SlideShare a Scribd company logo
1 of 9
Download to read offline
PH Muntinlupa Delco Renovation
Renovation of
(LOCATION : National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila)
PH Muntinlupa Delco
(LOCATION : National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila)
VICINITY MAP
1
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
VICINITY MAP
PERSPECTIVE
1
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
PERSPECTIVES
PERSPECTIVE
1
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
PERSPECTIVES
8055
2452 3943 1660
UEPB
5 8
9
9 8 6
20
DOUGH PREP. AREA
STORAGE
26 10
12
14
13
HA
WASH-UP AREA
LOW WALL PARTITION
GB
GCR
STR
CCR
GTR
D
3 2
D
POS
RBD
VICINITY
MAP
11110
19
18
11
50
16
LINE
OF
HELMET
SHELF
DW
D
5
3 2
1
4
D
DELCO
WALL
MURAL
D
1
D
8
7
D
D
6
HW
SS
RIDER'S
HALLWAY
LINE CEILING MT. AIRCON
4065 4065
300 975 1168 2487 1700 1725
450
1200
150
1712
450
4498
450
2200
1750
1290
1027
1050
1144
824
650
2775
800
950
600
425
2350
1225
1005
991
1877
3287
13
49
900
1125
650 625 725
824
575
1101
1
W
8205
1000
EQUIPMENT SCHEDULE
REMARKS QTY
1. POINT OF SALE
2. JUICE DISPENSER
3. SOFTDRINK DISPENSER
4. SS FLOUR RACK
5. DOUGH MIXER
6. SS PREP. TABLE
7. DOUGH ROLLER
8. SS OVERHEAD SHELF
9. PROOFER UNIT
10. 20 CU.FT. CHILLER
11. 40 CU.FT. RETARDER
12. MAKE TABLE
13. OVEN UNIT
14. SS HOT PAN RACK
15. SS OVEN HOOD
16. SS CUTTING TABLE
17. SS BOX DISPENSER
18. SS POUCH RACK
19. SODA COOLER
20. 40 CU.FT. CHILLER
21. ELECTRIC WATER HEATER
22. SS GLASS RACK
23. SS 3 SINK SYSTEM
24. CASH DRAWER
25. FRYER HOOD
26. DEEP FAY FRYER
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 2
REFURB 1
REFURB 1
NEW 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
15
25
AREA ANALYSIS
DINING AREA
EXISTING PLAN
1
BOH : 68.98 sq.m. 72.90 %
FOH : 22.83 sq.m. 27.10 %
TOTAL AREA = 91.81 sq. m. 100.00%
CONSTRUCTION LEGEND
- Existing Concrete Column
- 150mm THK. CHB Wall
SEATING CAPACITY
T - 2 : 6 PCS
LOOSE SEATS : 12 PCS
T - 2 : 6 PCS (2) 12 SEATS
Loose Seats : 12 PCS (1) 12 SEATS
TOTAL NO. OF SEATS = 12 SEATS
QUANTITIES OF FURNITURES
LEGEND
NOTE:
TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE
DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN /
WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL
SITE CONDITION FOR MORE ACCURACY. CONSULT THE
ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE
THE PLAN.
GCR - Guest Comfort Room
HA/LA - Hanger/ Locker Area
POS - Point of Sale
SS - Stainless Steel
UEPB - Unitized Electrical Panel Board
GTR - Gas Tank Room
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
EXISTING PLAN
DEMOLITION PLAN
1
8055
2452 3943 1660
UEPB
5 8
9
9 8 6
20
DOUGH PREP. AREA
STORAGE
26 10
12
14
13
HA
WASH-UP AREA
LOW WALL PARTITION
GB
GCR
STR
CCR
GTR
D
3 2
D
POS
RBD
VICINITY
MAP
11110
19
18
11
50
16
LINE
OF
HELMET
SHELF
DW
D
5
3 2
1
4
D
DELCO
WALL
MURAL
D
1
D
8
7
D
D
6
HW
SS
RIDER'S
HALLWAY
LINE CEILING MT. AIRCON
4065 4065
300 975 1168 2487 1700 1725
450
1200
150
1712
450
4498
450
2200
1750
1290
1027
1050
1144
824
650
2775
800
950
600
425
2350
1225
1005
991
1877
3287
13
49
900
1125
650 625 725
824
575
1101
1
W
8205
1000
EQUIPMENT SCHEDULE
REMARKS QTY
1. POINT OF SALE
2. JUICE DISPENSER
3. SOFTDRINK DISPENSER
4. SS FLOUR RACK
5. DOUGH MIXER
6. SS PREP. TABLE
7. DOUGH ROLLER
8. SS OVERHEAD SHELF
9. PROOFER UNIT
10. 20 CU.FT. CHILLER
11. 40 CU.FT. RETARDER
12. MAKE TABLE
13. OVEN UNIT
14. SS HOT PAN RACK
15. SS OVEN HOOD
16. SS CUTTING TABLE
