SlideShare a Scribd company logo
1 of 3
Arvind M Kaboo Page 1 of 3
Profile:
♦ 23 years of industry experience encompassing a wide range of skill set and roles.
♦ Designing, formulating and implementing the Maintenance Strategies to achieve Optimum use of Utilities
& Machineries / Equipment of Plant to meet Internal Customers Production targets adding profitability of
the Company.
♦ Maintenance plans to bring down the Breakdown to minimal
♦ Continuous improvement Activities, launch Maintenance & Engineering related activities by co-ordination
Plans.
♦ Monitoring the Maintenance activities as per the priorities & Criticalities on daily Basis by coordinating with
the Maintenance Engineers, Supervisors, Electricians & fitters. Technical guidance is shared between the
Departmental People for speeding / Training maintenance activities if & when required Co-ordinate with
the Internal & External Agencies for the activities of Maintenance, Spare Parts arrangement, Statutory
requirements, Procurement of the spares in emergency.
♦ Spare parts Planning, Requisitions, approval from the Approving Authority, Follow-Up with the Purchaser
& Technical Discussions with the suppliers
♦ Technical Inspection of the equipment as per the specifications with No Load & Load Trial (if possible) at
manufacturer's site before delivery
♦ Execution of the Fabrication Jobs on Priorities ensuring the completion of the jobs In-time
♦ Experienced to work in SAP System (SAP PP)
Strengths:
 Strong grasp of the fundamentals.
 Good communication skills and a well-rounded personality.
 Ability to think problems through and generate a keen sense of attention to detail.
 Persistence.
 Passionate about making a career
 Quality Work under pressure.
Education:
• B.E. Electronics & Communication (68%) Final Grade Ist,
SLN College of Engineering, GULBARGA University
City-: RAICHUR, Karnataka, Country-: India
Period 01.06.1987 to 01.12.1991
Broad Field of Educ. Field of Engineering, Subjects-: Electronics & Communication
• Bachelor of Science (B.Sc.) Physics, Chemistry & Mathematics. (65%) Final Grade Ist,
G.G.M. Science College, Jammu University,
City-: Jammu Region-: Jammu & Kashmir Country India
Period 01.04.1985 to 01.04.1987
Broad Field of Education Science, Subjects-: Physics, Chemistry & Mathematics
Employment History & Role
Organization Role Duration
Gujarat Cycles Ltd., (Joint Venture
of Hero Cycles)
Maintenance Engineer 3 years
Banco Gaskets (India) Limited Maintenance Head 18 years
Mayur Uniquoters Limited Maintenance Head 2.5 years (Contd)
Arvind M Kaboo Page 2 of 3
Professional Experience
Mayur Uniquoters Limited (Textile Division) Manufacturer of artificial Leather / PVC Vinyl,
Location: Jaipur
Period-: 19.05.2014 – Till Date
Functional Area Machinery Maintenance /General/Civil
Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.)
Description
Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL)
I am being reported by a team of 22 People which consists of Mechanical Maintenance Engineers / Supervisors
looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop
—02 Person who are being reported by the fitters / Operators & Casual Workers having strength of 15 People
(Each one is responsible for separate Division i.e., Coating Line, Process & Knitting) Engineer for Electrical
Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning
-----02 Person who are being reported by the electricians & Casual Workers (Total strength-:07Nos. )
Services by my Department:
