SlideShare a Scribd company logo
1 of 2
Download to read offline
From To
Hyatt Regency Hotel & 
Apartments
Project 
Manager
Feb 
2014
Present Wasl Properties …….. RMJM ABM KCA
Louvre Abu Dhabi‐     Mock‐
up Building
Project 
Manager
Sep 
2013
Jan 
2014
TDIC Turner
KEO Intl‐
Buro 
Happold
ASO JV AJN
Bab Al Qasr Hotel & 
Serviced Apartments‐    Abu 
Dhabi
Project/ 
Construction 
Manager
May 
2013  
Jan 
2014
EMROC Jacobs Surbana Nurol PSI
Izel Restaurant & Bar at 
Conrad Hotel‐Dubai
Project 
Manager
May 
2012  
Apr 
2013
Private Property 
Management (PPM)
…….. Atkins
Arabtec/DCC 
JV
WA Intl
Sheikh Zayed Desert 
Learning Center (SZDLC) Al
Project/ 
Construction
Aug  Apr  Al Ain Wildlife  Chalabi 
Architects & Ed Zublin AG
Fino 
International
Duration Interior 
Designer
Projects in UAE:
DesignationEmployer Project  Client
Project 
Managemen
Consultant/  
Engineer
Main 
Contractor
Page 1 of 2
Learning Center (SZDLC)‐Al 
Ain
Construction 
Manager
2011   2012 Park & Resort
…….. Architects & 
Partners (CAP)
Ed.Zublin AG ……..
Dubai Metro (Red Line & 
Green Line )
Construction 
Manager
May 
2009  
Jul 2011
Road & 
Transportation 
Authority (RTA)
……..
Atkins/ 
SYSTRA
Dubai Rapid Link 
Consortium 
(JTMJV)
……..
EC Harris 
International
Dubai Industrial City 
(Warehouses & Labor Cities)
Project 
Manager
Sep 
2008 
Apr 2009 TATWEER EC Harris Intl MEECON
Al Hamad 
Contracting
……..
Dubai Marina Mall & Hotel 
Apartments
Construction 
Manager
Oct 
2007 
Aug 
2008
EMAAR Hill Intl
DP 
Architects
ALEC ……..
Palm Jumeirah Villas (Frond 
B)
Project 
Engineer
Aug 
2006  
Sep 
2007
Nakheel Hill Intl KEO Intl
Parkway 
International 
Contracting
……..
Parkway 
International 
Contracting
Page 1 of 2
From To
Vosough Vahdat 
Residential Complex
………
Sep 
2005
Jul 2006 ……… ……… ……… ……… ………
Bostan Manesh Residential 
Complex
………
Jun 
2005
Feb 
2006
……… ……… ……… ……… ………
Iran Polymer & 
Petrochemical Institute
Construction 
Manager
Aug 
2004
May 
2005
……… ……… ……… ……… ………
Zaferaniyeh Residential 
Complex
Construction 
Manager
Oct 
2003
Jul 2004 ……… ……… ……… ……… ………
Kian Hotel & Trade centre
Project 
Engineer
Jan 
2002
Sep 
2003
……… ……… ……… ……… ………
Ameri Residential Complex Site Engineer
Aug  Dec 
……… ……… ……… ……… ………
Projects in Iran:
Employer Project  Designation
Duration
Client
Self Employee
Lariz Sazan 
Engineering 
Co.
Project 
Managemen
Consultant/  
Engineer
Main 
Contractor
Interior 
Designer
Page 2 of 2
Ameri Residential Complex Site Engineer
2000 2001
……… ……… ……… ……… ………
Saba Residential 
Tower(G+31)
Site Engineer
Jan 
1999
Jul 2000 ……… ……… ……… ……… ………
Pasdaran Residential 
Complex
Site Engineer
May 
1997
Dec 
1998
……… ……… ……… ……… ………
Imen Fan 
Abniyeh Co.
Page 2 of 2

More Related Content

What's hot

CV - Ayman Hassan Mahmoud
CV - Ayman Hassan MahmoudCV - Ayman Hassan Mahmoud
CV - Ayman Hassan MahmoudAyman Mahmoud
 
Civil Engineer Mohammad Suwi
Civil Engineer Mohammad SuwiCivil Engineer Mohammad Suwi
Civil Engineer Mohammad SuwiMohammad Suwi
 
Application for the post of Project Engineer & Site Engineer
Application for the post of Project Engineer & Site  EngineerApplication for the post of Project Engineer & Site  Engineer
Application for the post of Project Engineer & Site EngineerNagendran Murugesan
 