17. SS BOX DISPENSER
18. SS POUCH RACK
19. SODA COOLER
20. 40 CU.FT. CHILLER
21. ELECTRIC WATER HEATER
22. SS GLASS RACK
23. SS 3 SINK SYSTEM
24. CASH DRAWER
25. FRYER HOOD
26. DEEP FAY FRYER
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 2
REFURB 1
REFURB 1
NEW 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
15
25
AREA ANALYSIS
DINING AREA
BOH : 68.98 sq.m. 72.90 %
FOH : 22.83 sq.m. 27.10 %
TOTAL AREA = 91.81 sq. m. 100.00%
CONSTRUCTION LEGEND
- Existing Concrete Column
- 150mm THK. CHB Wall
SEATING CAPACITY
T - 2 : 6 PCS
LOOSE SEATS : 12 PCS
T - 2 : 6 PCS (2) 12 SEATS
Loose Seats : 12 PCS (1) 12 SEATS
TOTAL NO. OF SEATS = 12 SEATS
QUANTITIES OF FURNITURES
LEGEND
NOTE:
TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE
DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN /
WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL
SITE CONDITION FOR MORE ACCURACY. CONSULT THE
ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE
THE PLAN.
GCR - Guest Comfort Room
HA/LA - Hanger/ Locker Area
POS - Point of Sale
SS - Stainless Steel
UEPB - Unitized Electrical Panel Board
GTR - Gas Tank Room
CHB WALL TO BE DEMOLISHED
CHB WALL TO BE DEMOLISHED
CHB WALL TO BE DEMOLISHED
*TOILET FIXTURES AT BOH WILL
BE REMOVED AS WELL
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
DEMOLITION PLAN
8055
2452 3943 1660
UEPB
5 8
9
9 8 6
20
DOUGH PREP. AREA
STORAGE
26 10
12
14
13 WASH-UP AREA
LOW WALL PARTITION
GB
GCR
STR
GTR
D
3 2
D
POS
RBD
VICINITY
MAP
11110
19
18
11
50
16
LINE
OF
HELMET
SHELF
DW
D
5
3 2
1
4
D
DELCO
WALL
MURAL
D
1
7
D
D
6
HW
SS
RIDER'S
HALLWAY
LINE CEILING MT. AIRCON
4065 4065
300 975 1168 2487 1700 1725
450
1200
150
1712
450
4498
450
2200
1750
1290
1027
1050
1144
824
650
2775
800
950
600
425
2350
1225
1005
991
1877
3287
13
49
900
1125
650 625 725
824
575
1101
8205
1000
EQUIPMENT SCHEDULE
REMARKS QTY
1. POINT OF SALE
2. JUICE DISPENSER
3. SOFTDRINK DISPENSER
4. SS FLOUR RACK
5. DOUGH MIXER
6. SS PREP. TABLE
7. DOUGH ROLLER
8. SS OVERHEAD SHELF
9. PROOFER UNIT
10. 20 CU.FT. CHILLER
11. 40 CU.FT. RETARDER
12. MAKE TABLE
13. OVEN UNIT
14. SS HOT PAN RACK
15. SS OVEN HOOD
16. SS CUTTING TABLE
17. SS BOX DISPENSER
18. SS POUCH RACK
19. SODA COOLER
20. 40 CU.FT. CHILLER
21. ELECTRIC WATER HEATER
22. SS GLASS RACK
23. SS 3 SINK SYSTEM
24. CASH DRAWER
25. FRYER HOOD
26. DEEP FAY FRYER
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 2
REFURB 1
REFURB 1
NEW 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
REUSE 1
15
25
AREA ANALYSIS
DINING AREA
BOH : 68.98 sq.m. 72.90 %
FOH : 22.83 sq.m. 27.10 %
TOTAL AREA = 91.81 sq. m. 100.00%
CONSTRUCTION LEGEND
- Existing Concrete Column
- 150mm THK. CHB Wall
SEATING CAPACITY
T - 2 : 6 PCS
LOOSE SEATS : 12 PCS
T - 2 : 6 PCS (2) 12 SEATS
Loose Seats : 12 PCS (1) 12 SEATS
TOTAL NO. OF SEATS = 12 SEATS
QUANTITIES OF FURNITURES
LEGEND
NOTE:
TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE
DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN /
WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL
SITE CONDITION FOR MORE ACCURACY. CONSULT THE
ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE
THE PLAN.
GCR - Guest Comfort Room
HA/LA - Hanger/ Locker Area
POS - Point of Sale
SS - Stainless Steel
UEPB - Unitized Electrical Panel Board
GTR - Gas Tank Room
PROPOSED FLOOR PLAN
1
T-2
T-2
T-2
T-2
T-2
T-2
STORAGE
LIGHTED MEDALLION
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
PROPOSED FLOOR PLAN
2200
450
4498
