, producing 1.671 million ounces of gold in 2015 at total cash costs of $567 per ounce.
- Stable production of approximately 1.53 million ounces per year is expected from 2016-2018, with 2016 guidance of 1.525-1.565 million ounces at total cash costs of $590-630 per ounce.
- Gold reserve grades increased at key mines in 2015 and significant increases in measured, indicated, and inferred gold resources were reported, while gold reserves declined only slightly.
The document provides an agenda for an Investor Day presentation on February 18, 2016. The presentation agenda includes an overview of the gold market, a company update, an overview of New Gold, operational results and outlook for 2015 and 2016, mineral reserve updates, development of the Rainy River project, 2015 financial results, and a conclusion. The document also includes cautionary statements regarding forward-looking statements and information contained in the presentation.
This document provides an overview of Ascendant Resources, a pure-play zinc mining company. Key points include:
- Ascendant's flagship asset is the 100% owned El Mochito zinc/lead/silver mine in Honduras, which has been in continuous operation since 1948.
- In 2017, operational improvements transformed El Mochito into a free cash flow generating mine, exceeding production targets. Guidance for 2018 forecasts further production increases.
- A new reserve and resource estimate extended El Mochito's mine life to over 7 years, with significant additional exploration potential on its 11,000 hectare land package.
- Management believes Ascendant offers a compelling investment opportunity as the only junior pure
This document provides an overview of Ascendant Resources, a pure-play zinc mining company. It discusses Ascendant's flagship El Mochito zinc-lead-silver mine in Honduras, which has been in continuous operation since 1948. The document highlights Ascendant's 2018 operational guidance of producing 85-95 million pounds of zinc equivalent metal at a direct operating cost of $70-80 per tonne. It also provides details on Ascendant's new reserve and resource estimates for El Mochito, which extend the mine life to over 7 years.
1. The document provides information about Ascendant Resources, a pure-play zinc producer. It summarizes Ascendant's flagship El Mochito zinc-lead-silver mine in Honduras, which has been in continuous operation since 1948.
2. In 2017, Ascendant transformed El Mochito into a free cash flow generating operation through operational improvements. Production exceeded targets and direct operating costs decreased. Guidance for 2018 is 85-95 million pounds of zinc equivalent production at a cost of $70-80 per ton.
3. A new reserve and resource estimate extended El Mochito's mine life to over 7 years. Proven and probable reserves contain 597 million pounds of zinc and 209 million pounds
Ascendant Resources is a pure-play zinc producer with its flagship El Mochito mine in Honduras. In 2017, production at El Mochito increased 81% over 2016 and the mine became cash flow positive. For 2018, Ascendant is guiding zinc-lead-silver production of 85-95 million pounds and continued cost reductions to below $70 per ton. Ascendant aims to grow organically at El Mochito and through acquisitions of assets like Lagoa Salgada to become the only junior pure-play zinc producer.
1. Ascendant Resources is a pure-play zinc producer focused on its El Mochito mine in Honduras, which has been in continuous operation since 1948.
2. The document provides Ascendant's 2018 operational guidance, which forecasts producing 93-109 million pounds of zinc equivalent metal at a direct operating cost of $70-80 per tonne and capital expenditures of $16-18 million.
3. Ascendant also discloses an updated NI 43-101 reserve and resource estimate for El Mochito that extends the mine life beyond 7 years, with proven and probable reserves of 5.7 million tonnes grading 4.7% zinc and 1.7% lead.
Alamos Corporate Presentation - March 2016alamosgoldinc
This corporate presentation provides an overview of Alamos Gold Inc., including cautionary notes about forward-looking statements, non-GAAP measures, and technical information. It highlights Alamos Gold's diversified gold production from three North American mines, peer-leading growth portfolio, and strong balance sheet with $320 million in cash and securities. The core strategy involves near-term focus on ramping up underground production at Young-Davidson and developing satellite deposits at Mulatos, utilizing cash flow to fund future growth projects with highest returns.
- Agnico Eagle exceeded gold production guidance for the fourth consecutive year, producing 1.671 million ounces of gold in 2015 at total cash costs of $567 per ounce.
- Stable production of approximately 1.53 million ounces per year is expected from 2016-2018, with 2016 guidance of 1.525-1.565 million ounces at total cash costs of $590-630 per ounce.
- Gold reserve grades increased at key mines in 2015 and significant increases in measured, indicated, and inferred gold resources were reported, while gold reserves declined only slightly.
The document provides an agenda for an Investor Day presentation on February 18, 2016. The presentation agenda includes an overview of the gold market, a company update, an overview of New Gold, operational results and outlook for 2015 and 2016, mineral reserve updates, development of the Rainy River project, 2015 financial results, and a conclusion. The document also includes cautionary statements regarding forward-looking statements and information contained in the presentation.
BMO Capital Markets 25th Global Metals & Mining Conference PresentationKinrossGold
Kinross Gold Corporation presented at the BMO Capital Markets Global Metals & Mining Conference on February 28 - March 2, 2016. Kinross delivered strong operational performance in 2015, meeting or exceeding its revised guidance targets. Kinross expects to produce 2.7-2.9 million ounces of gold equivalent in 2016 at an all-in sustaining cost of $890-990 per ounce and capital expenditures of $595 million. Kinross' diversified portfolio is expected to source over 60% of 2016 production from its Americas mines. Kinross outlined organic growth opportunities from its La Coipa project in Chile and exploration programs at Bald Mountain and across its global portfolio.
BMO Capital Markets Global Metals & Mining Conferenceyamanagold2016
- The document discusses Yamana Gold's operational results and expectations for 2016-2018.
- In 2015, Yamana achieved gold production within guidance and is positioned to meet or exceed 2016 targets following repositioning efforts.
- Yamana provides production, cost, and capital expenditure guidance for 2016 and breakdowns of expected gold production by mine for 2016-2018, projecting year over year growth at lower costs.
- The document also discusses Yamana's development pipeline and 2016 exploration program goals.
- The document discusses Golden Star's plans to expand production and reduce costs at its projects in Ghana through underground mining techniques.
- It highlights the exploration upside potential to increase mine lives at existing operations and the experience of management in project delivery.
- Key milestones in the company's transformation include commercial production from the Wassa Underground expected in mid-2017 and from the Prestea Underground also expected in mid-2017.
Raymond James Institutional Investors Conference OrlandoAgnico Eagle Mines
The document provides forward-looking statements and notes regarding non-GAAP financial measures for Agnico Eagle Mines Limited. It summarizes Agnico Eagle's fourth quarter and full year 2015 operating results, including record annual gold production of 1.671 million ounces at total cash costs of $567 per ounce. It also outlines Agnico Eagle's strategic plan for 2016 and beyond, focusing on optimizing existing mines and projects, delivering on expectations, building a project pipeline, and developing people. The company aims to improve its cost structure, increase reserve quality, and maximize free cash flow per share.
Kinross Gold Corporation completed studies on a two-phased expansion of its Tasiast mine in Mauritania. Phase One involves expanding the processing capacity to 12,000 tonnes per day at an initial capital cost of $300 million, which is expected to increase average annual production to 409,000 ounces, reduce costs per ounce by 50%, and generate an internal rate of return of 20%. Phase Two pre-feasibility studies were also completed. The two-phased approach offers significant growth potential for Tasiast at a lower capital cost than previously estimated. Kinross is proceeding with Phase One of the expansion.
Gary Goldberg, President and CEO of Newmont Mining Corporation, presented at the BMO Metals & Mining Conference on February 29, 2016. The presentation included forward-looking statements and cautioned that actual results could differ materially from expectations. It provided an overview of Newmont's strategy to improve the underlying business, strengthen its portfolio, and create shareholder value. Key highlights included ongoing cost and efficiency improvements, a focus on projects with long mine lives and lower costs, and strong financial and operating performance.
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $6.5 million in working capital.
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $6 million in working capital.
ATAC is a Vancouver-based exploration company focused on exploring for copper and gold in Yukon, BC and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt) and a positive Preliminary Economic Assessment for the Tiger Gold Deposit.
ATAC is well-financed with approximately $5.5 million in working capital.
Teranga Gold Corporation plans to acquire Gryphon Minerals, creating a multi-jurisdictional West African gold producer. The all-share transaction is valued at $63 million and represents a 45% premium to Gryphon's share price. The combined company will have reserves of 3.7 million ounces of gold located in Senegal and Burkina Faso. Gryphon's Banfora project in Burkina Faso is shovel-ready and could increase Teranga's annual production to 275,000-325,000 ounces once construction is completed in mid-2019. The transaction is expected to be accretive to Teranga's net asset value and reserves.
Golden Star is expanding production and reducing costs at its Wassa and Prestea mines in Ghana. Production is expected to increase to an average of 281,000 ounces annually from 2017 onwards. Cash operating costs are forecast to decrease as higher grade ore is accessed at Wassa Underground and Prestea Underground ramps up. Exploration drilling will target expanding reserves and mine lives at both operations.
ATAC is a Vancouver-based exploration company focused on exploring for gold in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $5.5 million in working capital.
- The document is a corporate presentation from May 2016 that contains cautionary statements about forward-looking information.
