1. Arvind M Kaboo Page 1 of 3
Profile:
♦ 23 years of industry experience encompassing a wide range of skill set and roles.
♦ Designing, formulating and implementing the Maintenance Strategies to achieve Optimum use of Utilities
& Machineries / Equipment of Plant to meet Internal Customers Production targets adding profitability of
the Company.
♦ Maintenance plans to bring down the Breakdown to minimal
♦ Continuous improvement Activities, launch Maintenance & Engineering related activities by co-ordination
Plans.
♦ Monitoring the Maintenance activities as per the priorities & Criticalities on daily Basis by coordinating with
the Maintenance Engineers, Supervisors, Electricians & fitters. Technical guidance is shared between the
Departmental People for speeding / Training maintenance activities if & when required Co-ordinate with
the Internal & External Agencies for the activities of Maintenance, Spare Parts arrangement, Statutory
requirements, Procurement of the spares in emergency.
♦ Spare parts Planning, Requisitions, approval from the Approving Authority, Follow-Up with the Purchaser
& Technical Discussions with the suppliers
♦ Technical Inspection of the equipment as per the specifications with No Load & Load Trial (if possible) at
manufacturer's site before delivery
♦ Execution of the Fabrication Jobs on Priorities ensuring the completion of the jobs In-time
♦ Experienced to work in SAP System (SAP PP)
Strengths:
Strong grasp of the fundamentals.
Good communication skills and a well-rounded personality.
Ability to think problems through and generate a keen sense of attention to detail.
Persistence.
Passionate about making a career
Quality Work under pressure.
Education:
• B.E. Electronics & Communication (68%) Final Grade Ist,
SLN College of Engineering, GULBARGA University
City-: RAICHUR, Karnataka, Country-: India
Period 01.06.1987 to 01.12.1991
Broad Field of Educ. Field of Engineering, Subjects-: Electronics & Communication
• Bachelor of Science (B.Sc.) Physics, Chemistry & Mathematics. (65%) Final Grade Ist,
G.G.M. Science College, Jammu University,
City-: Jammu Region-: Jammu & Kashmir Country India
Period 01.04.1985 to 01.04.1987
Broad Field of Education Science, Subjects-: Physics, Chemistry & Mathematics
Employment History & Role
Organization Role Duration
Gujarat Cycles Ltd., (Joint Venture
of Hero Cycles)
Maintenance Engineer 3 years
Banco Gaskets (India) Limited Maintenance Head 18 years
Mayur Uniquoters Limited Maintenance Head 2.5 years (Contd)
2. Arvind M Kaboo Page 2 of 3
Professional Experience
Mayur Uniquoters Limited (Textile Division) Manufacturer of artificial Leather / PVC Vinyl,
Location: Jaipur
Period-: 19.05.2014 – Till Date
Functional Area Machinery Maintenance /General/Civil
Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.)
Description
Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL)
I am being reported by a team of 22 People which consists of Mechanical Maintenance Engineers / Supervisors
looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop
—02 Person who are being reported by the fitters / Operators & Casual Workers having strength of 15 People
(Each one is responsible for separate Division i.e., Coating Line, Process & Knitting) Engineer for Electrical
Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning
-----02 Person who are being reported by the electricians & Casual Workers (Total strength-:07Nos. )
Services by my Department:
• Maintenance of Plant & Equipment
• Operation & Maintenance of Utilities e.g., Diesel Generators, Air Compressors, Chillers, Steam Boilers,
Thermic Fluid heaters etc.
• Co-coordinating with Projects Department for New Plant / Equipment’s Installation, Commissioning &
Trials
• Fabrication Activities In-House to meet Departmental & Plant requirement
Banco Gaskets (India) Limited Manufacturer of Gaskets
Location: Bharuch, Gujarat
Period-: 23.11.1995 – 01.02.2014
Functional Area Machinery Maintenance /General/Civil
Hierarchy Level: Manager. Internal Job Title: Maintenance Manager (Head of the Maintenance Dept.)
Description
Looking after MAINTENANCE ACTIVITIES (ELECTRICAL & MECHANICAL) & also supervising the activities of
Machine Shop.
I am being reported by a team of 45 People which consists of Mechanical Maintenance Engineers / Supervisors
looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning / Machine shop
—03 Person who are being reported by the fitters / Operators & Casual Workers having strength of 30
People(Each one is responsible for separate Division i.e., Gasket, Moulding & CFJS) Engineer for Electrical
Maintenance looking after Preventive & Breakdown Maintenance / Utility / Record Keeping / Spares Planning
-----01 Person who is being reported by the electricians & Casual Workers (Total strength-:10 Nos. )
Gujarat Cycles Ltd., (Joint Venture of Hero Cycles)
Location: Vadodara, Gujarat
Period-: From 01.12.1992 To 01.10.1995
Functional Area Equipment & Plant’s Electrical / Electronic Maintenance
Hierarchy Level-: Engineer Internal Job Title Maintenance Engineer
Achievements:
• The Major projects that I have worked on and completed on time
3. Arvind M Kaboo Page 3 of 3
• Additional Contract demand from 475 KVA to 700 KVA / 1000KVA / 1600 KVA
• To install Oil Circuit Breaker, New 1200 KVA & 750 KVA Transformer, New 1250 KVA & 800
KVA Stabilizer & New Switchgears in the LT Panel for additional Power Source & Contract
Demand
• Reconditioning of 30 years old Kneader machine (having cost of 35 Lacs) for 1.5 Lacs
• Captive Power Plant & Waste Heat Recovery
• Modified LT Distribution Panels
• Additional Solvent Recovery Plant Vessel
• To remove MS corrosion Particles in Solvent, MS Storage Tanks, Separator tanks & Pipeline
Replaced with SS Tanks & pipeline along with Coarse & Fine Filters
• New Procedures, practices and processes that have been introduced or developed
• Preventive & Predictive maintenance Procedures introduced & implemented
• Calibration Plan of Equipments & carryout the same In-House
• Establishing the system as per ISO/Q.S./TS for Maintenance Activities bringing down Break-
Down Time to Minimal with Scientific Analysis
• SPARE PARTS Planning
• Fulfilling the STATUTORY Requirement
• Working in SAP PP system
• Reduced costs / saved money in my department
o Captive Power Generation in place of Power from Govt. Regulatory Board reducing Lot of
Energy Bills
o Calibration of Equipment is being carried out in house saving calibration Costs on regular
basis
o Alternate Soft water supply has been made available from Govt. Supply reducing Water Bills
to large extent
• Other achievements that have benefited my Company.
o Regularly modified the Main LT Distribution Panels to cater to increased Demand of Power
due to which Capital investments were avoided
o Looking after all Construction works.
Personal Details:
1. Date of Birth : 12.10.1967
2. Marital Status : Married
3. Email Id : arvindkaboo@yahoo.com
4. Phone No : 0091 9979940528 (Preferred for Contact) (Cell Phone)
5. Passport No : M6372454 (Valid till 19 /02 /2025)