450
1862
1200
450
1660
4344
950
1101
8055
4065 4065
300 975 1168 2487 1700 1725
2350
1225
1005
991
1877
3287
13
49
OVEN HOOD
FRYER HOOD
1000
638
1000
744
64
1
777
450
450
825
450
1000 1000 358
357 308 1000 1000 1000 308
745
520
345
1000
565
250
645 600 155
200 600 600 320 280
605
400
300
1050
520
600
600
600
600
600
600
600
400
348
244
500
161
335
410 466
266
245
245
2600 mm CEILING HEIGHT
2
VERIFY EXISTING CLG. HT.
1
2600 mm CEILING HEIGHT
2
2600 mm CEILING HEIGHT 2
2600 mm CEILING HEIGHT 2
2600 mm CEILING HEIGHT 4
2600 mm CEILING HEIGHT
3
REFLECTED CEILING PLAN
1
CEILING FINISHES
FOH & BOH CEILING:
OPEN CEILING (EXISTING) IN
SEMI-GLOSS FINISH "ONYX" PAINT
BY BOYSEN.
12MM THK. BORAL BRAND
BUILT-UP GYPSUM BOARD IN
SEMI-GLOSS "CRYSTAL CLEAR
WHITE" PAINT BY BOYSEN.
50mm X 50mm TUBULAR STEEL
WITH EXPANDED METAL WIRE
MESH ON 12mmØ HANGER ROD IN
MATTE BLACK PAINT FINISH.
(RECTANGULAR)
50mm X 50mm TUBULAR STEEL
WITH EXPANDED METAL WIRE
MESH ON 12mmØ HANGER ROD IN
MATTE BLACK PAINT FINISH.
(TRIANGULAR)
1
2
3
4
QUANTITY
VERIFY
COVERAGE
6 PCS
(VERIFY
DIMENSIONS)
VERIFY
COVERAGE
6 PCS
(VERIFY
DIMENSIONS)
CEILING LEGEND
GENERAL LIGHTING:
26W/3000K LED COB GIMBALO
RECESS DOWNLIGHT 173MMØ.
ACCENT LIGHTING (TRACKLIGHT):
10W/3000K LED DIRECTIONAL
MICRO BUCKET RACKLIGHT,
BLACK, 24D.
KITCHEN LIGHTING:
600MM X 600MM LED LIGHTING.
OTHERS/ ACCESSORIES:
STEEL TRACKS (FOR TRACK
LIGHTS)
QUANTITY
22 PCS
20 PCS
20 PCS
7 PCS
NOTE:
TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE
DIMENSIONS OF ALL MATERIALS / FINISHES IN THE ACTUAL
SITE CONDITION FOR MORE ACCURACY. CONSULT THE
ARCHITECT FOR VERIFICATIONS.
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
REFLECTED CEILING PLAN
UEPB
D
3
POS
RBD
SS
FLOOR AND WALL FINISHES
1
SOP
F1
RETAIN EXISTING FLOOR TILES
RETAIN
EXISTING
FLOOR FINISH
SOP
F2
F2
F2 F2
F2
W3
W3
W3
W2
W2
W2
W2
W3
W3
W3
W2
W2
W2
W2
W2
W3
W3
W3
W1
W1
W1
W1
W1
W1
W1
W1
2200
450
4498
450
1862
1200
450
1660
4344
950
1101
8055
4065 4065
300 975 1168 2487 1700 1725
2350
1225
1005
991
1877
3287
13
49
FLOOR FINISHES
600mm x 600mm PORCELAIN FLOOR TILE
"ARTESIA GRIGIO" BY MOZZAICO.
400mm x 400mm NON-SKID FLOOR TILE
"403 / 432" BY FLOOR CENTER (REPAIR
ONLY)
F1
QUANTITY
325 PCS
F2 62 PCS
CONSTRUCTION LEGEND
- TILE SETTING OUT POINT
6MM X 12MM STAINLESS STEEL
- TILE TRIM (HAIRLINE FINISH)
(8.50 m - TOTAL LENGTH)
SOP
NOTE:
TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY
AND THE DIMENSIONS OF ALL REFURB EQUIPMENT IN
SUPPLY CHAIN / WARE HOUSE, OTHER MATERIALS /
FINISHES IN THE ACTUAL SITE CONDITION FOR MORE
ACCURACY. CONSULT THE ARCHITECT FOR
VERIFICATIONS.
WALL FINISHES
QUANTITY
W1 SKIMCOAT APPLIED CONCRETE FINISH
300mm x 300mm CERAMIC WALL TILE
"ROMANA WHITE" BY MARIWASA WITH
GA. 20 S/S BASEBOARD (SMOKE FINISH)
SEMI-GLOSS "CRYSTAL CLEAR WHITE"
BY BOYSEN
STUCCO PAINT MATTE FINISH "EMERY
GRAY" BY BOYSEN
W2
W3
W4
VERIFY
W4
W4 W4
VERIFY
VERIFY
VERIFY
· LIGHTED MEDALLION ARTWORK
· 8 REASONS TO LOVE PIZZA (PAINTS & PADDLES)
· GLASS FROSTING
QTY / DIM
1 SET
VERIFY
1200mmØ
OTHER MURALS / ACCESSORIES
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
DATE : - -
PHILIPPINE PIZZA INCORPORATED
APPROVED BY :
J.L. Araneta
APPROVED BY :
L.L.C. Juinio
ENDORSED BY :
J. Buenaventura
CHECKED BY :
R. Blanco
CHECKED BY :
R. Dizer
CHECKED BY :
L. David
DESIGNED BY :
J.A. Abines
PH MUNTINLUPA DELCO RENOVATION
National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila
FLOOR AND WALL FINISHES