Resume_Tathagata Sen
Resume_Tathagata SenResume_Tathagata Sen
Resume_Tathagata SenTathagata Sen
 
Ibrahim Mahmoud Qawasmeh CV
Ibrahim Mahmoud Qawasmeh CVIbrahim Mahmoud Qawasmeh CV
Ibrahim Mahmoud Qawasmeh CVIbrahim Qawasmeh
 
yossif el semary cV III
yossif el semary cV IIIyossif el semary cV III
yossif el semary cV IIIYossif Semary
 
C.v (project manager)
C.v (project manager)C.v (project manager)
C.v (project manager)Ahmed Attia
 
b k jha resume revised d g m
b k jha resume revised d g mb k jha resume revised d g m
b k jha resume revised d g mbasant jha
 
Neil Bron Jalac- CV1 (2)
Neil Bron Jalac- CV1 (2)Neil Bron Jalac- CV1 (2)
Neil Bron Jalac- CV1 (2)Neil Jalac
 
Hüsnü sefa selek cv-in english-updated-2022
Hüsnü sefa selek cv-in english-updated-2022Hüsnü sefa selek cv-in english-updated-2022
Hüsnü sefa selek cv-in english-updated-2022Hüsnü Sefa SELEK
 

What's hot (17)

CV - Ayman Hassan Mahmoud
CV - Ayman Hassan MahmoudCV - Ayman Hassan Mahmoud
CV - Ayman Hassan Mahmoud
 
Civil Engineer Mohammad Suwi
Civil Engineer Mohammad SuwiCivil Engineer Mohammad Suwi
Civil Engineer Mohammad Suwi
 
Application for the post of Project Engineer & Site Engineer
Application for the post of Project Engineer & Site  EngineerApplication for the post of Project Engineer & Site  Engineer
Application for the post of Project Engineer & Site Engineer
 
M.Nasr
M.NasrM.Nasr
M.Nasr
 
Ashraf Mamdouh CV
Ashraf Mamdouh CVAshraf Mamdouh CV
Ashraf Mamdouh CV
 
Resume.doc
Resume.docResume.doc
Resume.doc
 
Resume_Tathagata Sen
Resume_Tathagata SenResume_Tathagata Sen
Resume_Tathagata Sen
 
Ibrahim Mahmoud Qawasmeh CV
Ibrahim Mahmoud Qawasmeh CVIbrahim Mahmoud Qawasmeh CV
Ibrahim Mahmoud Qawasmeh CV
 
CV
CVCV
CV
 
CV samir02
CV samir02CV samir02
CV samir02
 
yossif el semary cV III
yossif el semary cV IIIyossif el semary cV III
yossif el semary cV III
 
B K SIKDAR CV
B K SIKDAR CVB K SIKDAR CV
B K SIKDAR CV
 
C.v (project manager)
C.v (project manager)C.v (project manager)
C.v (project manager)
 
b k jha resume revised d g m
b k jha resume revised d g mb k jha resume revised d g m
b k jha resume revised d g m
 
Neil Bron Jalac- CV1 (2)
Neil Bron Jalac- CV1 (2)Neil Bron Jalac- CV1 (2)
Neil Bron Jalac- CV1 (2)
 
Hüsnü sefa selek cv-in english-updated-2022
Hüsnü sefa selek cv-in english-updated-2022Hüsnü sefa selek cv-in english-updated-2022
Hüsnü sefa selek cv-in english-updated-2022
 
CURRICULUM VITAE uptodate
CURRICULUM VITAE uptodateCURRICULUM VITAE uptodate
CURRICULUM VITAE uptodate
 

Similar to My Projects

Similar to My Projects (20)

CV-Acdm - 1
CV-Acdm - 1CV-Acdm - 1
CV-Acdm - 1
 
Wael CV Latest1
Wael CV Latest1Wael CV Latest1
Wael CV Latest1
 
Wael CV Latest1
Wael CV Latest1Wael CV Latest1
Wael CV Latest1
 
CV AKPuri July 2015
CV AKPuri July 2015CV AKPuri July 2015
CV AKPuri July 2015
 
Hamdy el shahat abd el-baky
Hamdy el shahat abd el-bakyHamdy el shahat abd el-baky
Hamdy el shahat abd el-baky
 
Vinay - HSE Manager
Vinay - HSE ManagerVinay - HSE Manager
Vinay - HSE Manager
 
Wajid (Draftsman)12
Wajid (Draftsman)12Wajid (Draftsman)12
Wajid (Draftsman)12
 
RED CV
RED CVRED CV
RED CV
 
CV- arshad
CV- arshadCV- arshad
CV- arshad
 
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - FinalAhmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
 