- It warns that statements regarding future financial performance, projects, activities, and expectations are forward-looking and subject to risks and uncertainties that could cause actual results to differ materially.
- The presentation outlines numerous risk factors that could affect the company's projections including economic, geological, permitting, environmental, social, regulatory, political, and financial risks.
The document cautions readers that certain information in the presentation regarding New Gold's future performance are forward-looking statements that are based on estimates and assumptions that are subject to risks and uncertainties. It provides context for forward-looking production, cost, and capital expenditure guidance. The document also lists key assumptions underlying the forward-looking statements and outlines risk factors that could materially affect actual results.
This document provides an overview of Alamos Gold Inc. It begins with cautionary notes regarding forward-looking statements and non-GAAP measures. It then discusses Alamos' track record of delivering shareholder value through its Mulatos mine acquisition and operations. The rest of the document summarizes Alamos' diversified production assets in safe jurisdictions, growth strategy, 2016 guidance, H1 2016 performance, development pipeline, balance sheet, and political risk exposure.
Ur-Energy December 2016 Corporate PresentationBrooke Rock
This document provides an overview and summary of Ur-Energy Inc., a uranium mining company. Key points include:
- Ur-Energy operates the Lost Creek in-situ recovery uranium facility in Wyoming and is developing the Shirley Basin project.
- Lost Creek has steadily produced over 2 million pounds of uranium since 2013 and resource expansion continues.
- The company aims to realize better sales prices through long-term sales agreements and reduce exposure to volatile markets.
- Ur-Energy has a strong technical team with over 180 years of combined uranium production experience in ISR operations.
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $5.5 million in working capital.
ATAC Resources is exploring for gold and copper in Yukon, Canada and Nevada, USA. In Yukon, they have two inferred gold resources totaling over 3 million ounces and will evaluate historical high-grade silver-lead-zinc targets. In Nevada, over 4,000 meters of drilling is planned at the East Goldfield project to step-out from historical holes and test new anomalies. Exploration will also advance copper-molybdenum-gold porphyry targets in Yukon and conduct regional exploration. ATAC is fully funded for their 2021 work programs with a strong treasury of C$6.5 million.
ATAC Resources is exploring for gold and copper in Yukon, Canada and Nevada, USA. In Yukon, they have two inferred gold resources totaling over 3 million ounces and will evaluate historical high-grade silver-lead-zinc targets. In Nevada, over 4,000 meters of drilling is planned at the East Goldfield project to step-out from historical holes and test new anomalies. Exploration will also advance copper-molybdenum-gold porphyry targets in Yukon and conduct regional exploration. ATAC is fully funded for their 2021 work programs with a strong treasury of C$6.5 million.
- The document is a corporate presentation from New Gold that contains forward-looking statements and cautionary language regarding those statements.
- It discusses New Gold's portfolio of assets in top-rated jurisdictions including Canada, the US, Mexico, and Australia.
- The presentation provides highlights from 2015 including record gold production that exceeded guidance and lower than planned costs. It also outlines New Gold's growth pipeline and 2016 guidance.
This corporate presentation discusses Great Panther Silver's operations and financial performance. It provides production and cost guidance for 2017, forecasting 4-4.1 million silver equivalent ounces at a cash cost of $5-6 per ounce and all-in sustaining cost of $14-16 per ounce. Great Panther operates two mines in Mexico, Guanajuato and Topia, and discusses its project pipeline including an upcoming acquisition of the Coricancha mine in Peru with potential for 3 million silver equivalent ounces per year.
This corporate presentation discusses the company's operations in Mexico and Peru. It highlights the Guanajuato Mine Complex in Mexico, which is one of the country's most historic mining districts and currently produces over 700,000 ounces of silver annually from underground mines. The presentation also provides recent financial and production results, showing declining costs per ounce and positive earnings before non-cash items. Overall, it summarizes the company's focus on low-cost silver production in prominent mining jurisdictions in Latin America.
BMO Capital Markets 25th Global Metals & Mining Conference PresentationKinrossGold
Kinross Gold Corporation presented at the BMO Capital Markets Global Metals & Mining Conference on February 28 - March 2, 2016. Kinross delivered strong operational performance in 2015, meeting or exceeding its revised guidance targets. Kinross expects to produce 2.7-2.9 million ounces of gold equivalent in 2016 at an all-in sustaining cost of $890-990 per ounce and capital expenditures of $595 million. Kinross' diversified portfolio is expected to source over 60% of 2016 production from its Americas mines. Kinross outlined organic growth opportunities from its La Coipa project in Chile and exploration programs at Bald Mountain and across its global portfolio.
BMO Capital Markets Global Metals & Mining Conferenceyamanagold2016
- The document discusses Yamana Gold's operational results and expectations for 2016-2018.
- In 2015, Yamana achieved gold production within guidance and is positioned to meet or exceed 2016 targets following repositioning efforts.
- Yamana provides production, cost, and capital expenditure guidance for 2016 and breakdowns of expected gold production by mine for 2016-2018, projecting year over year growth at lower costs.
- The document also discusses Yamana's development pipeline and 2016 exploration program goals.
- The document discusses Golden Star's plans to expand production and reduce costs at its projects in Ghana through underground mining techniques.
- It highlights the exploration upside potential to increase mine lives at existing operations and the experience of management in project delivery.
- Key milestones in the company's transformation include commercial production from the Wassa Underground expected in mid-2017 and from the Prestea Underground also expected in mid-2017.
Raymond James Institutional Investors Conference OrlandoAgnico Eagle Mines
The document provides forward-looking statements and notes regarding non-GAAP financial measures for Agnico Eagle Mines Limited. It summarizes Agnico Eagle's fourth quarter and full year 2015 operating results, including record annual gold production of 1.671 million ounces at total cash costs of $567 per ounce. It also outlines Agnico Eagle's strategic plan for 2016 and beyond, focusing on optimizing existing mines and projects, delivering on expectations, building a project pipeline, and developing people. The company aims to improve its cost structure, increase reserve quality, and maximize free cash flow per share.
Kinross Gold Corporation completed studies on a two-phased expansion of its Tasiast mine in Mauritania. Phase One involves expanding the processing capacity to 12,000 tonnes per day at an initial capital cost of $300 million, which is expected to increase average annual production to 409,000 ounces, reduce costs per ounce by 50%, and generate an internal rate of return of 20%. Phase Two pre-feasibility studies were also completed. The two-phased approach offers significant growth potential for Tasiast at a lower capital cost than previously estimated. Kinross is proceeding with Phase One of the expansion.
Gary Goldberg, President and CEO of Newmont Mining Corporation, presented at the BMO Metals & Mining Conference on February 29, 2016. The presentation included forward-looking statements and cautioned that actual results could differ materially from expectations. It provided an overview of Newmont's strategy to improve the underlying business, strengthen its portfolio, and create shareholder value. Key highlights included ongoing cost and efficiency improvements, a focus on projects with long mine lives and lower costs, and strong financial and operating performance.
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $6.5 million in working capital.
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $6 million in working capital.
ATAC is a Vancouver-based exploration company focused on exploring for copper and gold in Yukon, BC and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt) and a positive Preliminary Economic Assessment for the Tiger Gold Deposit.
ATAC is well-financed with approximately $5.5 million in working capital.
Teranga Gold Corporation plans to acquire Gryphon Minerals, creating a multi-jurisdictional West African gold producer. The all-share transaction is valued at $63 million and represents a 45% premium to Gryphon's share price. The combined company will have reserves of 3.7 million ounces of gold located in Senegal and Burkina Faso. Gryphon's Banfora project in Burkina Faso is shovel-ready and could increase Teranga's annual production to 275,000-325,000 ounces once construction is completed in mid-2019. The transaction is expected to be accretive to Teranga's net asset value and reserves.
Golden Star is expanding production and reducing costs at its Wassa and Prestea mines in Ghana. Production is expected to increase to an average of 281,000 ounces annually from 2017 onwards. Cash operating costs are forecast to decrease as higher grade ore is accessed at Wassa Underground and Prestea Underground ramps up. Exploration drilling will target expanding reserves and mine lives at both operations.
ATAC is a Vancouver-based exploration company focused on exploring for gold in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $5.5 million in working capital.
- The document is a corporate presentation from May 2016 that contains cautionary statements about forward-looking information.
- It warns that statements regarding future financial performance, projects, activities, and expectations are forward-looking and subject to risks and uncertainties that could cause actual results to differ materially.
- The presentation outlines numerous risk factors that could affect the company's projections including economic, geological, permitting, environmental, social, regulatory, political, and financial risks.
The document cautions readers that certain information in the presentation regarding New Gold's future performance are forward-looking statements that are based on estimates and assumptions that are subject to risks and uncertainties. It provides context for forward-looking production, cost, and capital expenditure guidance. The document also lists key assumptions underlying the forward-looking statements and outlines risk factors that could materially affect actual results.
This document provides an overview of Alamos Gold Inc. It begins with cautionary notes regarding forward-looking statements and non-GAAP measures. It then discusses Alamos' track record of delivering shareholder value through its Mulatos mine acquisition and operations. The rest of the document summarizes Alamos' diversified production assets in safe jurisdictions, growth strategy, 2016 guidance, H1 2016 performance, development pipeline, balance sheet, and political risk exposure.