More Related Content

Similar to +Ph muntinlupa delco archl plans 01-2020

The Overall Land Situation of Baguio City: Issues and Challenges
The Overall Land Situation of Baguio City: Issues and ChallengesThe Overall Land Situation of Baguio City: Issues and Challenges
The Overall Land Situation of Baguio City: Issues and ChallengesTimons Cabansi
 
03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)Sergio Penton
 
Plumbing and Renovation Plan
Plumbing and Renovation PlanPlumbing and Renovation Plan
Plumbing and Renovation PlanSergio Medina
 
19 View Acres with a Home, Barn and More!
19 View Acres with a Home, Barn and More!19 View Acres with a Home, Barn and More!
19 View Acres with a Home, Barn and More!Wendy Ogden
 
Jesse Reyes Portfolio
Jesse Reyes PortfolioJesse Reyes Portfolio
Jesse Reyes PortfolioJesse Reyes
 
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)Nicole Eng
 
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3jamesmaredmond
 
Mt Sinai WH Rplcmnt 081016
Mt Sinai WH Rplcmnt 081016Mt Sinai WH Rplcmnt 081016
Mt Sinai WH Rplcmnt 081016Jim Kennedy
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
CHAPTER - 1. INTRODUCTION.ppt
CHAPTER - 1. INTRODUCTION.pptCHAPTER - 1. INTRODUCTION.ppt
CHAPTER - 1. INTRODUCTION.pptMahendraH2
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTRene Aguilar
 
132 KV transmission line
132 KV transmission line 132 KV transmission line
132 KV transmission line Manoj Shah
 

Similar to +Ph muntinlupa delco archl plans 01-2020 (20)

The Overall Land Situation of Baguio City: Issues and Challenges
The Overall Land Situation of Baguio City: Issues and ChallengesThe Overall Land Situation of Baguio City: Issues and Challenges
The Overall Land Situation of Baguio City: Issues and Challenges
 
03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)
 
Plumbing and Renovation Plan
Plumbing and Renovation PlanPlumbing and Renovation Plan
Plumbing and Renovation Plan
 
19 View Acres with a Home, Barn and More!
19 View Acres with a Home, Barn and More!19 View Acres with a Home, Barn and More!
19 View Acres with a Home, Barn and More!
 
