PCR & TBR Project Gyongyos Hungary
Organization: Greenfield Project, Apollo Tyres, Hungary
Duration: Mar’14- Present
Location: Gyongyos, Hungary
Role: Associate manager Projects – Electrical and electronics
Description: Apollo Tyres is setting up PCR & TBR plant in Hungary focusing mainly on EU tyre market. This is
also a Greenfield project in Gyongyos, Hungary, and spread over an area of 120 acres. The plant
terminal capacity is to produce 60000 PCR tyres/ day & 6000 TBR tyres/day.
Key Deliverables:
 Spearheaded Material Track and trace project in the entire plant using RFID and Barcode right from the starting
 Hands on experience in implementing MES (manufacturing execution system ) throughout the plant
 Coordinated, discussed and finalised the special requirements needs to be considered in the process machines for
implementing MES and RFID/Barcode Material Mistake proofing.
 Coordinated religiously to incorporate all the improvement points from the past experience in the newer machines.
 Conducted discussions with vendors regarding various manufacturing equipments such as Cutters and slitters, Bead
winding, Bead apexing & Tyre Building Machines.
 Responsible for erection and commissioning of manufacturing machines like Cutters (4 Machines), Slitters (2
Machines), Bead Winding (2 Machines), Bead Apexing (5 Machines) & Tyre Building (10 Machines) of both PCR & TBR.
PCR & TBR Project Channai
Organization: Greenfield Project, Apollo Tyres, Chennai
Duration: Jan’09 - Present
Location: Oragadam, Chennai
Role: Team Member - Electrical & Electronics Engineering
Description: Apollo Tyres, Chennai is setting up a plant in Chennai which caters to the PCR & TBR market
requirements, both domestic & abroad. The same is a Greenfield project that is setup in SIPCOT
Industrial Park, Chennai, and spread over an area of 125 acres. The plant terminal capacity is to
produce 30000 PCR tyres/ day & 6000 TBR tyres/day.
Key Deliverables:
 Spearheaded the entire project activities right from the starting phase
 Performed O&M activities, executed small improvement projects & PDCA activities of the commissioned machines
along with erection & commissioning activities of other machines
 Supervised sub projects during trial run of newly commissioned machines to eliminate the issues relatedto safety,
product quality, cycle time, maintainability, power consumption and critical component failures
 Conducted discussions with vendors regarding various manufacturing equipments such as Mixers (2 Machines),
Automatic Chemical and Carbon Charging & Weighing System (2 Machines) & Tyre Building Machines (12 Machines).
OTR Plant & PCR Expansion Project Vadodara
Organization: Expansion Project, Apollo Tyres, Vadodara
Duration: Feb ’08 – Jan ’09
Location: Vadodara, Gujarat
Role: Executive-Electrical and Electronics Projects
Description: Apollo Tyres, Vadodara was setting up an OTR (Off the road) plant [7 MTPD ] and was enhancing
its PCR (Passenger Car Radial) plant capacity from 12,500 tyres/ day to 17,000 tyres/ day.
Key Deliverables:
 Proactively participated in project planning, identified potential areas, facilitated support of internal & external
stakeholders and financial & other resources to ensure final project execution
 Coordinated with vendors about various manufacturing equipments such as Mixers, Automatic Chemical & Carbon
Charging, Weighing System & Tyre Building Machines
 Erection, commissioning & testing of manufacturing equipments after finalizing the electrical drawings and cable
routing
 Key role in commissioning activity to ensure the functioning of machine/equipment as per the required blue book
specification
 Supervised purchase & service requisitions in SAP for materialprocurement & service respectively and ensured
continuous follow up with Purchase Team for material delivery
 Liaised with different contract agencies at site for timely completion of the work.

More Related Content

What's hot (17)

ANIKET RESUME NEW
ANIKET RESUME NEWANIKET RESUME NEW
ANIKET RESUME NEW
 
Korea R
Korea RKorea R
Korea R
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
PM_SSN_Steel.
PM_SSN_Steel.PM_SSN_Steel.
PM_SSN_Steel.
 
Presentation of SP Engg Corp Pvt. Ltd. India
Presentation of  SP Engg Corp Pvt. Ltd. IndiaPresentation of  SP Engg Corp Pvt. Ltd. India
Presentation of SP Engg Corp Pvt. Ltd. India
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
Pardeep kumar
Pardeep kumarPardeep kumar
Pardeep kumar
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
Nguyen Viet Dang _ Rotating & Package
Nguyen Viet Dang _ Rotating & PackageNguyen Viet Dang _ Rotating & Package
Nguyen Viet Dang _ Rotating & Package
 
ENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVENG- AhmedHussien _ CV
ENG- AhmedHussien _ CV
 
christy chacko resume (1) (3)
christy chacko resume (1) (3)christy chacko resume (1) (3)
christy chacko resume (1) (3)
 
Shashank Proposal Engineer
Shashank Proposal EngineerShashank Proposal Engineer
Shashank Proposal Engineer
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
 