Ur-Energy December 2016 Corporate PresentationBrooke Rock
This document provides an overview and summary of Ur-Energy Inc., a uranium mining company. Key points include:
- Ur-Energy operates the Lost Creek in-situ recovery uranium facility in Wyoming and is developing the Shirley Basin project.
- Lost Creek has steadily produced over 2 million pounds of uranium since 2013 and resource expansion continues.
- The company aims to realize better sales prices through long-term sales agreements and reduce exposure to volatile markets.
- Ur-Energy has a strong technical team with over 180 years of combined uranium production experience in ISR operations.
ATAC is a Vancouver-based exploration company focused on exploring for gold and copper in Yukon and Nevada. Work on its ~1,700 km2 Rackla Gold Property in Yukon has resulted in the Osiris Project Inferred Mineral Resource of 1,685,000 oz of gold at an average grade of 4.23 g/t (in 12.4 Mt), a positive Preliminary Economic Assessment for the Tiger Gold Deposit, and numerous early-stage gold and base metal discoveries. ATAC is well-financed with approximately $5.5 million in working capital.
ATAC Resources is exploring for gold and copper in Yukon, Canada and Nevada, USA. In Yukon, they have two inferred gold resources totaling over 3 million ounces and will evaluate historical high-grade silver-lead-zinc targets. In Nevada, over 4,000 meters of drilling is planned at the East Goldfield project to step-out from historical holes and test new anomalies. Exploration will also advance copper-molybdenum-gold porphyry targets in Yukon and conduct regional exploration. ATAC is fully funded for their 2021 work programs with a strong treasury of C$6.5 million.
ATAC Resources is exploring for gold and copper in Yukon, Canada and Nevada, USA. In Yukon, they have two inferred gold resources totaling over 3 million ounces and will evaluate historical high-grade silver-lead-zinc targets. In Nevada, over 4,000 meters of drilling is planned at the East Goldfield project to step-out from historical holes and test new anomalies. Exploration will also advance copper-molybdenum-gold porphyry targets in Yukon and conduct regional exploration. ATAC is fully funded for their 2021 work programs with a strong treasury of C$6.5 million.
- The document is a corporate presentation from New Gold that contains forward-looking statements and cautionary language regarding those statements.
- It discusses New Gold's portfolio of assets in top-rated jurisdictions including Canada, the US, Mexico, and Australia.
- The presentation provides highlights from 2015 including record gold production that exceeded guidance and lower than planned costs. It also outlines New Gold's growth pipeline and 2016 guidance.
This corporate presentation discusses Great Panther Silver's operations and financial performance. It provides production and cost guidance for 2017, forecasting 4-4.1 million silver equivalent ounces at a cash cost of $5-6 per ounce and all-in sustaining cost of $14-16 per ounce. Great Panther operates two mines in Mexico, Guanajuato and Topia, and discusses its project pipeline including an upcoming acquisition of the Coricancha mine in Peru with potential for 3 million silver equivalent ounces per year.
This corporate presentation discusses the company's operations in Mexico and Peru. It highlights the Guanajuato Mine Complex in Mexico, which is one of the country's most historic mining districts and currently produces over 700,000 ounces of silver annually from underground mines. The presentation also provides recent financial and production results, showing declining costs per ounce and positive earnings before non-cash items. Overall, it summarizes the company's focus on low-cost silver production in prominent mining jurisdictions in Latin America.
This corporate presentation discusses the company's operations in Mexico and potential in Peru. It highlights recent financial performance including increased production and lower costs per ounce. Charts show the company's costs are competitive amongst peers. Operations include the historic Guanajuato Mine Complex in Mexico, which is expanding production and exploring new areas. Production is focused on silver and gold with concentrate shipped to smelters in Japan and Germany.
Aura Minerals Corporate Presentation- May 2014DeniseFlo
This presentation provides an overview of Aura Minerals Inc. as of May 2014. It discusses the company's assets which include producing gold mines in Brazil, Honduras, and Mexico, as well as advanced copper and gold projects. It provides 2014 guidance for gold and copper production and cash costs. The presentation also highlights that the company is executing two transformational projects - expanding capacity at its Aranzazu copper mine in Mexico from 2,600 tonnes per day to 4,500 tonnes per day.
This corporate presentation provides an overview of Great Panther Silver Limited's operations and financial performance. It summarizes that GPR has two producing silver mines in Mexico, with plans to bring two projects in Peru into production by 2018. This will increase projected annual silver production to 4-4.1 million ounces. The presentation also highlights GPR's strong balance sheet, reduced costs, and potential for organic growth through exploration and acquisitions.
Pretium resources q1 2018 conference call may 11 , 2018PretiumR
The document discusses Pretium Resources' Q1 2018 conference call about its Brucejack gold mine. Some key points:
- Pretium produced 75,689 ounces of gold in Q1 2018 and is ramping up to steady-state production mid-to-late 2018.
- Production levels improved month-over-month in Q1 with the implementation of improved grade control.
- All-in sustaining costs were $1,009/ounce in Q1 but are expected to decrease as production levels out.
- The company had $70.5 million in cash and $16.8 million in earnings in Q1 2018.
The document provides an overview of Aurico Gold's operations and projects. It discusses the company's production growth profile, with expected increases in gold production of up to 25% in 2014. It also notes declining costs and capital investments. Aurico's primary assets include the Young-Davidson and El Chanate mines, and it has exploration projects underway. The document includes production figures and cost estimates for 2014.
- The presentation discusses Great Panther's financial and operating performance, as well as its outlook for 2016. It highlights the company's two producing mines in Mexico, Guanajuato and Topia, which are expected to produce between 4-4.2 million silver equivalent ounces in 2016 at cash costs of $4-6/oz and all-in sustaining costs of $12-14/oz.
- Great Panther has a strong balance sheet with $52.9 million in cash and no debt, and an extensive project pipeline beyond its current operations.
- The presentation provides an overview of Great Panther Silver's corporate performance and outlook. It discusses their two mining operations in Mexico, recent financial results showing increased production and lower costs, and guidance for continued production growth through 2016. Great Panther emphasizes their strong balance sheet with no debt and over $50 million in cash as well as low costs relative to peers.
- The presentation provides an overview of Great Panther Silver's corporate performance and outlook. It discusses their two mining operations in Mexico, recent increases in production and reductions in costs per ounce.
- Great Panther Silver has significantly improved their cost per ounce through higher grades and efficiencies at their Guanajuato and Topia mines in Mexico. They maintain a strong balance sheet with no debt and over $50 million in cash and working capital.
- Guidance for 2016 forecasts total silver equivalent production between 4-4.2 million ounces, with cash costs per ounce of $4-6 and all-in sustaining costs of $12-14. The presentation outlines Great Panther Silver's goals of continued organic growth
- The presentation provides an overview of Great Panther Silver's corporate performance and outlook. It discusses their two mining operations in Mexico, recent increases in production and reductions in costs per ounce. Great Panther provides production and cost guidance for 2016 of between 4-4.2 million silver equivalent ounces at cash costs of $4-6 per ounce and all-in sustaining costs of $12-14 per ounce. The presentation also outlines their capital structure and recent financial results.
- The presentation discusses the company's two producing silver mines in Mexico, their plans to increase production at the mines and explore other properties, and goals to lower costs and generate growth. It provides recent financial and production results showing increased output and significantly reduced costs per ounce. Charts display the company's low costs compared to peers and its strong balance sheet with no debt and increasing cash position.
The document provides an overview of Aurico Gold Inc., including forward-looking statements about production plans, cost estimates, and exploration results. It summarizes key details about Aurico's two main operations - the Young-Davidson mine in Ontario, Canada and the El Chanate mine in Mexico. Production is expected to increase up to 25% in 2014, with costs decreasing significantly. The document also provides an overview of the potential Kemess Underground project in British Columbia.
The document provides an overview of Aurico Gold's sales desk presentation from August 2014. It discusses Aurico's key assets including the Young-Davidson and El Chanate mines, highlights 2014 production and cost guidance showing growth, and summarizes reserve and resource estimates. It also provides details on the Kemess Underground project and exploration program results.
Pan American Silver Corp. presented its investor presentation for January 2018. The presentation highlights include:
1) Pan American is a leading silver producer with diversified mining and exploration assets in four countries and a track record of growing production over 20+ years.
2) Preliminary 2017 results show a 28% decrease in cash costs per ounce and production of 25 million ounces of silver.
3) The outlook forecasts continued production growth over the next three years, with further reductions in cash costs per ounce and sustained capital expenditures.
The document provides information about the Young-Davidson Mine located in Ontario, Canada. It discusses that the mine has a long history of gold production dating back to the 1930s. Currently, the mine is ramping up production under new ownership with a goal of increasing production by up to 32% in 2014 through expanded underground mining operations and productivity improvements. The mine has a reserve of 3.7 million ounces of gold and potential for further exploration success.