Jesse Reyes Portfolio
Jesse Reyes PortfolioJesse Reyes Portfolio
Jesse Reyes Portfolio
 
January 8, 2013 Agenda Packet
January 8, 2013 Agenda PacketJanuary 8, 2013 Agenda Packet
January 8, 2013 Agenda Packet
 
SWAIN
SWAINSWAIN
SWAIN
 
Case study plant4 putrajaya[arul hisham]
Case study plant4 putrajaya[arul hisham]Case study plant4 putrajaya[arul hisham]
Case study plant4 putrajaya[arul hisham]
 
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)
Sample CAD DWG_CHENG_Nicole Eng (Not Final Set)
 
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
Gaggero/Mooring/Walters/Praske/Chatfield/Sulphur County Records/Cases 3
 
Mt Sinai WH Rplcmnt 081016
Mt Sinai WH Rplcmnt 081016Mt Sinai WH Rplcmnt 081016
Mt Sinai WH Rplcmnt 081016
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
A2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLANA2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLAN
 
CHAPTER - 1. INTRODUCTION.ppt
CHAPTER - 1. INTRODUCTION.pptCHAPTER - 1. INTRODUCTION.ppt
CHAPTER - 1. INTRODUCTION.ppt
 
Am ltwn hseleft (1)
Am ltwn hseleft (1)Am ltwn hseleft (1)
Am ltwn hseleft (1)
 
P2
P2P2
P2
 
ONTARIO A320 SITE DETAILS MAY.16.16
ONTARIO A320 SITE DETAILS MAY.16.16ONTARIO A320 SITE DETAILS MAY.16.16
ONTARIO A320 SITE DETAILS MAY.16.16
 
LA FLORESTA
LA FLORESTALA FLORESTA
LA FLORESTA
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
 
132 KV transmission line
132 KV transmission line 132 KV transmission line
132 KV transmission line
 

Recently uploaded

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girladitipandeya
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 

Recently uploaded (20)

Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 

+Ph muntinlupa delco archl plans 01-2020

  • 1. PH Muntinlupa Delco Renovation Renovation of (LOCATION : National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila)
  • 2. PH Muntinlupa Delco (LOCATION : National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila) VICINITY MAP 1 DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila VICINITY MAP
  • 3. PERSPECTIVE 1 DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila PERSPECTIVES
  • 4. PERSPECTIVE 1 DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila PERSPECTIVES
  • 5. 8055 2452 3943 1660 UEPB 5 8 9 9 8 6 20 DOUGH PREP. AREA STORAGE 26 10 12 14 13 HA WASH-UP AREA LOW WALL PARTITION GB GCR STR CCR GTR D 3 2 D POS RBD VICINITY MAP 11110 19 18 11 50 16 LINE OF HELMET SHELF DW D 5 3 2 1 4 D DELCO WALL MURAL D 1 D 8 7 D D 6 HW SS RIDER'S HALLWAY LINE CEILING MT. AIRCON 4065 4065 300 975 1168 2487 1700 1725 450 1200 150 1712 450 4498 450 2200 1750 1290 1027 1050 1144 824 650 2775 800 950 600 425 2350 1225 1005 991 1877 3287 13 49 900 1125 650 625 725 824 575 1101 1 W 8205 1000 EQUIPMENT SCHEDULE REMARKS QTY 1. POINT OF SALE 2. JUICE DISPENSER 3. SOFTDRINK DISPENSER 4. SS FLOUR RACK 5. DOUGH MIXER 6. SS PREP. TABLE 7. DOUGH ROLLER 8. SS OVERHEAD SHELF 9. PROOFER UNIT 10. 20 CU.FT. CHILLER 11. 40 CU.FT. RETARDER 12. MAKE TABLE 13. OVEN UNIT 14. SS HOT PAN RACK 15. SS OVEN HOOD 16. SS CUTTING TABLE 17. SS BOX DISPENSER 18. SS POUCH RACK 19. SODA COOLER 20. 40 CU.FT. CHILLER 21. ELECTRIC WATER HEATER 22. SS GLASS RACK 23. SS 3 SINK SYSTEM 24. CASH DRAWER 25. FRYER HOOD 26. DEEP FAY FRYER REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 2 REFURB 1 REFURB 1 NEW 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 15 25 AREA ANALYSIS DINING AREA EXISTING PLAN 1 BOH : 68.98 sq.m. 72.90 % FOH : 22.83 sq.m. 27.10 % TOTAL AREA = 91.81 sq. m. 100.00% CONSTRUCTION LEGEND - Existing Concrete Column - 150mm THK. CHB Wall SEATING CAPACITY T - 2 : 6 PCS LOOSE SEATS : 12 PCS T - 2 : 6 PCS (2) 12 SEATS Loose Seats : 12 PCS (1) 12 SEATS TOTAL NO. OF SEATS = 12 SEATS QUANTITIES OF FURNITURES LEGEND NOTE: TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN / WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL SITE CONDITION FOR MORE ACCURACY. CONSULT THE ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE THE PLAN. GCR - Guest Comfort Room HA/LA - Hanger/ Locker Area POS - Point of Sale SS - Stainless Steel UEPB - Unitized Electrical Panel Board GTR - Gas Tank Room DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila EXISTING PLAN
  • 6. DEMOLITION PLAN 1 8055 2452 3943 1660 UEPB 5 8 9 9 8 6 20 DOUGH PREP. AREA STORAGE 26 10 12 14 13 HA WASH-UP AREA LOW WALL PARTITION GB GCR STR CCR GTR D 3 2 D POS RBD VICINITY MAP 11110 19 18 11 50 16 LINE OF HELMET SHELF DW D 5 3 2 1 4 D DELCO WALL MURAL D 1 D 8 7 D D 6 HW SS RIDER'S HALLWAY LINE CEILING MT. AIRCON 4065 4065 300 975 1168 2487 1700 1725 450 1200 150 1712 450 4498 450 2200 1750 1290 1027 1050 1144 824 650 2775 800 950 600 425 2350 1225 1005 991 1877 3287 13 49 900 1125 650 625 725 824 575 1101 1 W 8205 1000 EQUIPMENT SCHEDULE REMARKS QTY 1. POINT OF SALE 2. JUICE DISPENSER 3. SOFTDRINK DISPENSER 4. SS FLOUR RACK 5. DOUGH MIXER 6. SS PREP. TABLE 7. DOUGH ROLLER 8. SS OVERHEAD SHELF 9. PROOFER UNIT 10. 20 CU.FT. CHILLER 11. 