• Maintenance of Plant & Equipment
• Operation & Maintenance of Utilities e.g., Diesel Generators, Air Compressors, Chillers, Steam Boilers,
Thermic Fluid heaters etc.
• Co-coordinating with Projects Department for New Plant / Equipment’s Installation, Commissioning &
Trials
• Fabrication Activities In-House to meet Departmental & Plant requirement
Banco Gaskets (India) Limited Manufacturer of Gaskets
Location: Bharuch, Gujarat
Period-: 23.11.1995 – 01.02.2014
Functional Area Machinery Maintenance /General/Civil
Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.)
Description
Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL) & also supervising the activities of
Machine Shop.
I am being reported by a team of 45 People which consists of Mechanical Maintenance Engineers / Supervisors
looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop
—03 Person who are being reported by the fitters / Operators & Casual Workers having strength of 30
People(Each one is responsible for separate Division i.e., Gasket, Moulding & CFJS) Engineer for Electrical
Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning
-----01 Person who is being reported by the electricians & Casual Workers (Total strength-:10 Nos. )
Gujarat Cycles Ltd., (Joint Venture of Hero Cycles)
Location: Vadodara, Gujarat
Period-: From 01.12.1992 To 01.10.1995
Functional Area Equipment & Plant’s Electrical / Electronic Maintenance
Hierarchy Level-: Engineer Internal Job Title Maintenance Engineer
Achievements:
• The Major projects that I have worked on and completed on time
Arvind M Kaboo Page 3 of 3
• Additional Contract demand from 475 KVA to 700 KVA / 1000KVA / 1600 KVA
• To install Oil Circuit Breaker, New 1200 KVA & 750 KVA Transformer, New 1250 KVA & 800
KVA Stabilizer & New Switchgears in the LT Panel for additional Power Source & Contract
Demand
• Reconditioning of 30 years old Kneader machine (having cost of 35 Lacs) for 1.5 Lacs
• Captive Power Plant & Waste Heat Recovery
• Modified LT Distribution Panels
• Additional Solvent Recovery Plant Vessel
• To remove MS corrosion Particles in Solvent, MS Storage Tanks, Separator tanks & Pipeline
Replaced with SS Tanks & pipeline along with Coarse & Fine Filters
• New Procedures, practices and processes that have been introduced or developed
• Preventive & Predictive maintenance Procedures introduced & implemented
• Calibration Plan of Equipments & carryout the same In-House
• Establishing the system as per ISO/Q.S./TS for Maintenance Activities bringing down Break-
Down Time to Minimal with Scientific Analysis
• SPARE PARTS Planning
• Fulfilling the STATUTORY Requirement
• Working in SAP PP system
• Reduced costs / saved money in my department
o Captive Power Generation in place of Power from Govt. Regulatory Board reducing Lot of
Energy Bills
o Calibration of Equipment is being carried out in house saving calibration Costs on regular
basis
o Alternate Soft water supply has been made available from Govt. Supply reducing Water Bills
to large extent
• Other achievements that have benefited my Company.
o Regularly modified the Main LT Distribution Panels to cater to increased Demand of Power
due to which Capital investments were avoided
o Looking after all Construction works.
Personal Details:
1. Date of Birth : 12.10.1967
2. Marital Status : Married
3. Email Id : arvindkaboo@yahoo.com
4. Phone No : 0091 9979940528 (Preferred for Contact) (Cell Phone)
5. Passport No : M6372454 (Valid till 19 /02 /2025)