Fourth Quarter 2017 Financial Results Webcast and Conference CallPretiumR
- The document discusses the ramp up of production at Pretium Resources' Brucejack Mine in northern British Columbia. Key highlights include producing over 150,000 ounces of gold in the first six months of operations and ending 2017 with a cash position of $56.3 million. Operations are being optimized to increase productivity and refine grade control. Guidance for 2018 anticipates gold production of 150,000-200,000 ounces at an all-in sustaining cost of $900-$1,000 per ounce sold.
International Lithium Presentation January 2018.Kirill Klip
International Lithium Corp. owns lithium projects in Argentina, Canada, and Ireland. Its flagship Mariana project in Argentina is a brine-based lithium project located in a prominent salar in a major lithium-producing region. Recent resource estimates for Mariana indicate an indicated resource of 1.2 million tonnes LCE and an inferred resource of 0.6 million tonnes LCE. The project is held in a joint venture with Ganfeng Lithium, with ongoing work including pump testing, geophysical surveys, and a proof of concept study.
BMO Capital Markets 28th Global Metals & Mining ConferencePretiumR
1) The Brucejack Mine in British Columbia has consistently generated profits every quarter since start-up six quarters ago through high-grade underground gold production and low costs.
2) In 2018 the mine produced over 376,000 ounces of gold at a total cash cost of $764 per ounce on average and generated over $20 million in adjusted net earnings.
3) For 2019 the mine is targeting production of 390,000 to 420,000 ounces of gold at an all-in sustaining cost of $775 to $875 per ounce through continued ramp up to 3,800 tonnes per day.
Osisko reported strong financial and operating results for Q4 2016 and full year 2016. In Q4, Osisko earned 8,964 gold equivalent ounces, revenues of C$13.7 million, and net cash flows of C$12.8 million. For the full year 2016, Osisko earned a record 38,270 gold equivalent ounces, revenues of C$62.7 million, and net cash flows of C$53.4 million. Osisko is forecasting gold equivalent ounce production of 43,300 to 46,100 ounces for 2017. Osisko ended 2016 with C$499.2 million in cash and cash equivalents.
Similar to Ascendant Corporate Presentation - August 2018 (20)
Cleades Robinson, a respected leader in Philadelphia's police force, is known for his diplomatic and tactful approach, fostering a strong community rapport.
UnityNet World Environment Day Abraham Project 2024 Press ReleaseLHelferty
June 12, 2024 UnityNet International (#UNI) World Environment Day Abraham Project 2024 Press Release from Markham / Mississauga, Ontario in the, Greater Tkaronto Bioregion, Canada in the North American Great Lakes Watersheds of North America (Turtle Island).
Methanex is the world's largest producer and supplier of methanol. We create value through our leadership in the global production, marketing and delivery of methanol to customers. View our latest Investor Presentation for more details.
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfSOFTTECHHUB
The world of blockchain and decentralized technologies is about to witness a groundbreaking event. ZKsync, the pioneering Ethereum Layer 2 network, has announced the highly anticipated airdrop of its native token, ZK. This move marks a significant milestone in the protocol's journey, empowering the community to take the reins and shape the future of this revolutionary ecosystem.
Collective Mining | Corporate Presentation - June 2024
Ascendant Corporate Presentation - August 2018
1. 1
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
A Pure-Play Zinc Producer
August 2018
PROFITABILITY • GROWTH • OPPORTUNITY
2. 2
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Forward Looking Statements
This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within the meaning of applicable Canadian securities legislation. All
information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use
of words such as "plans", "expects", "budget", "guidance", "scheduled", "estimates", "forecasts", "strategy", "target", "intends", "objective", "goal", "understands", "anticipates" and "believes" (and variations of
these or similar words) and statements that certain actions, events or results "may", "could", "would", "should", "might" "occur" or "be achieved" or "will be taken" (and variations of these or similar
expressions). Forward-looking information is also identifiable in statements of currently occurring matters which may continue in the future, such as "providing the Company with", "is currently",
"allows/allowing for", "will advance" or "continues to" or other statements that may be stated in the present tense with future implications. All of the forward-looking information in this presentation is
qualified by this cautionary note.
Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by Ascendant at the date the forward-looking information is
provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the
forward-looking information.
Forward-looking statements involve known and unknown risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or
implied by the forward-looking information. The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking
information may include, but are not limited to, risks generally associated with the mining industry, such as economic factors (including future commodity prices, currency fluctuations, energy prices and
general cost escalation), uncertainties related to the development and operation of Ascendant's projects, dependence on key personnel and employee and union relations, risks related to political or social
unrest or change, rights and title claims, operational risks and hazards, including unanticipated environmental, industrial and geological events and developments and the inability to insure against all risks,
failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, compliance with government and environmental regulations, including permitting requirements and
anti-bribery legislation, volatile financial markets that may affect Ascendant's ability to obtain additional financing on acceptable terms, the failure to obtain required approvals or clearances from government
authorities on a timely basis, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, uncertain
costs of reclamation activities, tax refunds, hedging transactions, as well as the risks discussed in Ascendant's most recent Annual Information Form on file with the Canadian provincial securities regulatory
authorities and available at www.sedar.com. Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary
materially from those expressed or implied in the forward-looking information. Accordingly, the reader should not place undue reliance on forward-looking information. Ascendant does not assume any
obligation to update or revise any forward-looking information after the date of this presentation or to explain any material difference between subsequent actual events and any forward-looking information,
except as required by applicable law.
The information concerning the Company’s mineral properties has been prepared in accordance with National Instrument 43-101 (“NI-43-101”) adopted by the Canadian Securities Administrators. In
accordance with NI-43-101, the terms “Mineral Reserves”, “Proven Mineral Reserve”, “Probable Mineral Reserve”, “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred
Mineral Resource” are defined in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) Definition Standards for Mineral Resources and Mineral Reserves adopted by the CIM Council on May
10, 2014. While the terms “Mineral Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” are recognized and required by NI 43-101, the U.S. Securities
Exchange Commission (“SEC”) does not recognize them. The reader is cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated
economic value. Inferred Mineral Resources have a high degree of uncertainty as to their existence and as to whether they can be economically or legally mined. It cannot be assumed that all or any part of
any Inferred Mineral Resource will ever be upgraded to a higher category. Therefore, the reader is cautioned not to assume that all or any part of an Inferred Mineral Resource exists, that it can be
economically or legally mined, or that it will ever be upgraded to a higher category. Likewise, you are cautioned not to assume that all or any part of a measured or Indicated Mineral Resource will ever be
upgraded into Mineral Reserves.
Readers should be aware that the Company’s financial statements (and information derived therefrom) have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by
the International Accounting Standards Board and are subject to Canadian auditing and auditor independence standards. IFRS differs in some respects from United States generally accepted accounting
principles and thus the Company’s financial statements (and information derived therefrom) may not be comparable to those of United States companies. Unless otherwise indicated, all dollar values herein
are in US$.
3. 3
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Why Ascendant Resources?
A Compelling Investment Opportunity
A Unique Zinc Opportunity
Long-Term Low Cost Producer
Multiple Avenues for Growth
• The only pure-play junior zinc producer set to benefit
from the tight zinc market
• 2018 Cost Guidance US$70-80/t with activities underway
for further long-term cost reduction
• Focused on organic growth opportunities within
El Mochito and Honduras as well as accretive growth
opportunities
• US$11.3 million in cash as at June 30, 2018
Deeply Discounted to Peers
• Undervalued vs peers on P/EBITDA & P/NAV
• Significantly greater Resource/share vs peers
The only junior pure-play
ZINC PRODUCER
4. 4
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc-Lead-Silver Mine
Flagship El Mochito Mine
• 100% owned underground Zn/Pb/Ag mine.
• In continuous operation since 1948 producing 27+
million tonnes ZnEq over its lifetime.
• 2017 Zn/Pb/Ag production of 66 MM lbs ZnEq. 2018
guidance of 85-95 MM lbs ZnEq.
• Significant Resource base with 7+ year Reserve mine
life.
• 11,000 ha land package; the majority unexplored.
• Very limited exploration work undertaken by
previous owners in 5+ years.
• Secure 9-year offtake agreement in place with
Nyrstar N.V.
Typical NSR breakdown:
Zn 70% Pb 20% Ag 10%
5. 5
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
38,521 38,866
53,729
49,393
50,597 50,795
57,458
58,978 59,601
64,449 64,327
69,578
30,000
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
7-day work
stoppage.
81%
Production
Increase in
2017
Introduction of
additional
underground
shift.
First new
Equipment in
rotation.
Positive EBITDA
Free Cash Flow Positive
2017 Operational Turnaround Highlights
El Mochito Transformed to a Free Cash Flowing Operation: Annual Production Exceeded 2017 Production Target.
TonnesMilled
31%
DIRECT OPERATING
COSTS
Note: All % figures are provided on a full 2017 calendar year basis from Jan 2017-Dec 2017.