CV_Piyapol
CV_PiyapolCV_Piyapol
CV_Piyapol
 
Aliasgar Parekh_0115
Aliasgar Parekh_0115Aliasgar Parekh_0115
Aliasgar Parekh_0115
 
GSShukla 2016
GSShukla 2016GSShukla 2016
GSShukla 2016
 

Similar to Arun Mohanan project summery-2016

Similar to Arun Mohanan project summery-2016 (20)

Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
final resume
final resumefinal resume
final resume
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 
GOPINATH DEVANI
GOPINATH DEVANIGOPINATH DEVANI
GOPINATH DEVANI
 
AmoghKarambelkar Resume
AmoghKarambelkar ResumeAmoghKarambelkar Resume
AmoghKarambelkar Resume
 
Resume_vikas
Resume_vikasResume_vikas
Resume_vikas
 
Dipanjan Sikidar-CV
Dipanjan Sikidar-CVDipanjan Sikidar-CV
Dipanjan Sikidar-CV
 
Kartik CV
Kartik CVKartik CV
Kartik CV
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
DRS
DRSDRS
DRS
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
Cv amit
Cv amitCv amit
Cv amit
 
Cv amit
Cv amitCv amit
Cv amit
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya
 
CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)
 
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
 

Arun Mohanan project summery-2016

  • 1. PCR & TBR Project Gyongyos Hungary Organization: Greenfield Project, Apollo Tyres, Hungary Duration: Mar’14- Present Location: Gyongyos, Hungary Role: Associate manager Projects – Electrical and electronics Description: Apollo Tyres is setting up PCR & TBR plant in Hungary focusing mainly on EU tyre market. This is also a Greenfield project in Gyongyos, Hungary, and spread over an area of 120 acres. The plant terminal capacity is to produce 60000 PCR tyres/ day & 6000 TBR tyres/day. Key Deliverables:  Spearheaded Material Track and trace project in the entire plant using RFID and Barcode right from the starting  Hands on experience in implementing MES (manufacturing execution system ) throughout the plant  Coordinated, discussed and finalised the special requirements needs to be considered in the process machines for implementing MES and RFID/Barcode Material Mistake proofing.  Coordinated religiously to incorporate all the improvement points from the past experience in the newer machines.  Conducted discussions with vendors regarding various manufacturing equipments such as Cutters and slitters, Bead winding, Bead apexing & Tyre Building Machines.  Responsible for erection and commissioning of manufacturing machines like Cutters (4 Machines), Slitters (2 Machines), Bead Winding (2 Machines), Bead Apexing (5 Machines) & Tyre Building (10 Machines) of both PCR & TBR. PCR & TBR Project Channai Organization: Greenfield Project, Apollo Tyres, Chennai Duration: Jan’09 - Present Location: Oragadam, Chennai Role: Team Member - Electrical & Electronics Engineering Description: Apollo Tyres, Chennai is setting up a plant in Chennai which caters to the PCR & TBR market requirements, both domestic & abroad. The same is a Greenfield project that is setup in SIPCOT Industrial Park, Chennai, and spread over an area of 125 acres. The plant terminal capacity is to produce 30000 PCR tyres/ day & 6000 TBR tyres/day. Key Deliverables:  Spearheaded the entire project activities right from the starting phase  Performed O&M activities, executed small improvement projects & PDCA activities of the commissioned machines along with erection & commissioning activities of other machines  Supervised sub projects during trial run of newly commissioned machines to eliminate the issues relatedto safety, product quality, cycle time, maintainability, power consumption and critical component failures  Conducted discussions with vendors regarding various manufacturing equipments such as Mixers (2 Machines), Automatic Chemical and Carbon Charging & Weighing System (2 Machines) & Tyre Building Machines (12 Machines). OTR Plant & PCR Expansion Project Vadodara Organization: Expansion Project, Apollo Tyres, Vadodara Duration: Feb ’08 – Jan ’09 Location: Vadodara, Gujarat Role: Executive-Electrical and Electronics Projects Description: Apollo Tyres, Vadodara was setting up an OTR (Off the road) plant [7 MTPD ] and was enhancing its PCR (Passenger Car Radial) plant capacity from 12,500 tyres/ day to 17,000 tyres/ day. Key Deliverables:  Proactively participated in project planning, identified potential areas, facilitated support of internal & external stakeholders and financial & other resources to ensure final project execution  Coordinated with vendors about various manufacturing equipments such as Mixers, Automatic Chemical & Carbon Charging, Weighing System & Tyre Building Machines  Erection, commissioning & testing of manufacturing equipments after finalizing the electrical drawings and cable routing  Key role in commissioning activity to ensure the functioning of machine/equipment as per the required blue book specification  Supervised purchase & service requisitions in SAP for materialprocurement & service respectively and ensured continuous follow up with Purchase Team for material delivery  Liaised with different contract agencies at site for timely completion of the work.