More Related Content

What's hot

plant layout for services
plant layout for servicesplant layout for services
plant layout for services
naveen13safare
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1
Bob Bin
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
Irfan Ali
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
pragna1510
 

What's hot (20)

Plant layout
Plant layout Plant layout
Plant layout
 
Resume
ResumeResume
Resume
 
PLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODELPLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODEL
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for services
 
Pawan Resume-2014(rev)
Pawan Resume-2014(rev)Pawan Resume-2014(rev)
Pawan Resume-2014(rev)
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plant layout
Plant layoutPlant layout
Plant layout
 
PLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTSPLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTS
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layout
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plant layout,Factors influencing plant layout,Types and principles of plant l...
Plant layout,Factors influencing plant layout,Types and principles of plant l...Plant layout,Factors influencing plant layout,Types and principles of plant l...
Plant layout,Factors influencing plant layout,Types and principles of plant l...
 
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersDrying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Combined layout
Combined layoutCombined layout
Combined layout
 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
 

Similar to CV Latest

Similar to CV Latest (20)

PS JOB RESPONSIBILITIES - Linkedin
PS JOB RESPONSIBILITIES - LinkedinPS JOB RESPONSIBILITIES - Linkedin
PS JOB RESPONSIBILITIES - Linkedin
 
chayana
chayanachayana
chayana
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
 
resume 23
resume 23resume 23
resume 23
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Dharmendra (1) (1)
Dharmendra (1) (1)Dharmendra (1) (1)
Dharmendra (1) (1)
 
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
 
Upender CV
Upender CVUpender CV
Upender CV
 
Upender CV
Upender CVUpender CV
Upender CV
 
RAMESH CV
RAMESH CVRAMESH CV
RAMESH CV
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
dinesh.Resume.new (2)
dinesh.Resume.new (2)dinesh.Resume.new (2)
dinesh.Resume.new (2)
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
 
Shift E
Shift EShift E
Shift E
 
Resume_Vivek Jain - Copy
Resume_Vivek Jain - CopyResume_Vivek Jain - Copy
Resume_Vivek Jain - Copy
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
 
Instrument engineer resume
Instrument engineer resumeInstrument engineer resume
Instrument engineer resume
 