20%
TRUCK
AVAILABILITY
PRODUCTIVE
WORKING HOURS
40%
IMPROVED
VENTILATION
VOLUMES
23%
6. 6
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Operational Guidance
Putting El Mochito Back on the Map
Operating Data
Contained Metals:
Zinc Equivalent Metal 85 – 95 million lbs
Zinc 60 – 66 million lbs
Lead 18 – 22 million lbs
Silver 800,000 – 950,000 ozs
Other Operating Assumptions
Direct Operating Costs $70 – $80 / tonne
Capital Expenditure $23 – $28 million
Financial Assumptions
Adjusted EBITDA
1
$23 – $28 million
Free Cash Flow $2 – $5 million
Note: Figures are based on assumed metal prices of zinc US$1.20/lb, lead US$0.95/lb and silver US$16.00/oz and 355 operating days in 2018 and are
expressed in US dollars. Assumed metal prices are based on the 2018 and 2019 price forecasts from the BMO Capital Market’s Base Metals and Bulk
Commodities Outlook report dated October 18, 2017.
7. 7
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Operating Results
Continuous Improvements at El Mochito following 2017 Turnaround Year
$0.00
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
Q1 17 Q2 17 Q3 17 Q4 17 Q1 18 Q2 18
Contained Zinc Production (lbs) Contained Lead Production (lbs)
Zinc Equivalent Production (lbs) Direct Operating Costs $/t Ore Milled
6+ quarters
of consecutive production
growth
22.9M ZnEq lbs
Record contained metal
production achieved in Q2 18
3% decrease
in direct operating costs in
2018
8. 8
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
1.2x
1.7x
2.2x
3.5x
4.9x 4.9x
5.5x
6.2x
Ascendant
Resources Inc.
Atico Mining
Corporation
Trevali Mining
Corporation
Capstone Mining
Corp.
Sierra Metals, Inc. Red River
Resources Ltd.
Copper Mountain
Mining Corp.
Taseko Mines
Limited
EV/EBITDA
Peer Value Comparison
The Rerating Case for ASND
Source: Consensus from Bloomberg as at market close July 18, 2018.
0.42x 0.43x 0.43x
0.48x 0.49x 0.50x 0.51x
0.64x 0.65x
0.69x
0.86x
1.08x
1.50x
Capstone
Mining Corp.
Red River
Resources Ltd.
Tinka
Resources Ltd.
Ascendant
Resources Inc.
Copper
Mountain
Mining Corp.
Taseko Mines
Limited
Atico Mining
Corporation
Trevali Mining
Corporation
Titan Mining
Corporation
Excellon
Resources Inc.
Heron
Resources
Limited
Arizona Mining
Inc.
Sierra Metals,
Inc.
P/NAV
1.6x 1.7x
2.2x 2.3x 2.5x
3.6x
5.1x
5.8x
7.5x
3.6x
Ascendant
Resources Inc.
Atico Mining
Corporation
Trevali Mining
Corporation
Capstone
Mining Corp.
Copper
Mountain
Mining Corp.
Taseko Mines
Limited
Sierra Metals,
Inc.
Excellon
Resources Inc.
Red River
Resources Ltd.
Average
P/CF
ASND appears undervalued on all metrics
relative to its peers.
0.67x
3.8x
Note: ASND 1.2x EV/EBITDA is based on analysts consensus EBITDA for 2018.
Note: ASND 1.6x P/CF is based on analysts consensus of cash flow expectations for 2018.
3.6x
1.60x
9. 9
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
New El Mochito Reserve and Resource Estimate
El Mochito Life of Mine Extended Beyond 7 Years
El Mochito Mineral Reserve Statement – Effective 01 January 2018
Category Tonnes Grade Contained Metal
(kt)
Zn
(%)
Pb
(%)
Ag
(g/t)
ZnEq.
(%)
Zn
Mlbs
Pb
Mlbs
Ag
Moz
ZnEq.
Mlbs
Proven Reserves 785 4.7 2.1 54 7.2 81 35 1.4 124
Probable Reserves 4,946 4.7 1.6 36 6.6 516 174 5.8 717
Proven & Probable Reserves 5,731 4.7 1.7 39 6.7 597 209 7.2 841
Notes:
(1) Metal price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/oz Ag.
(2) Zinc equivalent metal grade (ZnEq %) was calculated as follows Zn% +(Pb % x 0.8175) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn, 74.3% Pb and 77.7% Ag metallurgical recoveries.
(3) A cut-off value of 4.76% ZnEq was used to estimate the Mineral Reserve which considered metal price assumptions, metal recoveries, refining charges, concentrate mass pulls, operating costs, royalties, concentrate treatment
charges, payables, penalties and transportation/selling costs.
(4) Mineral Resources are stated inclusive of Mineral Reserves, tonnages, grades and contained metal values have been rounded, totals may vary due to rounding.
(5) The Mineral Reserve and Metallurgical technical contents of this presentation were completed by Eugene Puritch, P.Eng. FEC, CET, James Pearson, P.Eng. and D. Grant Feasby, P.Eng. of P&E Mining Consultants Inc., all
“Independent Qualified Persons” as defined by NI 43-101.
El Mochito Mineral Resource Statement – Effective 01 January 2018
Category Tonnes Grade Contained Metal
(kt)
Zn
(%)
Pb
(%)
Ag
(g/t)
ZnEq.
(%)
Zn
Mlbs
Pb
Mlbs
Ag
Moz
ZnEq.
Mlbs
Measured Resources 1,100 5.5 2.0 65 8.2 134 48 2.3 198
Indicated Resources 6,452 5.2 1.7 41 7.2 735 241 8.4 1,019
Measured & Indicated Resources 7,553 5.2 1.7 44 7.3 869 289 10.7 1,216
Inferred Resources 4,972 5.1 1.4 33 6.7 556 156 5.4 739
Notes:
(1) Mineral Resources are stated inclusive of Mineral Reserves, Tonnage, grade and contained metal values have been rounded, totals may vary due to rounding.
(2) Price assumptions used were US$1.21/lb Zn, US$1.06/lb Pb and US$18/troy oz Ag. Zinc equivalent metal grade (ZnEq. %) was calculated as follows: Zn% +(Pb % x 0.82) +(Ag g/t x 0.0149) = ZnEq% and is based on 88.9% Zn
recovery, 74.3% Pb recovery and 77.7% Ag recovery.
(3) A cut-off of 3.1% ZnEq. was used to estimate Mineral Resources and is based on fourth quarter 2017 marginal direct operating costs.
(4) Results of an interpolated bulk density deposit model have been applied, and contributing 5ft downhole assay composites were capped at 38% Zn, 36% Pb and 2000g/t Ag.
(5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
(6) The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of
the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.
(7) The Mineral Resource content of this presentation was completed by Michael Cullen, P. Geo. of Mercator Geological Services Limited, Mr. Cullen supervised and is responsible for the Mineral Resource Estimate and is an
“Independent Qualified Person” as defined by NI 43-101.
For further details on the El Mochito Mineral Reserve and Resource Estimate effective January 01, 2018, please refer to the Technical Report on the Company’s website or SEDAR www.sedar.com.
10. 10
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
The El Mochito Mine, Honduras
Las Vegas, Honduras
El Mochito Mine, Honduras ( 100% )
Underground Zn/Pb/Ag mine on an 11,000
hectare land package, operating since 1948
Country Snapshot
• 70 years of continuous operations at El Mochito.
• El Mochito represented ~3% of exports in 2014. The mining
industry (2 mines) represented 4% of GDP in 2015.
• Business friendly jurisdiction with a history of mining.
• Overwhelming community support; Las Vegas emerged as a
result of the mine’s existence.
• Stable democratic constitution; Current President was re-
elected for another 4-year term in 2017; focus remains on
security, corruption and business investment.
• Decentralized government; municipalities have autonomy.
• Solid infrastructure; 2 hour drive from international airport
(San Pedro ~1.5M pop.). Paved road to site and reliable
power source.
• 25% Corporate Tax Rate + 5% NSR ($53MM in tax losses
available for 2018/2019).
• Standard & Poor’s raised Honduras’ credit rating in July 2017
from B+ to BB- and changed the country’s risk outlook from
stable to positive.
11. 11
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Honduras
A Beautiful and Growing Tourist Destination
Roatán Island Copán Ruins
Lake Yojoa Tegucigalpa, Capital
12. 12
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Exploration Strategy
El Mochito Mine
• Continually grow high-grade
Reserve/Resource and extend
LOM
• New NI 43-101 defines
significant Reserves &
Resources with 7+ years LOM
Long history of Resource conversion and discovery
New High-
Grade Zones
Grow
El Mochito
Longer-term
Discovery
• Several known targets to
potentially add high-grade
material to mill to improve
grade for the long-term
• Long history of converting
Inferred Resources into
Measured & Indicated
Resources
• Follow up on regional targets
identified by historical drilling
data
• 11,000 ha land package barely
explored
13. 13
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Extensive 2018 Program with Significant Upside Potential
2018 Exploration Initiatives:
• Follow up on known ‘chimney’ ore bodies and define
new ‘chimney’ targets (historical grades in excess of
17% ZnEq).
• SGH soil geochem survey of El Mochito concession.
• Review and prioritize near-mine targets (Manzanal,
Caliche, Porvenir Trend, Big Fuzzy) as well as other
concessions within Honduras.
• Review of historical mining areas in upper levels
which still contain a number of high-grade targets.