40 CU.FT. RETARDER 12. MAKE TABLE 13. OVEN UNIT 14. SS HOT PAN RACK 15. SS OVEN HOOD 16. SS CUTTING TABLE 17. SS BOX DISPENSER 18. SS POUCH RACK 19. SODA COOLER 20. 40 CU.FT. CHILLER 21. ELECTRIC WATER HEATER 22. SS GLASS RACK 23. SS 3 SINK SYSTEM 24. CASH DRAWER 25. FRYER HOOD 26. DEEP FAY FRYER REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 2 REFURB 1 REFURB 1 NEW 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 15 25 AREA ANALYSIS DINING AREA BOH : 68.98 sq.m. 72.90 % FOH : 22.83 sq.m. 27.10 % TOTAL AREA = 91.81 sq. m. 100.00% CONSTRUCTION LEGEND - Existing Concrete Column - 150mm THK. CHB Wall SEATING CAPACITY T - 2 : 6 PCS LOOSE SEATS : 12 PCS T - 2 : 6 PCS (2) 12 SEATS Loose Seats : 12 PCS (1) 12 SEATS TOTAL NO. OF SEATS = 12 SEATS QUANTITIES OF FURNITURES LEGEND NOTE: TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN / WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL SITE CONDITION FOR MORE ACCURACY. CONSULT THE ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE THE PLAN. GCR - Guest Comfort Room HA/LA - Hanger/ Locker Area POS - Point of Sale SS - Stainless Steel UEPB - Unitized Electrical Panel Board GTR - Gas Tank Room CHB WALL TO BE DEMOLISHED CHB WALL TO BE DEMOLISHED CHB WALL TO BE DEMOLISHED *TOILET FIXTURES AT BOH WILL BE REMOVED AS WELL DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila DEMOLITION PLAN
  • 7. 8055 2452 3943 1660 UEPB 5 8 9 9 8 6 20 DOUGH PREP. AREA STORAGE 26 10 12 14 13 WASH-UP AREA LOW WALL PARTITION GB GCR STR GTR D 3 2 D POS RBD VICINITY MAP 11110 19 18 11 50 16 LINE OF HELMET SHELF DW D 5 3 2 1 4 D DELCO WALL MURAL D 1 7 D D 6 HW SS RIDER'S HALLWAY LINE CEILING MT. AIRCON 4065 4065 300 975 1168 2487 1700 1725 450 1200 150 1712 450 4498 450 2200 1750 1290 1027 1050 1144 824 650 2775 800 950 600 425 2350 1225 1005 991 1877 3287 13 49 900 1125 650 625 725 824 575 1101 8205 1000 EQUIPMENT SCHEDULE REMARKS QTY 1. POINT OF SALE 2. JUICE DISPENSER 3. SOFTDRINK DISPENSER 4. SS FLOUR RACK 5. DOUGH MIXER 6. SS PREP. TABLE 7. DOUGH ROLLER 8. SS OVERHEAD SHELF 9. PROOFER UNIT 10. 20 CU.FT. CHILLER 11. 40 CU.FT. RETARDER 12. MAKE TABLE 13. OVEN UNIT 14. SS HOT PAN RACK 15. SS OVEN HOOD 16. SS CUTTING TABLE 17. SS BOX DISPENSER 18. SS POUCH RACK 19. SODA COOLER 20. 40 CU.FT. CHILLER 21. ELECTRIC WATER HEATER 22. SS GLASS RACK 23. SS 3 SINK SYSTEM 24. CASH DRAWER 25. FRYER HOOD 26. DEEP FAY FRYER REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 2 REFURB 1 REFURB 1 NEW 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 REUSE 1 15 25 AREA ANALYSIS DINING AREA BOH : 68.98 sq.m. 72.90 % FOH : 22.83 sq.m. 27.10 % TOTAL AREA = 91.81 sq. m. 100.00% CONSTRUCTION LEGEND - Existing Concrete Column - 150mm THK. CHB Wall SEATING CAPACITY T - 2 : 6 PCS LOOSE SEATS : 12 PCS T - 2 : 6 PCS (2) 12 SEATS Loose Seats : 12 PCS (1) 12 SEATS TOTAL NO. OF SEATS = 12 SEATS QUANTITIES OF FURNITURES LEGEND NOTE: TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN / WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL SITE CONDITION FOR MORE ACCURACY. CONSULT THE ARCHITECT FOR VERIFICATIONS. DO NOT MEASURE / SCALE THE PLAN. GCR - Guest Comfort Room HA/LA - Hanger/ Locker Area POS - Point of Sale SS - Stainless Steel UEPB - Unitized Electrical Panel Board GTR - Gas Tank Room PROPOSED FLOOR PLAN 1 T-2 T-2 T-2 T-2 T-2 T-2 STORAGE LIGHTED MEDALLION DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila PROPOSED FLOOR PLAN