CV Latest

  • 1. Arvind M Kaboo Page 1 of 3 Profile: ♦ 23 years of industry experience encompassing a wide range of skill set and roles. ♦ Designing, formulating and implementing the Maintenance Strategies to achieve Optimum use of Utilities & Machineries / Equipment of Plant to meet Internal Customers Production targets adding profitability of the Company. ♦ Maintenance plans to bring down the Breakdown to minimal ♦ Continuous improvement Activities, launch Maintenance & Engineering related activities by co-ordination Plans. ♦ Monitoring the Maintenance activities as per the priorities & Criticalities on daily Basis by coordinating with the Maintenance Engineers, Supervisors, Electricians & fitters. Technical guidance is shared between the Departmental People for speeding / Training maintenance activities if & when required Co-ordinate with the Internal & External Agencies for the activities of Maintenance, Spare Parts arrangement, Statutory requirements, Procurement of the spares in emergency. ♦ Spare parts Planning, Requisitions, approval from the Approving Authority, Follow-Up with the Purchaser & Technical Discussions with the suppliers ♦ Technical Inspection of the equipment as per the specifications with No Load & Load Trial (if possible) at manufacturer's site before delivery ♦ Execution of the Fabrication Jobs on Priorities ensuring the completion of the jobs In-time ♦ Experienced to work in SAP System (SAP PP) Strengths:  Strong grasp of the fundamentals.  Good communication skills and a well-rounded personality.  Ability to think problems through and generate a keen sense of attention to detail.  Persistence.  Passionate about making a career  Quality Work under pressure. Education: • B.E. Electronics & Communication (68%) Final Grade Ist, SLN College of Engineering, GULBARGA University City-: RAICHUR, Karnataka, Country-: India Period 01.06.1987 to 01.12.1991 Broad Field of Educ. Field of Engineering, Subjects-: Electronics & Communication • Bachelor of Science (B.Sc.) Physics, Chemistry & Mathematics. (65%) Final Grade Ist, G.G.M. Science College, Jammu University, City-: Jammu Region-: Jammu & Kashmir Country India Period 01.04.1985 to 01.04.1987 Broad Field of Education Science, Subjects-: Physics, Chemistry & Mathematics Employment History & Role Organization Role Duration Gujarat Cycles Ltd., (Joint Venture of Hero Cycles) Maintenance Engineer 3 years Banco Gaskets (India) Limited Maintenance Head 18 years Mayur Uniquoters Limited Maintenance Head 2.5 years (Contd)
  • 2. Arvind M Kaboo Page 2 of 3 Professional Experience Mayur Uniquoters Limited (Textile Division) Manufacturer of artificial Leather / PVC Vinyl, Location: Jaipur Period-: 19.05.2014 – Till Date Functional Area Machinery Maintenance /General/Civil Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.) Description Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL) I am being reported by a team of 22 People which consists of Mechanical Maintenance Engineers / Supervisors looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop —02 Person who are being reported by the fitters / Operators & Casual Workers having strength of 15 People (Each one is responsible for separate Division i.e., Coating Line, Process & Knitting) Engineer for Electrical Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning -----02 Person who are being reported by the electricians & Casual Workers (Total strength-:07Nos. ) Services by my Department: • Maintenance of Plant & Equipment • Operation & Maintenance of Utilities e.g., Diesel Generators, Air Compressors, Chillers, Steam Boilers, Thermic Fluid heaters etc. • Co-coordinating with Projects Department for New Plant / Equipment’s Installation, Commissioning & Trials • Fabrication Activities In-House to meet Departmental & Plant requirement Banco Gaskets (India) Limited Manufacturer of Gaskets Location: Bharuch, Gujarat Period-: 23.11.1995 – 01.02.2014 Functional Area Machinery Maintenance /General/Civil Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.) Description Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL) & also supervising the activities of Machine Shop. I am being reported by a team of 45 People which consists of Mechanical Maintenance Engineers / Supervisors looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop —03 Person who are being reported by the fitters / Operators & Casual Workers having strength of 30 People(Each one is responsible for separate Division i.e., Gasket, Moulding & CFJS) Engineer for Electrical Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning -----01 Person who is being reported by the electricians & Casual Workers (Total strength-:10 Nos. ) Gujarat Cycles Ltd., (Joint Venture of Hero Cycles) Location: Vadodara, Gujarat Period-: From 01.12.1992 To 01.10.1995 Functional Area Equipment & Plant’s Electrical / Electronic Maintenance Hierarchy Level-: Engineer Internal Job Title Maintenance Engineer Achievements: • The Major projects that I have worked on and completed on time
  • 3. Arvind M Kaboo Page 3 of 3 • Additional Contract demand from 475 KVA to 700 KVA / 1000KVA / 1600 KVA • To install Oil Circuit Breaker, New 1200 KVA & 750 KVA Transformer, New 1250 KVA & 800 KVA Stabilizer & New Switchgears in the LT Panel for additional Power Source & Contract Demand • Reconditioning of 30 years old Kneader machine (having cost of 35 Lacs) for 1.5 Lacs • Captive Power Plant & Waste Heat Recovery • Modified LT Distribution Panels • Additional Solvent Recovery Plant Vessel • To remove MS corrosion Particles in Solvent, MS Storage Tanks, Separator tanks & Pipeline Replaced with SS Tanks & pipeline along with Coarse & Fine Filters • New Procedures, practices and processes that have been introduced or developed • Preventive & Predictive maintenance Procedures introduced & implemented • Calibration Plan of Equipments & carryout the same In-House • Establishing the system as per ISO/Q.S./TS for Maintenance Activities bringing down Break- Down Time to Minimal with Scientific Analysis • SPARE PARTS Planning • Fulfilling the STATUTORY Requirement • Working in SAP PP system • Reduced costs / saved money in my department o Captive Power Generation in place of Power from Govt. Regulatory Board reducing Lot of Energy Bills o Calibration of Equipment is being carried out in house saving calibration Costs on regular basis o Alternate Soft water supply has been made available from Govt. Supply reducing Water Bills to large extent • Other achievements that have benefited my Company. o Regularly modified the Main LT Distribution Panels to cater to increased Demand of Power due to which Capital investments were avoided o Looking after all Construction works. Personal Details: 1. Date of Birth : 12.10.1967 2. Marital Status : Married 3. Email Id : arvindkaboo@yahoo.com 4. Phone No : 0091 9979940528 (Preferred for Contact) (Cell Phone) 5. Passport No : M6372454 (Valid till 19 /02 /2025)