Exploration and Resource Upside
~40,000 metres
of exploration and definition drilling is planned at El
Mochito for 2018.
• ~20,000 m of definition drilling for Resource
conversion.
• ~20,000 m of exploration drilling to define additional
material near mine and regional exploration targets.
14. 14
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
• Mine extends laterally for around 2 km, open East - West • Combination of lower grade mantos and higher grade chimneys
El Mochito Mine Layout – Long Section
A Long History of Resource Discovery and Conversion
15. 15
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Key Areas Optimizing Existing Development
2018 Exploration Areas – Plan View
Esperanza
Port Royal
Santa Elena
Deep North
Deep East
Nueva Este
Palmar
Dyke TrendDefined Faults Targeted
Exploration Areas
Planned Drill
Holes
Development Planned
Development
Ore Body
Victoria
Niña BlancaNispero and
Upper San Juan
Included in 2017 drill results:
Deep East Manto: 6.4% ZnEq
Deep North Manto: 6.8% ZnEq
Historical Results:
Port Royal Chimney: 17.25% ZnEq
Imperial Trend Targets 8% - 17% ZnEq
Dec 2015 Estimations:
Palmar: 9.1% - 13.8% ZnEq
Victoria: 6.95 – 7.4% ZnEq
16. 16
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Significant High-Grade Mineralized Intercepts
2018 Drill Program Results
12,015 metres
Step-out Holes
DDH 10956 – 1.4m at 35.8% ZnEq, 20.1% Zn, 13.4% Pb and 318 g/t Ag (Porvenir)
DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena)
DDH 10949 – 8.6m at 9.6% ZnEq, 5.7% Zn, 3.4% Pb and 75.8 g/t Ag (Esperanza)
and – 7.5m at 8.9% ZnEq, 5.5% Zn, 3.3% Pb and 41.4 g/t Ag
Results continue to support Company’s goals of increasing tonnage for further Mineral Reserve and
Resource growth and identifying higher-grade mineralization at El Mochito:
In-fill Holes
DDH 10957 – 17.7m at 9.1% ZnEq, 5.9% Zn, 2.9% Pb and 59.9 g/t Ag (Esperanza)
DDH 10958 – 6.3m at 12.6% ZnEq, 6.2% Zn, 5.6% Pb and 125.2 g/t Ag (Santa Elena)
DDH 10950 – 4.1m at 15.3% ZnEq, 15.1% Zn, 0.1% Pb and 6.4 g/t Ag (Santa Elena)
DDH 10902 – 3.9m at 9.9% ZnEq, 8.0% Zn, 0.6% Pb and 101.6 g/t Ag (Port Royal Manto)
1 Please refer to tables in the press release dated June 14, 2018 for true/apparent widths which are estimated from
actual drilled lengths.
2 ZnEq grades in % represents zinc grade together with the lead and silver grades (zinc equivalent) in terms of zinc
using certain metal price, payable metal, and processing recoveries assumptions: Metal prices - Zn$1.21/lb,
Pb$1.06/lb, Ag$18.00/oz; processing recoveries - Zn 88.9%, Pb 74.3%, Ag 77.7%.
of exploration and definition
drilling has been completed with
results announced. The 40,000
metre programs continues with
all orebodies remaining open
along strike and at depth.
Step-out (66%) &
In-fill (34%)
Drill program targets extensions
of four ore bodies, namely
Porvenir, Santa Elena, Port Royal
Manto and Esperanza.
Key Highlights (true/apparent widths) Include:
17. 17
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Victoria
Santo Niño
Porvenir Fault
Planned 2018 Drilling: ~11,000 ft
Surface Exploration Holes:
14-PS-01: 30.7 ft @ 9.9% Zn, 2.0% Pb, 32 g/t Ag. ZnEq= 12.9%
14-PS-02: 27.8 ft @ 5.9% Zn, 3.8% Pb, 35 g/t Ag. ZnEq= 10.7%
14-PS-04A: 13.3 ft @ 12.6% Zn, 0.4% Pb, 27 g/t Ag. ZnEq= 13.9%
L-2790
• Follow up on historical drill
holes along structure.
• Historical holes show high-
grades over meaningful
widths.
• Porvenir fault target
(highlighted here) is one of
several such targets.
• Potential to add meaningful
tonnage/extend mine life if
trends continue which could
support potential mill
expansion.
• Resource Expansion moving
East.
Longer Term Regional Exploration Opportunities
2018 Porvenir Trend Targets Could Add Significant Scope
Plan view
Deep East Manto - ZnEq 6.4%
Deep North Manto - ZnEq 6.8%
1 500 1000ft
18. 18
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Long-Term Growth – Regional Exploration Opportunities
Known Targets Discovered by Past Surface Exploration Activities
N
Lake
Yojoa
Valid
Concessions
Known
Targets
Fault
Lines
Existing Orebodies
Being Mined
Manzanal:
- drillholes
- geochemistry
- trenches
- geophysics
Salva Vida Trend:
- drillholes
Caliche:
- exploration
tunnel
- drillholes
- geochemistry
Soledad:
- exploration tunnel
- drillholes
Big Fuzzy:
- drillholes
- 8m @ 5% Zn
Porvenir Trend:
- drillholes
0 1 2
Km
19. 19
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
High-Grade Polymetallic VMS Deposit in the Prolific Iberian Pyrite Belt
Lagoa Salgada Project
• 25% interest in the Project with an option to
increase to 80% announced August 1, 2018.
• Low-cost entry to a known high-grade
polymetallic VMS deposit with significant
exploration potential.
• Located along the Iberian Pyrite Belt in
Portugal; a region home to multiple world class
mines that has been transformational for
Lundin Mining (Neves Corvo) and Trafigura
(Aguas Tenidas).
• Established Resource suggests near-term
development and mineable opportunity with a
modest drill program.
• Jurisdictional and commodity diversification in
a region management has operated before.
Ascendant owns an 25% interest in Redcorp – Empreendimentoes Mineirs, LDA., which owns an 85% interest in the Lagoa Salgada Project as well as acts as
the operating entity. Ascendant has an option to increase ownership to 80% upon completion of certain milestones and payments. On a pro rata basis
Ascendant currently owns an effective 21.25% of the Project.
ALJUSTREL
NEVES CORVO
AGUAS TENIDAS
LAGOA SALGADA
PROJECT
19
Zn Pb Ag Cu Au
20. 20
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
High-Grade Polymetallic VMS Deposit with Significant Growth and Development Potential
Lagoa Salgada Project – Highlights
• High-grade polymetallic VMS deposit:
Zn/Pb/Cu/Ag/Au.
• Ideally located in terms of infrastructure and
community with strong government support.
• Large land package of 10,700 ha with minimal drilling
and numerous known targets.
• Drilling to date is limited to 71 holes identifying 17
gravimetric targets with only 2 being significantly
tested.
• 2 defined Resource deposits; LS-1 & LS-1 Central
remaining open in al directions.
• Iberian Pyrite Belt has a long history of successful
VMS discovery demonstrating typical characteristics
of VMS deposits: large in scale, multiple deposit
mines, high-grade in nature.
LS-1 DEPOSIT
(approx. outline)
LS-1 CENTRAL DEPOSIT
2018 Ascendant lead drill program will focus
on expanding the known Resources of LS-1
and LS-1 Central deposits and following up on
the untested targets.
21. 21
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Significant Resource with Significant Upside Potential
Lagoa Salgada – Resource Estimate for the LS-1 & LS-1 Central Deposits
Mineral Resources for the LS-1 Deposit at a 3.5% ZnEq cut-off grade - Effective date January 05, 2018
Classification
Tonnage
(‘000 t)
Zn
(%)
Pb
(%)
Cu
(%)
Ag
(gpt)
Au
(gpt)
ZnEq
(%)
Indicated 5,840 2.79 2.96 0.32 53.54 0.78 8.88
Inferred 2,010 2.44 2.80 0.24 47.37 0.65 7.82
Notes:
(1) Block matrix is 10mx10mx10m
(2) Grades are estimated by ordinary kriging interpolation
(3) A cut-off grade of 3.5% ZnEq was used to report the Mineral Resource for the LS-1 Deposit
(4) Zinc equivalent metal grade (ZnEq%) was calculated as follows:
ZnEq% = ((Zn Grade * 25.35) + (Pb Grade * 23.15) + (Cu Grade * 67.24) + (Au Grade * 40.19) + (Ag Grade * 0.62)) / 25.35
Metal prices used: US$1.15/lb Zn, US$1.05/lb Pb, $3.05/lb Cu, US$19.40/oz Ag, and 1,250/oz Au
No recoveries were applied
(5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability
(6) Shown on a 100% basis. Ascendant holds a 25% interest in Redcorp, the operating subsidiary which holds an 85% interest in the Lagoa Salgada Project
Mineral Resources for the LS-1 Central Deposit at a 3.5% ZnEq cut-off grade - Effective date January 05, 2018
Classification
Tonnage
(‘000 t)
Zn
(%)
Pb
(%)
Cu
(%)
Ag
(gpt)
Au
(gpt)
ZnEq
(%)
Inferred 2,220 1.91 1.11 0.51 17.76 0.07 4.80
Notes:
(1) Block matrix is 10mx10mx10m
(2) Grades are estimated by inverse distance squared interpolation
(3) A cut-off grade of 3.5% ZnEq was used to report the Mineral Resource for the LS-1 Deposit
(4) Zinc equivalent metal grade (ZnEq%) was calculated as follows:
ZnEq% = ((Zn Grade * 25.35) + (Pb Grade * 23.15) + (Cu Grade * 67.24) + (Au Grade * 40.19) + (Ag Grade * 0.62)) / 25.35
Metal prices used: US$1.15/lb Zn, US$1.05/lb Pb, $3.05/lb Cu, US$19.40/oz Ag, and 1,250/oz Au
No recoveries were applied
(5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability
(6) Shown on a 100% basis. Ascendant holds a 25% interest in Redcorp, the operating subsidiary which holds an 85% interest in the Lagoa Salgada Project
22. 22
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc Fundamentals
Zinc Fundamentals Remain Strong as Supply Continues to Drive Tightening Market
Source: Bloomberg
Jan 2007 Nov 2017
300,000
600,000
900,000
1, 200,000
0
$0.00
$0.50
$1.00
$1.50
$2.00
LME Zinc Warehouse Stock Levels (T) / Zinc Spot Price ($/Lb)
Key drivers for a sustained and strong zinc price:
Physical zinc market remains very tight
Fundamentals continue to indicate structural deficits due to depleting global inventories. Supply deficits drove prices to
10-year highs of $1.63/lb in Jan. 2018. Although current prices have edged down due to new supply expectations and
trade war rhetoric, analysts forecast continued tightness in the physical market.