Resume - Ajith Kumar.B (2)
Resume - Ajith Kumar.B (2)Resume - Ajith Kumar.B (2)
Resume - Ajith Kumar.B (2)
 
ROHITRESUME
ROHITRESUMEROHITRESUME
ROHITRESUME
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
 
Rajinder
RajinderRajinder
Rajinder
 
Projects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former PositionsProjects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former Positions
 
Hamzah Al Masri CV
Hamzah Al Masri CVHamzah Al Masri CV
Hamzah Al Masri CV
 
Safaa Al-Bahrany-CV
Safaa Al-Bahrany-CVSafaa Al-Bahrany-CV
Safaa Al-Bahrany-CV
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 Final
 
fawad pervez raja (1)
fawad pervez raja (1)fawad pervez raja (1)
fawad pervez raja (1)
 
M.E.P. Draftsman
M.E.P. DraftsmanM.E.P. Draftsman
M.E.P. Draftsman
 

My Projects

  • 1. From To Hyatt Regency Hotel &  Apartments Project  Manager Feb  2014 Present Wasl Properties …….. RMJM ABM KCA Louvre Abu Dhabi‐     Mock‐ up Building Project  Manager Sep  2013 Jan  2014 TDIC Turner KEO Intl‐ Buro  Happold ASO JV AJN Bab Al Qasr Hotel &  Serviced Apartments‐    Abu  Dhabi Project/  Construction  Manager May  2013   Jan  2014 EMROC Jacobs Surbana Nurol PSI Izel Restaurant & Bar at  Conrad Hotel‐Dubai Project  Manager May  2012   Apr  2013 Private Property  Management (PPM) …….. Atkins Arabtec/DCC  JV WA Intl Sheikh Zayed Desert  Learning Center (SZDLC) Al Project/  Construction Aug  Apr  Al Ain Wildlife  Chalabi  Architects & Ed Zublin AG Fino  International Duration Interior  Designer Projects in UAE: DesignationEmployer Project  Client Project  Managemen Consultant/   Engineer Main  Contractor Page 1 of 2 Learning Center (SZDLC)‐Al  Ain Construction  Manager 2011   2012 Park & Resort …….. Architects &  Partners (CAP) Ed.Zublin AG …….. Dubai Metro (Red Line &  Green Line ) Construction  Manager May  2009   Jul 2011 Road &  Transportation  Authority (RTA) …….. Atkins/  SYSTRA Dubai Rapid Link  Consortium  (JTMJV) …….. EC Harris  International Dubai Industrial City  (Warehouses & Labor Cities) Project  Manager Sep  2008  Apr 2009 TATWEER EC Harris Intl MEECON Al Hamad  Contracting …….. Dubai Marina Mall & Hotel  Apartments Construction  Manager Oct  2007  Aug  2008 EMAAR Hill Intl DP  Architects ALEC …….. Palm Jumeirah Villas (Frond  B) Project  Engineer Aug  2006   Sep  2007 Nakheel Hill Intl KEO Intl Parkway  International  Contracting …….. Parkway  International  Contracting Page 1 of 2
  • 2. From To Vosough Vahdat  Residential Complex ……… Sep  2005 Jul 2006 ……… ……… ……… ……… ……… Bostan Manesh Residential  Complex ……… Jun  2005 Feb  2006 ……… ……… ……… ……… ……… Iran Polymer &  Petrochemical Institute Construction  Manager Aug  2004 May  2005 ……… ……… ……… ……… ……… Zaferaniyeh Residential  Complex Construction  Manager Oct  2003 Jul 2004 ……… ……… ……… ……… ……… Kian Hotel & Trade centre Project  Engineer Jan  2002 Sep  2003 ……… ……… ……… ……… ……… Ameri Residential Complex Site Engineer Aug  Dec  ……… ……… ……… ……… ……… Projects in Iran: Employer Project  Designation Duration Client Self Employee Lariz Sazan  Engineering  Co. Project  Managemen Consultant/   Engineer Main  Contractor Interior  Designer Page 2 of 2 Ameri Residential Complex Site Engineer 2000 2001 ……… ……… ……… ……… ……… Saba Residential  Tower(G+31) Site Engineer Jan  1999 Jul 2000 ……… ……… ……… ……… ……… Pasdaran Residential  Complex Site Engineer May  1997 Dec  1998 ……… ……… ……… ……… ……… Imen Fan  Abniyeh Co. Page 2 of 2