  • 8. 2200 450 4498 450 1862 1200 450 1660 4344 950 1101 8055 4065 4065 300 975 1168 2487 1700 1725 2350 1225 1005 991 1877 3287 13 49 OVEN HOOD FRYER HOOD 1000 638 1000 744 64 1 777 450 450 825 450 1000 1000 358 357 308 1000 1000 1000 308 745 520 345 1000 565 250 645 600 155 200 600 600 320 280 605 400 300 1050 520 600 600 600 600 600 600 600 400 348 244 500 161 335 410 466 266 245 245 2600 mm CEILING HEIGHT 2 VERIFY EXISTING CLG. HT. 1 2600 mm CEILING HEIGHT 2 2600 mm CEILING HEIGHT 2 2600 mm CEILING HEIGHT 2 2600 mm CEILING HEIGHT 4 2600 mm CEILING HEIGHT 3 REFLECTED CEILING PLAN 1 CEILING FINISHES FOH & BOH CEILING: OPEN CEILING (EXISTING) IN SEMI-GLOSS FINISH "ONYX" PAINT BY BOYSEN. 12MM THK. BORAL BRAND BUILT-UP GYPSUM BOARD IN SEMI-GLOSS "CRYSTAL CLEAR WHITE" PAINT BY BOYSEN. 50mm X 50mm TUBULAR STEEL WITH EXPANDED METAL WIRE MESH ON 12mmØ HANGER ROD IN MATTE BLACK PAINT FINISH. (RECTANGULAR) 50mm X 50mm TUBULAR STEEL WITH EXPANDED METAL WIRE MESH ON 12mmØ HANGER ROD IN MATTE BLACK PAINT FINISH. (TRIANGULAR) 1 2 3 4 QUANTITY VERIFY COVERAGE 6 PCS (VERIFY DIMENSIONS) VERIFY COVERAGE 6 PCS (VERIFY DIMENSIONS) CEILING LEGEND GENERAL LIGHTING: 26W/3000K LED COB GIMBALO RECESS DOWNLIGHT 173MMØ. ACCENT LIGHTING (TRACKLIGHT): 10W/3000K LED DIRECTIONAL MICRO BUCKET RACKLIGHT, BLACK, 24D. KITCHEN LIGHTING: 600MM X 600MM LED LIGHTING. OTHERS/ ACCESSORIES: STEEL TRACKS (FOR TRACK LIGHTS) QUANTITY 22 PCS 20 PCS 20 PCS 7 PCS NOTE: TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE DIMENSIONS OF ALL MATERIALS / FINISHES IN THE ACTUAL SITE CONDITION FOR MORE ACCURACY. CONSULT THE ARCHITECT FOR VERIFICATIONS. DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila REFLECTED CEILING PLAN
  • 9. UEPB D 3 POS RBD SS FLOOR AND WALL FINISHES 1 SOP F1 RETAIN EXISTING FLOOR TILES RETAIN EXISTING FLOOR FINISH SOP F2 F2 F2 F2 F2 W3 W3 W3 W2 W2 W2 W2 W3 W3 W3 W2 W2 W2 W2 W2 W3 W3 W3 W1 W1 W1 W1 W1 W1 W1 W1 2200 450 4498 450 1862 1200 450 1660 4344 950 1101 8055 4065 4065 300 975 1168 2487 1700 1725 2350 1225 1005 991 1877 3287 13 49 FLOOR FINISHES 600mm x 600mm PORCELAIN FLOOR TILE "ARTESIA GRIGIO" BY MOZZAICO. 400mm x 400mm NON-SKID FLOOR TILE "403 / 432" BY FLOOR CENTER (REPAIR ONLY) F1 QUANTITY 325 PCS F2 62 PCS CONSTRUCTION LEGEND - TILE SETTING OUT POINT 6MM X 12MM STAINLESS STEEL - TILE TRIM (HAIRLINE FINISH) (8.50 m - TOTAL LENGTH) SOP NOTE: TO CHECK AND VERIFY THE QUANTITY, AVAILABILITY AND THE DIMENSIONS OF ALL REFURB EQUIPMENT IN SUPPLY CHAIN / WARE HOUSE, OTHER MATERIALS / FINISHES IN THE ACTUAL SITE CONDITION FOR MORE ACCURACY. CONSULT THE ARCHITECT FOR VERIFICATIONS. WALL FINISHES QUANTITY W1 SKIMCOAT APPLIED CONCRETE FINISH 300mm x 300mm CERAMIC WALL TILE "ROMANA WHITE" BY MARIWASA WITH GA. 20 S/S BASEBOARD (SMOKE FINISH) SEMI-GLOSS "CRYSTAL CLEAR WHITE" BY BOYSEN STUCCO PAINT MATTE FINISH "EMERY GRAY" BY BOYSEN W2 W3 W4 VERIFY W4 W4 W4 VERIFY VERIFY VERIFY · LIGHTED MEDALLION ARTWORK · 8 REASONS TO LOVE PIZZA (PAINTS & PADDLES) · GLASS FROSTING QTY / DIM 1 SET VERIFY 1200mmØ OTHER MURALS / ACCESSORIES DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - DATE : - - PHILIPPINE PIZZA INCORPORATED APPROVED BY : J.L. Araneta APPROVED BY : L.L.C. Juinio ENDORSED BY : J. Buenaventura CHECKED BY : R. Blanco CHECKED BY : R. Dizer CHECKED BY : L. David DESIGNED BY : J.A. Abines PH MUNTINLUPA DELCO RENOVATION National Highway, Brgy. Tunasan, Muntinlupa, 1773 Metro Manila FLOOR AND WALL FINISHES