Global zinc demand remains steady.
Modest global GDP growth of 2-3% implies strengthening demand (~400kt pa of additional new supply required).
Zinc price forecasts remain strong.
Analysts’ average annual zinc price forecasts:
2018E: US$1.46/lb
2019E: US$1.40/lb
2020E: US$1.31/lb
23. 23
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Pro Forma Capital Structure
Ascendant Resources Inc.
Share Price ($C, as at Aug. 10/18) $0.67
Shares Issued / Outstanding (MM’s) 76.6
Shares Fully Diluted (MM’s) 98.3
Estimated Float ~25%
Market Capitalization (C$MM) $51.3
CQS 18.4%
Steve Laciak 16.5%
Vertex One Asset Management 14.0%
MM Asset Management Inc. 13.8%
Directors and Management approx. 16.4%*
Major Shareholders
Stock Symbol TSX: ASND
*fully diluted basis
Analyst Coverage
Dalton Baretto Canaccord Genuity
Matthew O’Keefe Cantor Fitzgerald
Stefan Ioannou Cormark Securities
Gabriel Gonzalez Echelon Wealth Partners
Jacques P. Wortman Eight Capital
Ian Parkinson GMP Securities
Heiko F. Ihle H.C. Wainwright & Co.
Ryan Hanley Laurentian Bank Securities
24. 24
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Catalysts and Deliverables
A Year of Profitability and Resource Growth
Deliver Meaningful FCF
Guidance and market outlook support robust FCF in 2018 and beyond
Remain focused on operating margins and maximize value per tonne milled
New NI 43-101 Resource Report
Updated Reserve & Resource in April 2018 incorporating all 2017 exploration work
defined significant Resource with 7+ year Reserve life (LOM)
Sustained Higher Production Rates
2018 expected metal production 41-65% higher than 2017
Mill has demonstrated ability to sustain the newly increased production rates
Increase Ore Head Grades
Focus on increasing high-grade ore to the mill with better dilution control and higher
grade zones now in the mine plan
Long-Term Optimization
Focus on long-term cost reduction opportunities and operational efficiencies for
profitability in any metals price environment
Extensive Exploration Activities
(El Mochito & Lagoa Salgada)
El Mochito - Maintain aggressive internal and near mine exploration for further
Resource growth and commence regional exploration for long-term LOM extension
Lagoa Salgada – commence exploration work with goal to expand Resources at defined
deposits and test known targets
Strategic Opportunities
Pursue and evaluate accretive growth opportunities in country and globally
Long-term goal of being a multi-asset mid-tier metals producer
25. 25
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
WHY NOW IS THE TIME FOR
ASCENDANT?
Restored
Mine optimization and rehabilitation complete
Profitability
Significant Free Cash Flow in 2018; Rerating expected
Exploration Potential
Updated Reserve & Resource defined significant Resource with 7+ year
Reserve life (LOM); 40,000 m drill program in 2018
Long-term Mid-Tier Producer
Maximize profitability and shareholder value; organic growth and accretive opportunities
26. 26
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Appendices
T S X - V A S N D
27. 27
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Management
CHRIS BUNCIC, MBA, CFA, P. Eng – PRESIDENT, CEO, AND DIRECTOR | Mr. Buncic is one of the founding partners in the
formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in
2016. Prior to cofounding Ascendant, Mr. Buncic served in senior management roles at several Canadian corporations in the
technology and resources sectors. His depth of experience also includes six years in Institutional Equity Research at leading
Canadian independent full service brokerage firms Cormark Securities Inc. and Mackie Research Capital Corporation. Mr. Buncic is
a CFA Charterholder, has a MBA from Schulich School of Business and B.A.Sc. from the University of Toronto. Mr. Buncic is a
member of the Professional Engineers of Ontario and the CFA Society.
CLIFF HALE-SANDERS, MBA, CFA – EXECUTIVE VICE PRESIDENT | Mr. Hale Sanders is one of the founding partners in the
formation of Ascendant Resources Inc. and its acquisition of the company’s flagship operating El Mochito mine from Nyrstar NV in
2016. Mr. Hale Sanders’ career has spanned approximately 20 years in the capital markets industry working as a leading Base
Metals and Bulk Commodities research analyst in Canada working at RBC Capital Markets, TD Securities, CIBC World Markets and
Cormark Securities. During this period, Mr. Hale Sanders visited and reviewed numerous mining operations and corporate
entities around the world. Mr. Hale-Sanders holds a B.Sc. in Geology and Chemistry, an MBA from McMaster University and is a CFA
Charterholder.
NEIL RINGDAHL – CHIEF OPERATING OFFICER | Mr. Ringdahl is a senior mining executive with over 23 years of
international mining, development, and executive management experience. Mr. Ringdahl has a strong technical background in a
career that has been primarily focussed on underground and open pit mining in Latin America and Africa. Previously, Mr. Ringdahl
held the roles of Chief Operating Officer at Orvana Minerals Corp. and Chief Executive Officer at Apogee Silver. At Apogee, he
significantly de-risked the rehabilitation project at the Pulacayo mine in Bolivia while fostering proactive community relations
improvements and agreements. Prior to this, Mr. Ringdahl has held various senior positions with Korea Zinc, Volcan Companía
Minera, Anglo Platinum, and AngloGold. Mr. Ringdahl holds a bachelor's degree with Honors in mining engineering from the
University of the Witwatersrand in South Africa.
ROHAN HAZELTON, CPA, CA – CHIEF FINANCIAL OFFICER | Mr. Hazelton is a Chartered Professional Accountant with
over 20 years of international finance experience including 15 years in the mining sector. Has was formerly Vice President, Strategy
at Goldcorp Inc. where he held a variety of roles including Vice President Finance, Chief Financial Officer of Mexican Operations and
Corporate Controller. He holds a B.A. in Applied Mathematics and Economics from Harvard University.
28. 28
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Board of Directors
MARK BRENNAN
EXECUTIVE CHAIRMAN
Mr. Brennan is a founding partner of
Ascendant Resources Inc. and has over
30 years of financing and operating
experience in North America and
Europe. Mr. Brennan most recently
served as President and CEO of Sierra
Metals Inc. Prior to Sierra Metals, Mr.
Brennan served as President & CEO at
Largo Resources Ltd.
RENAUD ADAMS
DIRECTOR
Mr. Adams recently served as President
and Chief Executive Officer of Richmont
Mines Inc. until it was acquired by
Alamos Gold Inc. Mr. Adams has over
20 years of experience as an executive
and as an operator in the mining
industry.
CHRIS BUNCIC, MBA, CFA, P. Eng
PRESIDENT, CEO, AND
DIRECTOR
PETRA DECHER, CPA
DIRECTOR
Ms. Decher currently serves as
Chairwoman of the Board at Red Pine
Exploration Inc. and recently served
as the Lead Independent Director of
Integra Gold Corp. until its acquisition
by Eldorado Gold Corporation. Ms.
Decher served as the VP, Finance and
Assistant Secretary for Franco-Nevada
Corporation from 2009 to 2016.
GUILLERMO KAELIN
DIRECTOR
Mr. Kaelin is a capital markets
professional with over 18 years of
experience in private equity,
investment banking, research and
public securities and is currently
the Head of Latin America of
Appian Capital Advisory LLP.
KURT MENCHEN
DIRECTOR
Mr. Menchen has over 37 years' of
experience operating and managing
mining projects, including over 20 years
as General Manager at the Jacobina
Gold project in Brazil where he
successfully operated the underground
project for Anglo American, Desert Sun
Mining and eventually Yamana Gold.
STEPHEN SHEFSKY
LEAD DIRECTOR
Mr. Shefsky is the President & CEO,
Founder and Director of James Bay
Resources Ltd. and has over 40 years’
experience in the investment and
mining industry through Canada and
Latin America.
ROBERT CAMPBELL
DIRECTOR
Mr. Campbell is an exploration
geologist with over 40 years experience
in mining and exploration industry
through Canada, United States and
Latin America. Mr. Campbell is
currently VP, Exploration at Largo
Resources Ltd.
29. 29
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2018 Exploration & Definition Drilling Program
Realized to August 2018
Target
Numbers
Exploration Targets
New Exploration (m)
Definition Drilling
(m)
Total Expl. & Def. Drilling
(m)
Budget Real Budget Real Tot. Budget Tot. Real
1 Esperanza Chimney & Manto 1,937 646 3,237 973 5,174 1,619
2 Santa Elena Manto 3,927 6,860 4,269 320 8,196 7,180
3
Deep East & North
(Porvenir Trend)
2,414 3,327 2,283 932 4,697 4,259
4 New Chimney L-2100 2,331 2,294 2,303 4,625 2,303
5 Victoria Chimney & Manto 2,248 300 1,537 3,785 300
6 Santa Barbara Manto 2,675 1,199 2,675 1,199
7 Port Royal - Esperanza 2,042 942 2,676 2,984 2,676
8 Upper San Juan 766 867 1,426 92 2,192 959
9 Niña Blanca Chimney 351 435 786
10 Upper Canoe 713 713
11 El Pie Niña - Blanca 701 701
12 Upper Historic Mine Levels 1,571 1,571
Total (m) 18,288 12,000 19,812 8,495 38,100
20,495
(54%)
30. 30
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
2017 Operating Summary
El Mochito Operational Results
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Metal Production Profile
Zn lbs Pb lbs Zn Eq. lbs (Production)
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Zinc Production (lbs)
-
500,000
1,000,000
1,500,000
2,000,000
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Contained Lead Production (lbs)
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$110.00
$120.00
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Cost Profile
Cash Cost $/t of Ore MilledDirect Operating Cost $/t Ore Milled
31. 31
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Highlights from 2017 Drill Program
Significant High-Grade Mineralized Intercepts
• Results are targeting the
extensions of four ore bodies;
Palmar Dyke, Santa Elena,
Victoria and Esperanza.
• Three areas are very close to
existing workings and could
be accessed within 6 to 12
months.
• The fourth, the Esperanza
orebody, is already being
mined and this drilling
represents a further
extension showing similar
grades.
Step-out Holes
HOLE 10846 – 17.6m at 5.3% zinc, 3.8% lead and 83 g/t silver (Palmer Dyke) - 10.0% ZnEq
HOLE 10845 – 17.0m at 5.0% zinc, 2.0% lead and 53 g/t silver (Victoria) - 7.7% ZnEq
HOLE 10837 – 5.5m at 17.3% zinc, 3.6% lead and 142 g/t silver (Palmar Dyke) - 23.0% ZnEq
HOLE 10875 – 5.5m at 5.2% zinc, 2.7% lead, 2,297 g/t silver and 0.98% copper (Palmar Dyke) - 45.5% ZnEq
HOLE 10887 – 23.4m at 6.5% zinc, 1.0% lead, and 24 g/t silver (Santa Elena) - 7.7% ZnEq
HOLE 10904 – 12.2m at 6.6% zinc, 5.6% lead, and 81 g/t silver (Esperanza) - 12.6% ZnEq
HOLE 10909 – 3.7m at 19.3% zinc, 15.0% lead and 122 g/t silver (Deep East) - 33.7% ZnEq
HOLE 10941 – 15.2m at 5.8% zinc, 1.4% lead and 61 g/t silver (Esperanza) – 7.9% ZnEq
In-fill Holes
HOLE 10833 – 35.4m at 5.6% zinc, 2.0% lead and 31 g/t silver - 7.8% ZnEq
including 5.4m at 7.8% zinc, 2.6% lead and 35 g/t silver (Santa Elena) - 10.6% ZnEq
HOLE 10847 – 17.5m at 6.2% zinc, 2.2% lead and 41 g/t silver (Esperanza) - 8.8% ZnEq
HOLE 10828 – 26.5m at 5.7% zinc, 0.6% lead and 18 g/t silver (Santa Elena) - 6.5% ZnEq
HOLE 10826 – 17.1m at 5.8% zinc, 1.2% lead and 36 g/t silver (Esperanza) - 7.5% ZnEq
HOLE 10880 – 5.1m at 3.1% zinc, 2.5% lead, 149 g/t silver and 0.55% copper (Palmar Dyke) - 7.6% ZnEq
HOLE 10870 – 4.1m at 10.0% zinc, 1.9% lead, and 95 g/t silver (Victoria) - 12.0% ZnEq
HOLE 10932 – 10.2m at 9.3% zinc, 7.5% lead and 229 g/t silver (Port Royal) – 19.2% ZnEq
HOLE 10936 – 25.6m at 7.4% zinc, 2.5% lead and 27.5 g/t silver (Santa Elena) – 9.9% ZnEq
A few significant results include (true and apparent widths):
Results are significantly
higher grade than
current Reserve and
Resources.
32. 32
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Historical Operating Statistics
El Mochito Back on Track
El Mochito – back on track:
• Historically El Mochito has demonstrated the ability for
sustained annualized production of +90 MM lbs.
• Minimal development and exploration work by previous
operators impacted 2016 operating results
90
2014 2015 2016 2017
Tonnes Milled 756.0 765.9 515.6 656.3
Average tpd 2,071 2,098 1,409 1,889
Average Head Grades
Zinc 4.56% 3.43% 3.40% 3.50%
Lead 2.61% 1.68% 1.16% 1.39%
Silver 85.9 50.1 46.0 43.0
ZnEq 9.5% 6.3% 5.8% 5.63%
Average Recoveries
Zinc 85.6% 87.2% 90.7% 88.9%
Lead 78.7% 75.9% 73.3% 74.3%
Silver 87.4% 88.3% 80.5% 77.7%
Contained Metal Production
Zinc (ktonnes) 29.5 23.0 15.9 20.4
Lead (ktonnes) 15.5 9.8 4.4 6.8
Silver (Kozs) 1,827.0 1,105.0 614.3 698.5
ZnEq (MMlbs) 133.5 90.5 54.8 66.1
60.6
41
24.8
29.9
0
500
1000
1500
2000
0
10
20
30
40
50
60
70
2014 2015 2016 2017
Silver000’sozs
ContainedMetalProduction
Zinc (ktonnes) Lead (ktonnes)
ZnEq (ktonnes) Silver (Kozs)
33. 33
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Process Flow Diagram
El Mochito Mine Processing
34. 34
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
El Mochito Geological Long-Section
El Mochito Mine
35. 35
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Ore Genesis of a Carbonate Replacement Deposit
Representative of the El Mochito Carbonate Replacement Skarn Mineralization
El Mochito
36. 36
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRFEl Mochito Mine Entrance
Las Vegas, Honduras
El Mochito Mine Flotation Circuit
37. 37
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Zinc Basics
Zinc is the 30th element in the periodic table of elements.
Zinc is the fourth most consumed metal
in the world after iron, aluminum and
copper.
The most common and commercial use for zinc is
galvanizing (rust-proofing) steel accounting for
60% of usage.
ZnZinc
30
14 millions tonnes consumed
globally in 2016 75% sourced
from mining.
25% sourced
from recycling.
Fertilizer accounts for
~2% of zinc usage.
38. 38
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
Responsible Mining at El Mochito
El Mochito Mine
COMMUNITY
WORKFORCE
ENVIRONMENT
Through various community investments, El Mochito has contributed to local employment generation, infrastructure improvement and
education advancement. El Mochito strives to play an active role in the strengthening of the surrounding community and will continue
to remain a steward of responsibility going forward.
El Mochito’s multiple environmental sustainability programs seek to preserve the region's natural resources and monitor the quality of
soil, water, air and the protection of local wildlife. Through various initiatives, we continue to make environmental protection a core
pillar in our day-to-day operations.
We believe our workforce and their well being are imperative to the success and sustainability of the El Mochito operation. The
continuous commitment to our workforce is reaffirmed through the development of our employees in the areas of workplace and
educational advancement and a strong commitment to the improvement of ongoing health and safety initiatives.
Ascendant Resources continues to make mining responsibly at El Mochito its top
priority as it creates tangible benefits for all our stakeholders, including our
employees, the local communities and the environment in which we operate in.
9th
Consecutive Annual Award
Received for Corporate Social
Responsibility
39. 39
w w w . a s c e n d a n t r e s o u r c e s . c o mT S X : A S N D OTCQX: ASDRF
79 Wellington St. W., Suite 2100
Toronto, Ontario M5K 1H1
www.ascendantresources.com
Tel: 647-796-0066
Fax: 647-796-0067
T S X A S N D
Investor Contact:
Katherine Pryde, MBA, CPA, CMA
Director, Communications and
Investor Relations
info@ascendantresources.com